Downtime Phase
Hello All,
Would just like to ask for your feedback on this activity EHP4. We almost complete the preparation steps and reached the end of step "Preprocessing".
However, there were certain steps that we need to do prior to the "downtime" phase:
- Stop all production activities now. --- no users already logged on the system
-Make sure that all users have logged out. --- no users already logged on the system
--Isolate the central instance. For more information, see the installation guide. --- does it mean we need to shutdown the SAP instance?
Backup the complete installation directory now (including subdirectory "sdt"). > Caution: To restart the program from this point, you must be able to restore the database and the program directory to the current state -- installation directory has been backed-up already.
Hope to see your feedback. Thank you.
I checked the table and it shows in shadow system that this table has an inconsistency.
Logs:
Check: Active runtime object for VZFZE is Inconsistent
Transparent table VZFZE
Time stamp runtime object: 19.10.2006 15:35:10
Time stamp ABAP: 05.05.2004 03:21:55
Time stamp DYNP: 05.05.2004 03:21:55
@1B@Fields: Active runtime object and Active source has Inconsistent
Active runtime object Active DD source Field position Depth in nested structures Data Type ABAP length DB length Decimal places Field offset Output length
MANDT MANDT 1 0 CLNT 6 6 0 0 3
BUKRS BUKRS 2 0 CHAR 8 8 0 6 4
SVORGANG SVORGANG 3 0 NUMC 20 20 0 14 10
LFDNR LFDNR 4 0 CHAR 6 6 0 34 3
SBUAKT SBUAKT 5 0 NUMC 6 6 0 40 3
SATZART SATZART 6 0 CHAR 20 20 0 46 10
SOBJEKT SOBJEKT 7 0 CHAR 20 20 0 66 10
VARLNG VARLNG 8 0 INT2 2 2 0 86 5
XVAR700 9 0 LCHR 2000 2 0 88 1000
XVAR700 2400 2.4 1200
Similar Messages
-
Upgrade Fails in downtime Phase - MAIN_SWITCH/PARMVNT_XCNV
Dear All,
We are working on the upgrade from ECC6.0 to ECC6.0 with EHP4 and now running in the downtime phase. In the downtime phase, the upgrade stopped in the phase of MAIN_SWITCH/PARMVNT_XCNV and stated that to check the logs of MVNTXCNV.ELG. In the log file it stated that
MVNTXCNV.ELG
MVNTTABS ERRORS:ddlntabs and RETURN CODE in PD000825.FSO
SQL -error Duplicate name:SRT_MONLoG_DATA2 in DDL st
SRT_MONLOG_DATA2
error in DDL nametab for "SRT_MONLOG_DATA2 not activated
Then I have searched in SMP and in SDN and came to know that we need to implement the notes of
Note 1399438 - System upgrade stops in phase XCNV
Note 1310677 - System upgrade terminates in phase MAIN_SWITCH/PARMVNT_XCN
Hence, I have started the instance manually and unlocked the tp to login as different user for applying this note ( Because we cannot apply note usign DDIC ) . Then able to login into the system and downloaded the notes as well,
While implementing the when I try to create a request - it immediately throwing a short dump and dump states that
TRINT_INSERT_COMM_HEADER
SQL error in the database when accessing a table
Database error text: POS(40) too few values
Internal call code: RSQL/INSR/EO70C
Please check the same in SM21
In system logs the logs says that
Runtime error DBIF_RSQL_SQL_ERROR
Short dump created
Database error -1200 at PRE access to table E070c
POS (40) Too few values
Instead of creating a new request and tried to use own request but the results are same, Also i tried to change the client settings from automatic recording of changes and also changes w/o automatic recording of changes - but both are giving the same output.
Is there any other possibility to get rid off this issue? Any suggestions are highly appreciated
Regards
VijayIts fixed and I have just implemented the note 589296 - Solved our issue
select * from "SAPFSO"."DDXTT~" where TABNAME = 'SRT_MONLOG_DATA2'
or
select * from "SAPFSO"."DDXTT" where TABNAME = 'SRT_MONLOG_DATA2'
Check it approximately it should return with the FLAG value as F
update "SAPFSO"."DDXTT~" set modeflag = 'A' where TABNAME = 'SRT_MONLOG_DATA2'
Thanks for your support
Regards
Vijay -
Error while doing EHP4 upgrade in downtime phase
HI .
Iam facing the below error while doing the EHP4 upgrade , in downtime phase.
Checks after phase MAIN_SWITCH/STARTSAP_TRANS were negative!
Last error code set: RFC call to subst_get_uvers failed with key RFC_ERROR_COMMUNICATION (open): SAP_CMINIT3 : rc=20 >
Connect to SAP gateway failed Connect_PM GWHOST=Hydhtc4526D, GWSERV=sapgw04, SYSNR=04 LOCATION CPIC (TCP/IP) on local host with Unicode ERROR partner '10.136.162.30:3304' not reached TIME Mon Jun 06 18:17:46 2011 RELEASE 720 COMPONENT NI (network interface) VERSION 40 RC -10 MODULE nixxi.cpp LINE 3286 DETAIL NiPConnect2: 10.136.162.30:3304 SYSTEM CALL connect ERRNO 10061 ERRNO TEXT WSAECONNREFUSED: Connection refused COUNTER System start failed
Please help me in resolving this error.
Sanketh.Hi,
Upgrade tool is trying to start the system but system is not coming up. Try to start system manually and see if system comes up or not. If not then check logs in work directory for why system is not coming up.
Thanks
Sunny -
XPRAS_UPG error in DOWNTIME phase in EHP4
Hi,
I am getting the below error in XPRAS_UPG in DOWNTIME phase of EHP4 installation in ERP 6.0 on HP-UNIX and Oracle.
XPRA ERRORS and RETURN CODE in SAPRW70104.HD1
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1AETR012XProgram terminated (job: "RDDEXECL", no.: "10302400")
Long text:
Cause
Program "&V#&", which was started in the background, was terminated
abnormally.
System Response
The system created a job log for the terminated program.
What to do
Proceed as follows:
Log onto the system in which the program was executed. The system is
specified at the beginning of the transport log.
Then call transaction SM37 to display the job log.
Enter "&V#&" as job name and "DDIC" as user name.
Restrict the starting date to the starting date specified in the
transport log.
For the other selection criteria, select only jobs with the status
"cancelled". Then press <LS>Execute</>.
A list of the jobs satisfying the selection criteria is displayed.
You can display the log by pressing <LS>Job log</>.
If the list contains several jobs, you can select the job with the ID "
&V#&" with <LS>Display</> -> <LS>Job details</> or define further
details for the selection criteria in the initial screen of transaction
SM37.
If the ABAP processor reports cancellation, double-clicking on the
corresponding message in the job log branches to the display of the
corresponding short dump.
1AEPU320 See job log"RDDEXECL""10302400""HD1"
1 ETP111 exit code : "12"
>>> PLEASE READ THE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<<
XPRAs are application reports that run at the end of an upgrade.
Most XPRA reports have a report documentation that explains what
the report does and how errors can be corrected.
Call transaction se38 in the SAP system, enter the report name,
select 'Documentation' and click the 'Display' button.
>>> The problematic XPRAs are mentioned in messages of type PU132 above <<<
I was successfully able to umlock the system and in SM37 I could see the job log pointing to ST22. In ST22 we have many dumps related to error PXA_NO_FREE_SPACE. I found many notes in marketplace but all are referring the parameter abap/buffersize which needs to increased. I am a bit apprehensive about the fact that since we are in DOWNTIME phase and in the middle of XPRA execution phase should we increase the parameter and restart the system and then continue with the upgrade???
I have also tried to run the phase many times but the same error persists.
Please can anyone help me to come out of this problem.....
Thanks & regards,
RozalHello Rozal,
You are correct XPRAS is a downtime 2 phase, but actually your system is up and running. It was started way back in phase "STARTSAP_NBAS" its just that you cannot use your system productively. XPRAS executes the XPRAS methods in the running system.
Its absolutely safe, you can change the parameter take a restart and continue further.
- Niraj -
Error in EHPi at downtime phase DEPLOY_ONLINE_DEPL.
Hello,
We are getting error in downtime phase DEPLOY_ONLINE_DEPL as java.lang.NullPointerException: null and other term in the error ticket is Error while executing DeploymentManager phase with action deploySlot. I searched the notes pointing to this and none of the notes seem to solve the problem . Also i was not able to find thread related to this. Any help would be appreciated.
Here is the excerpt of the JSPM trace file
Jul 12, 2010 6:36:29 PM [Error]: ....sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:275) [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException
at com.sap.sdt.jspm.deployment.queuemanager.QueueManager.findLastQueue(QueueManager.java:350)
at com.sap.sdt.jspm.deployment.queuemanager.QueueManager.findQueue(QueueManager.java:326)
at com.sap.sdt.jspm.deployment.DeploymentFacade.findQueue(DeploymentFacade.java:390)
at com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:178)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:134)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
Jul 12, 2010 6:36:29 PM [Error]: ....sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:283) [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: Could not process deploy queue sapjup-queue request.
Jul 12, 2010 6:36:29 PM [Error]: ....sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:296) [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException
at com.sap.sdt.jspm.deployment.queuemanager.QueueManager.save(QueueManager.java:371)
at com.sap.sdt.jspm.deployment.DeploymentFacade.save(DeploymentFacade.java:400)
at com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:290)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:134)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.tools.eval.JspmEvaluation.createEvaluationResults(JspmEvaluation.java:165) [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.tools.eval.JspmEvaluation [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException
at com.sap.sdt.jspm.tools.eval.CreateJspmEvaluation$ComparableManagedComponent.compareTo(CreateJspmEvaluation.java:607)
at java.util.Arrays.mergeSort(Arrays.java:1144)
at java.util.Arrays.mergeSort(Arrays.java:1155)
at java.util.Arrays.mergeSort(Arrays.java:1155)
at java.util.Arrays.mergeSort(Arrays.java:1155)
at java.util.Arrays.sort(Arrays.java:1079)
at java.util.Collections.sort(Collections.java:117)
at com.sap.sdt.jspm.tools.eval.CreateJspmEvaluation.sortComponents(CreateJspmEvaluation.java:561)
at com.sap.sdt.jspm.tools.eval.CreateJspmEvaluation.addComponentInformation(CreateJspmEvaluation.java:271)
at com.sap.sdt.j2ee.tools.eval.CreateEvaluation.addVersions(CreateEvaluation.java:215)
at com.sap.sdt.j2ee.tools.eval.CreateEvaluation.createEvaluation(CreateEvaluation.java:167)
at com.sap.sdt.jspm.tools.eval.JspmEvaluation.createJspmEvaluation(JspmEvaluation.java:267)
at com.sap.sdt.jspm.tools.eval.JspmEvaluation.createEvaluationResults(JspmEvaluation.java:154)
at com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:300)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:134)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.util.diag.DiagException [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: Deserialized exception com.sap.sdt.util.diag.JavaException: java.lang.NullPointerException: null
at com.sap.sdt.jspm.unattended.processors.ExecuteRequestProcessor.process(ExecuteRequestProcessor.java:275)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:134)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.util.diag.DiagException [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: Deserialized exception com.sap.sdt.util.diag.DiagException: java.lang.NullPointerException: null
JSPM version is 7.01.5.1.3. Current JSPM log directory is C:\usr\sap\BWQ\DVEBMGS02\j2ee\JSPM\log\log_2010_07_12_17_14_16.
at com.sap.sdt.jspm.unattended.RequestController.addContextInfo(RequestController.java:178)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:150)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.unattended.RequestController.logResponse(RequestController.java:242) [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: java.lang.NullPointerException: null
JSPM version is 7.01.5.1.3. Current JSPM log directory is C:\usr\sap\BWQ\DVEBMGS02\j2ee\JSPM\log\log_2010_07_12_17_14_16.
Jul 12, 2010 6:36:29 PM [Error]: com.sap.sdt.jspm.unattended.RequestController [Thread[CommLink(com.sap.sdt.util.net.CharacterCommLink),5,main]]: com.sap.sdt.util.diag.DiagException: java.lang.NullPointerException: null
JSPM version is 7.01.5.1.3. Current JSPM log directory is C:\usr\sap\BWQ\DVEBMGS02\j2ee\JSPM\log\log_2010_07_12_17_14_16.
at com.sap.sdt.jspm.unattended.RequestController.logResponse(RequestController.java:242)
at com.sap.sdt.jspm.unattended.RequestController.processRequest(RequestController.java:153)
at com.sap.sdt.jspm.unattended.CommunicationController.notifyJSPMRequestListeners(CommunicationController.java:120)
at com.sap.sdt.jspm.unattended.CommunicationController$JSPMConnectionObserver.receive(CommunicationController.java:249)
at com.sap.sdt.ucp.communication.SDTServerConnection$SDTServerConnectionObserver.msgReceived(SDTServerConnection.java:589)
at com.sap.sdt.util.net.AbstractCommLink.fireMsgReceived(AbstractCommLink.java:276)
at com.sap.sdt.util.net.AbstractCommLink.run(AbstractCommLink.java:218)
at java.lang.Thread.run(Thread.java:677)
And the excerpt of the JSPM_MAIN file is as follows:
Jul 12, 2010 6:36:29 PM [Info]: Message type received execute.
Jul 12, 2010 6:36:29 PM [Info]: Processing request to deploy queue sapjup-queue.
Jul 12, 2010 6:36:29 PM [Error]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Error]: Could not process deploy queue sapjup-queue request.
Jul 12, 2010 6:36:29 PM [Error]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Info]: Adding system configuration.
Jul 12, 2010 6:36:29 PM [Info]: Generating phase and total run times.
Jul 12, 2010 6:36:29 PM [Info]: Adding version information.
Jul 12, 2010 6:36:29 PM [Warning]: Cannot generate JSPM evaluation results.
Jul 12, 2010 6:36:29 PM [Error]: java.lang.NullPointerException: null
Jul 12, 2010 6:36:29 PM [Error]: java.lang.NullPointerException: null
JSPM version is 7.01.5.1.3. Current JSPM log directory is C:\usr\sap\BWQ\DVEBMGS02\j2ee\JSPM\log\log_2010_07_12_17_14_16.
Please help..!
We are trying to upgrade NW 7.0 SPS 20 system to NW EHP1 SP 05
Thanks,
Sachhi.Hi,
could you please check below things:
1) Stack xml file should be correct and contains all components.
2) All the support patches should be in download directory and also in EPS/in.
Thanks
Sunny -
Duration between Preprocessing and Downtime phase
Hello All,
We are currently upgrading our system from SAP ECC 6.0 EHP4 to EHP5. To reduce the performance issues caused to our production system due to the preprocessing phase running inthe background during productive use, we are planning to complete the Preprocessing phase over one weekend and start the Downtime phase during the subsequent weekend.
Though logically I think we can do it, can anyone confirm if there could be any issues by seperating the end of the Preprocessing phase and start of the downtime phase by a week?
Let me know what precautions we need to take in case if this is possible.
Thanks
DHello Jorge,
Sorry for the delay in my response, SCN was not letting me logon. SSO error. Yes you can start the downtime phase later. Just take care that there is a change freeze so that no changes/transports being moved to production.
Hope this helps.
Regards
Dee -
Error in Downtime phase STARTSAP_NBAS
Hi Experts,
Am in the middle of EHP7 upgrade from ECC6.0 with 7.4 SP 37 kernel.
Got an error saying Logon not possible (error in license check). So tried to upload the new license file via SLICENCE but got into new issue saying
The license key library has not been initialized.
I have downloaded the latest COMMONCRYPTO LIB file and updated in the kernel. SAP is not starting after applying those new files even reverted with the old crypto lib files but still the same issue.
SAP is not coming up. R3trans -d is fine. There was no log written in work directory as well.
Please assist.
Regards,
Raja. GSAPSTARTSRV.LOG
[Thr 01] Tue Apr 8 09:18:07 2014
No halib defined => HA support disabled
CCMS agent initialization for instance type ABAP: return code 0.
CCMS agent start: return code 0.
Initializing SAPControl Webservice
Starting AutoRestart thread
[Thr 515] Tue Apr 8 09:18:13 2014
AutoRestart thread started
SapSSLInit failed => https support disabled
Starting WebService thread
Webservice thread started, listening on port 50313
Trusted http connect via Unix domain socket '/tmp/.sapstream50313' enabled.
trusted unix domain socket user is starting SAP System at 2014/04/08 9:18:17
trusted unix domain socket user is starting SAP System at 2014/04/08 9:22:27
trusted unix domain socket user is starting SAP System at 2014/04/08 9:49:49
trusted unix domain socket user is starting SAP System at 2014/04/08 9:59:04
SAPSTART.LOG
SAP-R/3-Startup Program Rel 740 V2.0 (2008/11/15)
Starting at 2014/04/09 08:45:51
Startup Profile: "/usr/sap/SID/SYS/profile/SID_DVEBMGS03_hostname"
Starting Programs
(16580712) Waiting for Child Processes to terminate.
(16580712) **** No more Child Processes to wait for.
(16580712) Parent Shutdown at 2014/04/09 08:45:51
Execute Post-Shutdown Commands
(16580712) Exiting with Return-Code 3. (No more child processes)
Regards,
Raja. G -
Error in Phase MAIN_SWITCH/JOB_RSVBCHCK_D
Hello Gurus,
I am in the Downtime phase and got below error
Error Details:
Checks after phase MAIN_SWITCH/JOB_RSVBCHCK_D were negative!
Last error code set: BATCHJOB RSVBCHCK FAILED: Errors found in logfile (accumulated in file PSVBCHCK.ELG).
PSVBCHCK.ELG log is:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CHECK OF UPDATE TASK Errors and RETURN CODE in RSVBCHCK.IJE
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
A2EEMCEX 141 Struct. appl. "02" cannot be changed due to setup table -> Long text" ""MC02M_0CGRSETUP""800"
Long text:
Cause
Changing the extract structure &V#& for application &V#& is not
permitted, because the restructure table &V#& for the extractor still
contains data in &V#&.
You cannot change the structure in this status, because when you load
an InfoPackage from BW, this leads to errors.
What to do
<DS:TRAN.LBWG>Delete</> the entries for all restructure tables for
application &V#&.
A2EEMCEX 141 Struct. appl. "02" cannot be changed due to setup table -> Long text" ""MC02M_0HDRSETUP""800"
Long text: see above
A2EEMCEX 141 Struct. appl. "02" cannot be changed due to setup table -> Long text" ""MC02M_0ITMSETUP""800"
Long text: see above
i am able to login to shadow instance with DDIC in 000client and created new user with copy of DDIC.
i tried to login with new user but it not allowing me to login and giving error as Upgrade running logon not possible.
i tried to unlock shadow system by SAPehpi unlockshd <SID> but it is not working and giving error as FATAL ERROR: Calling 'tp.exe' failed with return code 232
Please help me to solve.
Thanks,
Venkat Raja
M:8657374364Hello Venkat,
Please run the below command to unlock the instance from ..../EHPI/abap/exe directory.
tp unlocksys <SAPSID> pf=<transport profile>
tp unlock_eu <SAPSID> pf=<transport profile>
Please note that these structure application errors has to be reviewed and cleared (in transaction LBWG) by your functional team with necessary approval from the client.
Thanks,
Siva Kumar -
UPGRADE/SWITCH: START OF PHASE STARTSAP_TRANS ERROR
hi
My upgrade is failing to start the sapsystem at the upgrade/switch phase
SYSTEM START failed, code -2
-2: the test rfc did not work.
Try to log on to the system with user DDIC.
i have tried to log in as ddic but its not running.am i supposed to start it manually or Sapup is supposed to do that.what could have gone wrong as the upgrade was running fine before this phase .
Any ideas appreciatedHi Frank Pedro
I am also facing the same problem. Can u specify what parameters you have changed.
Upgrade Phase Group: Downtime phases II: Conversion, Main Import, XPRAs
STARTSAP_NBAS
SYSTEM START failed, code -2
-2: the test rfc did not work.
Try to log on to the system with user DDIC
Thanks
Gopal -
Execution of Reports phase error during SAP EHP4 upgrade with EHPi
I started getting an error message in the "Execution of reports after put" phase
(within the Downtime phase) during the SAP EHP4 upgrade with Enhancement
Package Installer.
***** LIST OF ERRORS
AND RETURN CODES *****
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~XPRA ERRORS and RETURN CODE in SAPRB70104.OPQ
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~1AETR012XProgram terminated (job: "RDDEXECL", no.: "09064300") Long
text: Cause Program "&V#&", which was started in the background, was
terminated abnormally. System Response The system created a job log for
the terminated program. What to do Proceed as follows: Log onto the
system in which the program was executed. The system is specified at the
beginning of the transport log. Then call transaction SM37 to display the
job log. Enter "&V#&" as job name and "DDIC" as user name. Restrict the
starting date to the starting date specified in the transport log. For
the other selection criteria, select only jobs with the status
"cancelled". Then press <LS>Execute</>. A list of the jobs satisfying the
selection criteria is displayed. You can display the log by pressing
<LS>Job log</>. If the list contains several jobs, you can select the job
with the ID " &V#&" with <LS>Display</> -> <LS>Job details</> or define
further details for the selection criteria in the initial screen of
transaction SM37. If the ABAP processor reports cancellation,
double-clicking on the corresponding message in the job log branches to
the display of the corresponding short dump. 1AEPU320 See job
log"RDDEXECL""09064300""OPQ" 1 ETP111 exit code : "12" >>> PLEASE READTHE REPORT DOCUMENTATION OF THE REPORTS MENTIONED ABOVE <<< XPRAs are
application reports that run at the end of an upgrade.
Most XPRA reportshave a report documentation that explains what the report does and how
errors can be corrected. Call transaction se38 in the SAP system, enter
the report name, select 'Documentation' and click the 'Display' button.
>>> The problematic XPRAs are mentioned in messages of type PU132 above
<<<
I tried to follow the instructions in note 1269960, but the enhancement spot
CLASSIFICATION_TOOL was already active. I activated it again and reran the phase
but got the same error. Also, I couldn't implement the note using SNOTE because it is
the middle of the upgrade process.
I also found the following long text in ST22
"Internal error during syntax check: ("//bas/710_REL/src/krn/gen/scsymb.c#11"
Processing had to be terminated because an internal error
occurred when generating the ABAP/4 program
"CL_CLS_BADI_CHARACTERIZATION==CP".
The internal system error cannot be fixed by ABAP means only."
I am on a 64 bit System with CentOS Linux. 8 GB RAM, 250 GB HD with 20 GB free space.
So far, I could not find any information on this. Any help would be greatly appreciated!
Thanks,
VictorHi Victor,
Go to SM37 and put in the username as DDIC and see the job log.
Also check Sm50 and see whether you have BTC processes available.
Last but not the least check your filesystem space usage too.
Gerard -
PI 7.1 upgrade error in GETSYNC_PROFILES_CHANGED phase
Hello
Currently I am upgrading an XI 7.0 system to PI 7.1. The downtime phases have just started and I've hit an error in the phase 'GETSYNC_PROFILES_CHANGED'; the error is 'Not enough space for string replacement'. Based on the phase name, and the previous phases, it looks as if the error is something to do with the profiles. The relevant upgrade logs have no useful info in them except for the string space message.
I have done the usual SDN, SAP Marketplace and Google searches but could not find an answer to my problem. I have also opened a high priority call with SAP but they have not come up with an answer yet. Does anybody have any useful advice?
The system being upgraded is running on Windows 2003 Server R2 64bit, has an Oracle 10.2.0.4 DB, and the source system was XI/PI 7.0 SP15.
Thanks.Hello Rohit
Freespace is more than sufficient:
C:\ = 5.2GB (O/S)
D:\ = 18.9GB (Oracle & SAP)
E:\ = 8.53GB (Oracle)
Andrew
Edited by: Andrew Turvey on May 28, 2009 3:48 PM -
Upgrade to ECC 6.04 PHASE: MAIN_NEWBAS/PARCONV_UPG ERROR
Hi
get error in Upgrade to ECC 6.04 in downtime phase - MAIN_NEWBAS/PARCONV_UPG.
The screen says:
Checks after phase MAIN_NEWBAS/PARCONV_UPG were negative!
Last error code set: Conversion entries have been found in, see phase log for more detaile
In the SAPup.log says that:
CURRENTPHASE MAIN_NEWBAS/PARCONV_UPG
...started at 20110324123904
Using phase log file 'PARCONV.LOG'.
..finished at 20110324124157 with status ERROR CHECKING MODEFLAGS.
Error message set: 'Conversion entries have been found in, see phase log for more detaile'
...begin dialogue at 20110324124157
And in the PARACONV.ELG file says:
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
PARALLEL ALTER TABLES MODEFLAG RESET: RSMFCONV and RETURN CODE in RSMFCONV.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
PARALLEL ALTER TABLES MODEFLAG RESET: RSMFCONV and RETURN CODE in RSMFCONV.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
MVNTABS ERRORS: ddlntabs and RETURN CODE in PD990324.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1 ETP111 exit code : "0"
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CONVERSION ERRORS and RETURN CODE in NCONV00.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CONVERSION ERRORS and RETURN CODE in NCONV01.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CONVERSION ERRORS and RETURN CODE in NCONV02.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CONVERSION ERRORS and RETURN CODE in NCONV03.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
MVNTABS ERRORS: delntabs and RETURN CODE in PL000324.DEV
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
1 ETP111 exit code : "0"
I look this log files ( RSMFCONV.DEV RSMFCONV.DEV PD990324.DEV NCONV00.DEV NCONV01.DEV NCONV02.DEV NCONV03.DEV PL000324.DEV ) but all of this, is exit code '0'
I don't know where is the error.
Any idea for helpme,
thanks in advise.
Sergio.
Edited by: Sergio Mazzeo on Mar 24, 2011 1:24 PM
The last lines of the PARACONV.LOG says that:
4 ETQ260 Starting batchjob "NTBUF_SYNC"
4 ETQ230 Starting RFC Login to: System = "DEV", GwHost = "LKMDEV", GwService = "sapgw00"
4 ETQ359 RFC Login to: System="DEV", Nr="00", GwHost="LKMDEV", GwService="sapgw00"
4 ETQ232 RFC Login succeeded
4 ETQ233 Calling function module "SUBST_START_BATCHJOB" by RFC
4 ETQ233 Calling function module "subst_start_batchjob" by RFC
4 ETQ399 JOBNAME='NTBUF_SYNC', REPNAME='RSNTSYNC', VARNAME='', BATCHHOST='LKMDEV', IV_SCHEDEVER=' '
4 ETQ234 Call of function module "SUBST_START_BATCHJOB" by RFC succeeded
4 ETQ233 Calling function module "SUBST_CHECK_BATCHJOB" by RFC
4 ETQ010 Date & Time: 20110324124156
4 ETQ234 Call of function module "SUBST_CHECK_BATCHJOB" by RFC succeeded
4 ETQ239 Logging off from SAP system
3 ETQ399 log analyse: search for '.[WT ]' in '^N......\.DEV$'
1 ETQ399 Conversion entries found:
2 ETQ399 CONV ENTRY TBATG TABL/SCMB/TREEVIEW2 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLCMS_RE_OBJ_SPC 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLCNVCDMC_PROJHIER 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOB_COND_DIFF 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_AMT 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_BDT 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_DATE 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_DIFF 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_FMOD 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_LIST_COND 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOT_DATEPOS 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLGMBDGTLSTNUMBER 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLGMGRSPONSOREDOBJ 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLHRWEB_RULE_GROUP 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLT5RSOP_SCHEME 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_PRD_FSTAT 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_PRD_PRD_SET 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_RE_EX_BPRL 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_RE_EX_TYP 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCWB_CATT_HEADER 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCWB_ITEM_POOL 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTJBR_US_ACCT_T 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLVALT_SP_VAL_SEC 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLVDDD_HEADER_COL 0CNVIE20110323DDIC
4 ETQ001 START time "No modeflag to check for"
1 ETQ206 Executing pre-phase DB specific actions.4 ETQ010 Date & Time: 20110324124157The last lines of the file PARACONV.LOG says that:
4 ETQ234 Call of function module "SUBST_CHECK_BATCHJOB" by RFC succeeded
4 ETQ239 Logging off from SAP system
3 ETQ399 log analyse: search for '^.[^WT ]' in '^N.......DEV$'
1 ETQ399 Conversion entries found:
2 ETQ399 CONV ENTRY TBATG TABL/SCMB/TREEVIEW2 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLCMS_RE_OBJ_SPC 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLCNVCDMC_PROJHIER 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOB_COND_DIFF 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_AMT 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_BDT 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_DATE 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_DIFF 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_COND_FMOD 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOC_LIST_COND 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLFICOT_DATEPOS 0CNVIE20110322DDIC
2 ETQ399 CONV ENTRY TBATG TABLGMBDGTLSTNUMBER 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLGMGRSPONSOREDOBJ 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLHRWEB_RULE_GROUP 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLT5RSOP_SCHEME 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_PRD_FSTAT 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_PRD_PRD_SET 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_RE_EX_BPRL 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCMS_RE_EX_TYP 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCWB_CATT_HEADER 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTCWB_ITEM_POOL 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLTJBR_US_ACCT_T 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLVALT_SP_VAL_SEC 0CNVIE20110323DDIC
2 ETQ399 CONV ENTRY TBATG TABLVDDD_HEADER_COL 0CNVIE20110323DDIC
4 ETQ001 START time "No modeflag to check for"
1 ETQ206 Executing pre-phase DB specific actions.
4 ETQ010 Date & Time: 20110324124157
Can any helpme to this error. I don´t know what and where is the error. Not found this item in SAP Notes.
Thansk a lot.
Sergio. -
Guidelines to reduce downtime during upgradation R/3 to ECC6
hi all........
Here we implemented SAP R/3 4.6 in the year 2005.
Now we are planning to upgrade our system to ECC6 unicode .
We are planning to upgrade our Production and Development system to SAP
ERP6 EHP4.As part of the upgradation; we had setup a test system with the
following details:
Sun Fire 480R (UltraSparc III + 1.05GHz x 4 processor)
Memory 16 GB and Storage : Sun CSM 200 SATA HDD
SAP R/3 4.71, single code pages 1100, Oracle 9.2.0.8.0, Solaris 9
Test system with 1.2TB data copied from Production System.
We have upgraded the test system using CU&UC method ( Upgrade Guide SAPERP6.0 EHP4 SR1 Abap ). It took 2 days downtime for full upgradation and 8 days for Unicode conversion.
Requirement :
To Upgrade the current systems without any additional hardware to SAP
ERP6 EHP4 Unicode.
As a part of the above, the cluster has to be upgraded to Sun cluster
3.2, and operating system to Solaris10 (5.10)
We are having the following queries:
1. With only 1.3 TB data, we feel, the down time of 10 days is not
realistic.Though we had not deviated from the above mentioned upgrade
guide, what could be the reasons for this down time of 10 days?what arethe affecting factors? Kindly suggest the ways by which we can get
reduced downtime . The referred Notes are (784118, 855772, 952514,
936441, 954268, 864861 ) still we are unable to pin point the reason. Abreak up of this down time is given below for reference.
2. Are there any alternate approved upgradation methods to reduce
downtime in our present set up? (details of present set up is given below)
3. How to calculate the down time with reference to(sapnote:857081) to in
our setup
Current Production System Details :
System : Sun Fire V890
Processor : 1.5GHz UltraSPARC IV+ processors -- 8no.s
Memory : 64 GB
Storage : Sun Storagetek 6180: HDD FCAL(16 no.s x 450 GB)
15,000-rpm 4 Gb/sec 4GB data cache (Storage connected to server using FC
cable)
SAP : R/3 4.71 single code pages 1100
Database : Oracle 9.2.0.8 data-size is around 1.3 TB
OS : Solaris 9 (5.9)
Cluster : Sun cluster 3.1
Network : 1GB ethernet (1000BASE-SX)
Architecture : Application and database server on Same system
SAP Development system specification same as the above with 187 GB data
size. PRD and DEV systems are on cluster; PRD failover to DEV system.
The time taken for test upgrade - brief details:
1. Kernel upgraded 6.20 to 6.40 (2hours)
2. Oracle Upgrade to 10.2.0.4.0 (3.30 hours)
3. SAP UPGRADE Preparation-Apply support packages (18 hours)
4. Downtime Phase and Pre-Processing and Finalization Phase (20 hours)
5. Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB
size)(98 hours)
6. Installation of unicode system using export (95 hours)
Looking forward to hear from you.
Best Regards,
Rajeesh K.PHi .......
i am very sorry for late reply...............................
The time taken for test upgrade - brief details:
1. Kernel upgraded 6.20 to 6.40 (2hours)
2. Oracle Upgrade to 10.2.0.4.0 (3.30 hours)
3. SAP UPGRADE Preparation-Apply support packages (18 hours)
4. Downtime Phase and Pre-Processing and Finalization Phase (20 hours)
5. Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB
size)(98 hours)
6. Installation of unicode system using export (95 hours)
2 days downtime means the sum of time used for above 4 activities ..........................
as you suggested we can do the same 4 different down times......................
Unicode Conversion-Taking DB Export 109GB(Almost 10% of total DB size) is taking a continuous down time
of 98 hours (4.5 days ) (Activity 5)+ installation of Unicode system using the Unicode export is taking 95 hours 4.5 days
(Activity 6)
i think the we have to do activity 5 & 6 in a single stretch with out users, so it will take a continuous down time of 9 Days
With this in mind I have a few questions for you to clear a little bit more all the problem.
Q:1 Did you use more parallel jobs during Downtime than default? and I mean real Downtime where the SAP system is taken down
No.we have used default number (3 ) of parallel jobs during downtime
Did the system allow you to use ICNV (incremental converssion) for some tables?
yes we may use ICNV
Can you separate the Unicode conversion to a different weekend? or is a must for some business reason?
Yes , we can separate the Unicode conversion to a different weekend , it will not affect our business
Did you save the post download Report so you can see what are the most time consuming phases?
i am not so clear about this question , we have made an activity chart with time duration as per the test upgrade. Or how we can save the post download report from the system
Looking forward to hear from you.
Best Regards,
Rajeesh K.P -
EHP4 error in ABAP Down time phase
Hi All,
I am installing EHP4, currently the system got stuck in downtime phase .Facing the SQL error
"22859 - ORA - 22859: invalid modification of columns in DDLs "
2EETP345 TATEMENT for 2EETP345
2EETP345 : error in DDL , name tab 2EETP345 not activated
We also got a solution for this through SAP note : 1160950
They have recomended to implement this correction note in the system, but since we are in Shadow phase, we are not allowed to get into the system and through shadow system we are able to connect only via DDIC,SAP* user.But with these users we are not able to implement SNOTE
So we even tried to unlock the physical system using the command : ./SAPup unlockshd <SID>
Its throwing an error :
"SAPup error unable to set envronment variable"
Please help to resolv this issuehi Sunny,
Here it is :
gbahev99:dh2adm 112% ./SAPehpi -help
Enter the path of your root directory [/import/basis/EHG/D2/EHPI/abap]:
Root directory = /import/basis/EHG/D2/EHPI/abap
Reexecuting ./SAPehpi with adapted environment and restart=3.
Usage: SAPehpi [parameter options] [functional options] [functions]
parameter options:
rootdir=<upgrade directory path>
gt=SCROLL/SERVER
uaport=<port number>
hm=<n>
cdpath=<CDROM path>
toc=<CD archive>
functional options:
DEBUGON
functions:
-V[ERSION]
startshd/stopshd
unlockshd/lockshd
set stdpar/rswpar/shdpar
set ddicpwd/shdddicpwd
set dbopsys/adjprp/sapmodi
analyse table <table-name>
reset prepare
showinput <file>
readCD/readKernel
export type=SPDD/SPAU ta=.. rel=.. log=.. -
Minimize downtime during UNICODE conversion
Hello forum !
I am looking at the UNICODE conversion of a large (?) SAP Oracle database for ECC. The Database it self is at about 10 TB. UNICODE converting this in one single run will take too long to fit inside the company defined tolerable downtime window.
When looking at the data I find that the largest 50 tables makes up about 75% of the total database size. Most of the 50 largest tables have data for several years back, and I am able to partition the tables with one partition pr year.
The good thing about this is that I am able to make the partitions with old data (more than one year old data) READ-ONLY.
My assumption is that I will be able to UNICODE convert 60-70% and create the indexes for these partitions without taking down the database to be converted.
Now,- doing the downtime-phase I will be able to exclude the old partitions of the largest tables in the export since I have already created a new UNICODE database with these objects and thereby drastically reducing the required downtime.
Is there anyone who has any experience with an approach like the one I have schetched out here ?
Kjell Erik FurnesCan you please be a bit more specific on your installation? How long is your possible downtime (export time should be about 2/3 of that)? How long is your actual export estimation? Do you have suitable hardware (CPU/disk)?
What you absolutely need to have:
[1043380 - Efficient Table Splitting for Oracle Databases|https://service.sap.com/sap/support/notes/1043380] -> export tables with ROWID splitting
[855772 - Distribution Monitor|https://service.sap.com/sap/support/notes/855772] -> enables distributed and parallel export/import
So on the hardware side you will need, a storage subsystem as fast as possible with two copies of the disks (one for exporting and one for importing). A bunch of application servers with fast CPUs helps a lot, everything connected with at least gigabit ethernet.
If you knew all this already, sorry for the spam. But i achived throughputs at about 400gb/hour on a medium sized hardware, i think throughputs of 1tb/hour should be possible (not talking about cluster tables
Regards, Michael
Maybe you are looking for
-
I have a mac book pro with retina,I haven't turned it on in a couple of months.no problems then, now when I try to turn it on i only get apple logo and progress bar. After a few mins the laptop just turns off and nothing eles.any help would be appre
-
Installation keeps coming up to 'You must reboot your computer"
Hi, I am trying to do a clean rebuild of my MacBook Pro from the Install DVD (OS 10.5.6) that came with the computer. My problem is that when I follow the instructions and boot from the DVD, Holding C or Alt to select boot drive, the drive spins for
-
I just migrated from Nokia C7 to Sony Xperia Z. I want to know how can I connect my phone to a hd tv?
-
Can user enter comments while creating shopping cart?
Hello All, While creating shopping cart, is it possible to enter some text/comment in one of the user defined attribute for the item? In other words I need to define a simple single value chracteristics that is ready for input during shopping cart cr
-
Integrate Crystal Reports with Spring MVC and Hibernate
Hi all, having successfully used the JRC version 11.8.4.1094 in a Java environment with: 1)JBoss 4.2.3, 2)Oracle 11, 3)EJB 2, 4)Crystal Reports 2008, I would like to integrate Crystal Reports into my existing spring MVC and hibernate web app using: 1