I need to update the bucket capacities of Resource at Vendor location in APO live cache for a particular period using BAPI_RSSRVAPS_CHANGEMULTI.
Here I am executing BAPI by passing -
Import Parameters:
LOGICAL_SYSTEM
COMMIT_CONTROL
PLANNING_VERSION
Tables:
RESOURCE_HEAD
(RESOURCE = Resource  " Test123
LOCATION = Vendor Number/Loctaion
CAPACITY_A = 5000.000
NUM_OF_PERIODS = 001
PERIOD = 02    " Day Wise
UTIL_BUCKET = 100.000 )
RESOURCE_HEAD_X
(All corresponding fields X)
RESOURCE_QUANMODEL
(RESOURCE = Resource  " Test123
VERSION = 01
ENDDA = 02/25/2011
BEGDA = 02/21/2011
QUANMODEL = 8000 )
RESOURCE_QUANMODEL_X
(All corresponding fields X)
[ I have a capacity variance:
Resource = Test123; Capacity Varient = 01; Valid From = 02/21/2011
Valid To = 02/25/2011; Bucket Util Rate = 100.000; Qty/Rate definition = 8000 ]
Now, while I execute /SAPAPO/RES01 to display Capacity for that resource-Location-PlanningVersion, Its showing that 'Bucket Capacity' and 'SNP Bucket Capacity' get changed into 5000. But this change happend for all the days and not only for the duration I passed into Bapi (From BEGDA to ENDDA).
How to change bucket capacity for a certain date range (duration)? Any help please.
Thanks
Roy

I did it myself. Hence closing the thread.
Solution:
1. Get RESUID from /SAPAPO/RESKEY table by passing Resource as NAME.
2. Call Function Module /SAPAPO/CRES_QUANPROF_UPDATE
3. Call Function Module /SAPAPO/CRES_SAVE_FROM_BT
For further help, change manually a single record in the 'capacity profile' in TXN /SAPAPO/RES01 and debug both the FM mentioned above.
BR
Roy

Similar Messages

  • How to see Control chart for a specific date range in QGC3

    Hi
    I am developing SPC for my client.I am facing one problem.
    I am using one control chart for all inspection lot for a particular MIC.Free inspection point is used in inspection plan.
    Control chart is used 516.(XMR chart)
    Now when i am calling control chart for MIC executing QGC3,chart is showing results since creation chart date to todays date.
    Now if i want to see chart for a particular period or date range,what is the procedure.
    Thanks in advance
    Nilanjan

    Hi,
    1. Even though when i give the Created on, and to date the system is displaying the report which is prior to the created on date.
    2. Similarly the report data is different when the field is maximum no of Hits is given. for example when i giving this field as 10, 20, 30, etc the report is showing only 10 line items. if i enter 50, 60 etc it is showing the list for half i given.
    Note that system is having more than 1000 line items to display..
    Regards,
    R. Loganathan

  • How to Search BPM Processes for a Given Date Range through a VC Report

    Hi All,
    We have a VC component build to view the BPM process information. Here we are supposed to provide a Date range option for searching the processes. But the Range search is not working.
    I tried in below ways.
    1. On Action Submit, I set the Occurance_D value as "=DSTR(@DATE_FROM,"M/D/YY")&" - "&DSTR(DADD(@DATE_TO,1,"D"),"M/D/YY")" it is working only if there are processes existing either on DATE_FROM or on DATE_TO, otherwise its not working.
    Like, I have 5 processes triggered on Sep-5-2011, then if i give the Date Range as 9/5/11 - 9/11/11  or 9/1/11 - 9/5/11  it is working. But if I give 9/1/11 - 9/11/11 it is not working.
    I tried this way as well.
    =DSTR(@DATE_FROM,"M/D/YY")&" : "&DSTR(DADD(@DATE_TO,1,"D"),"M/D/YY") . Even this is not working.
    Can some one please help.
    Regards,
    SrinivaS

    Dear SrinivaS,
    The main things you need to consider are:
    - store your date value from the UI in a store
    - the store gets used to submit a filter string in format (MM/DD/YY) to
    BI_START_TIME_D.
    If you follow http://help.sap.com/saphelp_nw72/helpdata/en/81/541300d147
    41b39057c8ab3be61f7a/frameset.htm
    you find that the process data source can be filtered in format  "9/9/11
    - 9/12/11" for field BI_START_TIME_D and BI_END_TIME_D.
    The trick is now at submission time to concatenate the strings
    accordingly and submit to BI_START_TIME_D. Use the following dynamic
    expression
    =DSTR(store@START_DATE_FROM,"MM/DD/YY")&" - "
    &DSTR(store@START_DATE_TO,"MM/DD/YY")
    to format the string during submission. I was able to verify this on my
    machine. I hope that also your locale settings work with this
    implementation.
    Find attached a link to a small sample application [(test_date.zip) |please find attached a small sample application (test_date.zip) which]which shows you the proper usage of a date picker in conjunction with the
    process data source. Please import the zip file into VC and deploy it.
    Best regards,
    Ralf.

  • Powershell to Remove Emails for a certain date range

    We are about to move our Email Archive System and are not going to be using stubs anymore.  Our current Email Archive System doesn't provide a solution to remove all the stubs we currently have in Exchange 2010 for all users.  So i need a Powershell
    command or script to do this and wonder if anyone hand one handy.  It needs to remove all emails/stubs over 6 months old from all folders on all users mailboxes.  It might be safer to move them to another mailbox if i can so any that aren't stubs
    can be moved back.  
    Also it would be really helpful if the command first off did this on just one user so i can test it before using it on all users, or can it be ran against a single database - as i can guess this command is going to take some time as we have stubs going back
    to 2006 on 200 mailboxes.
    Thanks

    Just found this 
    http://blogs.technet.com/b/exchange/archive/2010/10/27/removing-specific-messages-from-your-exchange-server.aspx
    Which fills all my requirements however can't get it to work because Export-Mailbox cmdlet doesn't seem to exist in SP1.  I have followed this guide:
    http://blogs.technet.com/b/exchange/archive/2010/03/26/3409621.aspx
    But that doesn't seem to enable it.  Anyone know how i can do this?

  • Sync with Outlook ONLY for a specific date range

    I have a Zire 31 that I'm syncing with Outlook via latest Palm Desktop/HotSync.   I did just install the latest conduit.
    I was getting several repeating calendar entries that were not syncing with the Zire (annual birthdays, etc.) - turns out that they did not have an "end-date" specified when created in Outlook.  Creating an end-date solved the problem.
    However - I would like to know if it is possible to specify a certain date range for the device to sync (e.g., sync calendar only for years 2007 through 2050, or in other words sync from 1 year ago to 50 years in future, etc...)
    I recall specifying this once years ago, but I may have been using a third party to sync with Lotus Notes at the time.  I'm wondering if this option is also available with syncing directly with Outlook using HotSync???  I can't imagine it's not, but I can't find where you specify it.
    One more interesting note:  while my Zire 31 had issues syncing those repeating calendar entries - my much older HandSpring Visor Deluxe syncs them no problem!  Go figure.
    Thanks much -
    Post relates to: Zire 31

    I'm not actually looking to purge old items.
    Rather - I would like to ONLY sync calendar entries between a specified range of dates.  For example - ONLY sync for calendar entries between Jan 1 2007 and Jan 1, 2050.
    the problem is that I have some repeating entries (birthdays, etc.) that are set up in Outlook with no end date.  Apparently Palm/HotSync is having trouble syncing these (they don't show up at all - for any year.)
    One resolution is to apply an end-date for each repeating calendar entry.  However, this is just another step my wife needs to remember to do.  If you happen to forget to to this, then Hotsync will ignore that entry.  Fine if you realize that's happening, but if you forget and forget to check - you won't even know it didn't sync!
    The other possible resolution is to only have HotSync sync for a SPECIFIC date range - one that does not presumably go to infinity.  That is my question - how does one sync ONLY for a specific date range.  Has nothing to do with purging old entries.
    Thanks!!
    Post relates to: Zire 31

  • How to change default approval for ResourceAuthorizerApproval ?

    Hi,
    I'am new in OIM and I follow documentation where I found some predefined workflows. I'd like to use them.
    Could you tell me, step by step, how to change default approval for ResourceAuthorizerApproval (only for my new defined resource).
    I'm using OIM 11g and Design Console 11.1.1.3.0.2.0

    Ok, I made new tamplate (copy of existing one), there I changed Template Level Approval Process and set allowed resources. It seems to be ok :)
    If there are other solutions please share with me
    Thanks
    M.

  • How to change a color for a row in ALV grid display

    Hi,
       how to change a color for a row in ALV grid display based on a condition.Any sample code plz

    Hello Ramya,
    Did you check in [SCN|How to color a row of  alv grid]
    Thanks!

  • How to change material component for a Purchase Order?

    How to change material component for a Purchase Order?
    I need FM .
    PLEASE help

    Dear ,
    Create PO with item category L....There in Item detail you will get tab for material.
    There click in component Button, it will take you to the component screen there you can assign and deassign components.
    Hope this helps.
    Regards
    Utsav

  • How I change the icon for iTunes songs?

    When I drag iTunes songs onto my desktop the icon is white with a gray iTunes icon. How can change this icon for all of my iTunes songs?

    Thanks Patrick. I used Control-Click on the actual audio file on my desktop opened the Show View Options menu and turned off the icon preview option. That changed my icons from gray with a white background to red with a white background which is exactly what I wanted.  You pointed me in the right direction. Appreciate it.

  • How to change Apple ID for all applications in iPad2?

    I have changed Apple ID via Settings > Store > Apple ID > Sign out my old Apple ID > Sign in with my new Apple ID.... But, by this method, Apple ID in  iCloud, Facetime, and iMessage isn't changed follow to my new one! Do I misunderstand about changing ID? and How to change Apple ID for these applications?
    PS. I do not want to do hard reset my iPad2
    Thank you all for your kindly help ^^

    Go into Settings > iCloud > Account > Change to your new Apple ID
    Settings > Messages >  Recieve At > New Apple ID
    Settings > Facetime > Change to new Apple ID

  • I cannot find how to change the language for labels in a quiz

    I cannot find how to change the language for labels in a quiz

    You have to be aware that this will only change labels if you edit before adding quiz slides: Preferences, Quiz, Default Labels. You will have to edit the labels, choosing another language will not change them automatically.

  • How to change the Icon for a JFileChooser ?

    Has anyone figured out how to change the icon for an instance of JFileChooser from the coffee cup to something else?
    I'm on 1.4
    Thanks,
    Ken

    Never mind. I figured it out.
    You have to use an instance of JFrame in the call to showXxxxDialog(Component c). Set the icon of the JFrame to what you want the JFileChooser's icon to be.

  • How to change the color for HTML words in JEditorPane?

    Hi Sir,
    In the JTextPane , we could change the word's color by using:
    Style style = doc.addStyle("test",null);
    StyleConstants.setForeground(style, Color.red);
    doc.setCharacterAttributes(10,20,syle,true);
    we can change the text into red color,which range is from 10 to 30.
    But how to change the color for HTML words in JEditorPane?

    Hi,
    you can use an AttributeSet to apply the foreground color. Let's say, doc is a HTMLDocument, then SimpleAttributeSet set = new SimpleAttributeSet();
    doc.getStyleSheet().addCSSAttribute(set, CSS.Attribute.COLOR, "#0D0D0D"); would apply a color to a given AttributeSet. The AttributeSet with your color then can be applied to a selected range of text in a JEditorPane by   /**
       * set the attributes for a given editor. If a range of
       * text is selected, the attributes are applied to the selection.
       * If nothing is selected, the input attributes of the given
       * editor are set thus applying the given attributes to future
       * inputs.
       * @param editor  the editor pane to apply the attributes to
       * @param a  the set of attributes to apply
      public void applyAttributes(JEditorPane editor, AttributeSet a) {
        ((HTMLDocument) editor.getDocument()).getStyleSheet().addCSSAttribute(set, CSS.Attribute.COLOR, "#0D0D0D");
        editor.requestFocus();
        int start = editor.getSelectionStart();
        int end = editor.getSelectionEnd();
        if(end != start) {
          doc.setCharacterAttributes(start, end - start, a, false);
        else {
          MutableAttributeSet inputAttributes =
            ((SHTMLEditorKit) editor.getEditorKit()).getInputAttributes();
          inputAttributes.addAttributes(a);
      } Ulrich

  • HT3500 How can change apple ID for updating of programs

    How can change apple ID for updating of programs?

    You need to delete them and then download them from the desired Apple ID.
    (85684)

  • How to change price total for "Change Unit Cost Estimate Screen" for KKE1 Tcode ?

    There is a requirement of bringing the Material Price in KKE1 while entering the Item Catogory M ( M for Material) from the Gross Price in the condition type (P001) that is entered in the Purchase order.Currently systems brings the material value from MAP(Moving average Price) in the Material Master data.
    I have looked into the user exit 1) EXIT_SAPLKKEC_001 2) EXIT_SAPLKKEC_002  available in this T code KKE1.When I put break-point in these user-exit,it is not going in debugging mode while fetching the price value in Price total column  for "Change Unit Cost Estimate" screen in KKE1.
    How will change pricing condition for material in KKE1?
    I want to change price condition for material  as marked in red as shown in the screen-shot.
      Where will write the code such that I will bring Price Total based on material number as shown in the image?

    Hi Ram,
    I think you can do the same in thei manner.
    Go to program SAPMV45A.
    use menu GOTO -
    > Text Elements----
    >Text Symbols
    Here make change of Text-002 Sold-To Party as saleable .
    Regards,
    Pravin

Maybe you are looking for

  • Position sensor with accelerometer

    Hi,           Recently, I have finished a project with accelerometer to detect the noise when the motor stroke hit some part or near by mechanical part. I wonder about using position sensor to my project in order to detect the stroke or mechanical pa

  • Using sound from one Movie in another one

    I have one animation movie and I want the sounds from that one on another version of the movie (another file). How can I export or copy these sounds?

  • How to store bit data in VARCHAR(4000) field?

    Hi. Please help! We are porting some C/C++ software with embedded SQLs from NT/DB2 to Linux/Oracle. On NT/DB2 we have some table to store file data in a VARCHAR(4000) blocks. Table looks like this CREATE TABLE FileData (filetime as timestamp not null

  • Is it possible to debug the selection screen???

    Hi Frdz, Is it possible to debug the selection screen. eg: if i want to know what is happening in PBO and PAI modules of the selection screen i am not able to debug that. Even in code if i click on MODULES present in PBO and PAI modules it is saying

  • Am I missing installed RAM?

    My MacBook Pro is over three years old now (MacPro 2,1). When I initially bought it I also added some RAM purchased from Crucial. Lately it felt a little more sluggish even though I am on a recent fresh Snow Leopard install. I also recently bought iS