How do I update standard cost for split valuation material?

We are using split valuation on our maintenance material.  Maintenance material is held in an inventory account separate from our production material.  We have materials that are set up with a Parent material as variable, and child materials  which are NEW or REFURBISHED or CORE.
The Child materials are set as standard cost.  Some of the standards are old.  Unlike our production materials, which have their cost standards on the Costing 2 tab of the material master, split valuation child parts have their costing on the Accounting 1 tab.
I attempted to update a cost standard by loading a future price manually in the material master.   I was able to load a future price, but could not get it to release in CK24.
I have been unsuccessful in finding a process or procedure that tells me how to update a child standard once is already exists.  There was one blog that said that the standards could only be released using CK24N if the quantity is zero.  I attemped to update costs on part with zero quantity on hand. This was also unsuccessful.
I am looking for a process- ie 1) load a future cost using tcode XYZ, 2) Mark and release cost using tcode XYZ, 3) validate changed inventory value using tcode XYZ.
Thank you in advance for your assistance.

Hi Govind
If your valuation variant reads MAP as the strategy sequence - Then average MAP will be taken... i.e. the MAP in the parent accounting view of the material will be taken
However, if your strategy sequence is intended to look for info records, then follow the link given in the earlier reply
Regards
Ajay M

Similar Messages

  • Physical inventory document creation for split valuated material

    Hi
    We are doing stock count in our company. We are using split valuation for some of the materials. When I tried to create a PID for split valuated material which are not in stock, system issued a standard error message. What I understood from that error message, we can create a PID for split valuated materials which are in stock. Is it so? If so, then how can we count split valuated material?
    Let me know if you need any info.
    Thanks in advance..
    Jeny...

    Please refer to SAP note 30254 and it should help.
    Symptom
    If you create a physical inventory document for a material in a storage
    location without existing storage location segment, error message M7006
    is displayed: 'Material & (material number) & (plant) & (storage
    location) does not exist'. Thus, a storage location segment is not
    created automatically for this material.
    The same also applies to the batch segment. The batch segment is also
    not created automatically but, if a batch is specified for a material
    when creating a physical inventory document, that is not yet created for
    this material, error message M7042 is generated: 'Batch & & & & does not
    exist'.
    The same applies to the special stock segments which are also not
    created automatically. Different error messages are generated here
    depending on the special stock (see also Note 64448).
    Additional key words
    MI01, MI09, MI10, M7076, M7183, M7184, M7185, MARD, MCHA, MCHB, MSKA,
    MKOL, MSKU, MSPR, MSLB
    Cause and prerequisites
    If no storage location segment or batch segment or special stock segment
    exists to a material, this then means that a goods movement did never
    occur before in the system to this material (batch) to this storage
    location (special stock), that is that the material (batch) never had a
    stock to this storage location (special stock) in the system before and
    that it was never posted before on this segment. It is therefore not
    possible to carry out a physical inventory for such a material (batch).
    It is different, if a goods movement has already occurred to a material
    (batch) to this segment and if only the present stock is zero. A
    physical inventory is then necessary and also feasible for this material
    (batch) since the different segments are not deleted automatically in
    the moment in which the stock becomes zero.
    Solution
    For a material for that no storage location segment, batch segment or
    special stock segment exists, it is not necessary, to carry out a
    physical inventory on this storage location or for this batch or this
    special stock. If, however, a quantity is physically found to such a
    material, the corresponding segment must be created before the physical
    inventory.
    There are 3 options to create storage location data:
           -  maintain the 'Storage' view in the material master for the
              material and storage location or
                                                                      Page 2
           -  use the 'Enter storage locations' function in the material
              master or
           -  post the first goods receipt (providing, the automatic
              creation of storage location data is permitted in the plant
              and for the movement type).
    There are 2 options to create batch data}:
           -  create the batches in the material master manually via
              function 'Create batch'.
           -  post the first goods receipt for the batches to the respective
              material.
    You can only post the various special stock segments via posting a goods
    receipt. An exception is special stock 'K' (vendor consignment). You
    must define a consignment price in the material master for this special
    stock using the 'Create vendor consignment' function before a goods
    receipt can be posted for this special stock.

  • Updating Standard Cost for an Item in Item Master Data

    How do you change the Item Cost field under the Inventory Data tab in Item Master Data if Standard Cost is selected as Valuation Method.  This field is greyed out.

    Hi ,
    If you have an inventory in the warehouse , you cannot change the item price of the standard cost .
    So it is greyed out .Once you donot have inventory ,this field becomes active and you can enter the price .
    Second option is from Item Revaluation .
    Please test it in test environment
    Thank you
    Bishal

  • Inforecord for Split valuated materials

    Hi all,
    How can i maintain different prices for split valuated materials
    For Eg.  I have a material split valuated based on its Quality vendor supplies two diff quality materials with different prices
    how to maintain the prices in inforecords or any alternative to maintain both the prices.
    With regards,
    Krishna

    hi..
    Split valuation is for Valuation Purpose only...
    SAP does not support....Procuring same material with Diff. Split Valuation Type from Single Vendor is not allowed by SAP standard..
    You cannot Maintain Purchase Info for Material which is having 2 Split Valuation type......with One Vendor......
    Because For One vendor and One material combination, you can maintain One split valuation type only....
    Hope it works..
    Thanks..

  • Different price for split valuation

    hai
    for split valuation material shal we define different pricing?
    for ex :
    materail - Pen
    we split the category is "colour "
    the valuation type is red , blue ,black (with different prices)
    red - 12 Rs
    blue -15 Rs
    black -10 Rs
    i know that we can maintain in material master record .
    But we need while doing THE P.O for red colour pen the price must be Automatically taken from the system as 12 Rs,
    and same as blue colour pen as 15 Rs , and for black colour pen as 10 Rs.
    i searched in "INFO RECORD" .we can only define the "valuation type " .we cant able to dife different pricing for split valuation material in info record
    where we have to maintain the different pricing for valuation material .kindly explain.
    regards
    christo.

    hi,
    you need maintain records for your pricing condition say (pb00).For that u need to create a table in m/03 with  combination of material valuation type , price.and  then assign the table in accesses sequence of the pb00. then maintain records in mek1 with key combination of the above created table.it will help u.

  • Split valuated material price change at header level (without val. Type)

    Hi All,
    Need to change Split valuated Material Price at Header level (without val. type).
    In MR21 valuation type is mandetory for split valuated material.
    Please suggest on changing Material price without val. type.
    Thanks

    You have to advise the users who create accounting views to enter a valid price when they create a material master. Maybe you need to make use of the user exit to prevent saving when no price (or a dummy 0,01)  is entered.
    It is not possible to change the header price with any SAP given transaction, as it could cause inconsistencies if you dont take care about the stocks at valuation type level.
    you may have to deveope an own report on own risk. I personally have the opinion that it is more secure to post stock and reverse it again (which just creates to accounting documents that equalize each other, no remaining value anywhere) than going the risk with an own program to screw up the valuation of a material  in general

  • Updating Standard Cost

    Hi Everyone,
    Is there anyway or any reason that the standard cost defined in the Item Master would be updated by the system?  I have a customer who claims that the standard cost for one of their items has somehow been changed and they believe the system somehow made this change.  The item is set up only as a Purchased Item. 
    I have gone into the Change Log for the item and printed off the Differences window for him because it appears that he changed it (he had changed the valuation method from Standard to FIFO and back to Standard).  He claims that he did not enter the standard cost, however.  I have tried to duplicate the changes he made in a Test Database to see if there is anyway to get the system to generate a change in the standard cost, and I haven't been able to do so.
    It would be nice if I could send him copies of the Item Master Data - History Instances screens, but unfortunately the history screens show all of the valuation methods as Moving Average even though the Differences screen shows the valuation method going from Moving Average to Standard to FIFO and back to Standard. 
    Can anybody please either confirm my thoughts on the standard cost or explain how the system is changing the item cost and what method it is using to calculate the new cost?
    I appreciate your help in advance.
    Thank you,
    Amanda

    Hi Amanda,
    A few points:
    - The system does not change this price on it's own.
    - Even if this was a Moving Average item it would not be updated by the system as this is not an Inventory item. FIFO and Moving Average are calculated prices, since no calculation is done it is an definition without meaning.
    - For non inventory Items (like the item you are describing) no item cost is ever calculated.
    - The price (when we are talking about a non inventory item) can be changed at any time.
    - The only method that makes sense for a non stock item is standard.
    - The standard price for these items to my knowledge would only be used as a cost price when this item is component in production bill of material and as a base price in gross profit calculation (this only works in 2007). (there might be other usage for it, but I wouldn't know of them)
    I hope this information helps.
    Jesper

  • Is it possible to update standard rate for an enterprise resource using CSOM

    We are facing issues while updating standard rate for any enterprise resource using CSOM. The field standard rate is not available in the enterprise resource. Is it possible to update the standard rate for any resource using CSOM ? 
    Thanks in advance for any help.

    Hi Vikas,
    You can do it via the PSI.
    Please find below a blog post with a PSI code sample for updating the resources standard rate:
    https://epmxperts.wordpress.com/2011/01/30/update-resource-cost-rate-using-psi/
    In addition, here is a blog post by Brian about a PSI bug while updating the resource rate:
    http://blogs.technet.com/b/projectsupport/archive/2013/02/12/project-server-resource-rates-changed-with-psi-not-seen-in-project-professional.aspx
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • HT1918 I cancelled a payment through PayPal. How do I update the payment for that charge?  I looked at my payment information and it has my credit card information.  I'm not sure where to update the PayPal part of payment.

    I cancelled a payment through PayPal. How do I update the payment for that charge?  I looked at my payment information and it has my credit card information.  I'm not sure where to update the payment that was associated with my PayPal account?  I am not sure what that paid for?  I am trying to process updates on my IPhone & IPad for apps. I have already downloaded. 

    Hi Xellana, and a warm welcome to the forums!
    I'm looking for information and pricing on possibly upgrading the processor from the PowerPC to Intel.
    While anything is possible if you had enough money... NOPE, you can't change the CPUs to Intel, nor can you get any faster PPC upgrades for it. It'd be far cheaper to buy a new IntelMac than to replace everything inside the G5, and I mean just about everything, then figure out how to machine the case & such to mount Intel Logic Board, Graphic Card & such.
    Sorry.

  • My iPod 5 32bytes ios 8 no longer works and is out of warranty, how much money would it cost for me to exchange it to apple for a new one?

    My iPod 5th generation iOS 8 32bytes is not bringing me to my home screen and is unresponsive, and gives me the constant apple logo each time I try to turn it on. My iPod is out of warranty, so I was wondering how much money would it cost for me to return my iPod back to Apple for a new one?

    Apple does not have a trade-in program. You can either try and restore your iPod, or you can try and sell it yourself. In some locations, Apple does provide for a recycling program, but the amount provided for devices is quite low.

  • SAP allows release of Standard Cost for Material with Moving Average Price

    Hi
    We set our Raw Material to use Moving Average Price (V) and price determination 2 (single level). And we activated material ledger.
    During mass calculation of standard cost (CK40N), If user accidentally forgot to restrict the Raw Material for being included in calculation, the system calculate standard cost anyway, even though I set it as Moving Average Price. And user is able to release it too without any problem.
    Why the system does not restrict it? By giving error maybe. Although as for now I can not find the wrong effect from releasing standard cost for MAP material, by your experience, is there any side effect that I should be aware of?
    Thanks

    CK40n is mass release of all materials. The release is not dependent on price indicator of the material in the master. It will calculate standard cost of all the materials.
    Releasing standard cost estimate of raw materials does not have any side effect as long your calculation is based on moving average price.
    Regards
    Divraj

  • How can I update Camera raw for Photoshop CS5 to access images from Canon Rebel T4i?

    How can I update Camera Raw for Photoshop CS5 to access images from Canon Rebel T4i? The updated version of Camera Raw 7 says it only works with CS6. Outside of buying a new Photoshop, is there anything I can do?

    Buy Lightroom (much cheaper alternative to Photoshop) - does all your 'Photo-related' tasks. Full version of LightRoom 4 is $149/- - http://www.adobe.com/products/photoshop-lightroom.html
    LightRoom 4 supports ACR (Adobe Camera Raw) 7. Once processed with Lightroom, if you still need, you could take the photo in JPG or TIFF format into Photoshop CS5 for further processing.
    Another option is to use Canon Raw Codec that would've come with your camera's box to process the RAW images and then take them into Photoshop.

  • How do I update plug-in for CS4 indesign?

    How do I update plug-in for CS4 indesign?

    JW.Designs wrote:
    A CS4 file was sent to me.
    This is most likely not the case. Try the script in http://forums.adobe.com/message/4071273 -- it will tell you what version this file really was saved with.

  • Proceeding without standard costing for May08 and June08

    Hi,
    We have implemented Material Ledger here.
    The backlogs are on.
    We are still on May08 backlogs.
    We had to proceed without standard costing for May and now also for June which we would be able to finish by July 20th.
    After that we will be doing the standard costing run for July 2008 by 22nd July.
    I dont think we neeed to calculate and settle variances for May and June 2008.
    Please guide.
    Could you please guide me on what precautions that need to be taken.
    Also, when I do the actual costing (ML) run for July in August 2008, I think only the variances for July will be calculated and settled.
    Any material Ledger experts, please advise and guide.
    regards,
    Nidhi

    Hi Elaine,
    Thanks a lot for your reply.
    You are absolutely right.
    The system will not allow me to close July in ML, unless I have closed May and June.
    Also, the second option is completely ruled out. Every material has to be included in the ML run.
    For carrying out ML closing activities for previous posting periods, the note no. 361236 would help. Please advise.
    Also, Elaine, I am noticing that despite the fact that we did not do the standard costing run for May 2008, the system is using the standard cost estimate of April 2008 to calculate all variances.
    I checked the costs analysis of all process orders and the system is correctly calculating the variances for all process orders.
    So please suggest if the steps I am mentioning below are correct:
    May 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production variance using: CO88
    Then I will carry out ML run for May using: CKMLCP
    May closes in Material Ledger
    June 2008:
    I will first calculate production variance using T code KKS1
    Then settle the production varinace using: CO88
    Then I will carry out ML run for June using: CKMLCP
    June closes in Material Ledger
    Then I will do the standard costing run for July 2008.
    (Also please note that we closed May and opened June in MM using MMPV, because one region is still in May backlogs while the other has started June backlogs. So the current period in MM is June and previous period is May 2008. This I guess should not have any impact on the ML run for May 2008)
    Please guide me with possible reconstruction of steps.
    Thanks a lot & regards,
    Nidhi

  • How to find the Commitment cost for a PM order using tables ?

    Hello all ,
           How to find the Commitment cost for a given PM order using table  .
    Thanks and regards ,
    Prem.

    Issue got resolved

Maybe you are looking for

  • Query Problem

    hi , i have 2 block based on scott.emp table.one is Search block and another one Emp block.Both are tabular format.i made the search block property 1 items displayed per page,and the emp block property 5 items displayed per page and used the followin

  • Problem with refcursor in 11g

    Hello, I have a problem with refcursor in a project migrated from 10 to 11g. I found this thread from a few years ago that talks about the same problem. It has no final answer - is it ok to comment the st.close(); in callStoredFunction in the AMImpl.

  • Explain plan cost it increases after migrating Oracle 9.2.0 to 10.2.0.3

    Hi: Recently the migration was made, we are testing (I'm developer) the performance in some querys, but the majority is but slow,I do not understand the reason because the new equipment has processing capacity much more. for example , a report , in 9

  • Different machines, different groups.

    ok.. so we of course have multiple machines and on each machine a user may be in different groups.. but i get errors ie: com.waveset.util.WavesetException: An error occurred modifying user 'USERUSER' on resource 'MACHINE'. com.waveset.util.WavesetExc

  • Do not have a plugin for quicktime on my firefox add-ons manager how do I get one

    can not get quicktime video to play. check add-on manager plugins and do not have a plug in for quicktime. how can I get quicktime videos to play