Hi Gurus iam a PP consultant
My PS collegue has a issue in Production order linking with his WBS element
As it is a Production order related iam in the loop for resolving it
Ok the Description of the Problem is
"Error in Planned Variance Calculation of Production Order related to WBS element in PS (Project Systems) after MRP Run and converting to Prod Order from Planned Order"
Detailed Description of the Problem:
The PS team is working on ECC6.0 Development server. In that they making  projects which consists of WBS elements and those have Materials like HALB leads for Production Order . The Halb price maintained in Mat Master is Standard Price Rs150
After MRP run they will get Planned Orders, then Manually convert into production Orders.
The Halbe Material contains one ROH qty 1 , BOM also maintained as base qty of halb as 1pc
Activity cost in work center is labour activity say 1560 kp26 has maintained
Now after converting Planned Order into Production order they stay in Production order screen and Menu bar select GOTO -> Cost -> itemization then they will get a screen.
In that item no .... Total cost will come
If you take Total cost column they are getting cost of ROH,next row Activity cost , example ROH cost - 100 Activity cost 10 then next row is total cost =110,
There is another row which has suppose say item HALB cost = -150
So next row should be Planned Variance = 40
But here what the problem is it is showing Halb cost as = -100 that is rawmaterial cost and showing wrong variance
If i do Manual Production order creation it is working Properly,
More over we are in Reimplementation the legacy is 4.6C that is also rightly working.
The problem we are getting in Development server of ECC6.0
I think i have explained my problem guys.
If any clarification required for detailing the Problem pl let me know
Note:Myself , PS and FI/Co as a team involved in resolving this issue
thanks
K.Prabakaran

The issue resolved and closing my thread
K.Prabakaran

Similar Messages

  • ERROR in COSTING VARIANCE and Picking the Halb Actual Cost in PrOr afterMRP

    Hi Gurus
    My PS collegue has a issue in Production order linking with his WBS element
    As it is a Production order related iam in the loop for resolving it
    Ok the Description of the Problem is
    "Error in Planned Variance Calculation of Production Order related to WBS element in PS (Project Systems) after MRP Run and converting to Prod Order from Planned Order"
    Detailed Description of the Problem:
    The PS team is working on ECC6.0 Development server. In that they making  projects which consists of WBS elements and those have Materials like HALB leads for Production Order . The Halb price maintained in Mat Master is Standard Price Rs150
    After MRP run they will get Planned Orders, then Manually convert into production Orders.
    The Halbe Material contains one ROH qty 1 , BOM also maintained as base qty of halb as 1pc
    Activity cost in work center is labour activity say 1560 kp26 has maintained
    Now after converting Planned Order into Production order they stay in Production order screen and Menu bar select GOTO -> Cost -> itemization then they will get a screen.
    In that item no .... Total cost will come
    If you take Total cost column they are getting cost of ROH,next row Activity cost , example ROH cost - 100 Activity cost 10 then next row is total cost =110,
    There is another row which has suppose say item HALB cost = -150
    So next row should be Planned Variance = 40
    But here what the problem is it is showing Halb cost as = -100 that is rawmaterial cost and showing wrong variance
    If i do Manual Production order creation it is working Properly,
    More over we are in Reimplementation the legacy is 4.6C that is also rightly working.
    The problem we are getting in Development server of ECC6.0
    I think i have explained my problem guys.
    If any clarification required for detailing the Problem pl let me know
    awaiting your responses
    Note: Iam combinly working with PS, FI/CO team for resolving the issue
    K.Prabakaran

    The issue resolved and closing my thread
    K.Prabakaran

  • Cost estimate (CK11N)is not picking the overhead cost for some of the mat

    Hi all,
    we are facing a problem. The overhead key is defined. the calculation base is defined in the cost sheet. But the overhead cost is not picking  for some of the materials
    Bad Material 5019-0581 via CK11n.
    As you can see in the itemization, only the material and the routing are listed.  No amounts from the OH of ZPTA ( .10).  It should show a line #5 with an amount of (28 quantity  x .10) = $2.80 added to the Total value.
    first three line items it is picked from material and fourth line item from the internal activity.
    the fifth item from G overhead is not picked.

    Hi,
    Check whether u have assigned the cost sheet in u r costing variant which is being used in CK11N.
    Regards
    SudhakarReddy

  • My Creative Cloud wont show the Apps, it says download Error contact support. And on the Home Menu on the creative cloud for MAC desktop it just loads and loads and never stops. Help please!!

    My Creative Cloud wont show the Apps, it says download Error contact support. And on the Home Menu on the creative cloud for MAC desktop it just loads and loads and never stops. Help please!!

    Hypesuh I would recommend reviewing both Error downloading Creative Cloud applications - http://helpx.adobe.com/creative-cloud/kb/error-downloading-cc-apps.html and Creative Cloud app doesn't open and hangs on spinning progress wheel - http://helpx.adobe.com/creative-cloud/kb/creative-cloud-app-doesnt-open.html as it appears both documents are applicable towards the difficulties which you are currently facing.

  • Is there a way to print something showing all the purchases that have been made and what the total cost is?

    Is there a way to print something showing all the purchases that have been made and what the total cost is?

    While it is not possible to directly print your iTunes account purchase history within the iTunes Store, you can take a screnshot of your purchase history on your computer, and then print that screenshot.
    The following article explains how to review your purchase history:
    http://support.apple.com/kb/HT2727
    This articles explains how to take a screenshot on Mac OS X:
    http://docs.info.apple.com/article.html?path=Mac/10.7/en/mh26782.html
    and this does on windows:
    http://windows.microsoft.com/en-CA/windows-xp/help/setup/take-a-screen-shot

  • Getting an error when i try and download the free photoshop trial

    getting an error when i try and download the free photoshop trial

    I have no problem downloading the trial from http://www.adobe.com/cfusion/tdrc/index.cfm?product=photoshop_elements
    If you still have these problems, try downloading from http://prodesigntools.com/photoshop-elements-12-direct-download-links-premiere.html
    Make sure you follow the Very Important Instructions on that page.

  • Everytime i try to sync my ipod an error screen comes up and says the sync session had failed to start?

    Everytime i try to sync my ipod an error screen comes up and says the sync session had failed to start? Why and what can i do to fix it.

    If you are using a Windows based computer to sync your iPod try restarting the AMDS...
    iPhone, iPad, iPod touch: How to restart the Apple Mobile Device Service (AMDS) on Windows

  • Iterating through bseg line items and picking the vendor line item

    Hello,
    I am creating a report in which i want to show the list of vendors (with their WHT's). The output will be based on selection of a certain period(range). I guess i have to first iterate through BKPF and get those documents that lie in the given range, then i 'll have to iterate through the selected documents in BSEG and pick out the vendor line items (KOART = 'S'). Will i be using GET for this..
    Is this the right way? secondly, if yes, can sumone show me how to iterate through BKPF and BSEG and get vendor details.?
    Thanks..
    SHehryar

    Hey,
    Instead of selecting data from BKPF-BSEG you could use BKPF-BSIK-BSAK.
    BSIK and BSAK have the same details as BSEG and are use by SAP for reporting purposes.
    Similarly for customer the table are BSID, BSAD and for GL the tables are BSIS and BSAS.
    BSIK will have the open items and BSAK will have the cleared items.
    -Kiran

  • Comparing and picking the right value form one of the line item in a doc.

    Hi Gurus,
    I have requirement such that I have to show the tax jurisdiction code of only one item. That is if there are 5 line items with in a document and each one has diffeerent tax jurisdiction code, then we should be showing only one tax jurisdiction code for a document. Line items are not displayed in report. The condition to pick up tax jurisdiction code is the one which has least ending zeros.
    Supppose
    Doc1          Item          Tax Jurisdiction code
    1800000002       1          CNQC00000000000
    1800000002       2          CNQC00000000000
    1800000002       3          CN0000000000000
    1800000002       4          CNQC00000000000
    1800000002       5          TXJOHNCLEBUR000
    I have to display  the value of tax jurisdiction code corresponding to item 5  as its has least  zeros in it.
    So what I am trying to do is add another custom z object tax jurisdiction code and the value for this is populated using a routine in the update rules, such that comparing all the tax jurisdiction code for all the corresponding items in a document.
    Now the question is if I am reading all values of document no. line item and tax jurisdiction code into an internal table form communication structure for a data package. And in the update rule I will be writing a routine comparing the values of tax jurisdiction code from internal table and populating the desired value. Now the big question for me is if there are two line items of a document in one data package and another 3 line items of the corresponding same document in data package 2 then how can we compare the values of Tax jurisdiction code of all the 5 line items of a document.
    If this can be achieved using customer exit on the front end let me know and just inputs how the abap code would be or if not do I have to write abap in updates rules. I just want to know how to compare different values of Tax Jurisdiction code and select the one with has least ending zeros. For information the tax jurisdiction code is of type character and length 15.
    Any help is really appreciated.
    Thanks,
    Raj

    Yes, it's possible. Just use a regular text item. Create an LOV using the LOV wizard. When you define the query for the LOV's record group, enter a statement that selects from the other database table. Set the return value of the appropriate LOV column to be the text item on the form. Finally, assign the LOV to that text item, so that the LOV pops up when the user presses the LOV key with the cursor in that text item. You can also set the LOV so that it automatically displays when the cursor enters the text item.
    Just look up LOV in online help if you need more info.

  • PE dism error - failed to get and initialize the PE provider

    This all started with: Win 8.1 could not be installed. error code 0X8007003. I ran DISM successfully with the /RestoreHealth flag, but it made no difference to installing Win 8.1. I ran DISM again (successfully) and looked at the log for "fails".
    The repeated fail was:
    2011-06-10 10:12:47, Warning               DISM   DISM Provider Store: PID=2552 Failed to Load the provider: C:\Users\ROSMAR~1\AppData\Local\Temp\0709052E-4C8D-43AD-B837-FB57E1CF832A\PEProvider.dll.
    - CDISMProviderStore::Internal_GetProvider(hr:0x8007007e)
    2011-06-10 10:12:47, Info                  DISM   DISM Provider Store: PID=2552 Failed to get and initialize the PE Provider.  Continuing by assuming that it
    is not a WinPE image. - CDISMProviderStore::Final_OnConnect
    How can I fix this? Is this the reason I can't install Win 8.1? Should I be looking at something else to fix whatever is generating error code 0X8007003?
    Thanks.

    WIM format changed in Win 8.1. You need to use the DISM from the ADK from Windows 8.1. Older versions of DISM cannot service drivers or packages for example.

  • TFS Integration Platform Error while Syncing - Caught and converted, The request was aborted: The request was canceled

    Hello,
    We are doing a 2-way version control sync between TFS 2013 servers. 
    TFS A - Project A is getting synched with TFS B - Project A.
    TFS A - Project A has got all the code and files, whereas TFS B - Project A is empty.
    Previously we have synced TFS 2013 projects across servers with out any error or issues. Today we came across an issue (check log at end of post) and hope Microsoft can
    provide some guidance on this. Following is the problem we are facing today:
    We have configured the TFS Integration platform tool for VC - 2 way sync and started the migration. Current
    status is that the discovery, analysis is complete and migration is half way when I started to get such errors
    (check log at end of post) .
    Note that the migration has not stopped...
    After doing some research and googling I understand that the reason for this error is that by default if
    an individual file transfer cannot complete 16MB in 5 minutes, the operation will fail. And the solution to this is to modify
    chunk size in the file of "TfsMigrationShell.exe.config". I have few questions regarding this...
    Question 1:Is
    above understanding and solution correct? I also notice that this error appears for every huge file (approx >30MB), is there any timeout setting at the target server? Is this something to be changed at the Tool level config or the Target IIS level
    config?
    Question 2: Suppose
    I do not change the config setting, then huge files are skipped due to this error. However, after the migration of the other files is finished, then, will the tool retry to sync the skipped (huge) files? Or has it skipped them forever?
    Question 3:
    Suppose I modify
    chunk size in the file of "TfsMigrationShell.exe.config", then, which of the following do I need to do (give me the best solution among the 3 below)
    a) Do I need
    to restart the migration (by deleting and recreating the project on the 2nd TFS Server and re-starting migration)? 
    b) Do
    I need to create a new configuration and restart migration?
    c) Do I need to restart the sync service?
    The concern here is that we have got 3 more jobs (TFS
    Integration tool configurations) running parallelly that
    is syncing Work Items & VC of other TFS projects and want to make sure that restarting the TFS Integration Job Service will not have any negative impact on the other jobs as well as no negative impact on the current migration job...
    Microsoft, Please advice. Thanks!
    Log:
    [1/21/2015 10:55:39 AM] AsyncUploadFileState.Completed -- caught and converted:
    [1/21/2015 10:55:39 AM] Microsoft.TeamFoundation.VersionControl.Client.VersionControlException: C:\TfsIPData\10\ications\MDM Folder\Binaries\v9.5\DMS Web Service Release 1.5.zip: The request was aborted: The request was canceled. ---> System.Net.WebException: The request was aborted: The request was canceled. ---> System.IO.IOException: Cannot close stream until all bytes are written.
    [1/21/2015 10:55:39 AM] at System.Net.ConnectStream.CloseInternal(Boolean internalCall, Boolean aborting)
    [1/21/2015 10:55:39 AM] --- End of inner exception stack trace ---
    [1/21/2015 10:55:39 AM] at System.Net.ConnectStream.CloseInternal(Boolean internalCall, Boolean aborting)
    [1/21/2015 10:55:39 AM] at System.Net.ConnectStream.System.Net.ICloseEx.CloseEx(CloseExState closeState)
    [1/21/2015 10:55:39 AM] at System.Net.ConnectStream.Dispose(Boolean disposing)
    [1/21/2015 10:55:39 AM] at System.IO.Stream.Close()
    [1/21/2015 10:55:39 AM] at System.IO.Stream.Dispose()
    [1/21/2015 10:55:39 AM] at Microsoft.TeamFoundation.VersionControl.Client.FileUploader.UploadChunk(FileStream fileContentStream, Int64 end)
    [1/21/2015 10:55:39 AM] --- End of inner exception stack trace ---
    [1/21/2015 10:55:39 AM] at Microsoft.TeamFoundation.VersionControl.Client.Workspace.EndUploadFile(IAsyncResult asyncResult, PendingChange& pendingChange, Byte[]& uploadedContentBaselineFileGuid, Int64& uncompressedLength)
    [1/21/2015 10:55:39 AM] at Microsoft.TeamFoundation.VersionControl.Client.Workspace.AsyncUploadFileState.Completed(IAsyncResult asyncResult)

    Hi Charles,
    I have been doing in depth research and testing of this and here are my findings:
    Replies to your points:
    1) It failed with UploadChunkSize value change. Tried 1MB, 500KB, even 100KB. Fails with same error! Is there any other setting we can change for the timeouts at the target TFS server also?
    2) The huge files are not skipped. The migration loops on the failed files and doesn't continue to process the next lot of files. So the migration is blocked on the huge files.
    3) OK. Thanks. 
    Please see below the finding on when migration succeeds and when it fails:-
    Scenario 1:
    a) Where Migration fails:
    TFS A is in India and TFS B is in UK. Both TFS are on different domain. Migration tool is installed on same machine as TFS A. There is a firewall that allows the access from TFS A machine to TFS B machine. The migration tool fails to work in this scenario
    when it encounters a file size approx > 8MB. I tried setting the UploadChunkSize value to 100KB. Yet it failed!
    b) Where Migration works:
    However, if the files are approx less than 3MB then the migration works without any errors.
    Scenario 2 where TFS migration tool works:
    TFS A is in India and TFS B is also in India (located closeby). Both TFS are on different domain. Migration tool is installed on same machine as TFS A. There is no firewall in this case. No changes were made to UploadChunkSize value and files with size
    of 10's and 100's of MBs got synced without any issue.
    Questions
    Question 1: Can we conclude now that there is some issue with the firewall or network in case of scenario 1? As mentioned above Scenario 1 works if file size is less then approx 3MB.
    Question 2: Is there any timeout setting on the Target TFS server which can be set so that it waits for the file without timing out?
    Thanks for any help...

  • An error occurred while creating and opening the C++ browsing database file.

    Hi,
    I am getting the following error. I tried to download the x86 and x64 versions of SQL Server Compact 3.5 & CE 4.0 and installed but that is not working. I tried with changing location of the project and its not working too. I am using windows 7 enterprise
    and VS 2010 professional SP1. Many thanks in advance. 
    Arshad
    I have tried the solutions on the following links but no one worked :(
    http://social.msdn.microsoft.com/Forums/en-US/vcgeneral/thread/98f2441b-a50a-4d43-9200-9ca972d4ac86
    http://social.msdn.microsoft.com/Forums/en-US/Vsexpressvc/thread/53e4b057-e0e2-42c6-9320-792bb7b82089
    http://social.msdn.microsoft.com/Forums/en-US/vssetup/thread/20d33b1b-d287-4f29-84c5-4ffb84c66b7c
    I have 
    *Uninstalled and reinstalled both 32-bit and 64-bit versions of Microsoft SQL Server Compact 3.5 Service Pack
    * Verified any existing .sdf is deleted
    *Verified directory that .sdf is supposed to be written to is writable (I do see the .opensdf when it tries to create the sdf)
    *Ran a repair of visual studio
    *Uninstalled completely VS and Sql Server then reinstalled it.
    None of this fixes the problem for me?   Please help.
    Muhammad Arshad Awan
    Muhammad Arshad Awan

    Hi,
    I have solved the issue as below:
    This error was started when I install a software which I have made myself and it uses sql server compact edition 3.5.  
    I saw when I manually replaced the sql related files from "C:\Program Files (x86)\Microsoft SQL Server Compact Edition\v3.5" with the files which  my software setup had "version 3.5.5386.0" then the error started. And if copy back the latest version 3.5.8080.0
    then it disappear. So use latest sql files in your software too.
    My software was replacing the the latest files with older version. 
    Muhammad Arshad Awan

  • How can i sort files and pick the latest among them

    Hi ABAPers
    I have a problem with sorting files. I have files coming from FTP into my Presentation server.Files are like
    3160SNIM_2007061201090010.in
    3160SNIM_2007061201190011.in
    3160SNIM_2007061201290015.in
    3360SNIM_2007061201490017.in
    3360SNIM_2007061201390014.in
    3360SNIM_2007061201490018.in
    3360SNIM_2007061201190013.in
    Among these files i should filter the files with 3160 and 3360. and among filtered files i should pick the most recent file of both 3160 and 3360 and put them in another internal table. I am getting stuck how to justify this requirement. Not only 3160 and 3360 i have few more like that. Please help me out.

    HI,
    let us  say itab contains ur files.
    data : begin of jtab occurs 0,
              fnamedate(20) type c,
              time(20) type c,
              end of jtab.
    data : begin of ktab occurs 0,
             filename(30) type c,
             end of ktab.
      Loop at itab.
    lv_len = strlen(itab-file).
      jtab-fnamedate = itab-file+0(17).
    lv_len = lv_len - 17.
    jtab-time  = itab+17(lv_len).
    append jtab.
      endloop.
    sort jtab by fnamedate time descending.
    loop at jtab.
    at new jtab-fnamedate.
    concatenate jtab-fnamedate jtab-time into ktab-filename.
    append ktab.
    endat.
    endloop.
    After this loop ktab will contain latest files.
    Thanks
    Mahesh

  • Comparing two tables and picking the records

    I have two tables A and B.  I have to compare a column ID in both table A and table B  A.ID=B.ID  And based on the above comparison if the match is found I need to pick the records from table A and if no match then need to pick the records from table B  My problem is if I join then I will have table A and table B as one record and will be difficult to separate out.  Please let me know how this can be acheived.  Thnx.

    I have two tables A and B.  I have to compare a column ID in both table A and table B  A.ID=B.ID  And based on the above comparison if the match is found I need to pick the records from table A and if no match then need to pick the records from table B  My problem is if I join then I will have table A and table B as one record and will be difficult to separate out.  Please let me know how this can be acheived.  Thnx.

  • Pipeline Materials (Info Record) Cost not getting picked in Standard Cost

    Dear Team,
    We are using the Pipeling Materials Concept in our client. Pipeline materials are procoured without referene to PO/Quotation.
    Pipeline materials cost is not getting updated in the the standard cost estimate in cost roll-up.
    All Sub-strategies options in the Valuation variant for price from Purchase Info Record are all wrt PO/Quotation.
    How can i get my pipeline materials cost in the standard cost estimate.
    Please guide.
    Regards,
    Vikrant Sood

    Hi Vikrant,
    Can you please advise us on how this issue was resolved? We're having the same error here.
    Thanks and best regards,
    Patrick

Maybe you are looking for

  • Help: I need Windows 8.1 32-bit Driver for my Officejet 4215

    I need driver for my Officejet 4215. I downloaded the HP Printer Install Wizard for Windows - hppiw.exe from http://support.hp.com/us-en/drivers/selfservice/HP-Officejet-4215-All-in-One-Printer-series/351105/model/351107?sku=Q5601A&ssfFlag=true#Z7_30

  • Audio Configuration

    When I open up iTunes 7.3 I receive an error message "iTunes has detected a problem with your audio configuration. Audio/Video playback may not operate properly." Then when I am in iTunes it does not play any of my music, just stays on 0:00. My TV sh

  • IPad Photo App that can be used to display photos

    Hello, I was wondering if anyone knows if there's a iPad Photo Application that will allow me to show pictures of my products to a customer instead of using a big bulky workbook. The products would be listed in different categories. Has anyone seen s

  • Will Dynamic Parameters remain connect if source system rebuild.

    Hi Experts, Will dynamic parameters remain connected if the source SAP system is formatted and rebuild. Our Scenario Now we pointed our Crystal Reports to SAP Ecc Tables. SAP Systems : A Client : 10; IP : 192.xxx.xx.xx Now the SAP Source system is fo

  • How ADD Times-Roman font

    Times New Roman in MS Word in Tiger differs substantially from Times-Roman. Currently working with text scanned from book which uses Times-Roman and need to add chapters. While I can add text in THAT font style INSIDE the text from the scan, unable t