EHP5 post installation activity

Dear All,
We have upgraded our DEV server to EHP5, but we have following queries. We are using SUSE Linux 11 and DB2 9.1 data base.
In system -> Status - > SAP system data -> component version "SAP ECC 6.0"
                                       System Component Information -> EA-APPL = 605, SAP-APPL = 605, EA-HR* = 605 etc
1. Is there any procedure to validate our installation is complete and doesn't require any more changes, during installation we didn't give any transport request? post intallation activity, if required.
2.  We are facing following issues in DBACockpit transaction, what is the solution to remove these errors?
                         Space -> virtual tables
                         @5D\QYellow LED; caution@     DEV     Last data collector run is older than 14 days
                         @8O\QError message@     DEV     SQL0204N  "SAPTOOLS.DBH_STG_TABLE" is an undefined name.
                         SQLSTATE=42704                   
                         Configuration -> parameter check
                        @5C\QRed LED; stop; errors@     DEV     Error when reading SAP Note 0001334923: Return code = 1.               mentioned note is not understandable.
3. During Pre processing phase installer recommended some manual changes in database, some tablespaces were manually created i.e. DEV#EL702D, DEV#EL702I, DEV#ES702D, DEV#ES702I. Do we need to drop these tablespaces or keep it as it is?

Hi,
> In system -> Status - > SAP system data -> component version "SAP ECC 6.0"
>                                        System Component Information -> EA-APPL = 605, SAP-APPL = 605, EA-HR* = 605 etc
>
> 1. Is there any procedure to validate our installation is complete and doesn't require any more changes, during installation we didn't give any transport request? post intallation activity, if required.
>
This is correct. Even if system it upgraded to EHP4/EHP5, it will show you as ECC 6.0. You can confirm this by seeing version of the component. For a system to be called on EHP5, SAP_APPL and EA-APPL must be on EHP5. And additionally if you have installed any other usage type, you can also check its version to EHP5.
> 2.  We are facing following issues in DBACockpit transaction, what is the solution to remove these errors?
>                        
>                          Space -> virtual tables
>                          @5D\QYellow LED; caution@     DEV     Last data collector run is older than 14 days
>                          @8O\QError message@     DEV     SQL0204N  "SAPTOOLS.DBH_STG_TABLE" is an undefined name.
>                          SQLSTATE=42704                   
>                       
>                          Configuration -> parameter check
>                         @5C\QRed LED; stop; errors@     DEV     Error when reading SAP Note 0001334923: Return code = 1.               mentioned note is not understandable.
>
For this, you can refer to SAP note 1554750.
> 3. During Pre processing phase installer recommended some manual changes in database, some tablespaces were manually created i.e. DEV#EL702D, DEV#EL702I, DEV#ES702D, DEV#ES702I. Do we need to drop these tablespaces or keep it as it is?
No, these are new containers of 702 release. You cannot drop it.
Thanks
Sunny

Similar Messages

  • SCM Dialog instance installation, post installation activity for livecache

    Hi All,
    We have installed SCM 7.0 Central instance with Livecache server. Now we have successfully installed additional application server (i.e. Dialog instance) for this SCM 7.0 system.
    We need to know
    After installation of SCM 7.0 Dialog instance what are the post installation activities?
    How we should integrate the livecache server with the Dialog instance which is installed on different hardware.
    We need to know how livecache server understand that the additonal application server ? Is there anything to do in LC10?
    Please reply
    Thanks

    Hi Ashley,
    Thanks for your time.
    Since i am installing app server, the SAP<SID> group will have to be online on this node. There is another group containing shared drives for components for livecache. This is also required to be online on node 2 for app server installation.
    The only cluster resource I can move back to node 1 is ORACLE<SID>. Tried doing that, but no luck.
    Any one here facing similar issue during SCM dialog instance installation in MSCS environment?
    Regards,
    Kiran

  • SCM 7.0 / LiveCache post installation

    Hi All,
    I am confused in SCM & Live cacache post installation activity. Please help me to clear out following doubts
    1) As per SCM Inst. guide 7.0 SR1, post installation activity "5.13BI-Specific Post-Installation Steps", We need to do client copy and BI specific.
    2) In the Same guide there is a activity "5.17Performing the Client Copy".
    3) In Live 7.7 cache inst. guide, post installation activity "5.1.1Setting Up the Connection to the liveCache Instance".
    I have gone through these two guides. Please clear out following doubts.
    1) As per SCM Inst. guide , Do we need separate client for BI-Specific activity and one more client for other acivity. OR we should have only one client for BI-Specific and SCM Specific activyt. So DO we required two separate clients ?. OR there always only one Production client in SCM system ?
    2) As per LiveCache inst. Guide, in the post installation activity we need to set up a connection. Is this connection to above mentioed BI-Specific client or other production client.?
    I am little confused. Please reply.
    Regards

    Hi All,
    I am confused in SCM & Live cacache post installation activity. Please help me to clear out following doubts
    1) As per SCM Inst. guide 7.0 SR1, post installation activity "5.13BI-Specific Post-Installation Steps", We need to do client copy and BI specific.
    2) In the Same guide there is a activity "5.17Performing the Client Copy".
    3) In Live 7.7 cache inst. guide, post installation activity "5.1.1Setting Up the Connection to the liveCache Instance".
    I have gone through these two guides. Please clear out following doubts.
    1) As per SCM Inst. guide , Do we need separate client for BI-Specific activity and one more client for other acivity. OR we should have only one client for BI-Specific and SCM Specific activyt. So DO we required two separate clients ?. OR there always only one Production client in SCM system ?
    2) As per LiveCache inst. Guide, in the post installation activity we need to set up a connection. Is this connection to above mentioed BI-Specific client or other production client.?
    I am little confused. Please reply.
    Regards

  • Post Installation Activities after BW 7.31 system copy

    Hi,
    Need to know the post Installation activity after BW 7.31 system copy.We plan to build a new QA system from our Development BW 7.31.
    What should be the sequence of steps I need to follow?
    Is it BDLS,SM59 & then RSA1?How should we manage the source system creation in RSA1?Do we restore or delete the old source system & create the new?

    Thanks Bala for the link..
    There is 1 step in the link
    se37
    Function: RSAP_BIW_DISCONNECT
    Parameter   I_BIW_LOGSYS                  <<SLOGSYS>>
                          I_OLTP_LOGSYS                <<RLOGSYS>>
                          I_FORCE_DELETE              X
    I could not understand why we need to execute this step?Can you please help me on that?

  • PI 7.0  Post Installation

    Hi All,
    I am facing diffuculty while doing the Post-installation activities for XI. I don't have the passwords for the Service Users like PILDUSER, PIAPPLUSER, SAPJSF etc.,. When I try to reset/change the password in the User Management Section, I am getting the following error message "An error occurred in the persistence; contact your system administrator". Pls suggest as to what can be done.
    Regards,
    Divya.

    Hi,
    Please see the below links
    Post Installation steps for activating Adobe Document Services in SAP XI NW 2004S
    -/people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    Link for posnt installation guide
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    https://websmp101.sap-ag.de/~sapidb/011000358700009389172004E.PDF
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    2004s PI installation - help.sap.com:
    http://help.sap.com/saphelp_nw04s/helpdata/en/78/f59442062bcd6ae10000000a155106/frameset.htm
    Regards
    Chilla

  • Post Installation Checklist: AC GRC 10

    Hello All,
    We have been told by the Basis team that the GRC PRD is ready for use after they have installed it. Just wanted to know if there is any post installation guide or document that we can refer to, to make sure we have the complete installation and settings before we go for the configuration and import of transports from DEV/QAS. An example of things to check can be:
    1. If the NWBC is working fine.
    2. If all the Connectors are created properly.
    3. If all the relevant BC sets are activated.
    We need this information to make a check that when the Basis team hands over the PRD server for us to use, we do not miss out checking anything that can have an adverse affect later when we import our configs and data from DEV or QAS.
    Thanks and look forward to hear soon.

    Hi,
    You can get more ideas about the same from the installation guide where you can have a look to see which are the important areas that you need to focus on. Broadly, these are:
    SP Levels for the key components.
    SICF services
    BC sets.
    Hope that helps.
    Regards,
    Hersh.

  • Problem in XI after post installation.

    I have done the post installation for PI, everything was fine and sucessfull,
    but the problem is, in XI check list there is no objects found in the Integration Repository and Integration Directory with the URL  ( http:
    emsap008:50100\rep\start\index.asp ).
    Let me explain the problem which i faced.
    In the transaction SXMB_IFR --> Tool --> Import Design Objects Option, the result displaied is " There is no Objects found ". But as per the document i need to get               " PI7_0_BASIS_6.40_18_00.tpz ".
    Please clarify my doubt, ask me if my question is insuffecient.

    Hi Senthil !!
    Here is the guide with necessary steps
    http://help.sap.com/bp_bpmv130/Documentation/Installation/XI30InstallGuide.pdf
    /people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    You will get the details of post installation activities for SAP XI in its installation guides itself. Have a look:
    SAP Exchange Infrastructure Release 3.0 - Installation Guide
    SAP Exchange Infrastructure 3.0 SR1 - Installation Guide
    Plus you can go through the following docs:
    SAP Exchange Infrastructure (XI) 3.0
    Troubleshooting Guide - SAP XI 3.0 and 2.0
    SAP XI Release 3.0 SPS11Configuration Guide
    Also you can have a look at the following thread, you will get some links in these threads too:
    Post installation of XI?
    XI INSTALLATION and POSTINSTALLATION
    XI Post Installation....Need help...
    XI Post Installation - Help
    XI Post Installation - SLD Connection
    refre this thread
    Post Installation of PI - PI template Installer not found
    <b>Pls rewards if useful</b>

  • POST Installation steps for SAP XI 7.0 SP06

    Hi Experts ,
    We are trying to install XI 7.0 SP06.We are suppose to carry out  post installation
    steps but we are not able to locate a proper post installation guide for the same.
    We have succesfully installed XI 3.0 earlier .However XI 7.0 post installation steps in the guide that we have "SAP NetWeaver 2004s SR1 ABAP+Java on Windows: Oracle" , are relatively less...
    Nevertheless, we have carried out the following steps
    5.21.1 Performing PI-Specific Steps for SLD Configuration
    Local and Central System Landscape Directory (SLD)
    Mapping Security Role to User
    1. Log on to the Visual Administrator of the J2EE engine of the SLD host.
    2. Choose Cluster® Server® Services® Security Provider.
    3. In the Runtime tab, choose Policy Configurations and then the column Components, and select the component
    sap.com/com.sap.lcr*sld.
    4. Switch to the Security Roles tab to display the assigned roles.
    5. Select role LcrInstanceWriterLD.
    The user SLDAPIUSER already exists with its security role LcrInstanceWriterLD.
    6. Switch to edit mode and add user PIAPPLUSER with the same role LcrInstanceWriterLD.
    Note
    For a central SLD, the user PIAPPLUSER must be created in the central SLD ABAP system first and be
    assigned to ABAP role SAP_XI_APPL_SERV_USER. The password must be same as in the XI Exchange
    Profile on the XI Integration Server.
    Note
    For information on the UME actions, see the Post-Installation Guide - SLD of SAP NetWeaver 2004s, section
    Configuring SLD Security, at service.sap.com/sld® Media Library.
    Maintaining SLD Connection Parameters (ABAP API)
    1. Log on to the SAP XI Integration Server System as user DDIC and call transaction SLDAPICUST. The screen
    Maintain SLD Access Data is displayed.
    2. Choose Display <-> Change and proceed as follows:
    a) Replace the existing SLDAPIUSER with PIAPPLUSER user.
    Note
    For a central SLD, make sure you use the user with security role LcrInstanceWriterLD.
    b) Make sure your entry is marked as Primary.
    Note
    Only the entry marked as Primary is active.
    c) Save your settings.
    April 10, 2006 PUBLIC 97
    Now we don't know wether the sld configuration is over or not ...or for that matter in RWB we see only J2se based adapter engine and  not J2ee based adapter engine...
    Kindly help

    Hi..
    Instaed doing this,please try out template based configuration which has been mentioned in the installation guide or else do as follows
    1.Login into NWA (netweaver administrator)
    as
    http://<host.<domain>.<com>:<port>/nwa
    2.Use J2ee_admin user id and password
    3.go to deploy and change
    4.select template based configuration for PI
    5.execute the template
    6.install it
    you can find the list of other templates which are clear and easy to do the post installation step..i found it useful ..
    Apart from these, as per sandro, you can check the data transfer in visual administrator or go the abap engine, transaction RZ70, press accept proposal button
    then execute button , check the data supply without any error
    Thanks
    Gopal
    (Avoid points if useful)

  • What are  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.

    BW on HANA :  Pre Database Copy and Post data base copy activity list, Pre Migration and Post Migration activity list from SAP BW 7.0 to SAP BW 7.4 SPS6.
    We are trying to copy database from SAP BW7.0 to SAP BW on HANA 7.4 SPS6 so we are in search for list of steps or activities during database copy both pre and post steps.
    Along with the above we are in search of Pre and post migration steps ones database is transferred successfully from oracle to HANA on 7.4 SPS6.
    Kindly help us in getting the exact course of action as requested.
    Thanks and Regards,
    Lavina Joshi

    Hi Lavina,
    try this link for starters: Upgrade and Migration - BW on HANA | SAP HANA
    Points to remember are:
    Preparation:
         -- Hardware Sizing
         -- Preparation of Data Centres
         -- HANA Hardware preparation
         -- System Landscape Readiness (upgrade software downloads, system readiness checks, etc)
         -- House Keeping activities on BW system (data clean up, etc)
    Post Installation:
         -- Sanity checks / Preparation and License checks
         -- JAVA Configurations
         -- Infoprovider conversions 
    Overall Stages are described below:
    # Environmental setup (HANA box)
         -- Initial system checks and Building Activities (system copy, Appln server setups, etc)
    # System readiness
                   - ZBW_HANA_COCKPIT Tool
                   - ZBW_HANA_CHECKLIST Tool
                   - ZBW_ABAP_ANALYZER Tool
                   - ZBW_TRANSFORM_FINDER Tool
                   - SIZING Report
                   - System Clean up Activities
                   - Impact of 7.4 on source system checks
                   - Java Upgrade for portal
    # DMO Stages
                   - Preparation & Pre Migration checks
                   - Execution / Migration
                   - Post Migration Activities
    # Testing Phase
                   - Source system checks/Activities
                   - System and Integration Testing
                   - End to End Testing
                   - Performance testing
                   - Reports
                   - BO reports / Interfaces
    Do let me know if you require any further information.
    Regards,
    Naren

  • XI Post-Installation problem (403 Forbidden)

    Hi,
    currently i'm executing the post-installation of XI.
    At topic "Creating RFC Destinations in the ABAP Environment" especially creating the RFC-Destination "INTEGRATION_DIRECTORY_HMI" (SM59) I have a problem. After saving all necessary entries in various tabs, i get after executing "Test connection" the HTTP-Code 403 (forbidden).
    Following is the exact error i am getting:
      HEADER NAME                HEADER VALUE
    ~response_line               HTTP/1.1 403 Forbidden
    ~server_protocol             HTTP/1.1
    ~status_code                 403
    ~status_reason               Forbidden
    connection                   close
    set-cookie                   MYSAPSSO2=AjExMDAgAA9wb3J0YWw6WElJU1VTRVKIABNiYXNpY2F1dGhlbnRpY2F0aW9uAQAIWElJU1VTRVICAAMwM
    set-cookie                   JSESSIONID=(ximac_XID_00)ID9751150DB19780753031607883521End; Version=1; Path=/
    set-cookie                   saplb_*=(ximac_XID_00)9751150; Version=1; Path=/
    pragma                       no-cache
    cache-control                no-cache
    expires                      0
    content-type                 text/html
    content-length               1506
    server                       SAP J2EE Engine/6.40
    date                         Mon, 23 Sep 2002 08:37:06 GMT
      HTTP BODY
    <!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
    <html>
    <head>
         <title>Error Report</title>
    <style>
    td {font-family : Arial,
    Tahoma, Helvetica, sans-serif; font-size : 14px;}
    A:link
    A:visited
    A:active
    </style
    >
    </head>
    <body marginwidth="0" marginheight="0" leftmargin="0" topmar
    gin="0" rightmargin="0">
    <table width="100%" cellspacing="0" cellpaddin
    g="0" border="0" align="left" height="75">
    <tr bgcolor="#FFFFFF">
    <td align="left" colspan="2" height="48"><font face="Arial, Verdana, Hel
    vetica" size="4" color="#666666"><b>  403 &nbsp Forbidden</b><
    /font></td>
    </tr>
    <tr bgcolor="#3F73A3">
        <td height="23" width="8
    4"><img width=1 height=1 border=0 alt=""></td>
        <td height="23"><img
    width=1 height=1 border=0 alt=""></td>
        <td align="right" height="2
    3"><font face="Arial, Verdana, Helvetica" size="2" color="#FFFFFF"><b>SA
    P J2EE Engine/6.40 </b></font></td>
    </tr>
    <tr bgcolor="#9DCDFD">
        <td height="4" colspan="3"><img width=1 height=1 border=0 alt=""></
    td>
    </tr>
    </table>
    <br><br><br><br><br><br>
    <p><font face="Arial, Ve
    rdana, Helvetica" size="3" color="#000000"><b>  You are not au
    thorized to view the requested resource.</b></font></p>
    <p><font face="
    Arial, Verdana, Helvetica" size="2" color="#000000"><table><tr><td valig
    n="top"><b> Details:</b></td><td valign="top"><PRE>No details avail
    able</PRE></font></td></tr></table></font></p>
    </body>
    </html>
      Time (ms)                             17,007
    I do not find the way to solve it....
    With regards
    Sunil

    Hi,
    Now i am getting another problem.
    While testing SLDCHECK i am getting exception while calling function LCR_LIST_BUSINESS_SYSTEMS.
    Please find the detail below.
    Testing the RFC connection to the SLD java client...
    RFC ping was successful
    SLD server access settings:
      host name:   XIMAC
      port number: 50000
      user       : XIAPPLUSER
    Use transaction SLDAPICUST if you wish to maintain the SLD server access data
    Launching the SLD GUI in a separate browser window...
    => Verify in the browser GUI that the SLD is in a healthy running state!
    Calling function LCR_LIST_BUSINESS_SYSTEMS
    Retrieving data from the SLD server...
    Function call returned exception code     3
    => Check whether the SLD is running!
    Summary: Connection to SLD does not work
    => Check SLD function and configurations
    Now checking access to the XI Profile
    any guess to solve this problem.
    with regards
    Sunil

  • Post installation for XI

    Hi All,
    I have installed ECC 6.0. I have added XI component also. Now i need to perform post installation steps for XI alone. i have downloaded the NW7 installation Guide MAXDB. is that enough? or should i need more documents....
    Also, i found out a document for post installation guide system landscape directory of SAP Netweaver 7.0....
    Which one should i follow?
    Please clarify....
    Thanks in advance,
    Madhukar

    Hi madhukar !!
    Is this what you are looking for:
    https://websmp103.sap-ag.de/~sapidb/011000358700001697502004E.PDF
    Also check this thread..
    Re: XI INSTALLATION and POSTINSTALLATION
    those describe din XI installation and configuration guides:
    http://help.sap.com/bp_bpmv130/Documentation/Installation/XI30InstallGuide.pdf
    http://help.sap.com/bp_bpmv130/Documentation/Installation/Configuration_Guide_FP.pdf
    check this thread for SLD configuration soon after XI installation
    SLD configuration
    Check this link also it has the procedure.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/78/20244134a56532e10000000a1550b0/frameset.htm
    Here is the guide with necessary steps
    http://help.sap.com/bp_bpmv130/Documentation/Installation/XI30InstallGuide.pdf
    /people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    You will get the details of post installation activities for SAP XI in its installation guides itself. Have a look:
    SAP Exchange Infrastructure Release 3.0 - Installation Guide
    SAP Exchange Infrastructure 3.0 SR1 - Installation Guide
    Plus you can go through the following docs:
    SAP Exchange Infrastructure (XI) 3.0
    Troubleshooting Guide - SAP XI 3.0 and 2.0
    SAP XI Release 3.0 SPS11Configuration Guide
    Also you can have a look at the following thread, you will get some links in these threads too:
    Post installation of XI?
    XI INSTALLATION and POSTINSTALLATION
    XI Post Installation....Need help...
    XI Post Installation - Help
    XI Post Installation - SLD Connection
    Post Installation of PI - PI template Installer not found
    Pls reward if useful

  • Java components of XI, post installation check

    Hey Guys,
    I have installed Netweaver 2004s PI along with the Java and ABAP stack, with the ABAP user management pointing to the ABAP stack. I selected the PI option during the installation.
    I wanted to know what java components get installed after a successful PI installation. I do not see any particular component related to XI/PI there. I feel the Java Components related to XI have not been installed during my installation. I found this problem during setup step of configuring RFC INTEGRATION_DIRECTORY_HMI. During the test of this HTTP destination the URL gave a 404 resource not found exception.
    You can find out the components by using the link
    http://<Server>:<Port>/sap/monitoring/ComponentInfo.
    The components that are currently installed on my machine are SAP-JEE  CAF    JLOGVIEW   SAP-JEECOR   BASETABLES  SAP_JTECHF   SAP_JTECHS   KM-KW_JIKS  CORE-TOOLS UMEADMIN  JSPM  LM-TOOLS ADSSAP  BI_MMR  BI_UDI   CAF-UM .
    Is this a common problem during the PI/XI installation.
    Please let me know.
    Best Wishes
    Sumit.

    Hello,
    Please check the folowing SAP Note for the problem during post-instalaltion activity..u have to set time value for that HTTP RFC..
    Note 782801 - SAP Exchange Infrastructure 3.0 SR1 Installation
    Note 495857 - Tool: Testing HTTP connection for URL
    The most important is that u must have same patch level for all the ABAP + JAVA compoenent to work properly.
    plz. dont forget to reward the points

  • Need Post installation configuration guide for PI 7.0

    Hi,
    Does anybody have Post installation configuration guide for PI 7.0 ?
    Our basis team has installed PI 7.0.
    Now we need to do the post installation.
    Do we need to do all configuration steps we use to do for XI 3.0 or is it different in PI 7.0.
    Your help appreciated.
    Thanks,
    Vinod

    HI,
    See the below links
    Post Installation steps for activating Adobe Document Services in SAP XI NW 2004S
    -/people/sravya.talanki2/blog/2006/11/15/post-installation-steps-for-activating-adobe-document-services-in-sap-xi-nw-2004s
    Link for posnt installation guide
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/95d7d490-0301-0010-ce93-c58f9a3cde0b
    https://websmp101.sap-ag.de/~sapidb/011000358700009389172004E.PDF
    Regards
    Chilla

  • Post Installation Steps for ERP add-on Inventory Manager 4.0

    Hi,
    I need to confirm what are the post-installation activities we must to perfom for ERP Add-on (Inventory Manager 4.0), besides de BC Activation. I did not find any information regarding the post installation steps for the ERP Add-on of Inventory Manager 4.0 (the installation guide for IM 4.0 on service marketplace does not remark the steps only explain the theorical part of the installation)... And we need to confirm if the steps are the same of Inventory Manager 3.2 Add-on or we must do an additional step?
    Best Regards,
    MC
    Stephen Streeter Manju Venkatesha

    Yeah...of course...
    I forgot to specify it.
    I install the first ERP 2005 SR2 on Oracle 10.2.0.2 and the other have to be installed on the same version of DB.
    All installation are not MCOD.
    This mean every installation has its own DB with different SID for every installation.
    And of course I have at least doubled the space required by installer. Taken from sap notes the required space for ERP 2005 SR2 is about 90 GB.
    The total space of mount point is about 500 GB....
    Thanks
    Dan

  • Post Upgrade Activity: db6_update_db script

    Hi Experts,
    I've already upgraded db2 version from 9.1 to 9.7 but I am stuck in post upgrade activity where I need to run the db6_update_db script.
    Question to this procedure: "Copy the file db6_update_db.bat (Windows) from the relevant operating system folder on the database DVD to a temporary directory (<temp_dir>)."
         Is the <temp_dir> can be any directory? If not, what specific directory that I need to save the db6_update_db script?
    I've tried to create a directory and save the script but when I issue the command I've got this error:
         JAVA could not be found on the maschine
         Please make sure that the DB2PATH environment variable is set to the installation directory of the DB2 software or set DB6_UPDATE_DB_JAVA to the      full qualified path of your java.exe
    I've tried this with different access like administrator, db2<dbsid> and <sapsid>adm but I have no  luck.
    Can anyone help me?
    Regards,
    Chonalyn

    Hi Chonalyn,
    Have a look at this note:
    1304436 - DB6: Documentation for db6_update_db scripts
    Regards,
    Hugo

Maybe you are looking for