How to add more data point in Pie chart

The default data point for Pie chart is 5, how could I add more data  point, I notice that I can do assign the cell to the value under data in General tab property of chart pie, but, in the sample drill down, there is no value for that value, and it still has 6 data point.

Hi DFW
The sample file has got the spreadsheet range missing thats all.  Just add the range you need to your pie chart.
Regards
Charles

Similar Messages

  • Cant add more data points to numbers chart

    I have a 2 axis 2D graph. I would guess i have about 150 data points along the y axis for both lines on the chart. I have been updating the chart each week no probem with new data points. However today, i can only seem to add a few more points - when i try to add past a certain amount of data points, the last 20 or so data points are removed from the series?
    It simply will not allow me to add more data?
    Any help on this matter would be greatly appreciated as the charts are for use in my business

    Hi Jerrold, thanks for the reply.
    I dont have category labels. I have a 2 axis 2D chart, with a line series and an area series on the chart. I add new data to the chart each week by clicking on either the line or the area series on the chart, then going to my data table beside the chart, and by holding apple command button and clicking on the relevant cells to add to the charts. As of this weeks adding, it starts of as usual, adding the cells to the line and area series, and thus adding data onto the existing chart and extending it out to the right, as it normally would. However, i can only add a certain amount of new cells (data points) to either the line or area series. When i go to add more, a very strange thing happens. The series switches from all the cells that are highlighted blue, to another table i have on the same document??? If i look at the Inspector in the Data box under the series tab, the data goes from the typical 'Table 1 :: D18', (highlighted in blue, to the following weird data point : 'D38,SFTGlobalID_CB7D88F601784CAC8DD283ECA59CFB41 :'
    Its worth noting that although i an working on a brand new macbook pro, numbers has crashed on me a number of times when adding large amounts of data to the chart The table has 1,120 rows, and 11 columns. Only 1 in every 5 or so rows are plotted (on y axis), so roughly 200 or so data points for both line and area chart are plotted. And only 1 column is used for each chart. Thus i have 11 charts on the one numbers document. Is it a case of too much for numbers to handle?
    I have just deleted all the y axis data for the area series for one chart, and added all the data from the whole table again, (rather than just adding this weeks to last weeks, which is where i saw the problem in the first place) to see if it made a difference. But none. Once i got to a certain point, if i add one more cell data point to the chart, the exact same thing happened as above - the highlighted data switched from what i had been highlighting the whole way down the table, to an entirely different table in the same workbook.
    Any ideas would be greatly appreciated.

  • In Share point 2013 how to add more than 2 group by in list

    In Share point 2013 how to add more than 2  group by in list .

    Hi,
    According to your post, my understanding is that you wanted to group by on more than 2 columns in a List View in SharePoint 2013.
    There is no out of the box way to achieve your scenario directly.
    As a workaround, we can use the following method to achieve it.
    First, we can insert Data View Web Parts in SharePoint Designer 2013.
    It’s because the SharePoint Designer 2013 can’t support Design view, then the Data View Web Parts XSL cannot be visually manipulated.
    You can refer to the following article to insert a Data View Web Part.
    http://www.synergyonline.com/Blog/Lists/Posts/Post.aspx?ID=259
    And then, you can use the following solution that can be used to
    group by on more than 2 columns in a view
    to implement it in SharePoint Designer 2013.
    http://techtrainingnotes.blogspot.com/2011/01/sharepoint-group-by-on-more-than-2.html
    http://chanakyajayabalan.wordpress.com/2010/03/15/group-by-for-more-than-two-columns-in-sharepoint-list/
    Best Regards,
    Linda Li
    Linda Li
    TechNet Community Support

  • How to add more summary data in the MIP of Compensation workbench

    Hi all,
    In the MIP (incentive plan) of the compensation workbench, we need to add more summary data in the summary section. I checked that all the summary data in that section are stored in the table 'ben_cwb_summary'.
    Even we can change the VIEW object for that page (using extension), we can't retrieve it because the new summary data/information we need to add are not stored in the table 'ben_cwb_summary'. We need to write our query to summerize data.
    How to implement it?
    Thanks in advanced!
    Jane

    faiz2000 wrote:
    > How to add more one record in the same time?
    >
    > Please I need your help to add more one record in the
    same time, how can I do
    > that?
    >
    > I have only one text field and the value it is linked
    from other table, if
    > user he bushes bottoms the all data it will copy it to
    new record:
    >
    > Ex.: <input name="textfield" type="text"
    >
    value="<%=(Recordset1.Fields.Item("webgroup").Value)%>">
    >
    >
    Use "Repeat Region"
    Mick

  • CWB: how to add more summary data in the summary section

    HI All,
    We need to add more summary data in the summary section. Some summary data need to calculated dynamically like (summary data A /summary data B).
    under the worksheet, there is a link:
    Personalize Dynamic Columns
    But this link allows to create Dynamic Columns for the worksheet, but not for summary setion.
    Is any way to add more summary data in the summary section through personalization instead of customization (VO extension)?
    Thanks in advanced!
    Jane

    faiz2000 wrote:
    > How to add more one record in the same time?
    >
    > Please I need your help to add more one record in the
    same time, how can I do
    > that?
    >
    > I have only one text field and the value it is linked
    from other table, if
    > user he bushes bottoms the all data it will copy it to
    new record:
    >
    > Ex.: <input name="textfield" type="text"
    >
    value="<%=(Recordset1.Fields.Item("webgroup").Value)%>">
    >
    >
    Use "Repeat Region"
    Mick

  • How to add more disk space into /   root file system

    Hi All,
    Linux  2.6.18-128
    can anyone please let us know how to add more disk space into "/" root file system.
    i have added new hard disk with space of 20GB, 
    [root@rac2 shm]# df -h
    Filesystem            Size  Used Avail Use% Mounted on
    /dev/hda1             965M  767M  149M  84% /
    /dev/hda7             1.9G  234M  1.6G  13% /var
    /dev/hda6             2.9G   69M  2.7G   3% /tmp
    /dev/hda3             7.6G  4.2G  3.0G  59% /usr
    /dev/hda2              18G   12G  4.8G  71% /u01
    LABLE=/               2.0G     0  2.0G   0% /dev/shm
    /dev/hdb2             8.9G  149M  8.3G   2% /vm
    [root@rac2 shm]#

    Dude! wrote:
    I would actually question whether or not more disks increase the risk of a disk failure. One disk can break as likely as one of two of more disks.
    Simple stats.  Buying 2 lottery tickets instead of one, gives you 2 chances to win the lottery prize. Not 1. Even though the odds of winning per ticket remains unchanged.
    2 disks buy you 2 tickets in The-Drive-Failure lottery.
    Back in the 90's, BT (British Telecom) had a 80+ node OPS cluster build with Pyramid MPP hardware. They had a dedicated store of scsi disks for replacing failed disks - as there were disk failure fairly often due to the number of disks. (a Pryamid MPP chassis looked like a Xmas tree with all the scsi drive LEDs, and BT had several)
    In my experience - one should rather expect a drive failure sooner, than later. And have some kind of contingency plan in place to recover from the failure.
    The use of symbolic links instead of striping the filesystem protects from the complete loss of the enchilada if a volume member fails, but it does not reduce the risk of loosing data.
    I would rather buy a single ticket for the drive failure lottery for a root drive, than 2 tickets in this case. And using symbolic links to "offload" non-critical files to the 2nd drive means that its lottery ticket prize is not a non-bootable server due to a toasted root drive.

  • How to add more Im's in c2-00

    I have a nokia c2-00 mobile phone and wants to use its chat app which is in messaging menu .
    But there is only 1 im (ovi.com) is available i want to add more im's like fb yahoo etc .

    faiz2000 wrote:
    > How to add more one record in the same time?
    >
    > Please I need your help to add more one record in the
    same time, how can I do
    > that?
    >
    > I have only one text field and the value it is linked
    from other table, if
    > user he bushes bottoms the all data it will copy it to
    new record:
    >
    > Ex.: <input name="textfield" type="text"
    >
    value="<%=(Recordset1.Fields.Item("webgroup").Value)%>">
    >
    >
    Use "Repeat Region"
    Mick

  • Is it possible to add more data to a prepaid plan before the current data allowance is used up?

    My data is nearly used up and I will b eon the road when it is completely used up.  I would like to add more now so that I do not have to pull off the road to login and add more data to my plan.  The website is very poorly designed and of it is possible to do this I can't find where it is.  Please do not tell me to call the CS line like you have everyone else who has asked similar questions.  If so please state that this is the only way to add more data to a plan/account as I don't have the availability to sit on hold for 40 minutes...  Thanks

        TSchlottman, we want that process to be as easy as possible for you. Happy to provide direction on how to change your plan. To change your minutes, text or data: Go to the Change Minutes, Text or Data page in My Verizon. If you have multiple lines on your account with separate plans, select the plan you’d you like to make a change to, and click Next. Select the data plan you’d like to have and click Next at the bottom of the page. Select the date when you want your changes to take effect and click Next. Review your changes and click Submit Changes.
    BrianP_VZW
    Follow Us on Twitter @VZWSupport

  • How to add more fields at level task for importing to MsProject

    Hi everyone,
    We would like to have the same number of fields either for importing as exporting; or at least, the fields that we need.
    The problem is when we are configurating the fields for exporting from cProjects to MsProject, we found 81 available fields and then we don't find the same amount for importing (34). So, in some cases we don't find fields which were configurated for exporting and it is no posible to upload the information back because the field is no available for importing.
    Does anyone knows how to add more fields for importing at the cProjects side?
    Thanks a lot,
    CAMILO URIBE

    Some fields can not be migrated because of MsProject designe. The above is the reason why cProjects' customizing does not offer the
    mapping of the same nuember of fields.

  • How to add more drop zones or movies in an idvd menu

    I was building a dvd in idvd and ran out of drop zones to fill but I couldn't figure out how to add more drop zones.
    I tried different templates but I could find none that had more than 12 drop zones.
    Then I was adding movies to the main menu and idvd refused to allow more movies added when I reached 10 movies. It said that the template did not accept more movies.
    I tried a few other templates and could not get it to accept more.
    I don't want to add submenus because the movies being used do not lend themselves to being put into different submenus.
    Is there some way to add more than the default drop zones in an idvd template and to add more movies in a menu without having to use submenus?
    Thanks for any advice.

    I couldn't figure out how to add more drop zones
    Sorry, the templates 'are what they are'.
    I don't want to add submenus because the movies being used do not lend themselves to being put into different submenus.
    You need to figure out how to work with what is available.
    If you want more freedom, buy Apple's Final Cut Studio and learn to use DVD Studio Pro.

  • How to add the date field in the dso and info cube

    Hi all.
    I am new to bi 7. in the earlier version v hav to button to add the date field. but in the bi 7 der is no option so can any body tell me how to add the date field in the data targets
    Thanks & Regard
    KK

    my prob is solved
    KK

  • How to add more than one tabular region in a page?...

    How to add more than one tabular region in a page?
    i have a page, that page contain form and tabular region. when i trying to add another tabular region it showing error
    1 error has occurred
    Updatable SQL Query already exists on page 2. You can only add one updatable SQL query per page. Select a different page.
    but i have to add the tabular in that page.
    Is it possible?
    pls help...
    Thanks and regards,
    skud

    hi,
    even i am searching for some thing similar.
    i want to have 3 calendars in one page.
    getting same message calendar already exists on page 2. You can only add one calander per page. Select a different page.
    pls help.

  • How to add one date column and charecter column

    hi all,
    i have 3 column start_date(date),end_date( date),duration (varchar2)
    i am trying to add start_time and duration like this
    end_date := to_char(start_time) + duration;
    but its showing value_error
    how to add one date column and charecter column.
    Thanks

    you need something that does:
    end_date (DATE) := start_date (DATE) + <number of
    days> (NUMBER)Not necessarily, because if the duration is just a string representation of a number then it will be implicitly converted to a number and not cause an error
    e.g.
    SQL> ed
    Wrote file afiedt.buf
      1  with t as (select to_date('01/07/2007','DD/MM/YYYY') as start_dt, '3' as duration_days from dual)
      2  -- END OF TEST DATA
      3  select start_dt + duration_days
      4* from t
    SQL> /
    START_DT+
    04-JUL-07

  • How to add TIMESTAMP data type in  Enterprise Architect...?

    Hi all
    There is no data type of timestamp in Enterprise Architech. There is only
    DATE type. I have ERD prepared from Enterprise Architech. How to modify
    DATE type to TIMESTAMP type.
    How to add TIMESTAMP data type in Enterprise Architect or in ERD ?
    Thanks in advance,
    Pal

    Have you asked this question of the vendor of Enterprise Architect? They may have a later version that supports the various TIMESTAMP data types. If your ERD tool doesn't support a data type, other than talking to the vendor or working around the problem (i.e. generate DDL to a text file and edit it before applying it to the database), you're probably out of luck.
    Justin

  • How to add new data file

    Hi Friends,
    We have 4 below file systems.
    Sybase/TST/sapdata_1
    Sybase/TST/sapdata_2
    Sybase/TST/sapdata_3
    Sybase/TST/sapdata_4
    Already we have added one data file each in sapdata_1 and 2.  Sapdata3 and 4 are emptry.
    How to add new data file in sapdata3 or 4.
    Please provide syntax for creating a new data file and steps for the same.
    Regards,
    Karthik.

    Just for the record: you have here the DBACockpit documentation:
    https://websmp201.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_OBJECT=011000358700000571562012E
    And this is a sample of the extend to be executed:
    Regards,
    Victoria.

Maybe you are looking for