Am dealing with a list of 20 materials used in 15 different BOMs. At my clients after the anual budget definition process is complete, the component scrap is reviewed and needs to be changed in some BOMs. Each material has an INDIVIDUAL value. CEWB only allows to massively change all the materials with ONE value. Is it possible to specify one individual value by material in this t code ?
Material A -> Component scrap 5%
Material B -> Component scrap 4,5%
Material C -> Component scrap 3,5%
etc.
I don't want to use the component scrap in the material master as it would affect all the BOM usage and this should only be changed in the budget and production BOMs.
Am starting to think only LSMW will do it...
Thanks for your help,
Olivier

Hi,
If it is only 15 BOM means, it is better you can make the changes manually. That will be the easiest and the simple way. As per your example the % of the scrap is not the same, it is varying. In LSMW you can't maintain different scrap %.
Regards,
V. Suresh

Similar Messages

  • Graph weekly scrap summary with zero value.

    Post Author: Phoebe
    CA Forum: Charts and Graphs
    Hello,
    I have a report that summarize weekly quantity by week. Example:
    ww1 total= 2
    ww2 total= 4
    ww3 total= 0
    ww4 total= 1
    However, crystal reports only graph the work week that contains a value, therefore ww 1, 2 and 4.
    How can I force it to display ww 3 even with 0?
    Regards,
    Phoebe

    Hi Markus,
    Thanks !!!
    I just checked depreciation key config according to your method - it is configured as "Cutoff value is ignored". Is this cutoff value list come with SAP? or is it user definable?
    I would like to change it to stop depreciating when scrap value is reached. May I know which option should I select?
    (1) Consideration is controlled by cutoff value key
    (2) Base value is reduced by the scrap value amount
    (3) Base value is not reduced
    (4) Default value from company code and depreciation area
    As for the current assets (some has been fully depreciated to zero in prior year, while some are still depreciating), is there any remedy i could make so that the depreciation value can be reflected correctly?

  • Entering numeric values with suffixes in Labwindows CVI (e.g 100 kHz instead of 100e3 or 100000 )

    is there any practical way of entering numeric values with suffixes in Labwindows CVI in order to prevent user from struggling with '0' es. 

    In LabVIEW there is another Display Format called "SI Notation" that is exactly what you're looking for.
    Maybe you can add a feature request in CVI Idea Exchange Forum and ask NI to add this Display Format in CVI too.
    Vix
    In claris non fit interpretatio
    Using LV 2013 SP1 on Win 7 64bit
    Using LV 8.2.1 on WinXP SP3
    Using CVI 2012 SP1 on Win 7 64bit, WinXP and WinXP Embedded
    Using CVI 6.0 on Win2k, WinXP and WinXP Embedded

  • Cost component split costed with value of zero

    Hi,
    We have ML activated for the Plant/ Valuation area.
    We have Company Code Currency type -10 and Controlling Area Currency type - 30. Both Currencies are different.
    I have maintained in OKYW, the company code and costing type and Valuation variant.
    When I am running the cost estimate for the material and Plant I am getting the error..
    "Cost component split costed with value of zero".
    I have also checked that the cost element is assigned to Cost Component split and is active.
    I am not able to find out what is the reason for the error. I am stuck up and not bale to run the cost estimate.
    Please help/ suggestion.
    regards
    Kami

    Dear Kami,
    This error is probably caused by the currency conversion. Error CK 240 is raised if
    a) cost component split in co-area currency is zero
    b) the costing variant is used for standard price update
    c) cost component split in co-area currency is stored on database
        (this is a customizing setting of the costing variant)
    There are 3 ways to proceed:
    1) use a greater costing lot size for the raw materials with CK 240
          --> costing value in CO area currency will be greater 0
    2) disable saving of cost component split in co-area currency
    3) deactivate coding of note 927372 --> please review note 1004727 for details.
    Kind regards,
    Antje

  • Attaching a form component value with the link

    Help! Desperate!
    How do I attach list box value with the link. This is part of my code. I am struggling with the <a href part of the code. When the user clicks one of the options from the list box, that value should be attached to the link.
    private String getWageFooter(String rate)
    StringBuffer sb1 = new StringBuffer();
    String typerate=rate;
    sb1.append("<hr size=\"3\" width=\"550\">");
    sb1.append("<table width=\"950\"><tr><td align=\"center\">");
    sb1.append(" To change the Rate Type view");
    sb1.append("<p>Click on a Rate Type in this list and click the<I><b>");
    sb1.append("<font color=\"blue\">GO</font></b></I> button");
    sb1.append("<br><select name=\"ratetype\"><option value=\"\">Select One");
    sb1.append("<option value=\"All\">All Rate Types<option value=\"Hourly\">Hourly Wage");
    sb1.append("<option value=\"Annual\">Annual Wage</select>");
    sb1.append("<a href=\"occWageReport.jsp?typerate=");
    sb1.append("<img src=\"../images/go.gif\" border=\"0\"></a>");
    return sb1.toString();
    Sue

    Anybody! Any ideas how to attach the value of the item in the list box with the link as a querystring?
    Sue

  • Make scrap value individually

    hi experts~
    my company use memo value in a given depreciation area
    but situation has been changed
    so we have to set scrap value each asset
    if it's possible plz share your knowledge
    thanks in advance

    Hi,
    The function of Scrap Value, memo Value and Cut off Value are similar only. So now you want to remove the Memo value which means that system will always have that much value in the asset which is kept in the Memo Value. Whereas Scrap Value means for each Asset you can define different Scrap Value. So in this case I dont know the purpose for such change as well as you can make the changes in the Asset through BDC recording of AS02 T-Code.
    Regards,
    Malhar.

  • Mass change in component Scrap % in BOM

    Hi Guru,
    Can someone explain me the process of mass change in component scrap % in BOM ? I have to make zero coponent scrap % in BOM for all materials.

    Dear Vikash,
    Check with t-code CEWB
    for this you need to define work area in OP77
    Regards
    Madhu

  • Component scrap queries

    Hi all,
    We have maintained component scrap of 10% in the material master.
    So if we create 100 PCS of header production order, component qty is 110. 10 pcs of scrap generated is sold outside.
    There is a scrap material maintained in system. We want 10 pcs of that scrap generated should be in stock.
    How can we get the stock of component scrap when we run the production order cycle.
    Please reply.
    Ragards,
    S Sudhir.

    Dear
    To address this business process you need to maintain the Scrap in BOM with -ve quantity then that scraped we can move to scrap storage location with movement type 551.So that you will be able to sell this scrap seprately.
    Once you have entered scrap in CO11N material movements are automatically posted in the system. By confirming scrap you are only reducing the balance confirmable qty in the order.
    You can post component scrap as byproduct using 531 movement type if u want ot reuse the scrap. Further action is you have confirmed the scrap quantity now you need to post in some storage location either to order or to the GL account of the material. Both are possible from MB1C. Maintain some storage location and post the scrap.
    By doing scrap in CO11N, material qty will consume from stock but scrap material you can not see in any where.
    Normally in production no one can do scrap.
    And also in every company they want to calculate monthly scarp qty.
    To achieve the above doing component scrap it will not use.
    Follow this method to get rid of your problem.
    1. Confirm all the qty as yield qty in CO11N or CO15. ( ok + scrap)
    2.Create one separate str location for rejection.
    3.Physically you know the how much rejected qty. Move that qty from accepted str location to rejection str location by using MB1B 311 mvt.
    4. Now yield qty will reduce.
    5. Check in MB51 with mvt type 311 with corresponding period, you came to know how much quantities are rejected.
    6.By 551 mvt materials people scrap that rejected qty.
    7. In this no need to create any extra material for scrap.
    8. No need to change in BOM assigning negative qty.
    9.No need to create Byproduct.
    If you want separated cost of scrap then you need to define it is as co-product then it possible with joint production costing. Co Product, In turn you need to setup the percentage, of cost sharing.
    In case of Co-product costs are settled with a apportionment structure. In case of By-product the price of this by-product is credited to the order or the material stock account of the lead material being manufactured. Co-Product are defined as BOM Components/Items with negative quantities.When BOM is created for FERT , you can see one indicator in COMPONENT DETAILS screen for co-product. You need to define the co-products with this special indicator .
    Stock transfer from storage location to storage location (in the plant) is also possible.
    Hope this will be useful
    Regards
    JH

  • Depreciation Value calculate on the basis of Scrap Value

    Hi! Experts,
    My client requirements are:
    (A)
    1)     Suppose Asset purchased Value is Rs. 100000 and its useful life is 5 years.
    2)     Now after 5 years sold the asset on Rs. 20000 .
    3)     The depreciation should calculate on the 80000  
    (B)
    1)     A new Machinery purchased its use life is 10 Year estimated.
    2)     After 2 years depreciation run, Engineer said machine life will be 12 years or 6 years.
    3)     Can we change the machine useful life after 2 years.
    With regards
    Rajesh

    Hi,
    A) depr. Key LINR, useful liefe 5 years
    1. 10.000
    2.  8.000
    3.  6.000
    4.  4.000
    5.  2.000
    (If you want Scrap value 2.000)
    B) You can change the useful liefe in AS02. This is no peroblem. The depr. will be new calculated for open fiscal years.
    regards Bernhard

  • Any SAP standard report on Asset scrap values?

    Dear All,
    Do you know of any Standard SAP report for asset scrap values? A customer needs to have the scrap values reported and would like the same in summary (asset class level) and detail (individual asset level).
    Help appreciated.
    Thanks and Regards,
    Sameer Aroskar

    Hi Sameer,
    I am sending you the list of all standard reports in SAP for Asset accounting
    Menu Path                                                                  Report
    Asset Balances -> Balance Lists -> Asset                       Balance List
    Balances
    Asset Balances -> Inventory Lists -> Physical                  Inventory List
    Inventory List
    Notes to Financial Statements -> International                 Asset History Sheet
    Explanations for P&L -> International                              Total Depreciation, Ordinary Depreciation,
                                                                                    Special Depreciation, Unplanned Depreciation,
                                                                                    Transfer of Reserves
    DepreciationExplanations for P&L -> International            Write-Ups, Depreciation Comparison, Manual
                                                                                    Depreciation
    Cost Accounting                                                         Depreciation and Interest
    Depreciation Forecast                                                   Depreciation on Capitalized Assets (Depreciation
                                                                                    Simulation)
    Preparations for Closing -> International                         Gain for Transfer of Reserves, Changes to Asset
                                                                                    Master Records
    Day-to-Day Activities -> International                             Asset Transactions, Asset Acquisitions, Asset
                                                                                    Retirements, Intracompany Asset Transfers,
                                                                                    Directory of Unposted Assets , List of Origins Of                                                                              Asset Debits, List of origin of cost elements
    I Hope this will help.
    Award points if of any use.

  • I have to validate the field enter in that table  values is enter in the ra

    i have one table field with data
    1. <=0.5
    2. <=1
    3.textsfsfs
    4. >=2 like that
    i have to validate the field enter in that table  values is enter in the range of the above field.
    can you help me how to validate
    ex:
    if wa-upper =  wa2-sumplus  here i have to check the upper and lowe values
    if the user enter in between and eq based on the i have to give erro message.
    Please help me the same.
    Thanks
    Ramkumar

    Hi Lekha,
    Thank you this problem was solve.
    we did the this validation in back end insted of front end.
    i passed the table data in to ZFM there we are validating and giving the error message.
    thank you for helping me all the time.
    ONE problem:
    LV_TEXT is the context attribut containe type string.
    i amgetting the values in to LV_TEXT attribut.
    LV_TEXT = nkafjkafkafhkafksfkak<b>#</b>bshfsafkasfkasfkas.
    i wanto to split this and will get the before <b>#</b> values in to other other node workarea LS_dis_new.
    this LS_DIS_NEW i have to modify with table LT_DIS_NEW.
    i used the code : Split wa at '#' into table LT_DIS_NEW.
    this is not working.
    please help me the same.
    Thanks
    Ramkumar

  • One pricing condition for BOM and other for individual component

    Hello SAP gurus,
    We have two pricing condition types created and assigned in the pricing procedure which has been created with reference to PR00 and condition records are maintained for both the condition types.
    But, we want only one pricing condition type to be triggered in the sales order depending on the usage of material in the sales order. As we are selling the same material individually and as well as a component in a bundle ( BOM).
    i.e, when one pricing condition for BOM component and other for individual component
    What are the configuration steps to be taken care to get this scenario?
    Thanks in advance.
    Regards,
    KB
    Edited by: K.byla on Jan 21, 2010 1:20 PM

    Hi Sagar,
    Thanks for your response.
    Yes, we are maintaining only one material. The same material is used to sell individually and also in a BOM.
    As i have mentioned earlier, whenever the material is sold individually it should pick condition type say 'YR00' and when the same material is sold as a bundle ( BOM) , it should pick condition type " YR01" in same the pricing procedure.
    For both the condition types, the condition records are maintained.
    To give the scenario details,
    A material "X" is sold individually as a single component and the same material is also used for selling bundled with other material "Y" and the bundled material as "Z"
    means, Z=X+Y
    Pricing procedure used is say ZRA000 which contains currently the price cond type YR00.
    Now for the bundle (BOM) involvement i want to use the same pricing pricing proc. and add the new cond YR01 in it so that the system will pick the cond.type YR00 when the material is sold individually and YR01 is taken as the price when the material is sold as a bundle against the item X.
    Need to know the steps for this scenario and do i need to maintain a specific requirement ? please suggest.
    BR,
    KB

  • KE28 with" Copy Characteristic Value with Reference Data" doesn't work

    Hi experts:
    We need to make a top-down setting the processing option 'Copy Characteristic Value with Reference Data'. We have the following source data:
    Customer Business Unit  Value field.
    6        #              100
    On the other hand, we have plan data as reference data:
    Customer Business Unit  Value field.
           A              40
           C              40
           D              20
    We need to run a top-down to distribute from client to Business Unit but copying client of reference data. Then, we set 'Copy Characteristic Value with Reference Data' and, in the selection criteria we set '*' for customer.
    After running, the result is that the system can find 1 sender and 3 receivers. It is exactly what we are expecting. However, program doesn't make individual items and anything is distributed.
    We have found notes 1086282 and 1273924 but the result is the same after implementing these notes.
    Thanks in advance for your help.
    Best regards
    Jose

    There are some restrictions on the XML Schema format that you can report off of in Crystal Reports.
    If you're using the ODBC XML driver, you may find this of relevance:
    [http://resources.businessobjects.com/support/communitycs/TechnicalPapers/cr_xml_data_sources.pdf|http://resources.businessobjects.com/support/communitycs/TechnicalPapers/cr_xml_data_sources.pdf]
    and if you're using the native XML driver, the following gives a guide for the accepted formats:
    [http://resources.businessobjects.com/support/communitycs/TechnicalPapers/cr_xi_native_xml_driver.pdf|http://resources.businessobjects.com/support/communitycs/TechnicalPapers/cr_xi_native_xml_driver.pdf]
    Sincerely,
    Ted Ueda

  • Scrap Values in Variable Selection Screen

    Hi,
    When the end user is trying to select a filter value for the characteristic in a workbook, the selection value screen displays a lot of scrap values, when he closes the selection screen and tries again to select a filter value then it displays the correct values. Can anyone please let me know how i can avoid the scrap values to be displayed or how i can remove the scrap values that are displayed.
    Thanks,
    AM

    Hi,
    Your Master data values might contain the junk values. That is the reason showing junk values in variable screen.
    At filter value selection you might have in the option 'Only Posted values for Navigation' option in InfoObject Properties->Business Explorer Properties.
    Cheers,
    With awards.

  • How can I compare single value with multiple value...

    Hello,
    I want to compare one value with multiple values, how can it possible ?
    Here in attachment I tried to design same logic but I got problem that when I entered value in y that is compared with only minimum value of x, I don't want that I want to compare y value with all the x value and then if y is less then x while loop should be stop.
    I want to do so because in my program some time I didn't get result what I want, for example x values is 4,5,6,7,8  and y value is  suppose 6 then while loop should be stop but here it consider only minimum number and its 4 here so while loop is not stop even y is less then 7 and 8. So I want to compare y value with all the entered values of x and if y is less then any of x values then while loop should be stop and led should be ON.
    Please guide me how can I do so.....
    Solved!
    Go to Solution.
    Attachments:
    COMPARISON.vi ‏8 KB

    AnkitRamani wrote:
    Thank you very mach for your help..
    may be i have solved this ....i have made one change in my vi that instead of min. i select max and max. value is compare with the value of y and then if y is less then the max. while loop will be stop other wise its run continuously.
    this is working fine...
    any ways thanks again for your help and time...
    I have to agree with Lewis - his way is more efficient.
    Bill
    (Mid-Level minion.)
    My support system ensures that I don't look totally incompetent.
    Proud to say that I've progressed beyond knowing just enough to be dangerous. I now know enough to know that I have no clue about anything at all.

Maybe you are looking for