How to capture Material costs, profit margins in pricing

Guys,
What is the way to capture material costs, profit margins and other sub-totals into the pricing procedure?
Thank you.

Hi
For capturing the material costs, you can use one of VPRS, EK01 or EK02 condition types. The usage of these condition types and their significance can be seen in some other thread here. There are lot of threads on these condition types.
You can also go to these links given below.
http://sap.ittoolbox.com/groups/technical-functional/sap-log-sd/condition-type-ek01-ek02-1396383
http://www.jt77.com/system-dynamics/model-08388.html
http://www.jt77.com/system-dynamics/model-05254.html
http://www.jt77.com/system-dynamics/model-04469.html
http://www.sap-img.com/sap-sd/difference-between-condition-type.htm
This should also tell you something about profit margin.
For subtotals, there is a separate column in pricing procedure and  you can mention which subtotal a condition type or subtotal should correspond to. The subtotals range from 1 to 9 and then A to Z. The purpose of these subtotals can be seen by putting an F1 in that column or through some oss notes.
Hope this helps you.
Rewards if this helps.

Similar Messages

  • How the raw material cost is picked in product cost in case of split materi

    how the raw material cost is picked in product cost in case of split material in BOM

    Hi
    In case of Std cost (CK11N), the planned price or MAP that you enter in the Parent accounting View will be considered for the cost calcualtoin purpose
    Parent view means the view which is above the 2 or more valuation types which consists of avg value of all other val types
    Ajay M

  • How to the *material costing* after below steps

    Hi sapgurus
    please help us,
    How to the material costing after below steps
    1.     Actual costing /material ledger
    2.     Material update
    3.     Actual costing
    4.     Production start up
    5.     Customizing setting in OBYC
    please sent to any documents.
    Thanks & Regards
    Sri

    Dear Friend
    A sales order is created say order no 10000 and for material X say 10 units this order is delivered and PGIed and invoiced and the payment too has come
    That means the order 10000 is closed
    Case 1
    Now an user goes to VA02 t code and put this order no 10000 and changes the material X qty from 10 to 12 and opens up the whole order once again
    This can be controlled by using t code OVAH choosing message class the V4 message no 083 and change from warning to error
    Case2
    But to avoid the user to add material Y to the existing order say 10000 then i think we have to go for user exit
    Because the system doesnot even throw a warning message too in case 2 (according to my knowledge) and allows another line item to be added in the same order
    But you can test it if it throws any warning message we can try to convert that error
    But in case 2 it is not happening(even warning is not there)
    Regards
    Raja

  • How to capture planned cost

    Dear experts ,
    please help me in the following scenario.
    At one of our location we have PP-PS scenario. production order is made for production in PP module.
       in that location mostly JOB production is done, there about 30 % of the total cost of equipment is given to outside contractors. our problem is how to capture that cost in budget ( WBS system is being followed ) in PO WBS is assigned.  we have created an activity and rate is maintained in KP26 for that activity so that planned cost is arrived at ( we have to capture the planned cost in production order) , our problem is in WBS amount is coming twice
    1)as remaining order plan in WBS and the available budget amount is getting reduced
    2) when the SR is made again the same amount is appearing in the commitment in WBS.and the available budget amount is reduced once again
    our requirement is budget what is to be done so that budget amount is not reduced twice , we also want to capture the planned cost in production order.
    Thanks and regards
    sanjiv

    HI,
    Inorder to get all the actual costs on activity which is actually on WBS. You can do an enhancement. This enhancement should find the all POs against PR which belongs to an activity and will repost the costs that is being posted on WBS on GR to the concerned activity.
    Regards,
    Anjali

  • How to include Material Cost in the SD report

    Hi,
    I am working on Cube 0SD_C03 for the Sales and Distribution Report "Sales Contribution - Product Wise u2013 KPI" where I have to show the following information which are given below.
    1. Total Sales Qty.
    2. Total Sales Value
    3. Total Material Cost
    For third one I do not know how to include this in this SD report.
    so please tell me about this if anybody has idea about this?

    Hi Francisco,
    Note:
    your xml should only have
    <URL>http://dbxserver.dbxprts.com:7778/pls/apex/f?p=134:1:::NO::P1_ID_CONSTANCIA:1183</URL>
    Show me your sample XML , i can help you.
    What is your expected output ? PDF or HTML ?
    here it is.
    option1:
    If the XML data includes an element that contains a hyperlink , then you can use that element to create dynamic hyperlinks at runtime.
    a. insert hyperlink from word menu
    b. In the Type the file or Web page name field of the Insert Hyperlink dialog box, enter the following syntax:
    c. {ELEMENT_NAME_WHICH_HAS_URL_LINK}
    where ELEMENT_NAME_WHICH_HAS_URL_LINK is the xml data element name
    option2:
    create a form field, you can add it
    <fo:basic-link external-destination="http://www.google..com">
    <fo:inline text-decoration="underline">google Link</fo:inline>
    </fo:basic-link>
    or
    <fo:basic-link external-destination="{ELEMENT_NAME}">
    <fo:inline text-decoration="underline">google Link</fo:inline>
    </fo:basic-link>
    or
    <fo:basic-link>
    <xsl:attribute name="external-destination"><xsl:value-of select="ELEMENT_URL"/>
    </xsl:attribute>
           <xsl:value-of select="LINK_NAME"/>
    </fo:basic-link>

  • How to capture the cost on project of freely supplied components to vendors

    Dear Friend's,
    My client is sending some child components to their vendor's on free of cost basis to manufacture products like panels, tanks etc. for any particular Customer Project.
    Once these products gets manufacured by vendor,  they supply to client stores, from here my client is doing the delivery & billing to their customer's.
    Here my client's requirement is that they wanted to capture the cost of free supplied child componenets to vendors for any particular project.
    How i can capture this cost for any project..............Kindly give some input on this scenario to full fill the requirement.
    Thanks & Regards,
    Sandeep Theurkar

    Dear Sandeep
    How is the client "sending" the parts to the vendor?How are you maintaining the process of sending  these parts to the vendor?
    Are these parts maintained in the Organization's inventory?
    Thanks and Regards

  • How to Update material cost of user defined org specific cost type

    Hi,
    We need to update material cost sub elements of an item for an org specific and user defined cost type.
    I have inserted a sample row in the CST_ITEM_CST_DTLS_INTERFACE, and running open interface 'Mass Update Material Costs', but the program is not at all processing the rows, the Process_flag remains 1.
    insert into cst_item_cst_dtls_interface
    (inventory_item_id,
    organization_id,
    resource_id,
    usage_rate_or_amount,
    cost_element_ID,
    Process_Flag ,
    last_update_date,
    last_updated_by,
    creation_date,
    created_by
    values
    (96023,
    343,
    52538,
    0.00208012,
    1,
    1,
    sysdate,
    fnd_global.user_id,
    sysdate,
    fnd_global.user_id
    Can someone help me out with this, thanks.
    Regards
    Dasu

    I think there is some confusion.
    "Mass Edit Material Costs" program is used to apply new activity rates to item costs. For this, you don't have to insert records in the interface. You have to define/update the new activity rates using screen.
    To process records in the cost interface tables, you have to run the "Cost Import Process" program.
    For more details, refer to http://download.oracle.com/docs/cd/A60725_05/html/comnls/us/cst/settas06.htm
    Hope this answers your question
    Sandeep Gandhi
    Omkar Technologies Inc.
    Independent Techno-functional Consultant

  • Profit Margin in Pricing

    Hi,
      I am using a pricing procedure which includes the condition type "vprs" for cost.
      However, my Profit Margin shows the sum of my TOTAL and my COST.
      Can you advice me on how to rectify this?
    Thanks and Regards,
       Aditya

    In the T.code: V/08 go to your pricing procedure and in that, in reference to the condition type <b>VPRS</b>  check if it is checked for <b>Statistical</b>.
    The functionality is given below
    <b>Statistical:</b>
    This indicator if it is activated will not allow the value of the condition type to be taken into net value calculation.
    It is used only for information purposes only.
    This indicator causes a surcharge or discount to be set in the document statistically (that is, without altering the value).
    This is commonly used for condition types
    SKTO - Cash Discount
    VPRS - Cost (Moving average price/Standard Price).
    Also Profit margin should be assigned with AltCTY as 11.
    Regards
    AK

  • Cost plus Margin in pricing

    Dear All,
    Can anyone explain me if I can link my sales price with GR value.?The requirement is the client wants to link the sales margin with GR value of the material.
    So I want to calculate price = cost + 10% margin. Can i use condition exclusion for EK01 and VPRS condition type and to find higher cost and then add margin.?
    Please guide me with what should be in subto field...
    Thanks in advance...
    Plz reply soon....
    Regards
    manish
    Edited by: Manish Patel on Oct 19, 2008 9:15 AM
    Edited by: Manish Patel on Oct 19, 2008 7:24 PM

    Hi,
    For this change, just enter the step number of the value after tax in the from field of the profit margin.
    see if this works out.
    every condition type has a step number and a counter number.
    enter the step number of the value after tax to the from to field in the profit margin value.
    regards,
    Siddharth.

  • How to Capture Multiple Cost centres and Business Unit information in a project?

    Dear Experts,
    With the help of UDA functionality in project super responsibility, I have captured Cost centre and Business unit information and this info will be used/reflected in CC and BU segments of all transactions gets recorded against that project.
    Now, our user wish to have multiple cost centres and business units to be tracked in the same one project. How is this feasible? Below example describes my requirement in a summary, please advise.
    An Indirect project is created when a defect on a machine reported from client's customer and all subsequent activities (purchases, travel to customer site to analyse and troubleshoot, purchases for any in-house analysis etc..involves costs spending internally) in resolving that defect/project involves 6 to 7 different departments (Sales, Tech Support, Quality team etc.,who actually work/travel and spend costs against project until defect resolution). And, each of the above departments will have 1 dedicated owner (project owners) to manage that project and each of these 6 or 7 owners owners will have their own cost centres (eg: 2345 - Sales team) against which they wish to see their transactions (travel, purchases during defect resolution) globally.
    So, all I want to know is how can I make one single project to accommodate multiple cost centresand business unit information to be assigned using UDA? Please let me know if I am not clear.
    Regards
    Venkat

    I think you should use the expenditure organization on the transaction itself to derive the CC/BU. Have AA lookups and define AA rules where you look at a Exp Org to BU or Cost Center to derive accounting.

  • VA01-TAD how to capture service cost

    Dear Experts,
    My client has a business scenario of services done to his client site.
    these services are booked in sales order with service material - item category TAD. in my pricing Procedure i have all condition types with EK01
    I wish to capture the service cost in sales order with EK01 , I have entered manually it is in inactive state.
    could you please suggest me the sales order capturing the service cost ?
    Regards,
    Pratheep

    Thanks G. Lakshmipathi
    I am great with your suggestions
    Testing service is done by scientists at company premises , the samples are given by customer.
    i have a service material , named - Water testing - in accounting view of material master - maintained 100 USD for cost involved
    Now if i have punch this service material in my sales order, will it fetch the cost through VPRS condition type, maintained determined cost in item category TAD
    Regards,
    pratheep

  • How to Capture Transportation cost of Sales Employee

    Dear All,
    If i am not implementing HR module, then is it possible to track the transportation cost of sales employee which is generated during sales or service.
    Is it possible in SD? How?
    Plz  send some solution for the same.
    Thanks & Regards,
    PM

    hello, friend.
    even without HR you can create sales employees and assign them to sales documents, outbound deliveries and shipments by using partner determination.  you assign the sales employee in the "Partner functions in procedures".
    however, i am not aware of direct assignments of partners to shipment cost documents.  you may need to use ABAP to link the shipment to the shipment costs, and from there find the partner assigned.  i am sure this is possible.
    regards.

  • Costing in cProjects 4.0 - Material costs not reflecting

    Hi,
    In cProjects 4.0, i have replicated the cProject to PS project. I wish to capture the material costs in the project. How should i proceed ?
    Please suggest.
    Regards,
    Amit
    9820502246
    [email protected]

    Hi Amit,
    cProjects has not field to caputure material costs.
    You may however, create an additional field and use that to capture material costs in cProjects. You will need to map this additonal field to the material cost field in PS while replicating project from cProjects to PS. I am not sure of how you will do this. See if there is any BAdI that can help you.
    Regards,
    Reema.
    <i>pl award all useful points.
    Do post back if you find a solution.</i>
    Message was edited by:
            Reema Shahbazkar

  • Excise Value and Freight value should be add to material cost in the depot

    Hi,
    Can any one help me on my scenario?
    We have depot concept my client requirement is excise Value and Freight value should be add to material cost (inventories at depot) in the depot
    Thanks & Regards
    KMR

    Hi All,
       In Depot Sale. This are the Excise Duty Passed on to the Customer BED, AED ECS, SHECS, Other then that its added to the material cost. Define a Pricing procedure for value added to the material cost in both Procurement & Sales base your problem will be solved.
    Regards,
    Pherasath

  • How to maintain profit margin in third patry sales

    Dear Experts
    Please suggest how to maintain profit margin in third party sales
    Regards
    Manoj

    hi,
    you need to maintain VPRS condition type in your pricing procedure.
    VPRS condition type captures COst of the material. This Value for Condition type VPRS is copied from Valuation segment from Material master.
    VPRS should have subtotal as B and requirement as 4 and also should be statistical in your pricing procedure.
    Moreover the item category of the sales order Determine cost should be marked in VOV7
    After maintaining this, you can maintain Z condition type with MARGINE % or value as per your requirment
    In normal scenario, clients do maintain the condition record for PROFIT MARGINE % so that this margine valu gets calculated automatically

Maybe you are looking for

  • Effect of Secondary Index on Performance Tuning

    Hi, I have a select statement with the below where statement. WHERE keyz1 = IT_dfkkzk-keyz1 AND bldat IN s_pblda AND valut IN s_pvalu. Table from data is accessed Primary key is a combination of two fields KEYZ1 & POSZA. We have a Secondary Index wit

  • Fatal Aperture 3.0.2 error

    I had to force quit aperture because it stalled and now everytime I try to run the application, I get the following error: "There was an error opening the database for the library "~/Pictures/Aperture Library.aplibrary". The error window only has a q

  • C# Joystick interface with SlimDX.DirectInput

    I am trying to create a robot controlled by a joystick.  I am using a Logitech Rumblepad with two POV's and multiple buttons (a gamepad). using System; using System.Collections.Generic; using System.Linq; using System.Text; using System.Threading.Tas

  • Sharing Folders Between Accounts - Advice Needed

    Looking for advice. I am running 10.5.2 on a MacPro and have several people on my network logging in to a Standard User Account. These users need to read and write files in the Documents folder but I do not want them to have the ability to delete or

  • 16:9 to 4:3 conversion

    Dear all, I've created a 16:9 AVCHD video and would like to export it with (AVI) DV Standard (4:3) format.  Everything is fine except that the small picture in Picture-In-Picture drops a bit out of the big screen as shown in the attached.  Do you kno