Error codes in F110. ECC 6.0

Hi,
Does anybody know where i can find a list of error codes that can occur in the payment program F110?
Thanks,
Richard

Hi,
Please refer the below blog on Troubleshooting F110.
/people/neeraj.batra3/blog/2009/10/13/troubleshooting-f110
Regards,
Krishna Kishore

Similar Messages

  • SAP ECC error:'Migration Monitor' exits with error code 103.

    Hi All,
    I am doing SAP ECC installation for windows 32 bit with MAXDB as backend.
    I am stuck at the import ABAP.Getting error
    ERROR 2008-08-08 16:10:53
    CJS-30022  Program 'Migration Monitor' exits with error code 103. For details see log file(s) import_monitor.java.log, import_monitor.log.
    1) imort_monitor.java.log-->contains
    java version "1.4.2_12"
    Java(TM) 2 Runtime Environment, Standard Edition (build 1.4.2_12-b03)
    Java HotSpot(TM) Client VM (build 1.4.2_12-b03, mixed mode)
    Import Monitor jobs: running 1, waiting 0, completed 18, failed 0, total 19.
    Loading of 'SAPVIEW' import package: ERROR
    Import Monitor jobs: running 0, waiting 0, completed 18, failed 1, total 19.
    2)import_monitor.log
    ERROR: 2008-08-08 16:10:36 com.sap.inst.migmon.LoadTask run
    Loading of 'SAPVIEW' import package is interrupted with R3load error.
    Process 'D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe -i SAPVIEW.cmd -dbcodepage 4103 -l SAPVIEW.log -nolog -c 0' exited with return code 2.
    For mode details see 'SAPVIEW.log' file.
    Standard error output:
    sapparam: sapargv( argc, argv) has not been called.
    sapparam(1c): No Profile used.
    sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline
    INFO: 2008-08-08 16:10:52
    All import packages are processed.
    WARNING: 2008-08-08 16:10:52
    1 error(s) during processing of packages.
    INFO: 2008-08-08 16:10:52
    Import Monitor is stopped.
    3)SAPVIEW.log
      error message returned by DbSl:
    (IMP) INFO: a failed DROP attempt is not necessarily a problem
    (DB) ERROR: DDL statement failed
    (CREATE VIEW "Z_T_CO_BW" ( "KOKRS" , "KOSTL" , "VERSN" , "KSTAR" , "WOG001" , "MEG001"  ) AS SELECT T0002."KOKRS", T0002."KOSTL", T0001."VERSN", T0001."KSTAR", T0001."WOG001",  T0001."MEG001" FROM "COSS" T0001, "CSKS" T0002 WHERE T0002."MANDT" = T0001."MANDT")
    DbSlExecute: rc = 103
      (SQL error -942)
      error message returned by DbSl:
    (DB) INFO: disconnected from DB
    D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe: job finished with 3108 error(s)
    D:\usr\sap\EC6\SYS\exe\uc\NTI386\R3load.exe: END OF LOG: 20080808174211
    Only SAPDB: SAPSID srvice of SAP DB is only up.
    No other services of database are  up.And i am not able to up the other services also.
    Is it required to up the other services?
    If not?
    Why this error is occuring?
    Any help will be appreciated.
    Thanks&Regards
    Manisha das

    Hello Manisha,
    The one of the possible reasons for this is due to lack of H/W.
    Increase your RAM size to atleast 2GB and utilise the same while you are installing ECC in database parameters step..
    If the issue is with H/W, then this should fix the issue.
    Hope it helps,
    Regards,
    Satish.

  • Timeout error in ECC "INTERNAL.CLIENT_RECEIVE_FAILED Error while receiving by HTTP (error code: 402 , error text: ICM_HTTP_TIMEOUT)"

    Dear Experts,
    I am very critical situation due to this timeout error in ECC, please help me as much as you can. Go-live date is very near, but I am not getting any clue why this error is occurring. our ECC system is EHP 4, and PI is dual stack 7.4
    My scenario is synchronous ABAP proxy to HTTP_AAE. request is triggering from ECC via proxy and reaching to third party (bank) through PI, I am reviving the response back in PI from bank. But from PI to ECC the response is not reaching. So in ECC after the defined Timeout limit its getting timed out.
    I have tried everything by increasing the timeout in ECC more than 15 minutes in HTTP_TIMEOUT under SXMB_adm in ECC, but nothing worked, even if I am increasing for half an hour then also its getting timeout after half an hour.
    response from bank to PI is coming within 30 to 40 seconds, but PI is not sending the response back to ECC.
    This is classical scenario, and I have checked the trace via SXMB_Moni in PI as well as in ECC, in ECC its showing the timeout error, but in PI i did not see any trace for this error.
    I have read many thread on SCN for the same error, and everywhere it has been suggested to increase the timeout, and I have tired that, it didn't help me.
    All ABAP proxy configuration has been done as follows.
    RFC destinations in ECC
    LCRSAPRFC(TCP/IP)
    SAPSLDAPI ((TCP/IP))
    G type destination to path "/sap/xi/engine?type=entry"
    G type destination SAP_PROXY_ESR to path "/rep"
    All the destination connection test is working fine.
    but i have a doubt on G type destination(AAE_XDJ) to path  "/sap/xi/engine?type=entry" which is returns the status code 500 with message "Empty HTTP request received", is it ok with 500 ?
    Configuration in ECC Integration Engine configuration is as follows
    Questions
    How the message gets pushed to ECC from PI, once the message received in PI, I believe by G type RFC destination on path  "/sap/xi/engine?type=entry" , please clarify.
    How to trace this, if message is not getting pushed to ECC, I mean I have checked the trace in PI XSMB_MONI, but didn't get anything for this error. In ECC SXMB_moni only I am able to the timeout error.
    Please expert help me as soon as you can, this error really effecting me badly in front of management
    Thanks,
    Farhan

    Hi Hareesh,
    I configured the scenario based on ICO, and again I received the same timeout error in ECC.
    I am really sick with this error, and I have raised the OSS message to SAP. Meanwhile I just want to double check my entire configuration with you. Please see the below configuration (for classical) for ABAP proxy to HTTP_AAE, and let me know if anything is wrong.
    Request structure (ECC->PI->Bank)
    <?xml version='1.0' ?>
    <PaymentInfoMessage>
    <PaymentInfoRequest>
    <CompanyCode>Partner01</CompanyCode>
    <BankCode>BSFRSARI</BankCode>
    <StartDate>2006-07-09T00:00:00</StartDate>
    <EndDate>2006-07-09T00:00:00</EndDate>
    <TransactionType>940</TransactionType>
    </PaymentInfoRequest>
    </PaymentInfoMessage>
    Response Structure (Bank->PI->ECC)
    <?xml version="1.0"?>
    <PaymentInfoMessageResponse>
    <PaymentInfoResponse>
        <TransactionType>940</TransactionType>
        <SequenceNum>1</SequenceNum>
        <ReceiptTime>2002-01-02T18:01:00</ReceiptTime>
        <ProcessStatus>1</ProcessStatus>
        <Comment>No Comment</Comment>
        <TransactionData>:20:MT940-1007200601
    :25:3210000079901
    :28C:190/0001
    </TransactionData>
        <CompanyCode>PARTNER01</CompanyCode>
    </PaymentInfoResponse>
    <StatusCode>OK</StatusCode>
    <StatusDetail>OK</StatusDetail>
    <ResponseItemCount>2</ResponseItemCount>
    </PaymentInfoMessageResponse>
    ESR Configuration
    Please see the below screenshot for ESR config. I have created 4 data types, 4 message types, 2 Service interface (synchronous), 2 mapping and one operation mapping.
    I just want to clarify about selecting the Request and response message type in inbound and outbound service interface.
    <?xml version='1.0' ?>
    <PaymentInfoMessage>
    <PaymentInfoRequest>
    <CompanyCode>Partner01</CompanyCode>
    <BankCode>BSFRSARI</BankCode>
    <StartDate>2006-07-09T00:00:00</StartDate>
    <EndDate>2006-07-09T00:00:00</EndDate>
    <TransactionType>940</TransactionType>
    </PaymentInfoRequest>
    </PaymentInfoMessage>
    Response Structure (Bank->PI->ECC)
    <?xml version="1.0"?>
    <PaymentInfoMessageResponse>
    <PaymentInfoResponse>
        <TransactionType>940</TransactionType>
        <SequenceNum>1</SequenceNum>
        <ReceiptTime>2002-01-02T18:01:00</ReceiptTime>
        <ProcessStatus>1</ProcessStatus>
        <Comment>No Comment</Comment>
        <TransactionData>:20:MT940-1007200601
    :25:3210000079901
    :28C:190/0001
    </TransactionData>
        <CompanyCode>PARTNER01</CompanyCode>
    </PaymentInfoResponse>
    <StatusCode>OK</StatusCode>
    <StatusDetail>OK</StatusDetail>
    <ResponseItemCount>2</ResponseItemCount>
    </PaymentInfoMessageResponse>
    ESR Configuration
    I have simply created 2 data types for requests(ECC->PI->Bank) and did one to one mapping. Similarly for response(Bank->PI->ECC) 2 data types, one to one mapping for this as well.
    But I just want to clarify about selecting the Request and response message type in inbound and outbound service interface. please explain me this for synchronous interface.
    Please see the below structure from ESR and inbound and Outbound service and let me know if the selection of Request and response message types is correct or not.
    OutBound service interface
    Inbound service interface
    Thanks,
    Farhan

  • Error While Installing SAP ECC 6.0 on Oracle DB at 19th Step Import ABAP

    Hey all,
    I am NEw to this Forum..And this is My First Post in this Forum...
    When I Was Installing SAP Ecc 6.0 on My PC.. I got An Error Message at 19th Step at Monitoring the Job 18...The Issue is Below...
    INFO 2013-08-30 06:12:14
    Copied file 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/inifile.xml' to 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/inifile.4.xml'.
    INFO 2013-08-30 06:12:14
    Copied file 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/inifile.xml' to 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/inifile.5.xml'.
    INFO 2013-08-30 06:12:16
    Execute step
    Component  W2K_ServicePack_Check|ind|ind|ind|ind
    Preprocess  of component |NW_Onehost|ind|ind|ind|ind|0|0|NW_First_Steps|ind|ind|ind|ind|0|0|W2K_ServicePack_Check|ind|ind|ind|ind|2|0.
    INFO 2013-08-30 06:12:28
    Copied file 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/keydb.xml' to 'C:/Program Files/sapinst_instdir/ERP/SYSTEM/ORA/CENTRAL/AS/keydb.3.xml'.
    INFO 2013-08-30 06:12:28
    Execute step runMigrationMonitor of component |NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|1|0|NW_CreateDBandLoad|ind|ind|ind|ind|10|0|NW_ABAP_Import_Dialog|ind|ind|ind|ind|5|0|NW_ABAP_Import|ind|ind|ind|ind|0|0.
    INFO 2013-08-30 06:12:33
    Switched to user: ramadm.
    INFO 2013-08-30 06:12:33
    Creating file C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\CENTRAL\AS\import_monitor.java.log.
    INFO 2013-08-30 06:12:33
    Switched to user: ramadm.
    INFO 2013-08-30 06:12:33
    Working directory changed to C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\CENTRAL\AS.
    INFO 2013-08-30 06:12:33
    Output of C:\j2sdk1.4.2_13\bin\java.exe -classpath migmon.jar -showversion com.sap.inst.migmon.imp.ImportMonitor -dbType ORA -importDirs "E:\ECC 6.0\ecc6\DB1\EXP1;E:\ECC 6.0\ecc6\DB2\EXP2;E:\ECC 6.0\ecc6\DB3\EXP3;E:\ECC 6.0\ecc6\DB4\EXP4;E:\ECC 6.0\ecc6\DB5\EXP5;E:\ECC 6.0\ecc6\DB6\EXP6;E:\ECC 6.0\ecc6\DB6\EXP7;E:\ECC 6.0\ecc6\DB6\EXP8;E:\ECC 6.0\ecc6\DB6\EXP9;E:\ECC 6.0\ecc6\DB6\EXP10;E:\ECC 6.0\ecc6\DB6\EXP11" -installDir "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\CENTRAL\AS" -orderBy "" -r3loadExe D:\usr\sap\RAM\SYS\exe\uc\NTI386\R3load.exe -tskFiles yes -extFiles yes -dbCodepage 4103 -jobNum 3 -monitorTimeout 30 -loadArgs " -stop_on_error" -trace all -sapinst is written to the logfile import_monitor.java.log.
    WARNING 2013-08-30 06:17:03
    Execution of the command "C:\j2sdk1.4.2_13\bin\java.exe -classpath migmon.jar -showversion com.sap.inst.migmon.imp.ImportMonitor -dbType ORA -importDirs "E:\ECC 6.0\ecc6\DB1\EXP1;E:\ECC 6.0\ecc6\DB2\EXP2;E:\ECC 6.0\ecc6\DB3\EXP3;E:\ECC 6.0\ecc6\DB4\EXP4;E:\ECC 6.0\ecc6\DB5\EXP5;E:\ECC 6.0\ecc6\DB6\EXP6;E:\ECC 6.0\ecc6\DB6\EXP7;E:\ECC 6.0\ecc6\DB6\EXP8;E:\ECC 6.0\ecc6\DB6\EXP9;E:\ECC 6.0\ecc6\DB6\EXP10;E:\ECC 6.0\ecc6\DB6\EXP11" -installDir "C:\Program Files\sapinst_instdir\ERP\SYSTEM\ORA\CENTRAL\AS" -orderBy "" -r3loadExe D:\usr\sap\RAM\SYS\exe\uc\NTI386\R3load.exe -tskFiles yes -extFiles yes -dbCodepage 4103 -jobNum 3 -monitorTimeout 30 -loadArgs " -stop_on_error" -trace all -sapinst" finished with return code 103. Output:
    java version "1.4.2_13"
    Java(TM) 2 Runtime Environment, Standard Edition (build 1.4.2_13-b06)
    Java HotSpot(TM) Client VM (build 1.4.2_13-b06, mixed mode)
    Import Monitor jobs: running 1, waiting 1, completed 17, failed 0, total 19.
    Loading of 'SAPAPPL2' import package: ERROR
    Import Monitor jobs: running 0, waiting 1, completed 17, failed 1, total 19.
    ERROR 2013-08-30 06:17:03
    CJS-30022  Program 'Migration Monitor' exits with error code 103. For details see log file(s) import_monitor.java.log, import_monitor.log.
    ERROR 2013-08-30 06:17:03
    FCO-00011  The step runMigrationMonitor with step key |NW_Onehost|ind|ind|ind|ind|0|0|NW_Onehost_System|ind|ind|ind|ind|1|0|NW_CreateDBandLoad|ind|ind|ind|ind|10|0|NW_ABAP_Import_Dialog|ind|ind|ind|ind|5|0|NW_ABAP_Import|ind|ind|ind|ind|0|0|runMigrationMonitor was executed with status ERROR .
    This info i found in the log file generated at sapint.log...So I request you all Plz Help me Regard this..and Thanx in Advance..
    Kumar

    Kumar,
    As suggested in this log, please try to see the logs import_monitor.java.log, import_monitor.log
    However above log files might not suggest something specific but as we can see the latest error was w.r.t the package SAPAPPL2.
    Please try to see SAPAPPL2.log and we should get something specific there as why the loading job failed for this package.
    Thanks

  • Error while running F110.

    Dear All,
    we are getting the following error while running F110.
    ERROR: "payment with the Currency EUR, Payment method 'S': No valid payment procedure"
    1. Invoice posted in EUR
    2. Vendor is not a onetime vendor& payment Methoed updated in Vendor master
    3. Bank determination mapped properly
    4. No Currency specific to the copuntry payments
    5. the payment method in the invoices is not different from the payment method showing in the vendor master
    the following is the error Diagnosys
    " Diagnosis
    The payment program could not find a combination of payment method and house bank account with which the payment can be carried out.
    System Response
    No payment is generated.
    Procedure
    In order to find out which combination of payment methods and house bank accounts were checked and subsequently not used, repeat the proposal run and activate the additional log for payment method selection for the account affected."

    This error could come from the following customizing settings: (some you
    may have already checked)
    A.- Assignment with house bank and a payment method.
        Please go to Tcd:FBZP -> Bank determination
        1) Choose company code
        2) Ranking order : Make sure you have currency + payment method
           assigned for house bank you intend to use.
        3) Bank accounts : Make sure that you have payment method assigned
           for currency /house bank/accountID/Bank subaccount.
        4) Available amounts : Make sure that 'available for outgoing paymen
           is filled for house bank/account ID from (3) and currency.
    B.-If the vendor is not from the country of the company code, please
       also check:
        Tcd:FBZP > Pmnt methods in company code -> choose your CC / payment
        method:C => 'Foreign business partner allowed" flag must be ticked
        on for this payment.
    C.-If you have required master record specifications flagged, however
       there is any address info in the master data of the vendor.
       Tcd:FBZP >  PAYMENT METHOD IN COUNTRY > Select your payment method
       Goto the tab   > required master record specifications, check
       if you switched on the flag on:
        x Street, PO box, P.O. box pst code
        x Bank details
    Run FK03 for the vendor and check if address (Street, PO box and P.O
       box pst code) are empty.
    Also, please consider the follwoing info for other possible cases:
    Many different reasons can cause an error when the run proposal is
    executed, it will be very useful to activate 'the additional log'
    in order to analize it.
    Solution
      Delete proposal.
      Edit; Parameters; Maintain parameters.
      Edit; Additional log
      Depending on the error message, activate additional log for
      - payment method selection for the appropriate vendor.
    Then reschedule the proposal and display/print the log.The problem
    must be explained in the additional log.
    Regards,
    Attila

  • ABAP Client Proxy error code: 401, error text: Unauthorized

    Hi,
    I have Client proxy in ECC for oubound interface in PI 7.0, when i look into SXMB_MONI of ECC i can see my message with Error "HTTP response contains status code 401 with the description Unauthorized Authorization error while sending by HTTP (error code: 401, error text: Unauthorized)".
    As per few thread i already assign SAP_XI_APPL_SERV_USER role to PIAPPLUSER in ECC, still i am getting same eror.
    I do not understand how this Proxy communication work, which ECC user will be use in communication and how this communcation link to RFC destination "SAP_PROXY_ESR" type G. Even i can not see type H in ECC so i created RFC destination of type G.
    With Regards
    Sunil

    We were able to get it working by making a change in the Integration Engine Configuration (in sxmb_adm).
    Changed "Corresponding Integ. Server" from "http://<server>:<port>/sap/xi/engine?type=entry"
    to "dest://RFCdestinationName"

  • Proxy to File - CLIENT_RECEIVE_FAILED - error code: 200, error text:

    I have configured a Proxy to JDBC scenario from a new ECC dev system and it works great.  I recently tried migrating the changes to the new ECC qas environment and I get the following error message.  Can anyone help, I must have missed some configuration somewhere?
      <?xml version="1.0" encoding="UTF-8" standalone="yes" ?>
    - <!--  Call Integration Server
      -->
    - <SAP:Error xmlns:SAP="http://sap.com/xi/XI/Message/30" xmlns:SOAP="http://schemas.xmlsoap.org/soap/envelope/" SOAP:mustUnderstand="">
      <SAP:Category>XIServer</SAP:Category>
      <SAP:Code area="INTERNAL">CLIENT_RECEIVE_FAILED</SAP:Code>
      <SAP:P1>200</SAP:P1>
      <SAP:P2>Error Parsing Response. No XI Response Received.</SAP:P2>
      <SAP:P3 />
      <SAP:P4 />
      <SAP:AdditionalText><html> <head> <title>SAP J2EE Engine Start Page</title> </head> <frameset framespacing="0" border="0" rows="90,*" frameborder="0"> <frame name="banner" scrolling="no" noresize target="contents" src="top.html" marginwidth="0" marginheight="0"> <frame name="main" src="main.html" marginwidth="10" marginheight="30" scrolling="auto"> <noframes> <body> <p>This page uses frames, but your browser doesn't support them.</p> </body> </noframes> </frameset> </html></SAP:AdditionalText>
      <SAP:ApplicationFaultMessage namespace="" />
      <SAP:Stack>Error while receiving by HTTP (error code: 200, error text: Error Parsing Response. No XI Response Received.)</SAP:Stack>
      <SAP:Retry>A</SAP:Retry>
      </SAP:Error>

    Hi!
    I think what michal told is correct there is a connectivity issue but please make sure regarding mapping also why it is unable to receive the response...
    Actually ERROR 200 code means::
    Description: The request has succeeded. The information returned with the response is dependent on the method used in the request GET an entity corresponding to the requested resource is sent in the response; HEAD the entity-header fields corresponding to the requested resource are sent in the response without any message-body; POST an entity describing or containing the result of the action; TRACE an entity containing the request message as received by the end server.
    Possible Tips:
    Have a look into SAP Note: 871959..
    I know this is not an exact answet but this ill give u some idea..
    Regards::
    Amar Srinivas Eli

  • Macbook Pro shutting down. Hardware error code 4MEM/62/40000000:0x7f537f90

    Macbook Pro shutting down. Not the same action making it shutdown. Anywhere from being online to attaching a photo to an email to working in Word or Photoshop. Even after it's closed and not being used. I come back to it being shut off and saying it had to restart because of a problem. I ran the Hardware check and got the Hardware error code 4MEM/62/40000000:0x7f537f90.
    I must say I am quite disappointed. I have used Mac for work but had a PC since day one, and I JUST got this Macbook Pro in Dec. I was delighted that Mac usually didn't have as many problems with viruses etc as PC. And now last couple days, constantly shutting itself down. The closest store to me is a few hrs away. I am in South Dakota, store is in Minnesota Any help would be appreciated.

    Can you post a screen shot of About This Mac -> (More Info) -> System Report -> Memory and click on each DIMM and post the bottom right pane. You can also do the same without a screen shot using just text version using the following highlighted command in OSX Terminal. The output is also listed.
    system_profiler SPMemoryDataType
    Memory:
        Memory Slots:
          ECC: Disabled
          Upgradeable Memory: No
            BANK 0/DIMM0:
              Size: 8 GB
              Type: DDR3
              Speed: 1600 MHz
              Status: OK
              Manufacturer: 0x02FE
              Part Number: -
              Serial Number: -
            BANK 1/DIMM0:
              Size: 8 GB
              Type: DDR3
              Speed: 1600 MHz
              Status: OK
              Manufacturer: 0x02FE
              Part Number: -
              Serial Number: -

  • SMTP Error Code : 530 . For more information, see your SMTP server manual.

    Hello,
    I am Getting
    "SMTP Error Code : <530>. For more information, see your SMTP server manual" error, While configuring SMTP in Data Services 4.0 system. I have tried executing the SMTP_TO function on another DS machine which has 3.2 verion installed, but getting the same error.
    FYI,
    1) Able to telnet the Exchange server through Data service machine
    2) Maintained SMTP settings in Data services server manager
    3) using the same SMTP server host name in other SAP systems (ECC,BI,PI) etc and able to send mails.
    Regards
    Puneet

    Thanks for the reply Julian.
    There was a problem in SMTP relay rights on Exchange server. Able to send mails now. Thanks!
    Getting another problem wherein I am not able to send mails to multiple recipients i.e. If I specify 5 recipients in SMTP_TO function and execute the job then Every individual is getting E-Mail having there own ID in TO field, other Id's are not gettting displayed in TO field.
    I hve checked note "1276348 - smtp_to function - multiple recipients not displayed"
    Settings mentioned in the note have been done and job is getting executed without any error but the mails are not getting delivered.
    It would be great if anyone can suggest on how to proceed here.
    Thanks & Regards
    Puneet

  • Error Of "Difference In Content (Error Code 191)" on doing CCR After SNP

    Dear Sir / Madam,
    On Taking SNP Heuristics, Our ECC system is getting choked. Proper stock transfer requisitions are getting generated in APO. Though. these purchase requisitions are  getting displayed in ECC but the same number is NOT getting updated in APO. On doing CCR, we are getting Error u201CDifference In Contentu201D with error code 191.  Even after repeated iterations by choosing the flow of data towards u201CAPOu201D, purchase requisition numbers are NOT getting updated.
    Kindly Advise Further.
    With Best Regards,
    Sanjeev Chugh

    Mam,
    Thanks for the reply and we feel sorry for Not Updating the forum. The problem is very critical and system's behaviour is quite eratic. I shall like to elaborate the complete scenario.
    On 4th October, we did the CCR iterations repeatedly and then Pur.Req. Number got  updated in APO. On our next SNP run (Taken on 11-OCT-2011), we did not face any such issue and all the working was normal as usual. But on the next SNP run (taken on 20-OCT-2011), same problem came again and this time, to get the end result, it took us nearly 3 days for repeated CCR iterations but we could get the end results
    Then, we took another SNP run on 02-NOV-2011 and again we are facing the same problem. Till date, we could not get the end results.
    We shall also like to confirm that we have checked all the IM for Purchase Orders And Purchase Requisitions. But could not find any duplicate IM (We have the very systematic nomenclateure for our IM's). We have checked almost all the IM's details as well.
    Around two years back, we faced some CIFFING issue, at that time, we found the problem of Multiple IM.
    This be for your kind information and further advise in this regard please.
    With Best Regards,
    Sanjeev Chugh
    03-NOV-2011 (M)

  • System copy errors during ABAP export ECC 5.0

    Hi
    I'm need to do system system copy for our ECC 5.0 system on Win/ora platform. I have followed the system copy document from SMP. I'm getting the below error while exporting the ABAP schema. Could someone guide me on how to fix this.
    ERROR 2008-12-25 11:32:27
    MSC-01015  Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPCLUST.log
    =======================
    (NT)  Error:  AABLG: normal NameTab from 20050112230750 younger than alternate NameTab from 20000323230317!
    (SYSLOG) INFO: k CQF : AABLG&20000323230317&20050112230750&                 rscpgdio 47
    (RSCP) ERROR: -
    3-
    (RSCP) ERROR: code:   64  RSCPECALL   
    (RSCP) ERROR: Altername NameTab too old                                          
    (RSCP) ERROR: module: rscpgdio location:   47 line:  3007
    (RSCP) ERROR: TSL01: CQF  p3: AABLG&20000323230317&20050112230750&      
    (RSCP) ERROR: -
    myCluster (55.20.Exp): 924: received return code 64 from rscpCheckNTTimeStamps.
    myCluster (55.20.Exp): 925: suspicious create timestamp of alternate nametab encountered.
    myCluster (55.20.Exp): 929: create timestamps of nametab: 20050112230750; alternate nametab: 20000323230317.
    myCluster (55.20.Exp): 299: error when retrieving physical nametab for table AABLG.
    (CNV) ERROR: data conversion failed.  rc = 2
    (RSCP) INFO: I18N_NAMETAB_TIMESTAMPS not in env: checks are ON (Note 738858)
    (DB) INFO: disconnected from DB
    ======================
    ERROR 2008-12-25 11:32:27
    MSC-01015  Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPPOOL.log
    ===========================
    (NT)  Error:  AT01: normal NameTab from 20050112234859 younger than alternate NameTab from 20011002204708!
    (SYSLOG) INFO: k CQF : AT01&20011002204708&20050112234859&                  rscpgdio 47
    (CNVPOOL) Altername NameTab too old AT01&20011002204708&20050112234859&   Abort.
    (CNVPOOL) conversion failed for row 0 of table  VARKEY = 010100                                           
    (CNV) ERROR: data conversion failed.  rc = 2
    (RSCP) INFO: environemnt variable "I18N_POOL_WIDTH" is not set. Checks are active.
    (RSCP) INFO: I18N_NAMETAB_TIMESTAMPS not in env: checks are ON (Note 738858)
    =========================
    ERROR 2008-12-25 11:32:27
    MSC-01015  Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPSSEXC.log
    ===========================
    (NT)  Error:  DOKCLU: normal NameTab from 20050112230750 younger than alternate NameTab from 20000323224119!
    (SYSLOG) INFO: k CQF : DOKCLU&20000323224119&20050112230750&                rscpgdio 47
    (RSCP) ERROR: -
    3-
    (RSCP) ERROR: code:   64  RSCPECALL   
    (RSCP) ERROR: Altername NameTab too old                                          
    (RSCP) ERROR: module: rscpgdio location:   47 line:  3007
    (RSCP) ERROR: TSL01: CQF  p3: DOKCLU&20000323224119&20050112230750&      
    (RSCP) ERROR: -
    myCluster (55.20.Exp): 924: received return code 64 from rscpCheckNTTimeStamps.
    myCluster (55.20.Exp): 925: suspicious create timestamp of alternate nametab encountered.
    myCluster (55.20.Exp): 929: create timestamps of nametab: 20050112230750; alternate nametab: 20000323224119.
    myCluster (55.20.Exp): 299: error when retrieving physical nametab for table DOKCLU.
    (CNV) ERROR: data conversion failed.  rc = 2
    (RSCP) INFO: I18N_NAMETAB_TIMESTAMPS not in env: checks are ON (Note 738858)
    ========================
    ERROR 2008-12-25 11:32:27
    MSC-01015  Process finished with error(s), check log file C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPSDIC.log
    ========================
    (EXP) INFO: check for inactive NameTab entries: Ok.
    (RSCP) INFO: I18N_NAMETAB_TIMESTAMPS not in env: checks are ON (Note 738858)
    (DB) INFO: disconnected from DB
    =======================
    Thanks & Regards
    Jagan

    C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPCLUST.log
    C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPPOOL.log
    C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPSSEXC.log
    C:\Program Files\sapinst_instdir\ECC50\COPY\EXPORT\ABAP\COPY\UC\DBEXP/SAPSDIC.log
    paste the above logs here.
    Thanks
    SM

  • Scheduled TMS_ # TMS_TP_IMPORT  background jobs fail with error code 0232

    Is anyone else having the problem we've just encountered since upgrading to ECC 6.0 and CRM 2007, where once setting up the automatic import ALL background jobs, to have all of the Transport Change Requests imported into the Q-Prod testing systems automatically, fail after several successful runs?
    After setting up the automatic import background job to run every 15 minutes, the first few run successfully (importing any transports as it should), then the transports stop being imported.
    The background jobs continue to run, but have the following in the job log overviews CRM 2007 - "Could not start transport control program tp". R\3 ECC 6.0 - "Transport control program tp ended with error code 0232".
    Only by deleting the background job and recreating it (or manually importing) from STMS, can the transports continue to be imported. Although I have noticed that there are multiple tp.exe processes started, which need to be deleted before the STMS and TMS Background jobs work again.
    The:
       DB is SQL Server 2005
       disp+work is at version 7000.150.14.48855
       R3Trans is at version 7000.149.14.47907
       tp is at version 7000.144.14.39594
    Any suggestions on how to cure this for good?

    Thanks All
    FYI
    SAP first suggested the following notes: 19466, 1150361, and to add a Startup profile parameter rfc/use_gwstart = 1. Which was only partially successful.
    I guess it had more to do with RFC processes hanging than it did with the tp, which was fixed in a later kernel patch level.
    I've upgraded the kernel to the latest (70000.181.0.0) and my problem was fixed.
    Ken

  • Error Code 51

    Hi Sdners,
    I am working on R3 XI MDM Vendor Scenario.
    While posting the data back to ECC the IDOC is failing.
    Transaction WE02 is showing error code 51 saying
    "Field RF02K - D0130 is not an input field"
    The field is not present in the standard IDOC.
    So what could be the possible problem and solution for the same.
    Thanks in Advance,
    Minaz.

    I guess I don't know. It's just a small 120gb Simpletech I've been using for about 5 years. It has always just worked with my Macs--drag and drop no problem.
    I drag and drop onto it while hooked up to the AEBS and it starts and then I get the errors

  • ERROR CODE 0XB80989AC P1 0XE00989AC

    Our  company one year ago ( 28-05-2015) bought Printer HP Officejet Pro X451dw. This product was decribed as one of  the best on a market in its category. But after 6 month blue color disapeared and it started mix colors wrong. We brought it to service. in servise they gave us new one, it was working 2 month then showed ERROR CODE 0XB80989AC P1 0XE00989AC and died.Product guerantee finished 2 month ago. First time in my life i faced with so bad quolity of HP products. Later i found out that these kind of problems has every second printer HP Officejet Pro X451dw.  My question :  Wha I have to do? Put it in a garbege, forget about money paid for nothing and never ever buy HP products?Or somebody knows something about this kind of error.

    Hi
    As far as I know this error occurs when PI tries to call ECC using HTTP connection and in the ECC side
    on that time no system resource is available to response to that call.
    If we restart the ICM then this error resolves.
    If we restart the message in PI after some time , then also the message processed.
    For the permanent fix , I think we need to increase the load in ECC apps server.
    Please check with basis team and they will be help you better.

  • Last error code set: Unresolved requests in buffer SID

    Hi All,
    We are installing EHP4 SP6 in our ECC 6.0 system. Weu2019ve created a .xml
    file in our solution manager and calculated a download queue with the MOPZ. The installation is on a Windows 2003 32 Bit platform with a SQL server 2005 SP2 DB. There is 40Gb pagefile and 15Gb memory available. The latest SAP kernel (254) is also installed.
    In roadmap step 5 (Preprocessing) the installation stops with the
    message: u201CChecks after phase MAIN_SHDRUN/ACT_UPG were negative! Last
    error code set: Unresolved requests in buffer <SID>Check logfiles 'ACTUPG.ELG' and 'J:\EHPI\abap\log\SAPehpi.ECO'u201D
    In the log files there many entryu2019s of: DDIC ACTIVATION ERRORS and
    RETURN CODE in SAPAW70106.VCW 1 ETP111 exit code : "12"
    By looking at the logfiles, it seems to be a problem with the job RDDMASGL in the shadow instance. The job terminates and a runtime TSV_LIN_ALLOC_FAILED error occurs.
    Iu2019ve changed some parameters in the shadow instance profile to:
    abap/heap_area_total = 4000000000
    ztta/max_memreq_MB = 1000
    ztta/roll_area = 2000000
    ztta/roll_extension = 2000000000
    abap/heap_area_dia = 2000000000
    abap/heap_area_nondia = 2000000000
    em/initial_size_MB = 2048
    But after repeating the phase, the installation stops again.
    Hopefully some of you can provide me some information so that I can solve this problem and continue the installation.
    Thanks in advance for your reply and support.
    Kind regards,
    Rik Hut

    Hi,
    Choose option Accept non-severe errors and repeat the phase. Because sometimes in ACT_UPG phase it tries to activate some obsolete object and get stuck.
    Thanks
    Sunny

Maybe you are looking for

  • How to scan legal size document with Adobe Acrobat 6.0?

    How do you scan legal (8.5 x 14.0) size documents with Adobe Acrobat 6.0.0 ? There is no option for that size paper in the scan menu. And I can't find the answer in either my help file or on-line with Adobe.com. Can anyone help me?

  • Telnet data out

    Hello, I am having a problem with the telnet read data out, i am getting with the wanted output also many other characters, is there any way to filter those? example:     [1;1HMicrosoft Windows XP [Version 5.1.2600] [2;1H(C) Copyright 1985-2001 Micro

  • Unable to download oracle 9i R2 for Windows XP.

    So that we may better diagnose DOWNLOAD problems, please provide the following information. I am trying to download Oracle 9i R2 for Win 2000/XP since two days. After clicking on the file, the browser comes with an errormessage. I tried from several

  • Tab Canvas with Child Block

    I have a question about a tab canvas. I have a parent child relationship where I would like to have the child records each placed on a differnt tab of a tab canvas. At most there will be 7 child records so at most there would be 7 tabs. My question i

  • Installing CiscoWorks 3.2

    Hi, I am installing CiscoWorks 3.2 on a Windows 2003 server. I am getting the following error "Cannot create the install dependency file." Any assistance would be useful. Thanks... Shaun