Duplicate depedent requirements for components

Hi Gurus,
We have KANBAN separate storage location which is a not a WM managed location for which we have defined control cycles for SFGs but their components are managed in other than KANBAN location which is WM managed storage location.
Now the issue is we have independent requirements created for those SFGs to plan components as KANBAN storage location is excluded from MRP the requirements are not created for SFGs but dependent requirement passed to components as the storage location is MRP relevant, apart from these there are independent production orders are created for KANBAN SFGs through KANBAN demand board  for which another dependent requirements are passed to components by which for  components we can see duplicate dependent requirements are created.
We cannot create KANBAN control cycle for WM managed location so the reason we have separate storage location for SFG control cycles and we cannot maintain the SFG components in non WM managed storage location.
Is there any possibility to create control cycles with WM managed location? Or is there in any way to control having created only one dependent requirement for components through standard configuration or through any enhancement?

I have an workaround for this situation ''We can have demand created for components itself rather than creating for SFGs to plan them in advance and we can control dependent requirements creation for components from KANBAN production order with MM MRP setting''
Any body have any better solution than this?

Similar Messages

  • Goods Receipt of BOM material- cost centre required for components

    I have created a subcontracting PO with a BOM material.
    When trying to post a Goods Receipt the components of the BOM material are required to have a cost centre assigned to them.
    The profit centre for the BOM material and components are the same. The BOM material does not require a cost centre to be entered in the Goods Receipt as the Profit Centre is allocated to account assignment tab.
    Why does the profit centre assigned to the components not default in the account assignment, why is the system asking for a cost centre?

    I receive this error when trying to post the material document:Field Cost Ctr is a required field for G/L account 1000 7023000200
    Message no. F5808
    Diagnosis
    The value for field "Cost Ctr" in the interface to Financial Accounting is an initial value but you are required to make an entry in the field selection for G/L account "7023000200" in company code "1000" linked to the field selection for posting key "81".
    System Response
    Error
    Procedure
    It might be an error in the configuration of the G/L account field selection. The initial application, used to call up the interface must otherwise define a value for field "Cost Ctr". If this is the case, contact the consultant responsible for the application used to call up the interface or get in contact with SAP directly.

  • Planning of Dependent Requirements for BOM Components in Make to Order scen

    Hi Friends - I want to execute a full cycle Make to Stock Scenario with Materials planning using MRP.
    The scenario will include BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    To execute this I have done the following
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - NORM, and General Item Category group as NORM
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6. Now created a standard sales order for the product.
    7. Executed the MD50 for the Sales Order Item.
    Now where do I find the BOM components for this material in the Sales Order?
    After executing the planning Run MD50 I am only getting the requirements for Product only. I can't see any dependent requirements for the BOM components.
    How do I make sure that the BOM components are also planned while the product is planned?
    I have checked the component Stock Requirement List - there are no requirements generated from the Sales Order Product BOM.
    Pls help me on this. How to do this so that the raw material components are also planned?
    Thanks
    Purnendu

    Hi Dhaval, Sandeep, Ashok - Thanks a lot for your replies.
    I have checked the Planned Order Created through Planning Run.
    If I click on the Components Tab I am getting following message
    No material components were determined
    Message no. 61027
    Diagnosis
    Until now, no BOM explosion has been carried out or no BOM has been created for this material yet.
    Procedure
    Either explode the bill of material for this material, or
    create the components manually by processing the planned order in change mode.
    If I try to explode the BOM through Header Menu - Edit> Explode BOM
    I am getting the same message.
    If I click on the Bill of Material Tab - I am getting the same above messge.
    Ashok - I have tried both the Selection Method -
    Nil - Selection by Order Quant.
    1 - Selection by Explosion Date
    But with no effect.
    Waiting for your advice.
    Thanks and warm regards
    Purnendu

  • Uploading Production Requirements For Finished Goods From External System To Run MRP For Components in SAP.

    Hello Production Planning experts,
    I'm looking to solve the current business problem:
    The company bought a third party software (JD Edwards) to calculate production requirements instead of using SAP's standard Production Planning or a tool like SAP's APO. They run a batch job to query Sales Orders, Deliveries, available stock, stock in transit, etc. from sap and feed/upload it to the third party software so it can calculate the Finished Goods Production Requirements for them. They love the third party software, so replacing it is not an option. Since the third party software is already taking into account Sales Orders, Deliveries, available stock, stock in transit, etc. from SAP, it just outputs a "Finished Goods Production Schedule" by week.
    My questions are:
    1) What's the best way to upload something like that in SAP in the form of Planned Orders or something of that nature?
    After i get that schedule in SAP:
    2) Is there any way to calculate components' requirements for that "Finished Goods Production Schedule" alone? The company would like to IGNORE existing stock AND expected-goods-issues in the future (sales orders, deliveries, etc) for Finished Goods ONLY. The components calculations would work the standard MRP way, taking into account existing stock and AND expected-goods-issues in the future (sales orders, deliveries, etc)
    I started looking into Master Production Schedule (MPS), but I don't know if that's the right approach since I'm not very familiar with it.
    Thanks in Advance! I will gladly reward points for helpful/correct answers.

    Hello Oscar
    I suggest you to upload your production plan in the for of "Planned Independent Requirements" using BAPI BAPI_REQUIREMENTS_CREATE. Later, MRP will create planned orders to cover the PIRs.
    If you don't want to consider the existing stock of the finished product, you should use the planning strategy 11 to create your PIRs. Take a look on the following link for more details about this planning strategy:
    Gross Requirements Planning (11) - Demand Management (PP-MP-DEM) - SAP Library
    Here you will find the following information:
    The make-to-stock strategy gross requirements planning is particularly useful in mass production environments; it is often combined with repetitive manufacturing. This strategy is particularly useful if you need to produce, regardless of whether you have stock or not. For instance, steel or cement producers might want to use this strategy because they cannot shut down production; a blast furnace or a cement factory must continue to produce, even if this means having to produce to stock.
    This strategy is also frequently used if there is a Material Requirements Planning system in a legacy system that needs to be linked to an SAP system which serves as a production execution system. The legacy system calculates a specific production plan, which has to be executed, regardless of the stock situation in the SAP system
    It looks like this planning strategy is exactly what you are looking for.
    BR
    Caetano

  • Components Required for CIC Web Client

    We have a question about CIC installation components for CRM 5.
    When we check the "Upgrade Master Guide" for "mySAP™ Customer
    Relationship Management" ( Pages 58 - 61 ) for all CIC components, we
    do not find that JAVA components are required for CIC ( Like JCRM).
    When we see details from Best Practices Doucment for CRM component matrix, we see that its required.
    We are not sure what to do. We were under the impression that Java
    components are not mandatory for CIC forCRM 5. All we need is TREX and IPC.
    Can someone please clarify/confirm ASAP as system needs to be build
    accordingly. If we do need JCRM, what functionalities is this required for?
    Thanks for help in advance.

    Hi Nikhil,
    With 04s all required installations will be completed by default. Just that you have create a domain and the track to make use Webdynpro Components in NWDI.
    Following are the SCs that are required.
    DI Build Tool 7.00
    SAP J2EE Engine 7.00
    SAP Java Tech Services 7.00
    This u can download from Service Market Place
    Support Packages and Patches - SAP NetWeaver - SAP NETWEAVER - SAP NETWEAVER 7.0 (2004S) - Entry by Component - Development Infrastructure
    Regards,
    Nagarajan.

  • CRM ISA Software Components required for Netweaver CE 7.1

    Hi Experts
    We are planning to migrate CRM ISA Application to Netweaver CE 7.1 environment. Currently we are in Netweaver 7.0 portal in which our CRM ISA 5.0 component is running.
    What are the Software components required for CRM ISA to be compatable for Netweaver CE 7.1 environment.
    Basically we need to know the SCA versions for CRM ISA compatable for Netweaver CE 7.1
    Any kind of documentation which describes SCA's and installation steps are very much helpful
    Thanks,
    cnu

    Hi cnu,
    Information about CRM Java component should be described in master guide, for example CRM 7.0 , these components are
    SAP Shared Java Applications 7.0
    SAP Java Data Dictionary 7.0
    SAP CRM Java Applications 7.0
    SAP Shared Java Components 7.0
    SAP Shared Web Components 7.0
    SAP CRM Java Components 7.0
    SAP CRM Web Components 7.0
    SAP IPC Mobile 7.0
    TeaLeaf 4.5
    you should be able to find the SCA files in service market place using these component name.
    Interesting to know why would you migrate from 7.0 to 7.1? or you just want to PoC? I don't think SAP will you support you unless you have made a very good deal with them.
    I also heard the version of web channel will bring some really good feature though it's still based on NW 7.0 with ehp, are you going to "migrate" it once again?
    good luck,
    Denny

  • Components required for each operation

    Hi Friends,
    In production order there are many operations.  How can I know components required for each operation.
    Thanks,
    Kiran

    Hi Kiran.
    Select the operation in the prodcution order.
    Hit component tab below.
    You will find the component attached to the operation.
    BR
    Subbu.

  • How to create requirement for BOM, not for its components?

    Dear gurus,
    I have never worked in PS module before. Now I have the following task:
    There is Project, Network and WBS. I inserted material for operation in WBS and exploded the material.
    Now the system must create requirement for this material but NOT for components of BOM. How can I configure the system?
    P.S. We don't use MRP and we can't change Material Master Data.
    Edited by: Azat Fayzullin on Dec 8, 2009 12:44 PM

    Have you read SAP help on PS
    also check this forum for similar posts
    If you have never worked on PS module I am not sure if you will be able to configure the system
    please attend some courses in PS from your local SAP academy course names are PLM200, PLM210, PLM220, PLM230, PLM240
    for your specific requirements I would recommend PLM200 and PLM220

  • SAP components required for implemeting SAP SRM MDM

    Hi all,
    Plz let me know , the SAP components required for implemeting SAP SRM MDM , for the following points:
    · Internal catalogs hosted and maintained by buyer?
    · Internal catalogs that are maintained by vendor (vendor will be using buyer's firewall)?
    · External catalogs hosted and maintained by vendor?
    Thanks and regards
    Harish

    Hi Harish,
    The SAP components you would be needed are
    SAP MDM5.5 or 7.1
    - MDM server
    - MDIS server
    - MDSS server
    SAP SRM5.5 or 7.0
    SAP SRM-MDM business content
    WAS engine typically used for deploying sca files given by SAP for configuring MDM as catalog. Mostly was engine of SRM is used in such case.
    If you need an integration with backend system SAP PI will be used.
    refer note
    1057316 - SRM-MDM Catalog 2.0 - Installation & configuration.
    refer article for understanding mdm catalog configuration steps
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/10d1bde2-699f-2910-8e86-f46bfe045fdc
    Regards,
    Abhijeet
    Edited by: abhijeet more on Apr 20, 2009 1:19 PM

  • Multiple planed order for depedent requirement

    Hi gurus,
    I have created multiple sales order for a MTO material. But after MRP run multiple planed order is generated for the same depedent requirement(which is a raw material). I have maintained MRP type-PD and Ind/collective req=2 (in MRP4). Actually i want all the depedent requirement should clubbed( for the same material) and one planned ord/Purch. req should be generated.Please tell me what to do.
    Regards
    Rajib Pathak

    You will not get that since each Raw Material is dependent on a Planned Order, that's why it's "DEPENDENT". It has to be assigned to 1 requirement.
    If they were INdependent they could have been grouped since there are no assignment generator for them except 1 source.
    They are also generated as dependent because they're listed in the BOM, once it explodes all the materials in it are generated as individual dependent requirement.
    However, you shouldn't worry about various planned/purchase requisitions for the raw materials, because the purchasing department could group all these requisitions into 1 Purchase Order.
    Points is appreciated if useful
    Thank you

  • Components required for sending Email from SAP [Kernel Release 46D]?

    Hi All,
    Can somebody please tell me the components and the Configuration settings required for sending Emails from SAP system[Kernel Release 46D] to the mail server[Win NT] using SMTP.
    From note 455127, I understood that "Sap Internet Mail Gateway" is required and there are other settings to be done. (SAPconnect with RFC can only be used as the Kernel version is 46D)
    It will be great if somebody can explain me in simple steps if He/She has done this before.
    Thanks,
    Varun

    Varun,
    sendmail comes with UNIX OS, there are versions of sendmail programs available for Windows too, but i guess you have to purchase them.
    Another alternative is a discontinued product called SAP Exchange connector, if you have a Windows environment and MS Exchange server as your mail server, you could use a SAP exchange connector and get your SAP Email config done.
    Regards,
    Siddhesh

  • One or more required office components failed to complete successfully. For more information , consult setup log file

    i got the above message when trying to install sharePoint server 2013, please can anyone help on the way forward?
    Thanks in anticipation of a swift response.

    HI,The issue could be of many specific reasons.Please find the below link that gives more information on the issue and the resolution.
    http://expertsharepoint.blogspot.de/2014/11/one-or-more-required-office-components.html
    Anil Avula[Partner,MCP,MCSE,MCSA,MCTS,MCITP,MCSM] See Me At: http://expertsharepoint.blogspot.de/

  • Rule based ATP is not working for Components

    Hi All,
    Our requirement is to do availability check through APO for Sales order created in ECC,so we are using gATP.
    Requirement: We are creating salesorder for BOM header (Sales BOM) and avaialbility check should happen for components i.e. Product avalaibility & Rule based substitution.
    Issue: Product availiabilty is working for components but rules based substituion is working,  mean Rules are not getting determind for components.
    Settings:
    - Header doesnot exist in APO and compnents do exist in APO
    - Availability check is not enabled for header item category and enabled for Item category for components
    - Rules have been created for Components in APO
    - Rule base ATP is activated in Check instructions
    We have also tried MATP for this i.e. PPM created in APO but still didn't get the desired result.
    If we create salesorder for the component material directly then Rule based ATP is happening, so for components Rule based ATP is not working.
    How do we enable enable Rulesbased ATP for components, i mean is there any different way to do the same.
    Thanks for help.
    Regards,
    Jagadeesh

    Hi Jagdeesh,
    If you are creating BOM in ECC and CIFing PPM of FG/Header material to APO, I think you need to CIF Header material, too, with material integration model.
    Please include header material in you integration models for material, SO and ATP check as well.
    For component availability check, you can use MATP; but for MATP, FG should be in APO. You need not to CIF any receipts of FG (stock, planned orders, POs etc), so that MATP will be triggered directly. Then maintaining Rules for RMs will enable to select available RMs according to the rule created.
    Regards,
    Bipin

  • I'm not able to download Itunes.  I keep getting this Apple Software Update message that states "There is a problem with this Windows installer package.  A program required for this install to complete could not be run.  Contact your package vendor"

    Not able to access Itunes store anymore.  Just quit working for no reason.  I've tried deleting Itunes and related components from the Control Panel, but when I try to remove Apple Software Update, I get a message that states "There is a problem with this Windows installer package.  A program required for this install to complete could not be run.  Contact your support personnel or package vendor".  Not sure what this message means.  Am I suppose to contact Apple ?  What is meant by package vendor ?

    Apparently it's an itunes issue. I just tried to update and got the same issue. Called att to activate my iphone 4s and they say they can do the swap but apple is telling them itunes is down atm.  So will have to wait

  • Error message on window 7 for install iTune and iCloud!!!"There is a problem with this Windows installer package. A program required for this install to complete could not be run. Contact your support personnel or package vendor."

    Hi,
    I just try to install the setup download from apple website for iTune and iCloud.
    During the installation, there was error message prompt out "There is a problem with this Windows installer package. A program required for this install to complete could not be run. Contact your support personnel or package vendor."
    I am using Window 7 32 bit. I have try several time for install, but the result is getting same error message.
    Anyone can help on this??????
    Thanks.
    Justin

    I have also tried extracting the individual components to the temp file and attempting to install them individually despite being unable to remove the previous install of Apple Software Updater.  The outcome, both Apple Software Updater and itunes encountered the same error message during the install process.

Maybe you are looking for

  • Where can I find an earphone splitter for my macbook pro

    My wife and I like to watch movies on my Macbook Pro on flights and have previously been able to do so by using our Apple earbuds through an audio splitter connected to the audio port of our Macbook, that is until I lost the splitter. Now I cannot se

  • Somehow when i click (arrange) nothing seems to be available.. it's all light and nonclikable.??

    for example the group function etc.. is not available.. i have a simple 3 layers with a shadow... i could use thoses functions before but somhow .. they are not working now.. what am i doing wrong ??

  • Change in Std SAP Program

    BW Experts, At my client I have changed a Std SAP program LRRSVF20. This was transported up all the way to production. Now that we did a Support pack upgrade in dev, This configuration is lost in development. What is the best approach to get it back.

  • FAQ: Why isn't the anchor point centered in shape layers?

    [UPDATE: In After Effects CC (12.1) and later, you can center the anchor point within the visible content of a layer. ] Short answer Because in shape layers you can have two distinct kinds of anchor points - the anchor point in the main transform pro

  • [how to] Thunar forgets preferred / default applications in Openbox

    This was my situation: I would set default image viewer to gpicview, default for movies and music was vlc, default for PDF's was evince. After reboot these settings would be forgotten and the system would use gimp for images, mplayer for movies and m