How ODI works? Doubt in basic Architecture.

Hi,
I need to know how ODI (Architecture) works on basic transformations. From my understanding,
1) ODI extracts the data from source, create some temp tables in Staging Area and put the data in temp table.
2) From that temp table it puts the data to target and drop the temp table.
is the two statements are correct? one more thing is that i am confident on 3rd point, please say wether its right.
3) We can make all the temp tables to be created in a different database without affecting the target database (Using the option"Staging area diff from target")
Any suggestions would really help.
Thanks in Advance,
Ram Mohan T

Hi,
Thanks a lot for your reply. I need no temporary tables should be created in target database. For that, i have taken
Source and target from different databases and staging area as different database (in total three database for source, target and staging area).
I used these knowledge modules - LKM Sql to Sql, IKM Oracle Incremental update, CKM oracle.
When i execute the interface, two tables are created in target database (SNP_Check_tab, E$_emp_table), how can i avoid that.
Any suggestions would really help.
Thanks in Advance,
Ram Mohan T.

Similar Messages

  • How to set up a basic file sharing server for my small architectural business?

    I have no idea if I have posted in the correct area as this is my first forum post within the apple support community!
    I have been using a 21.5" imac running 10.6.8 for the past 5 years to run my small home based architectural design business. I have been using the internal hard drive & backing up the necessary data to a simple usb external hard drive. I am now looking to firstly purchase a new imac 27" retina and purchase new autocad lt 2015 for mac software. I am looking to have another imac (my old mac) running in conjunction with the new mac. I want both macs to be able to access the same data and am slightly unsure what is the best way to achieve this.....As my old mac is currently only running snow leopard and an old version of autocad for mac 2011 it wont run on any more recent OS. Essentially i believe I have 2 main options with this.... (1) I Accept that I have to purchase 2 no. autocad lt 2015 licences @ a cost of £2300. Or option (2), I only run autocad on the new mac as this will be the primary station and the old mac used for primarily for admin & accounts. I have also recently discovered that it is possible to rent autocad licences for £300p/a which may also be another option (3)!
    I previously had a problem where my hard drive failed on my mac & lost all data on the internal hard drive, luckily I had been backing up all data regularly to my external hard drive and now loss occurred! Obviously with any new system I want to ensure that my data is safe!
    I currently utilise about 250GB of data for business operations but this will obviously grow with time.
    In the future I would like to have the option of potentially being able to access the network data remotely via macbook pro whilst abroad although at this stage this really isnt my primary objective. Although I believe I could achieve this through apple remote desktop.
    I suppose I should provide some information with regard to the required speed of the system...I regularly open 50-100 photos at the same time totalling around 250-500MB. I would like the system to be able to handle this fairly easily.
    I have been trawling through forums and to be honest they are totally confusing me. I have also spent time on the phone to the apple business team and have also discussed my objectives with a member of the apple team in store.
    There have been various options advised to me and I really do not know which is the most appropriate route forward.
    1 - Using a mac mini as the file server and linking the 2 mac devices to this and backing up the mac mini to an external hard drive to ensure no loss of data.
    2 - Using a time capsule as a file server and linking the 2 mac devices to this and backing up the TC to an external hard drive to ensure no loss of data.
    3 - Using the new mac hard drive and linking the 2 macs via thunderbolt (old mac does not have thunderbolt and so I guess I would need another new mac?!) and then backing up the data to a time capsule.
    4 - Using a RAID based server and linking the 2 no. macs.
    Sorry to ramble but any advice really would be greatly received!

    Hi sblemings,
    Welcome to the community.
    I think with your scenario you should ask yourself, how complicated do you want the setup to be and how much time would you have to be able to resolve an issue should one occur with this setup.
    All the options that have been advised would work but they come with complexity and therefore time.
    1 - Using a mac mini as the file server and linking the 2 mac devices to this and backing up the mac mini to an external hard drive to ensure no loss of data.
    2 - Using a time capsule as a file server and linking the 2 mac devices to this and backing up the TC to an external hard drive to ensure no loss of data.
    3 - Using the new mac hard drive and linking the 2 macs via thunderbolt (old mac does not have thunderbolt and so I guess I would need another new mac?!) and then backing up the data to a time capsule.
    4 - Using a RAID based server and linking the 2 no. macs.
    Sorry to ramble but any advice really would be greatly received!
    option 1
    Would be a way to achieve what you want, it would centralise your files and you would only need to backup your file server (as long as all the files you wanted backed up were on it). This could be achieved either using the client and sharing various folders or using Server which would give you more options than you would possibly need.
    option 2
    This is exactly like option 1 except that you wouldn't have to administer another mac however you may limit any future growth.
    option 3
    This option I probably wouldn't pick, you could achieve this with firewire and use a firewire to thunderbolt adapter (saves you having to buy a new iMac)
    option 4
    This option would, depending on your RAID level, give you disk redundancy but remember you would still need to back this up, as RAID is NOT a backup solution.
    I would also ask is there a pressing need to keep the old iMac in service and complicating things by having a server / NAS? Could you not just transfer all your information over to this and continue with the one backup? I would say that doing it this was would be the simplest way of achieving what you want from what I can take from your question.
    As for remotely accessing your data, if you have the right hardware the way to achieve this would be to use a VPN and connect back to your data. However a potentially easier way for you ,would be to use a service like logmein or teamviewer to connect back.
    Hope this helps, and by all means any questions please ask.
    Dan
    How to set up a basic file sharing server for my small architectural business?

  • How can I move the ODI Work Repository from one server to another server?

    How can I move the ODI Work Repository from one server to another server?

    Hi,
    If you would like to move your source models, target models and project contents from Work repository 1 to another work repository.
    I.e. Dev. server to Prod Server.
    1. Firstly, replicate the master repository connections i.e. with same naming conventions manually
    2. Go to Dev. Server work repository -> File Tab -> Click on Export work repository (save it in a folder)
    3. After exporting, you can view the xml files in the folders.
    4. Now, Open the Prod. server and make sure you already replicated mas. rep. details.
    5. Now, right click on model and import source model in synonym mode insert_update (select source model from the folder where your xml file located)
    6. Similarily, import again target then Project.
    Now, check. It should work.
    Thank you.

  • I was looking at the "Find my iPhone" app and I have a doubt regarding how it works for the macbook. In order to detect the location, the macbook should remain signed into iCloud. What if the thief logs out of iCloud. Would we able to locate the macbook?

    I was looking at the "Find my iPhone" app and I have a doubt regarding how it works for the macbook. In order to detect the location, the macbook should remain signed into iCloud. What if the person who has stolen my macbook logs out of iCloud.
    It should work fine for iPhone/iPad because we can enable "Restrictions" to prevent the user from signing out of iCloud. Do we have simialr settings for the macbook?
    Thanks,

    If it's not on the device list, it indicates that someone has gone to Find My iPhone on icloud.com and manually deleted it from the device list (as explained here: http://help.apple.com/icloud/#mmfc0eeddd), and it has not gone back online since (which would cause it to reappear on the device list; Find My iPhone has been turned of in settings on the device; the iClolud account has been deleted from the device; or the entire devices has been erased and restored.
    Unfortunately, there's no other way to track the phone other than through Find My iPhone.  You could call your carrier and see if they would blackliste it so at least the theif couldn't use it.

  • I am working in the Develop module of Lightroom 5 and have accidentally bumped a setting and lost the Basic menu and the option to retrieve it.  "Tone curve" is directly under the tool bar now.  How can I retrieve the "Basic" menu?

    How can I retrieve the "Basic" menu on Lightroom 5?  I accidentally bumped something while working in the Develop module of Lightroom 5, and now the Tone Curve menu is directly under the Tool Bar, with no option to click on "Basic." 

    Right-click on Tone Curve and choose basic again or press Ctrl+1 in Develop.
    On Mac (Control-Click or Cmd+1)

  • How does the generate ddl of the ODI works ?

    how does the generate ddl of the ODI works and is it used to generate ddl of any technology ?
    what is the use of interface in and interface out ?

    The best way to solve this is to look at the module functions that clears the buffers and use it.
    Closed.

  • I'm new to using dbms_scheduler. I'm trying out some basic stuff to see how it works

    I have not used the dbms_scheduler package before and trying out some basic functionality to see and understand how it works. The below code is what I have writtern
    BEGIN
    DBMS_SCHEDULER.create_job(
    job_name => 'Test_Job3',
    job_type =>  'PLSQL_BLOCK',
    job_action => 'BEGIN pr; END;',
    start_date => systimestamp,
    repeat_interval => 'freq=secondly;bysecond=4;',
    end_date => null,
    enabled => true,
    comments => 'This job is test for dbms_scheduler'
    END;
    create procedure pr
    is
    begin
    DBMS_OUTPUT.PUT_LINE('Inside the pr procedure called using scheduler');
    end;
    According to my understanding it should print the line inside the procedure 'pr' every 4 seconds, but I don't see any output being shown. Can someone help me understand what exaclty is wrong with my code. I'm using Toad for oracle.

    One more question - I'm trying to bring in one more functionality. Lets says - There is a job that needs to be executed every month at a particular time. I schedule it, but I want this job to be executed 'n' number of times.
    For example - There is procedure that is called in the scheduler. Since its processes lot of records - I'm breaking down in chunks of data - Say 5 chunks. Now when its scheduled each month at a particular time - it should ideally execute 5 times in order to complete the job for that month. How can this be achieved ? I thought of using max_runs, but that might end the job and never repeat it again.

  • How DHCP works?

    Guys, I have basic doubt, how does DHCP works?

    hi,
    How DHCP Works?
    Before learning the process through which DHCP achieves it’s goal, we first have to understand the different messages that are used in the process.
    1. DHCPDISCOVER
    It is a DHCP message that marks the beginning of a DHCP interaction between client and server. This message is sent by a client (host or device connected to a network) that is connected to a local subnet. It’s a broadcast message that uses 255.255.255.255 as destination IP address while the source IP address is 0.0.0.0
    2. DHCPOFFER
    It is DHCP message that is sent in response to DHCPDISCOVER by a DHCP server to DHCP client. This message contains the network configuration settings for the client that sent the DHCPDISCOVER message.
    3. DHCPREQUEST
    This DHCP message is sent in response to DHCPOFFER indicating that the client has accepted the network configuration sent in DHCPOFFER message from the server.
    4. DHCPACK
    This message is sent by the DHCP server in response to DHCPREQUEST recieved from the client. This message marks the end of the process that started with DHCPDISCOVER. The DHCPACK message is nothing but an acknowledgement by the DHCP server that authorizes the DHCP client to start using the network configuration it received from the DHCP server earlier.
    5. DHCPNAK
    This message is the exact opposite to DHCPACK described above. This message is sent by the DHCP server when it is not able to satisfy the DHCPREQUEST message from the client.
    6. DHCPDECLINE
    This message is sent from the DHCP client to the server in case the client finds that the IP address assigned by DHCP server is already in use.
    7. DHCPINFORM
    This message is sent from the DHCP client in case the IP address is statically configured on the client and only other network settings or configurations are desired to be dynamically acquired from DHCP server.
    8. DHCPRELEASE
    This message is sent by the DHCP client in case it wants to terminate the lease of network address it has be provided by DHCP server.

  • How does works default parameters in a program with logical database PNP?

    Hi Friends,
      I have a basic program, i need to filter info with period parameters in a program that uses logical database PNP, but it doesn't work.
      If i use "person selection period" that it's suposed to filter info according to infotype 0001 (as the sap help says), it doesn't work, i use: PNPBEGPS = today and PNPENDPS = today, and the result it's a lot of registers that doesn't meet that criteria.
      Also i tried with: data selection period, today, up to day, current month. And the result it's with the same problem.
      How does works period parameters in a program with logical database PNP?
    This it's the program example, i use the default category.
    REPORT  ZRPHRTEST.
    tables: pernr.
    infotypes: 0001.
    start-of-selection.
    get pernr.
      write: pernr-pernr, p0001-begda, p0001-endda.
    end-of-selection.
    write 'fin'.

    Hi,
    Define pernr table under tables statement then and use GET PERNR event.This get event is followed by End-Of-Selection.
    Syntax: Tables pernr.
                Get pernr.
    Try, activate and test. This should solve your problem.
    Regards,
    Abhijeet

  • How much work is it to add a callout item to open document in a specified program

    Hi, I am hoping someone can point me in the right direction.
    I want to know how much work it is to get a Sharepoint developer to add a link to the callout above, e.g. at the top level near OPEN SHARE, or in the sub menu would also be fine. The link would open the selected document in our application which can open
    TIFF / PDF and other image files. The link could say "Edit this document in MyApp", or "View this document in MyApp" as examples. We would need to provide this in a modular way, so that customers could optionally deploy it to their own
    sharepoint site. A possibility, if the customization is not a big job would be to write a document with details on how to customize the Sharepoint site to achieve this. I'm not sure if Sharepoint has a more intuitive way of sharing this type of customization,
    e.g. as an App package.
    Any idea how much work is involved approximately in developer hours?
    And is there any terminology I could have described better above?
    My apologies, I don't have any experience with Sharepoint but we have a requirement to integrate our software with it.
    This link https://msdn.microsoft.com/en-us/library/dn135236.aspx has some good info, which I think is in the right direction. But for myself with no Sharepoint experience is a bit above my head.
    Any advice is appreciated. Depending how much work it is I may post this up as a freelance job. (basically need to get approval for a budget, and ensure the scope is defined etc.)

    Hi,
    If you want to add the custom action in sub menu, we can use SharePoint designer to achieve it.
    Open SharePoint designer -> Find Lists and Libraries -> Documents
    More information:
    http://sharepoint-community.net/profiles/blogs/sharepoint-designer-custom-actions
    If you want to achieve the requirement of "The link would open the selected document in our application which can open TIFF / PDF and other image files". I suggest you use some jQuery plugin to achieve it.
    7 Best jQuery & JavaScript PDF Viewer plugin with examples
    http://www.jqueryrain.com/2012/09/best-jquery-pdf-viewer-plugin-examples/
    Best Regards,
    Dennis Guo
    TechNet Community Support
    Please remember to mark the replies as answers if they help, and unmark the answers if they provide no help. If you have feedback for TechNet Support, contact
    [email protected]

  • How to  work on SDK with SAP B1 2005

    hi all,
        its too urgent, if you have any information about it, kindly help me.
    1. i need some details related to SDK. what are the tools needed for working on SDK with SAP B1 2005,
    2. how to get the "microsoft visual studio" for writing code for sdk.is there any seperate tool available with SDK for that or we have to use the general " microsoft visual studio" for VB and VC++.
    3. how to work on Screen painter add-on, able to design the forms,but how and where to write the code to make it work, or is there any tool kit for generating the code.
    4. pls give the link in the SAP portal for downloading the " tools and software needed for working on SDK with SAP B1 2005.
    if you have any tools, software and guide files related to sdk kindly please send me to my gmail address " [email protected] ".
    it is very urgent, if you have any resources regarding this then kindly send me as soon as possible.
    regards
    sandip

    Sandip,
    The forum that you have posted your question in is for questions related to the SAP Business One Integration for SAP NetWeaver.  Your question is SDK related and should be posted in the SAP Business One SDK Discussion forum.
    That being said ... here are the answers to your questions ...
    1. As far as the SDK goes, it does not provide an IDE.  Since the API's are COM, then you can use any IDE that can communicate with COM objects such as VB6, VB.Net, C#, C++, etc.
    2. As stated above, the SDK does not provide an IDE.  You would need to purchase one or you can get a free one from Microsoft on there website such as Visual Basic 2005 Express Edition.
    3. The Screen Painter is an SAP tool (independant of any IDE) that allows you to graphically create new SAP Business One looking forms and then save them to an XML format.  You would then in your code use the LoadBatchActions method to load your XML form.  Documentation on the Screen Painter and the LoadBatchActions method is in the SAP Business One SDK Help Center Documentation that comes with the SDK as well as there is eLearning available for the SDK on this portal as well as the SAP PartnerEdge Portal if you are an SAP Business One partner.
    4. If you are an SAP Business One partner and have an "S" number, you can log into the SAP PartnerEdge Portal and then under SAP Business One and "Installations & Updates" you can download the SAP Business One product as the SDK installation is part of the overall installation package.  If you are not a partner you would need to contact your local SAP Business One sales representative.
    Other tools available that work with the SAP Business One SDK are located on the SDN Portal under this link ...
    SAP Business One Tools [original link is broken]
    HTH,
    Eddy
    P.S. please give points for helpful answers!

  • Can u explain me how to work with OOPs ABAP

    Hi,
    Can u explain me how to work with OOPS Abap,  If possible pls send me some sample programs regarding OOps concept used in Realtime.
    Thanks.

    hii,
    Please check this online document (starting page 1291).
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/BCABA/BCABA.pdf
    Also check this links as well.
    http://help.sap.com/saphelp_nw2004s/helpdata/en/ce/b518b6513611d194a50000e8353423/frameset.htm
    http://www.sapgenie.com/abap/OO/
    http://www.futureobjects.de/content/intro_oo_e.html
    http://www.sap-img.com/abap/business-add-in-you-need-to-understand-abap-oo-interface-concept.htm
    /people/ravikumar.allampallam/blog/2005/02/11/abap-oo-in-action
    What is Object Orientation?
    Object orientation (OO), or to be more precise, object-oriented programming, is a problem-solving method in which the software solution reflects objects in the real world.
    A comprehensive introduction to object orientation as a whole would go far beyond the limits of this introduction to ABAP Objects. This documentation introduces a selection of terms that are used universally in object orientation and also occur in ABAP Objects. In subsequent sections, it goes on to discuss in more detail how these terms are used in ABAP Objects. The end of this section contains a list of further reading, with a selection of titles about object orientation.
    Objects
    An object is a section of source code that contains data and provides services. The data forms the attributes of the object. The services are known as methods (also known as operations or functions). Typically, methods operate on private data (the attributes, or state of the object), which is only visible to the methods of the object. Thus the attributes of an object cannot be changed directly by the user, but only by the methods of the object. This guarantees the internal consistency of the object.
    Classes
    Classes describe objects. From a technical point of view, objects are runtime instances of a class. In theory, you can create any number of objects based on a single class. Each instance (object) of a class has a unique identity and its own set of values for its attributes.
    Object References
    In a program, you identify and address objects using unique object references. Object references allow you to access the attributes and methods of an object.
    In object-oriented programming, objects usually have the following properties:
    Encapsulation
    Objects restrict the visibility of their resources (attributes and methods) to other users. Every object has an interface, which determines how other objects can interact with it. The implementation of the object is encapsulated, that is, invisible outside the object itself.
    Polymorphism
    Identical (identically-named) methods behave differently in different classes. Object-oriented programming contains constructions called interfaces. They enable you to address methods with the same name in different objects. Although the form of address is always the same, the implementation of the method is specific to a particular class.
    Inheritance
    You can use an existing class to derive a new class. Derived classes inherit the data and methods of the superclass. However, they can overwrite existing methods, and also add new ones.
    Uses of Object Orientation
    Below are some of the advantages of object-oriented programming:
    Complex software systems become easier to understand, since object-oriented structuring provides a closer representation of reality than other programming techniques.
    In a well-designed object-oriented system, it should be possible to implement changes at class level, without having to make alterations at other points in the system. This reduces the overall amount of maintenance required.
    Through polymorphism and inheritance, object-oriented programming allows you to reuse individual components.
    In an object-oriented system, the amount of work involved in revising and maintaining the system is reduced, since many problems can be detected and corrected in the design phase.
    Achieving these goals requires:
    Object-oriented programming languages
    Object-oriented programming techniques do not necessarily depend on object-oriented programming languages. However, the efficiency of object-oriented programming depends directly on how object-oriented language techniques are implemented in the system kernel.
    Object-oriented tools
    Object-oriented tools allow you to create object-oriented programs in object-oriented languages. They allow you to model and store development objects and the relationships between them.
    Object-oriented modeling
    The object-orientation modeling of a software system is the most important, most time-consuming, and most difficult requirement for attaining the above goals. Object-oriented design involves more than just object-oriented programming, and provides logical advantages that are independent of the actual implementation
    http://www.sapgenie.com/abap/OO/index.htm
    http://www.geocities.com/victorav15/sapr3/abap_ood.html
    http://www.brabandt.de/html/abap_oo.html
    Check this cool weblog:
    /people/thomas.jung3/blog/2004/12/08/abap-persistent-classes-coding-without-sql
    /people/thomas.jung3/blog/2004/12/08/abap-persistent-classes-coding-without-sql
    /people/sap.user72/blog/2005/05/10/a-small-tip-for-the-beginners-in-oo-abap
    /people/ravikumar.allampallam/blog/2005/02/11/abap-oo-in-action
    /people/thomas.jung3/blog/2005/09/08/oo-abap-dynpro-programming
    http://help.sap.com/saphelp_nw04/helpdata/en/c3/225b6254f411d194a60000e8353423/frameset.htm
    http://www.sapgenie.com/abap/OO/
    http://www.sapgenie.com/abap/OO/index.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/c3/225b5654f411d194a60000e8353423/content.htm
    http://www.esnips.com/doc/375fff1b-5a62-444d-8ec1-55508c308b17/prefinalppt.ppt
    http://www.esnips.com/doc/2c76dc57-e74a-4539-a20e-29383317e804/OO-abap.pdf
    http://www.esnips.com/doc/5c65b0dd-eddf-4512-8e32-ecd26735f0f2/prefinalppt.ppt
    http://www.allsaplinks.com/
    http://www.sap-img.com/
    http://www.sapgenie.com/
    http://help.sap.com
    http://www.sapgenie.com/abap/OO/
    http://www.sapgenie.com/abap/OO/index.htm
    http://www.sapgenie.com/abap/controls/index.htm
    http://www.esnips.com/doc/2c76dc57-e74a-4539-a20e-29383317e804/OO-abap.pdf
    http://www.esnips.com/doc/0ef39d4b-586a-4637-abbb-e4f69d2d9307/SAP-CONTROLS-WORKSHOP.pdf
    http://www.sapgenie.com/abap/OO/index.htm
    http://help.sap.com/saphelp_erp2005/helpdata/en/ce/b518b6513611d194a50000e8353423/frameset.htm
    http://www.sapgenie.com/abap/OO/
    these links
    http://help.sap.com/saphelp_47x200/helpdata/en/ce/b518b6513611d194a50000e8353423/content.htm
    For funtion module to class
    http://help.sap.com/saphelp_47x200/helpdata/en/c3/225b5954f411d194a60000e8353423/content.htm
    for classes
    http://help.sap.com/saphelp_47x200/helpdata/en/c3/225b5c54f411d194a60000e8353423/content.htm
    for methods
    http://help.sap.com/saphelp_47x200/helpdata/en/08/d27c03b81011d194f60000e8353423/content.htm
    for inheritance
    http://help.sap.com/saphelp_47x200/helpdata/en/dd/4049c40f4611d3b9380000e8353423/content.htm
    for interfaces
    http://help.sap.com/saphelp_47x200/helpdata/en/c3/225b6254f411d194a60000e8353423/content.htm
    For basic stuff......
    abap oops
    http://esnips.com/doc/5c65b0dd-eddf-4512-8e32-ecd26735f0f2/prefinalppt.ppt
    http://esnips.com/doc/2c76dc57-e74a-4539-a20e-29383317e804/OO-abap.pdf
    http://esnips.com/doc/0ef39d4b-586a-4637-abbb-e4f69d2d9307/SAP-CONTROLS-WORKSHOP.pdf
    http://esnips.com/doc/92be4457-1b6e-4061-92e5-8e4b3a6e3239/Object-Oriented-ABAP.ppt
    http://esnips.com/doc/448e8302-68b1-4046-9fef-8fa8808caee0/abap-objects-by-helen.pdf
    http://esnips.com/doc/39fdc647-1aed-4b40-a476-4d3042b6ec28/class_builder.ppt
    http://help.sap.com/saphelp_nw04/helpdata/en/c3/225b5654f411d194a60000e8353423/frameset.htm
    ABAP Business Development and Service Provisioning/ABAP Objects
    General information
    What is Object Orientation?
    some blogs
    A small tip for the beginners in OO ABAP
    Object Oriented ABAP (OO-ABAP)
    and others wiki OO Abap
    cheers,
    sharad
    Edited by: sharad narayan on Apr 29, 2008 12:19 PM

  • How to learn MM module basics and SD module

    Hi all,
    As abapers you all need some basic knowledge of the modules, for example I need the info of the modules MM and SD, because I generally get works from these two module and I do not know much on them...
    How to learn these modules basics without having to any course?
    Could you please provide me documents if possible; my email is : [email protected]
    Thank you very much

    Hi Deniz,
    Process Summaries…
    Create Sales Order
    1.     Use Transaction Code VA01
    2.     Identify Sales Office
    3.     Enter Sold-to-party (customer) and purchase order number and date if applicable
    4.     Enter material, quantity and rate
    5.     Credit income to account (Internal Order or WBS element)
    6.     Enter partner (University contact details)
    7.     Save Sales Order
    Create Billing Document
    1.     Directly after saving the Sales Order, follow the path Sales document> Billing.
    2.     Save the billing document
    Other than as a follow-on function
    1.     Use Transaction Code VF01
    2.     The sales order number will default in – check that it is correct
    3.     Save the Billing document
    Print a Billing document immediately
    1.     Use transaction code VF03
    2.     Enter the Billing Document number.
    3.     Follow path Issue Output to > Printer
    4.     Click on execute twice
    5.     To preview, follow the path Issue Output to > Screen and click on execute twice to view
    Document Flow
    1.     Use transaction code VA03 (Sales Order/Credit Memo or VF03 (Billing document) or
    2.     Follow the path Environment > Document Flow
    3.     Enter the document number
    4.     Click on the document overview icon 
    Common Transaction Codes
    Access to transactions is limited by your security profile
    For easier access, add transactions to your favourites folders
    Create Sales Order     VA01
    Create Credit Memo     VA01
    Change Sales Order     VA02
    Display Sales Order     VA03
    List Sales Order     VA05
    Create Billing Doc     VF01
    Display Billing Doc     VF03
    Cancel Billing Doc     VF11
    Print Billing Doc     VF03
    Display Customer     XD03
    Display Material     MM03
    Display Customer Line Items          FBL5
    Document Structure…
    Numbering Range
    80000000 – 89999999 Sales Orders
    90000000 – 99999999 Billing Document
    60000000 – 69999999 Credit Notes
    800000 – 899999 Customers
    2000000 - 2999999 Materials
    for any further info check this link
    http://www.leeds.ac.uk/iss/infosystems
    Hope this helps u..
    Reward points if useful..
    Regards,
    Sreenivas

  • Anyone know how it works to have multiple websites on iweb?  I would like to make a separate one from the one I'm using now and have them both up and running

    Does anyone know how it works to create more than one site on iweb - I have my primary site and mobile me connected to my domain name for that site, but now I'd like to add a completely different site and domain name.

    Here is some additional info on multiple sites in a single MMe account:
    How to have multiple sites in a single MMe account with one or more sites having a domain name.
    A. All sites are in the same Domain.sites2 files
    1 - only one site can use the CNAME method of domain name forwarding and it must  the top site in the left hand pane of iWeb.
    Click to view full size
    2 - the other sites must use URL domain name forwarding which directs the domain name to the site's full MMe URL, http://web.me.com/MMe_Username/Site_Name,  or, if there is no domain name, just MobileMe's full URL.
    B. Each site is in its own Domain.sites2 file.
    Again, only one site can use CNAME forwarding.  This presents a problem since CNAME forwarding directs the domain name to the basic MMe account URL: http://web.me.com/MMe_Username/ which uses an index.html file in the root folder of the account, iDisk/Web/Sites. Each time a new site is published or an existing site uses the File->Publish Entire Site a new index.html file is created in that root directory, iDisk/Web/Sites folder, directing the browser to that particular site.  This file is what the CNAME method uses to find the site it represents.  Therefore some steps must be taken to assure that the index.html file in the MMe Accounts root directory always points to the correct site.  This can be accomplished is three ways.
    1 - don't use the CNAME method.  Just use  URL forwarding .  This, IMO, is the simplest method as it doesn't requre any additional effort on the user once the domain name has been set up.
    2 - use the following method suggested by Wyodor in this topic: Is it possible to have multiple sites when using ur Domain name?   
    In iWeb domainfile 1:
    Create a dummy site : _dummy
    with a blank page.
    Create your working site : Whatever
    Add pages
    Publish both Sites to the same same location on the same server.
    Your _dummy site is now the default Site.
    Check.
    In iWeb domainfile 2:
    Create/Use your CurrentSite.
    Move a page to the top of the Site and back. Publish the Site.
    iWeb will create a new index.html file in the root of the server and from now on CurrentSite is the default site.
    Check.
    From now on, never move your Whatever Site to the top of the list in the iWeb sidebar and never change the page in the _dummy site.
    Simply do not touch your _dummy ever again. And never forget that.
    3 - use Ethmoid's suggested method in Using two sites - setting one up with separate domain? or republishing the entire site that uses  CNAME forwarding.  Just making a minor change and publishing the site changes does not create a new index.html file. 
    The entire site must be republsihing in order to get that new site.  
    Or keep a copy of the CNAME site's index.html file on your Mac and replace it manually in the iDisk/Web/Sites fodler when necessary.
    NOTE:  the CNAME method provides a shorter URL:  http://www.Domain_Name.com/Site_Name/Page_Name.  CNAME does not have masking.
    The URL forwarding displays the full MMe URL:   http://web.me.com/MMe_Username/Domain_Name/Page_Name.   With domain name masking that will be shortened to:   http://www.Domain_Name.com for every page of your site.
    WARNING: with masking visitors will only be able to bookmark and enter at the first page of the site.  If a page is refreshed the visitor is taken back to the first page.  Also search engines will only be able to index the first page of the site.
    OT

  • How OAMessageLovInputHelper works?

    Please,
    Can anybody put some light about the OAMessageLovInputHelper class and the similars?
    I get this from the log:
    ++[49|http://forums.oracle.com/forums/]:EVENT:[http://fnd.framework.webui.OAFormValueHelper|http://fnd.framework.webui.oaformvaluehelper/]:OAF LOG: Event : Get Attribute Value, in: oracle.apps.fnd.framework.webui.OAFormValueHelper: View:AllocationsHeaderVO ,Attribute:ProjectId , Return Value without datatype conversion :1143++
    ++[49|http://forums.oracle.com/forums/]:EVENT:[http://fnd.framework.webui.OAMessageLovInputHelper|http://fnd.framework.webui.oamessagelovinputhelper/]:OAF LOG: Event : Get Attribute Value, in: oracle.apps.fnd.framework.webui.OAMessageLovInputHelper: View:AllocationsHeaderVO ,Attribute:ProjectNumber , Return Value without datatype conversion :null++
    ++[49|http://forums.oracle.com/forums/]:EVENT:[http://fnd.framework.webui.OAMessageLovInputHelper|http://fnd.framework.webui.oamessagelovinputhelper/]:OAF LOG: Event : Set Attribute Value, in: oracle.apps.fnd.framework.webui.OAMessageLovInputHelper: OldValue:null ,New Value:103
    I would like to know how it works with an example and where I can call this code to get the same data (I would like to know where the data is set in the OAMessageLovInput field).
    I've seen the following in the log this lines, so it's called from the procesform data (but I do not know how to get the same):
    [46]:EVENT:[everis.oracle.apps.ap.oie.framework.webui.xxOIEPageCO]:OAF LOG: Event : Call Process Form Data, in: everis.oracle.apps.ap.oie.framework.webui.xxOIEPageCO: Entering Process Form Data
    [46]:EVENT:[everis.oracle.apps.ap.oie.entry.accounting.webui.xxExpenseAllocationsPageCO]:OAF LOG: Event : Call Process Form Data, in: everis.oracle.apps.ap.oie.entry.accounting.webui.xxExpenseAllocationsPageCO: Entering Process Form Data
    [46]:EVENT:[everis.oracle.apps.ap.oie.entry.accounting.webui.xxAllocationsHGridCO]:OAF LOG: Event : Call Process Form Data, in: everis.oracle.apps.ap.oie.entry.accounting.webui.xxAllocationsHGridCO: Entering Process Form Data
    [47]:EVENT:[fnd.framework.webui.OAFormValueHelper]:OAF LOG: Event : Get Attribute Value, in: oracle.apps.fnd.framework.webui.OAFormValueHelper: View:null ,Attribute:_p , Return Value without datatype conversion :null
    Many thanks for your help.
    Juanje

    Currently not many companies have updated their 3rd party apps to integrate with PB... basically it's a app that functions similarly to an e-wallet and for example if you have an upcoming flight and have an electronic boarding pass it will/can be stored in PB for use when you need to scan it to enter the airport areas...
    Currently only a few companies support it with more to follow...
    Fandango Movies — Times & Tickets
    Live Nation
    Lufthansa
    MLB.com At Bat
    Sephora to Go
    Ticketmaster
    Walgreens
    Starbucks (by end of Sep)

Maybe you are looking for

  • 11.5.10.2 on Solaris 9 Install steps

    Hi, I have gone through 11.5.10.2 release update notes for Solaris .....i did not understand.... can anybody point to any doc....step by step installation of 11.5.10.2 on solaris 9 or 10. waiting for ur reply.................

  • Please help! Video Problem.

    Hey im doing a video project, I uploaded it from a camera onto iMovie at home, then when I saved i made a .mov file. I sent that .mov file to my home, but when I try to do anything with it, it says im missing "Clip 1" or "Clip 2" and wont play. Anyon

  • Hy rotation lock  is not checked, why not rotate?

    Hy rotation lock  is not checked, why not rotate?

  • When is Firefox going to stop hogging my system??

    Firefox constantly drains my RAM and CPU memory. I have 2GB of RAM and it dares to use over 1GB of that. I have a AMD 5200 processor and it dares to use over 50% of that. It's doing this constantly and I'm not the only one who has this problem. When

  • Problem with premiere pro cs5 creating Arabic subtitle

    Hi All, I have problem with creating arabic subtitle in premire. I  have a the arabic text in my mail but when I copy and paste the text, all the text is swaped, it does't show the correct text. Any idea on that? Many thanks.