Easy Cost Planning-prob Costing model

Hello ,
I am creating costing model
i want at time of Easy cost planning  court fee(Characteristics)   to be selected from drop down list
i have made characteristic court fee ,in currency format
(CKCM) while defining derivation rule(template), if i am mentioning quantity as court fee
Facing error that Syntax error in quantity
Pls help
Thanks

After Double click on Qty , you have to define the formula there,
correct your Formula which may be wrong leading to Syntax Error.
Regards,
Nitin

Similar Messages

  • Easy cost Planning & Network Costing

    Dear All
    In one Project can we use both Easy cost Planning & Network Costing. Easy cost planning is generally used when you have structure with WBS only. Network cost planning is a combination of group of activities, all these having their relevant cost elements/ work center combination. can we manage both this in one project. If it possible please explain in detail.
    Regards
    Nivrutti

    What is your business requirement ? It depends on that. Yes your understanding is quite correct. We use easy cost planning in the initial phase of project. Easy cost planning can be done in various versions including  0 plan / actaul version.  If you does easy cost planning in 0 along with network costin you will double up lannning cost.
    Network costing can only be done in plan / actual version 0 only.
    Best approach is to use easy cost plnnaing as rough cut level apart from 0 version. And use network costing. However it may very a/c to business requirement.
    With Regards
    Nitin P.

  • Report to display Mat Cost Planned Labour Cost and Over head cost

    Hi Abapers,
    Greetings of the day..
    I need a Report that Display Material Cost , Planned Labour Cost,Actual Labour Cost and Over head value
    where do i start from and what are the tables involving in this report..
    if already done this A code snippet is more helpful...
    Thanks In Advance...
    Thanks & Regards
    Sathish

    Assuming you are talking about Maintenance Order.
    Use table: PMCO.
    Here the line with field VORGA having value KPPS gives the Planned Costs of the Order in the field WRT01.
    Similarly, the line with field VORGA having value RKL gives the Actual Costs of the Order in the field WRT01.
    Also have a look at Tcode KKBC_ORD.
    Jogeswara Rao K

  • Personnel Cost Planning: creating cost item for Org unit

    Hi experts,
    I am trying to attach a cost item to an org unit by maintaing feature hcp02 but the somehow the cost item applies itself to both org unit and position. Could anyone please let me know the how this can be done?
    Thanks

    It is extremely difficult to answer your question without knowing all the details of your scenario.
    I can briefly explain the scenario I used:
    1. I have maintained IT1005 on job level to further distribute this information along the organization structure.
    2. First of all i had to run data collection on job level using method "Infotype planned compensation: 1005" and cost item that was a base for other items, e.g. basic salary. System creates records in infotype 5010 "Planning of Pers. Costs" for evaluated jobs.
    3. Then I collected cost items for positions using method "Data from related cost planning objects", calculation type A, basis that I previously set up, evaluation path O_O_S_C (I started from head org.unit) and object type source C. I did it for positions to have possibility to adjust cost items on position level using transaction PHCPDCUI - Edit Data, e.g. you can ask managers to review your defaults on position level before staring consolidation on org.unit level.
    4. Then you start data collection on org.unit level using cost items on position level. Process similar to step 3 but with different evaluation path and source object.
    5. When it's done you run cost planning (PHCPADMN - Manage) using special plan for planning based on OM data.
    There are plenty of other scenarios, so can't really give you exact answer on your question, as I don't which scenario you use.

  • Report Painter - Use SKF to calc act/plan unit costs in CCtr report

    Hi Report Painter Gurus,
    I am an end user working with our Report Painter consultant and I have asked for a Cost Centre report with columns for Actual Costs, Actual Unit costs, Plan costs, Plan Unit costs for Month and Cumulative. I have seen this report in my previous business so I know it can be done but consultant says it's impossible.
    The report I previously used had the SKF values at the bottom of the cost centre report and then the unit costs columns (both actual and plan) referenced these SKF cells in the formula which divided Cost by SKF.
    We have created the SKF using KK01 and posted dummy amounts in KB31N but consultant says he cannot reference the SKF values in the formlas.
    If you can spell it out to me (I have dabbled in Report Painter myself), then I am sure I can explain it to consultant.
    Any help gratefully appreciated!
    Cheers,
    Matthew.

    Matthew,
    I think it is quiet simple. When you add a column to the report painter report you can choose from the drop down menu for 'Basic Key figure' whether it is Costs, Activity quantity, Statistical quantities, etc.
    So if you have a column with Costs (X1) and one more column with quantities (X2), you can easily come up with another 'formula' column and use the equation (X1/X2).
    I think this should serve your purpose.
    Best regards,
    Vishal Thakur.
    Edited by: Vishal Thakur on Mar 2, 2010 11:08 AM

  • Cost Plan do not flow to PCA

    Hi,
    We do have profit center accounting activated and all cost planned at cost centers automatically flows to the Profit centers but All cost planned at cost centers do not flow to the respective profit centers. could anyone please tell what is the setting that i have missed out. thank you in advance
    Regards,
    Rovillle

    Hi Roville,
    Use 1KE0 T.code to copy plan cost from Cost Center to Profit Centers.
    If useful,please assign points.
    Thanks,
    Rau

  • Difference between COPC planning and cost object controlling

    I want to know why do we have to calculate the cost of a manufactured product by both COPC planning and Cost object controlling by order?
    Will the cost of a manufactured product be different in COPC planning method and cost object controlling method?
    if we use only cost object controlling to calculaute the cost of a manufactured product without using COPC planning wht will be the implications?

    Raja,
    Yes the cost can be different. The cost calculating thorught Product Cost Planning may be static, you calculate it by period it is more for planning prupose ans to set standard. The cost calculated through Cost Object Controlling is resulting from your actual transactions, and the are few variables that could increase or decrease the cost of product. For example the overhead cost (Increase of salaries) can directly affect your activity rate at the work center and impact cost of your product when the production order is complete. You need both costs (Cost Planning and Cost Object releated) so at the end of the period you can calculate variance betweeen your plan cost and your actual costs.
    Hope this clarifies your doubts.
    GG

  • Project costing/ Net working Costing

    Dear PS experts,
    I have some doubts related to PS.  Basically i m FICO. 
    1.  Normally in Product Costing we have a option Product Cost by Order/Period/Sales Order.  If we want
         to Costing in in PS with Customer Project, which one is suitable.
    2.  For calcularting of WIP also we have different option. which one is better.
    3.  Settlement of the Customer project is which cost object (we r not going with COPA)
    Regards
    Raj

    Hello
    1.There are different ways of Cost Planning in a Projects. Manual Cost Planning, Network Costing, Detailed Cost planning (based on Cost Element and Activity types), Easy Cost planning and Unit costing. The cost planning approach depends on your client. Usually if its a WBS structure go with Easy Cost Planning.If you are having complex structure with networks,activites and materials go for Network costing.
    2.The way to calculate WIP is Result Analysis. Assign RA key to your project profile.
    3.Customer projects are usually settled to PSG. If COPA is not activated, you can settle to Cctr. There are many threads around Settlement of customer project--without COPA, just refer them for more details.
    Thanks
    Sarang

  • Difference between Actual Cost and Allocable costs in splitting KSS2

    I have Cost splitting structure results with me(KSS2)
    What is the difference between Actual Costs, Control Costs, Allocable Actual, Actual cost balance and which amount will system consider for calculating the rate with dividing the activity rates.

    Hi,
    In Splitting Structure KSS2 There are two Costs One is Target Cost (Planned) and Control Cost (Actual Cost)
    In Variance Calculation U will See Target Cost (Planned), Actual Cost, Allocated Actual Costs.
    Target Cost = Planned Cost
    Control Cost = Actual Cost
    Actual Cost = Actual Cost
    Allocated Actual Cost = Actual Cost of the Output Qty. This is Actual Credits from Activity allocation. This is Actual Credits from delivery of Stock.
    Hope you are Clear.

  • Calculated field in model of easy cost planning

    Hi,
    I would like to introduce the cost model easy planing a calculated field (characteristic), which was the multiplication of two fields (Characteristics).
    I have entered into the transaction CKCM "Easy Cost Planning: Model", I created 3 Characteristics (A,B,C)through the option
    "Assign Characteristics to the model."
    I entered the "Define the derivation rules (template)" and created a calculation with the two characteristics( C = A * B). The problem I have is that I did not enter the calculation in characteristic 3, which is what I want to pick up the value.
    Many Thanks.
    Regards.

    Hi Vivek,
    Thanks for answering.
    My question is, how I can assign a  calculation in a characteristic?
    Characteristic A
    Characteristic B
    Characteristic C = A * B
    I want the easy cost planning screen, enter a value in the characteristic A and B, it will automatically calculate the C and view the calculation in the screen in characteristic C. As I can do?
    Thank you very much.

  • Easy Cost Planning & Project Stock

    Dear Experts,
    I am using Easy cost planning for WBS cost planning and Project definition control data tab page has Valuated Project stock selected.My costing model had an external procurement material for which I generated PR & PO thru Execution services.But the account assignment in my PR & PO was P with the corresponding WBS as account assignment and not Q.
    I have two question regarding this,
    1) Does it mean that while using ECP, Project stock concept will not work?
    2)How can we get the pop up of procurement type options(like Res + PR for WBS element) while generating PR through execution services?

    Hi,
    I am replying again because in my last answer there was some typing mistake.
    Hi,
    I tried your scenario is my system.
    whenever i am changing P to Q in Config in SPRO,It is giving an error that "The selected account assignment category is not supported" that means it is not meant for Q but i double click for object type PR WBS Element and changed Acct Assgmt Cat to Q then system allowed me to save.
    The i create a PR and WBSE is coming in the Account Assignement ,then i converted PR to PO and then i recived goods as project stock.when i issued the material in ECP it is not issuing from Project stock because 221 Q is not present in Config for SPRO so it is issuing from Normal stock so special stock from ECP is not supported.
    But you can manually issue the material to the WBSE in MIGO/MB1A by 221 Q.
    Hope it is clear.
    Muzamil

  • Easy Cost Planning -Costing has already been completed. No changes possible

    Hi,
    I am in Easy Cost Planning tool and i would like to remove some items or add in some items.
    The system is giving a message that "Costing has already been completed. No changes possible"
    May i know where did we complete the costing(Transaction code?) such that no changes are possible on East Cost Planning tool anymore?
    Thank you.

    Hi,
    Check the Costing Model in CKCM and do changes as per your requirement.
    Now Use this costing Model in CJ20N while cost planning for wbse. you can change cost plan here also as per wbse specific requirement.
    regards,
    Hari

  • Easy Cost Planning (SAP) in Tender Process

    Hi All,
    I am using SAP ECC 6.0 EHP 4. I wanted to know if Easy Cost Planning in SAP PS can be used to cost a project initially while Tendering process.Or is there any other tcodes in SAP for tender process? I created Costing Models for most of the possible processes in a civil project and included the labour cost,equipment cost and material cost in it.By this way can we proceed implementing SAP in our tendering department.Looking forward for your valuable replies.

    Hi ,
    SAP has easycost planning objects available to cater to it. Process starts with inquiry.
    1) Create inquiry for customer request. Define service material in material field in VA11
    2) Create Project copying closest executed in part ( you have said 70% is engineered fresh, then project is 30 % correct at the time of copying)
    3) Amend project to add/chnage/delete components & network activities. Add miilestone payment you wish to propose in quotation.
    5) Add project no in inquiry (Accoutn assignment in Line item )
    4) Use DP81 traxn to create quotation.Easy-cost planning need to be configured to calculate price( Cost+ mark up scenario possible) There are possibilites to pull as many deatils as you wish in quotation ( As line items) from project structure. It is possible to list major assemblies that will be delivered to customer( Make- To - Order variations). It is also possible to replace Service item used in inquiry with 'Material masters' of FERT & itemization in Quotation. Milestone dates from project will be copied you can propose % billing arrangement at each date to customer.
    5) Able to revise quotation seamlessly & resond to customer changes/addtioal request. Revised quotation reflects your ability understand customer request & changes are seamlessly reflected in qty,  total price & dates.
    6) Upon confirmation of Sale, Sales order can be created copying quotation. All hard work/ iteration of commnucation with customer , need not be defined in system again. Order Acknowledgement will reflect agreements with customer.
    SAP E C & O best practice has few more addtion for Civil project ... how to measure % completion based on Mortar used & daily output of cement mixing. That will help,
    Regards,
    Jatin

  • Easy Cost Planning in a currency other than Cont Area and comp code curren

    Hi,
        I want to do the easy cost planning in a currency which is other than controlling area and company code currency.
      But I am getting the option of only these two currencies only.
    Any idea how to do it?
    Example:
      Controlling Area currency :INR
    Company Code Currency : AED
    Planning Currency to be used for Easy Cost Planning :USD
    Regards,
    B P Singh

    Hello,
    You may try to go to transaction CT04 - Characteristics. There in tab BASIC DATA you choose Data Type - Currency Format. In field Currency enter the required currency. Save the characteristic.
    Next step is to go to CKCM - Models for Easy Cost Planning. Open the Costing model and add line with the created characteristic.
    Good luck, Aleksandra

  • Unable to update revenue plan values in Easy Cost Planning

    Hi,
    Business maintains planned costs and revenues on WBS element using Easy Cost Planning tool. But for one of the WBS element system is not allowing to update/add planned revenue line items.User is able to update the planned costs for this WBS element.
    The Legend in Easy Cost Planning screen is Non-Changeable Cost Estimate.
    The status of WBS is REL,ACPT(Order Accepted),NSCH(Not Scheduled - Forecast Dates),RESA(Result Analysis Carried out).
    We have checked all the business process and all the revenue planning is allowed.
    Please guide us on how to resolve this issue.

    This is resolved...Select the WBS and click on CLOSE icon to reset the cost estimate. This allows to plan revenues again.

Maybe you are looking for

  • Look up in Dictionary.app

    Is there any way to look up a word directly in Dictionary.app? Control clicking a selected word, choosing "Look up..." brings up the definition(s) in a pop up window. Then clicking on "Dictionary" takes you to the Dictionary application... But I pref

  • Forming a report query dynamically with the value of an item

    Hi Gurus, We wanted to create a report based on the value of an item in the page. For example There is a text box named p1_table depending on the value of this item the query of the report should change 1) when p1_table = emp then report query should

  • Sale of raw material without excise duty addition

    Hi Friends      Scenario is like this that my client also sale the raw material as this raw material is not used in prodution and it is sold ,so we can not avail the excise duty by passing it to customer then how to debit the input register with the

  • TS1702 iPad 1 apps

    Why do your apps randomly shut down when your playing them?

  • I updated to Yosemite and cannot turn on extensions in Safari

    I updated to Yosemite 10.10 on my MacBook Pro and now cannot turn on extensions in Safari (8.0), Preferences, Extensions. When I move the slide button to the "on" position it immediately moves to the "off" position. I turned off all extensions and re