How to configure sales forecasting  for trading business

Hello Gurus
Goodeve every one,
We have some requirement : Customer want sales forecasting  for his trading business
The company procure  goods from vendors  and sell the goods to customers, based on historical  selling  data  he want to have sales  forecast for next year so on..and also based on sales forecast data the company also prepare procurenment forecast for procuring the goods as this is trading businerss
Now my question : Is it possible to  do the forecasting for trading businesss , if yes please through me some tips where can we do this settings in SAP SD
Thanks and regards
Venkat

Hi,
As per my knowledge i am telling forecasting is done by Historical Data { MM & PP Module }
when you collect the data based that we have to plan every month how much you want to procure the raw material etc..,
that should be entered in the material master under "Forecasting" tab there we have to maintain monthly wise forecasting values
i think it should get some idea if i wrong please clarify
Regards,
Prasanna

Similar Messages

  • To Get the list of sales orders for a Business partner in CRM.

    Hi all
    Is there any Function module or BAPI to get the Sales orders for a Business partner in CRM. I know there is a BAPI to get the list of sales orders for a customer in ECC, but I donu2019t know how to get the list of sales orders for a Business Partner in CRM.
    Can anybody tell me if there is an inbuilt function module or BAPI available?
    If not how can I pick the sales orders of a business partner in CRM? Between which tables should I apply a join and write SELECT statement to get list of sales orders for a business partner in CRM.

    Hi Jessica,
    Try CRM function module CRM_BUPA_READ_ORDER_OBJECTS.
    You'll get a table with the documents associated to that partner, where you can work on.
    Kind regards.

  • How to configure sales forcast and assign marketing budget

    how to configure sales forcast and assign marketing budget

    Hi,
    As per my knowledge i am telling forecasting is done by Historical Data { MM & PP Module }
    when you collect the data based that we have to plan every month how much you want to procure the raw material etc..,
    that should be entered in the material master under "Forecasting" tab there we have to maintain monthly wise forecasting values
    i think it should get some idea if i wrong please clarify
    Regards,
    Prasanna

  • Where I can find instructions on how to install Sales Forecasting application?

    Hi,
    I'm looking for instructions on how to install Sales Forecasting application mentioned in this OBE: http://www.oracle.com/webfolder/technetwork/tutorials/obe/db/12c/r1/security/sec_redact/sec_redact.html.
    Prerequisite says:
    Installed Oracle Application Express (APEX) in a pluggable database, with the Sales Forecasting application created in an APEX workspace
    So, i want to read up on how to install this Sales Forecasting application created in an APEX workspace.
    Thanks for your help.

    I believe that was an older sample apex application that is no longer available.  At least not available in the set of sample and demo applications that ship with APEX..
    Thank you,
    Tony Miller
    LuvMuffin Software
    Salt Lake City, UT

  • How to configure Sales order item text copy to Purchase requisition item

    Hi,
    How to configure sales order item text copy to Purchase requisition text then copy to PO item text.
    Regards
    Jack

    Hi Rajesha,
    Thanks for your reply, some of the items in sales order are procured externally by us and our customer maintains text related to price and specification in the item details of the sales order, MRP creates planned order for these materials and these planned orders are always converted in pur requisition, we want that text from the sales order item details should be copied in to the purchase requisitions converted from planned orders.
    is there any user exit which can be called at the time of saving a purchase req or user exit for converting planned order in to pur req.?
    if there is any such exit available, then I think I can read the pegged requirement of the planned order where sales order item will be found then read the text in the item then copy this text in pur req then save pur req may work.
    but this will be a bulky development, please let me know if we can shorten the development.
    Thanks again
    Anand

  • How to exclude sales office for combination sales order type/division?

    Hi experts,
    I would appreciate if you could advise: How to exclude sales office for combination sales order type/division in ECC 6.0 ?

    Hi
    Standard SAP functionality would not be able to cater to this. Ideally create a Z table with sales order type and sales office combination. Put in entries for combinations that are allowed. In Sales order program MV45AFZZ use the exit USEREXIT_MOVE_FIELD_TO_VBAK. In this exit write down the logic passing the sales office determined and the order type and check if the entry is there or not. If the entry is there then it should go on to the next step. If it does not then pass an error message. You need to use the help of your ABAP er for this.
    Thanks
    Indranil

  • How to configure release procedure for rate contracts release

    Dear all,
    How to configure release procedure for rate  contract following are the requirements
    they are two release codes c1 & c2 <=100000,>=100000
                    if  c1 is not there c2 has to be approved
         Change in the value of the rate contract contract
         Change in the validity of the rate contract
         Addition of deletion of line items
    While using a non u2013 released rate contract in the PO an error message should shoot out.
    Also the logic should be changed while using the rate contract in the PO.
    The usage of the rate contract should be till the validity of the rate contract. i.e. the measurement should be end date of the rate contract and the PO creation date and not the delivery date of the PO. &
    It should be possible to refer existing valid rate contracts in purchase orders.
    Regards,
    bhaskar

    Hi,
    In SAP rate contract is known as value contract denoted with wk. The release procedure for rate contract is same as that of other contracts and scheduling agreements. The tables  for contracts will vary with SA (Scheduling agreement) .You may try and maintain condition records based on the customer combination and maintian the validity date of condition records as per your requirement.For contract and PO will have the same header/item table as EKKO/EKPO, and the release
    class in standard is the same FRG_EKKO, you can use the same for contract.
    To distinguish if it's a contract or PO, EKKO-BSART can be used.
    For contract EKKO-BSART will be MK or WK, while PO will have NB/UB etc..
    You can restrict the document type to set up the release strategy for only contract.
    Of cause, you can also create your own release class Z* for contract copying standard
    one FRG_EKKO via CL01/Class type 032, and then assign the class Z* to customizing:
    OLME:
    -> contract
    ->Release Procedure for Contracts
    ->Define Release Procedure for Contracts
    ->Release Groups
    If you have already created the PO release class.
    Assign a new chracteristic of Document Category -BSTYP
    Please check below link for detailed release procedure. I hope this wil help you out .Thanking you.
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/RELEASE+PROCEDURE#RELEASEPROCEDURE-TABLESUSEDFORRELEASEPROCEDURES

  • How to configure Broadcast messaging for IC Webclient profile

    Dear all,
    How to configure Broadcast messaging for IC Webclient profile. what are the prerequisites for it?
    We are not using EP interface for IC Webclient, then where can I find broadcast messaging URL in SAP CRM system.
    I have checked for the relevant BSP application, but could not find.
    Please help me to configure the scenario successfully, your help will be highly appreciated.
    Best regards,
    Raghu ram

    Hi raghu
    In CRM Broad cast messaging application is CRM _BM,
    Go to easy access u2013 go to favourites u2013 select add other objects - select BSP Applications- then select CRM_BM Application.
    Select that BSP application and test it u2026
    `
    Regards,
    Narsimha

  • How to configure Email notification for User login's in Exchange Infrastructure?

    How to configure Email notification for User login's in Client Machines?

    Hi ,
    Based on the description , you need to assign logon scripts to the end users via group policy and also use your exchange server as the smtp server in that logon script to relay emails to the internal recipients.
    Thanks & Regards S.Nithyanandham

  • How to configure SMTP server for osb 10.3.1

    Hi All,
    Can anyone share information on how to configure SMTP server for osb 10.3.1
    and then how to send an email from osb 10.3.1
    Thanks in Advance!!

    Thanks a lot!!
    I configured the same way. When I am sending email to an account on the same domain as my SMTP server is the sending of email is successful. But its giving error when I am trying to send an emain to an account which is on different domain. It giving error as "Operation has been cancelled"
    Please suggest something.

  • How to configure ATP check for "create standard order in SD (OR type)"

    first, I had check my stock, I only have ten PC
    , but when I enter 100 PC in a OR order, and issue ATP check, it is carries out, why? I had set availavility check into 02 in MRP3 view

    Availability check
    1. Availability check is an integral part of the business process that determines if the required delivery quantity can be met on a required delivery date. For this purpose the system takes into account pre-delivery activities such as scheduling for picking or packing times and the time taken to produce or obtain the material. It also performs several background functions such as Backorder processing, rescheduling and ATP quantities.
    2. Backorder processing: processing of a sales order that has not been fully confirmed or not confirmed at a certain delivery date.
    3. Rescheduling: is a proposal of how u2013 confirmed quantities already assigned to a sales order can be reassigned to other sales orders that have a higher priority.
    4. Available to promise (ATP): is a process of checking the available quantities of a material. The ATP quantity consists of warehouse stock + planned receipts (incoming stock) u2013 planned issues (outgoing stock). to examine stock on hand (CO09) proceed to logistics u2013 sales & distribution u2013 sales u2013 environment u2013 availability overview.
    5. Replenishment lead time (RLT): is the time taken for the material to become available either internally (in house production) or externally (from a vendor). The most important things to consider during an external procurement are purchasing and MRP2 (procurement) views of MMR where the processing time for purchasing, planned delivery time and goods receipt processing time are taken into account. On the other hand internal procurement is based on in house production time (MRP 2 view) goods receipt processing time or alternatively RLT time, which is found on MRP 3 view.
    6. RLT (Replenishment Lead Time) is the time taken for the material to become available. RLT is only used when doing an ATP check (Available To Promise). The value of RLT for a material is specified on material master record.
    7. There are three types of availability checks u2013
    Check on basis of ATP quantities.
    Check against product allocation.
    Check against planning.
    Configuring Availability check through Checking Groups
    1. The checking group + checking rule determine how the availability check is to be performed.
    2. The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.
    3. The checking rule applies to how the availability check is to be carried out at the transaction level. Note that you must define checking rules for each individual application such as for production orders for example. In Sales and Distribution, the checking rule is specified internally within the system and cannot be changed.
    4. The checking rule, in conjunction with the checking group, determines the scope of the availability check for every business operation; that is, which stocks, receipts and issues are to be included in the availability check and whether the check is to be carried out with or without the replenishment lead time.
    5. Briefly explaining the above u2013 checking group determines which type of requirement to be passed on to MRP whether it be individual or summarized and checking rule which is at the transaction level and can be configured independently for each application module, determines which stocks, receipts and issues to be taken into account. For performing an availability check checking group has to work in conjunction with checking rule.
    6. Advantages of individual processing over summarized processing u2013
    Backorder processing is possible.
    You can access (MD04) order, line and schedule line individually which gives a greater control on available stock and requirements placed on stock.
    The system automatically uses individual requirements in case of special stock items.
    7. Required data for the Availability check to be carried out u2013
    The Availability check must be switched on at the requirement class level.
    The Availability check must be set at the schedule line level.
    A requirements type must exist by which the requirements class can be found.
    A plant must be defined in the sales order for each schedule line item (in other words plant must be defined for every material in MMR).
    A checking group must be defined in the material master record in the MRP3 screen in the availability check field.
    8. Configuring Availability check and defining Checking Groups u2013
    Checking groups are introduced into the sales order based on the setting in the material master record.
    SAP standard checking groups are 01 u2013 summarized requirements and 02 u2013 individual requirements or you can create your own by copying the standard ones.
    Total sales and total deliveries columns are there to configure a checking rule to sum up requirements to post to MRP either individually or by day or week.
    Block quantity required can be set if you want several users to be able to process the material simultaneously in different transactions without blocking each other.
    The no check indicator is CHECKED when you DO NOT want the system to carry out ATP check.
    9. Defining material block for other users u2013 the block check box is an indicator that enables you to block material master records of a particular material during the availability check and restrict other users from accessing same master record and reserve the material. If the block is not set, two users can confirm the same material at the same time for two different orders, not knowing if the stock is available or not. If you select this field, the material is blocked during the availability check and other users cannot: a) Make changes in the material master record. b) Create purchase orders for the material. C) Create orders for the material.
    10. Defining default values for checking groups - Checking groups are introduced into the sales order based on the setting in the material master record.
    However if there is no entry present in the material master record for the checking group, a default value can be set here, depending on material type and plant.
    This default value will be used by the system depending on the material type mentioned in MMR and plant in sales order.
    If an entry exists, this default value is over written by MMR.
    11. Controlling Availability Check u2013 in this section, you tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check in addition to whether or not to consider the replenishment lead time.
    12. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sales and distribution transaction.
    13. These settings carry out control both for sales order and delivery as well. This is due to the fact that you may want to include specific stock or incoming stock for the sales order, yet at the time of the delivery only include physical stock on hand waiting to be shipped.
    14. It is possible to indicate to the system that you would like the availability check NOT TO CHECK the stock at the storage location level. This indicator is used to set the scope of the availability check.
    15. It is used to switch off the check at storage location level. You create a reservation for a particular storage location. However, the scope of the availability check is set in such a way as to exclude the storage location. In this case, the system carries out the check at plant level only and does not take the storage location into account that is specified in the reservation.
    16. Should you not want the system to automatically check RLT, you may indicate so here. RLT is the time taken for a material to become available. It is only used when doing an ATP check and is taken from MMR.
    17. defining the elements in the availability check entirely depends on the business needs, but a few tips are given under u2013
    When controlling the Availability check at the time of the sales order, a purchase requisition does not necessarily indicate by it is going to come into the plant.
    A shipping notification on the other hand - a confirmed purchase order u2013 is a good indicator of receiving stock on a specified date.
    It is always recommended not to select the shipping notifications for the delivery requirements type as you may not actually receive the stock into plant or warehouse for which you are creating a delivery.

  • How to configure internet proxy for portlet builder

    Hi All,
    We have downloaded the portlet builder from developer.bea.com. But while trying
    to access xmethods for adding web service, it can't access as the internet connection
    is thru proxy.
    Can anybody pls tell me how to configure the internet proxy with this portlet
    builder ?
    TIA,
    Sudarson

    Hi, I got the same problem...I try to configure a web service with Portal Builder
    7.0 in Bea E-Business Control Center... But I can not proceed cause there is no
    hint for a proxy... Have you found a solution?
    "sudarson" <[email protected]> wrote:
    >
    Hi All,
    We have downloaded the portlet builder from developer.bea.com. But while
    trying
    to access xmethods for adding web service, it can't access as the internet
    connection
    is thru proxy.
    Can anybody pls tell me how to configure the internet proxy with this
    portlet
    builder ?
    TIA,
    Sudarson

  • How to Configure Solution Manager for 1.Download SuppPacks 2. Monitoring 3

    We recently upgraded to ECC 6.0 and installed Solution Man., very vanilla.  Basically just to get the Key to do the upgrade with.
    I would really appreciate it if someone could share any documentation that would provide guidance on how to now further configure SolMan for the following
    1.  Monitor our Landscape which comprises of ABAP ECC (java is installed though not actively using), and SAP BI 7.0
    Sandbox, Dev, QAS and Prdn  for BOTH ECC & BI
    2. Download Support Patches from SAP Marketplace (currently we have had to donwload the long way with download manager creating a message to get them apporoved whew... this is work..)
    3. Add messages to SAP Market Place (thru SolMan)
    4 Possibly monitor security and manage userids etc (if possible)
    And if there is functionality that will make the BASIS experience better I would definitely appreciate it.  We don't need the help desk as we already have it ,but, we may take advantage of Project documentation
    I would really really appreciate it if someone could advise
    Kind Regards & Thank You
    Maria

    Hi Maria,
    With solution manager you can definitely do a world of things, below is a list inclusive of the features you wanted:
    1. Dowload SP-Stacks, etc - you will have to configure Maintenance Optimizer for this (MOPZ).
    2. Monitoring - you can monitor your ABAP and JAVA stacks using the monitoring features of CCMS which is embedded in Solution Manager, please have a look at the monitoring setup guide (for NW04S) in the Service Marketplace. Basically, it uses agents such as SAPCCMSR for JAVA Stacks and SAPCCM4X for ABAP stacks.
    3. You can also configure availability monitoring using th same guide as above - this uses the CCMSPING tool.
    4. You can monitor your business processes using the BPM/BPMon features of solution manager - you will also get this guide in http://service.sap.com/solutionmanager.
    5. You can scheule your earlywatch alerts (EWAs) in solution manager system - have a look at the following link for this:
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e0f35bf3-14a3-2910-abb8-89a7a294cedb
    6. You can also have DBACOCKPIT on your Solution Manager system and have it tomonitor backups, etc on your satellite systems. For thsi have a look at SAP notes 1028624, 1025707 and 1027146 (and the DBACOKPIT guide in SAP Note 1028624).
    Hope this is helpful. Kindly award points if useful.
    Thanks, Dibya

  • How to configure MWST -IN for the first time

    Dear Pals,
    I have newly installed SAP SD, MWST is not configured in  the software, please let me know how to configure MWST.
    2. Country India is too not there in the Tax Country list, how do I configure.
    3. If I need to configure two tax procedure, to be poped up in master data, how do I configure.  Request detailed configuration help.
    Regards
    Madhu

    Hi Madhu
    1. MWST is not a condition type defiend fro India
    2. You are unable to Find Country India , because the CIN Version ( Add on ) is not patched in your R/3 System
    Now coming to the MWST configuration
    MWST is the Condition type used to determine the tax.
    ( Same as Pricing , the configuration)
    YOu need to maintain condition records based on
    Customer Tax Classification ( Maintained in Customer Master)
    Material Tax Classification ( Maintained in Material Master)
    Destination Country
    or Domestic sale( no need for destination country)
    the same MWST is picked in your p[ricing procedure.
    Each Condition record needs to have the Tax Code
    e.e
    Local sales Tax 4%
    Central Sales Tax 10 %
    the we create this in FTXP transaction.
    Regards
    KRSNA

  • OBIEE 11g - How to configure Virtual IP for servers hosting OBIEE 11g

    Hi,
    I have 2 Linux servers.
    I have installed OBIEE 11.1.1.6 on first server and did a scale out on second server.
    I don't have a Load Balancer.
    I want to configure Virtual IP for these hosts.
    Please advise how to do it.
    Thanks
    Nitin Aggarwal

    Refer to below lhks.
    http://www.rittmanmead.com/2008/12/obiee-high-availability-the-bi-server/
    http://www.rittmanmead.com/2009/02/obiee-high-availability-presentation-services-and-scheduler/
    Thanks
    Jay.

Maybe you are looking for

  • Japanese Langauge Logon not possible

    Hello Colleagues I am working in 4.6 C IDES system. By default the Language Japanese comes installed. Even in default profile the parameter entries are maintained. But still the logon in client 000 is not possible with the Japanese Language. When we

  • OSX Lion 10.7.3 FREEZES on Macbook pro 13'' 2009

    I've got a macbook pro 13" mid 2009 and I upgraded to OSX Lion immediately when it came out. Never had any problem with it. Also I upgraded to 8 Gb a few weeks ago (because I use a virtual machine (win 7) + Adobe applications at the same time) and th

  • After upgard to IOS7 mic of ipad2 is not working

    after upgard to IOS7 mic of ipad2 is not working,

  • Issue formatting out put

    i have an app that stores text from a form, in a data base field called RESPONSE.  the form field is either a text input or textarea.  My issue is that the customer enters both paragraph text and list text in the same field.  When i out put this in 

  • Re-Loading an ODS from a flat file.

    Hi, I was loading an ODS and due to some system problem it was cancelled after 2 hours. Now I want to load the same data again. Do I have to just schedule the infopackage again or do I have to delete any request.