Hello Gurus,
I'm working on a requierement where the cost of all finished products need to be calculated according to:
1) Real material price of all components (raw materials and only raw materials of semifinished products)
2) Real material consumption of all components (raw materials and raw materials of semifinished products)
The actual costing structure is configured to calculate costs on the material list and operations. Also, the system is configured with the standard price control for semifinished and finished products and MAP for raw materials. We haven't activate the material ledger yet.
Standard cost cannot be modified.
In resume:
Standar costing and all the process is working fine, but we need to calculate real raw material consumption and real raw material consumption of the semifinished product that is being used in the finished product at real prices.
Thanks in advance.
Regards, Agustin

Change the material masters to be moving average.
But make sure your invoice and other administration is up to date...

Similar Messages

  • Cost Comps of REAL Costs

    Hello,
    We are working with cost collector, so when we execute the transaction CK11N in order to calculate the cost of the material we can see the cost comps that have been customized in transaction OKTZ.
    We can see the cost comps because this a planning cost. Nevertheless, if we want to see cost comps of “REAL COSTS” we can’t. So, our client wants to have the cost comps of real cost of a group of materials.
    Anybody knows if is possible to obtain the cost comps of real cost with cost collector (of a group of materials).
    Thank you very much in advance for your information.
    Patricia Guevara.

    Hello,
    Thank you for the information. We know that when we execute the production order we can obtain the actual cost or real cost.
    Nevertheless, our client want the COST COMPS (customized in transaction OKTZ) of the REAL cost.
    Maybe anybody knows if is possible to obtain this information and how can to obtain ir. 
    Thank you very much.

  • Cost  of finished product repetitive manufacturing

    Hi,
    My clients produces 5 different finshed products always. I want to map the scenario in Repetitive manufacturing.
    Is it possible in REM to get the actual cost of production of 5 products separately?? fir example can i get cost of finished product 1 as Rs200, in the month of Jan2009 for 10 quantity, cost of finished product 2 in the month of Jan2009 for 5 quantity etc etc .
    Regards.

    Thanks to all for their valuable inputs.
    Dear Mangalraj: Its really a challenge for me to decide whether to go for REM or not. The reason why I am not going for discrete is :
    1. Client doesnt know how much of ( for example) fertilizers it issues for finished 1 or finished 2 . client says he  knows that in a month how much he has used  for example 100 kg of fertilizers in total, not on basis of finished goods. So, i think i will have problem during BOM creation and goods issue in particular.
    2. Since finished products are rose plants, jasmine plants etc, client says i dont how much to do Goods reciept. few plants may still be not ready to be able to do goods reciept.Client says its very difficult for me to count flower plants everyday and then say out of 1000, 10 are ready to be done Goods reciept and 15 are dead so these should be scrapped etc.
    These are the resons why i thought it to map to REM. But client also wants to know price of each plant , means whats the price of rose plant(per plant), price of jasmine plant( per plant).
    Request you all to throw some light on this..
    Regards.

  • Change in finished product inventories / cost components

    Hello,
    We are in the process of implementing SAP and couldn't get an answer to the following.
    Our understanding is that the production cost of each finished product is calculated by SAP based on cost components. After manufacturing, the finished products are transferred to the finished product inventory. The change in finished product inventory account (say 713000) is credited with the production cost of the product.
    Instead of having this single 713000 account impacted, we would like to have the change in finished product inventory broken down into several, say 713001 raw material component in finished product, 713002 labour cost component in finished product, 713003 subcontracting cost component etc. Can we get SAP to credit automatically each of these accounts based on the cost component (or group of cost components) information in the system ? How should we configure it ? (is there a link between the cost component or group of cost component and the account)
    Many thanks for your help
    Best regards

    Hi Vincent,
    In my understanding you are not clear with the requirement and therefore you are struggling with SAP. Please understand the following:
    1. The posting of GL accounts are determined by valuation class in material master. So if you want to post on different GLs please define those many valuation class in MM and assign the correct Valuation class to FG goods.
    2. When you confirm the production, SAP post the goods issue (i.e. material you define in BOM) by debiting the Material consumption account and credit  the invertory accounts. And also post the goods receipt posting by debiting the FG inventory account and credit the Factory output a/c.
    3. Here you have to convience your client that it is best pratice to have one inventory account for one material type, like RM inventory, SFG inventory and FG inventory. Normally we classify the consumption posting in different GLs like Material consumption, Labour consuption, Overhead utilization etc. and that you can define in your cost component structure by grouping the relevent GLs in given cost component items.
    4. You have to explain them how SAP works in product costing and how GL documents are posted. You have to also explain them the posting impact in P&L and BS.
    I will suggest that you should rediscuss the requirement and explain them the SAP way of valuation and posting. It is a big change management issue and as a CO consultant it is most challenging task.
    Thanks and all the best,
    Vivek

  • Raw mat and procured finish product cost

    we need to run cost run for both raw material and product, we want have the following scenario:
    first mark the raw mat. cost run,  then our finished product will get the future price of raw mat and base on BOM to update the future price of finished product.
    after we mark finished product, we then release raw mat standard price and subsequently release finished product.
    is any solution we can define  costing variant for above scenario?
    we have another scenario, we need to run costing run for finished good A, but this product A 's BOM contain only one procured finished product B, B doesn't have BOM and purchase info record, how can we change product B 's price, so finally finished product A 's standard price will be updated upon costing run?

    Hi ,
    In Costing Variant .. we have a Tab for valuation variant . In the valuation variant type , we have seperate valuations for raw Materials , activities, subcontracting etc .
    Cost Estimate with Quanity Structure will refer to the Costing Variant and compute costs .. Hence , maintain Costing Variant and Valuation Variant properly..
    This will solve both your issues..
    Kindly revert back for any further questions..
    Regards
    Sarada

  • Average Costs of the Finished Products

    Hi,
    We are using the process order concept and we are calculating the costs of each FG seperately and our finished products are different kind of sizes and types.
    And the requirement here is that if we want to calculate the average cost of the two FG how we can do this ?
    For Example
    Product 1 is manufactured and the arrived cost is $ 30
    Porduct 2 is manufactured and the arrived cost is $ 10
    And if we use the ratios of 60 and 40 and we determine the avergae cost of (3060%+1040%)/100= $ 22
    And we adjust this $ 22 with Product cost of A and Product B.

    What is FG?

  • Revaluate Finish product GI

    Hi,
    We have Production order with settlement rule as follow:
    Sender:production Order
    reciever : material (Finish product)
    Type:Full
    and also we assign this Finish product to network and during month posting GI of following material to related network,when I make settle in current period according to settlement rule I expected  that production cost  transferred to material price but after settle only balance of order was zero and material price did not change,
    I have a doubt why material price did not change and  how actual price of Finish product will  transfer to network  that I assign this material ,
    with tracking project actual cost via CJI3 ,finish product price is standard price of previous period and because of at the first period we considering standard price of finish product  as 1 $ therefore all unit price of finish product in project is 1 and I dont have actual cost of project .
    The worst side of my problem is that because of business problem I could not settle production orders for 3 month and during following periods all  GI posting  with unit price 1 $ and  we dont have actual price in network,
    How I can revaluate all GI of previous periods to have real cost of project up to know?
    It would be my pleasure if you help me as soon as possible,
    Regards,
    Azam

    Hi
    1. GI revaluation is ruled out w/o Material Ledger in place, as said above.... However, I wont recommend Price Control V for SFG/FG either
    2. In a similar scenario, what I have seen a possble workaround is this
    a. The scenario was project driven MTO... .i.e. Production order was tagged to WBS element.. This scenario is called Production Lot scenario in SAP
    b. Each time you create a Production order, you create a project 1st and then create the Prod order...
    c. The Price control of the material was kept as V
    d. No partial GR was done from Prod order as a matter of policy to avoid unfav situations
    e. After GR, the prod order was settled so that any variance would be inventorized.... Even if not settled, and the stock is consumed, the variance will be booked on the WBS element... It wont tamper the entire FG valuation
    However, this workaround might not help you because you wish to revaluate the GI, which is not possible w/o ML
    br, Ajay M

  • Valuated Sales Order stock for Semi-Finished Products

    Dear Gurus,
    One of my client faced the issue that the semi-finished products is valuated-sales order.  We are in Mill Industries, downstream (steel processing).  The situation is:
    1.  We use configuration material for both finished and semi-finished products. Both are valuated at standard costs with valuated sales order stock.
    2.  Once the sales order is created, the cost estimates are created for both Finished, and semi-finished products.
    3.  The production orders is created for the semi-finished products.  During production, several semi-fg and fg can be manufactured at the same time.   We are using the co-products feature to cover that.
    4.  During the goods receipt of semi-finished products, instead of using the standard costs in sales order cost estimate, it use the planned costs in production orders which against our design.
    I tried to use the user exit COPC002 and influence the standard costs.  But it seems that the routine is not called for semi-fg at all.  Anyone has any light on this?
    Regards,

    Hi
    I think you are talking about Special Stock "E"...ie) Sale Order Stock...
    If my understanding is correct then,
    If you go and see the Table T156....For the
    Movement Type: 101,
    Special stock Indicator : E,
    Qty. Updation Checked,
    Val. Updation Checked,
    Movement Indicator : Against PO,
    Consumption Indicator: Sales Order Stock.....combination....the transaction Event Key....GBB only has been Assigned....these  settings you cannot change...
    This linkage you can view in OLMW-----> Account Determination -
    > Acc. Determination W/O Wizard -
    >Account Grouping....also
    Reward if useful
    Regards
    S.Baskaran
    Edited by: baskaran srinivasan on Dec 20, 2007 12:18 PM

  • With what value finish product as come when we do goods recipt from prd

    Hi,
    With what value finish product as come when we do goods recipt for oa prodution order in make to order scenerio.
    The material is not talking standard price form th e material master when we are doing goods recipt.
    Regards,
    somiraghu

    If you use non-valuated sales order stock (account assignment E) there will ne no value posting at all during GR, thus also no accounting document. The full actual costs (that Pankaj listed) will be posted during settlement of the production order.
    Regards,
    Kay

  • How to Control Finished Product Price based on Raw Material

    Hi Experts,
    Our client manufactures Steel Products where basic Raw Material is Steel.
    Customer will give annual contract/Sales Order on the rate prevailing on the contract date. But there is clause that if Steel prices increase / decrease by 5% then correspondingly Finished product price will change by 3%.
    How can this be mapped in SAP where by based on Raw Material price, Finished product can vary?
    Regards

    Hi Ajay,
    Please go through this link. you will get an idea
    Price list change according to raw material cost
    Thanks
    Dasaradha

  • Unit price of finished Product

    Dear All,
    Can any one tell me,how system calculate the unit price of finished product when we make reciept from production in SAP B1.
    Regard's
    Hari Narayan

    The Actual Production Cost is not derived from the BOM, but from the production order Components tab. It contains originally the lines from the BOM, but they are modifiable. And the system uses these data from the production order and the cost prices of the components at the time of the Receipt from Production transaction (Cost price = Item master data / Inventory tab / Item Cost ). So if you modify the production order, the system can use different components for getting the production cost for different receipts. And may be with different cost prices.
    The by-products (the negative quantity components in the production order) have no affect to the actual production cost.

  • Finished product profit plant wise

    Dear Friend ,
    Presently one of our client has three plants and they are taking all finished product to one account . They will sell to directly from there . Now they want to maintain sales profit / sales revenue of each plant wise and product wise . Is is possible maintain through cost centre . They don't want to maintain WM module in this case . They want to know finished product profit plant wise .
    RB

    Hi
    You need to use Profit Cneter accounting for this , you can miantin the Profit center plant wiase by maintaining the same in Sales/ Plant Data.
    Thanks & Regards
    Kishore

  • Manufacturing finished products from other finished product(co11n)

    Hiii all,
    Please can any body tell me how to avoid or block 261 movement type for some material..? we have some products which are manufactured with finished product then when we use CO11N to report the consumption: automatically that finished product used for manufacturing is s reported as if the raw material (261 mov)
    THANKS!!!

    Hello Abelo,
    First I would Like to understand in which country you / your client is. This is very important as in India there are Excise Tax Rules those ask you to submit the status of FG materials at the end of every month end. Now if you are consuming one FG material to produce another FG this is in general not applicable in Indian Scenario. (I am not aware about other countries).
    Now your requirement is "Not to consume 1 FG material while posting the production of another FG" (Correct me if I am wrong).
    In std. SAP this is possible as well as not possible.
    Possible:
    1.In the Bill of Material of FG2 (Header material for FG1), you can mark the component (FG1) as Engineering relevant and not Production and Costing Relevant. In this case, system will not propose the material for Back Flush.
    2. Mark Component (FG1) as Bulk Material in MRP2 view. System will not propose this material for Order Release as well as Backflushing (261 movement type).
    Not Possible:
    This is more of a discipline issue. If you are converting the One FG to another FG without consumption, How you are going to match the Stocks of Component. There will always be mis match in Physical and System Inventory. How you are going to address this? There will be Financial Impact of Inventory in this case.
    I suggest, please check the feasibility of stocks verification and then try solution given above.
    Please check and confirm whether you succeed or not.
    Rahul.

  • GR for production order post to cost center and not to the production order

    Hi all,
    when we post the goods receipt for the finished product against the production order (mov. type 101), the order is not credited with the corresponding stock value. Instead of this, the value accounts to a cost center.
    We specified this cost center in OKB9 (Default account assignment), because if not, we get an error when posting the goods receipt cause of lacking accounting object.
    I can't see why the system does not credit the production order?
    Any ideas?
    Thanks for your time
    Daniel

    Hi Daniel,
    This is the first time i am coming across an issue like this.
    neverthless from a logical front,
    1. Remove Cost center as a valid receiver in Settlement Profile.
    2. Your OKB9 setting are pretty much good. No need to worry about it.  Becasue, OKB9 only will work if the system doesn't identify any other cost object. In this case Production Order is an automatic cost object which system should have taken.
    3. Check the Settlement rule when you have created Production Order. It should have been MAT.
    4. I hope you are creating Production Order with Material (using CO01 and not CO07)
    5. Make sure in OPL8, the default rule in controlling tab is PP1.
    Once all these are fine, i do not see any reason why you will get your probelm.
    Please check and revert back to me if the problem still persists.
    Best Regards
    Surya

  • Selling semi-finished as finished product

    Dear Experts,
    A finished material FINMAT has a component COMPMAT which is procured externally . The production order is dummy production order which should not incurred any cost for activity or overheads. The GR of the finished production order should have the same value as the COMPMAT that procured outside.
    So we use a control key without costing for the dummy operation . How to prevent system from calculating material overheads other overhead costs. Actually both the finished material and the component are same , i.e we are procuring th semifinished component in different base unit of measure and selling the same material as finished product in different unit of measure.
    How to carryout this in system.

    Dear,
    Dont assign Costing sheet to the valuation variant(OPN2) used in the costing variant which is used in the default order type dependent paramenters in OPL8(Controlling Tab) and also which is used for standard cost estimation.
    Regards,
    Prasobh