How to deal with BDLS during 4.6C -- ECC 6.0 upgrade?

Hi,
I am currently performing an upgrade from 4.6C to ECC 6.0 and before which, I am also performing a data migration from x86 (Intel) servers to x64 (AMD) servers. So, we have three fresh AMD servers (DEV, QAS, PRD). While the current landscape (x86) is live, I migrated the data from PRD (x86) to DEV (x64) and performing the upgrade. I used the same data to perform upgrade on QAS (x64) also.
Now, performing the data migration and upgrade on the PRD (x64) would involve more downtime. So, in order to avoid that, have decided to split the whole process over two consecutive weekends. The plan is as follows:
Weekend 1:
Bring down the PRD (x86), do a complete backup and restore the same on PRD (x64), then perform the data migration activities on PRD (x64). Once this is done, we want to go live with the PRD (x64) running R/3 4.6C on MS SQL 2005 and Windows 2003, for one week (5 days - Monday through Friday).
And during these five days, I would perform the PREPARE phase.
Weekend 2:
I will start the upgrade on PRD (x64) on this weekend so that, we will get sufficient time to test and do post upgrade activities and decide to go live or not.
I hope the above procedure would work. What do you guys say?
Anyways, my question is, normally with the DEV and QAS, I perform the migration, PREPARE, upgrade and finally do the BDLS to convert the logical system to point to the new SID. But, with PRD, I cannot do so because, the system will go live with the new SID for one week. So, I may want to perform the BDLS on R/3 4.6C running on PRD (x64) and then perform the upgrade the following weekend. My question is, is it ok to do so?
NOTE: The SID in the x86 and x64 are not the same. I have mentioned above the same SID just for ease of reading and typing.
Thank you.

Hi Markus,
Sorry, it took a while to respond to your reply to my question. Yes, I understand that we don't have to convert the logical system. But, in our case, we use the production system database copy to upgrade the new development  box. So, we have to convert the logical system in the newly upgraded Development system from the one that currently belongs to the 32 bit production system to a new logical system that is unique to the landscape. We cannot even use the logical system name that belongs to the 32 bit Development System because, that box is currently being used until we go live with the 64 bit production box. So, we will have to create a new logical system. In this case, as we want to maintain consistency in the logical system naming format across the new 64 bit landscape, we are probably forced to convert the logical system name on the 64 bit production box also.
So, now can you please advise, is it wise to convert to the new logical system after migrating the production server from 32 bit to 64 bit but, before the upgrade to ECC 6.0? As I had mentioned in my previous question, we will be live with the 4.6C on the 64 bit box for one week after migration to 64 bit but, before upgrade. In this case, I will have to connect to APO 64 bit and BI 7.0 64 bit (RFC) for one week before upgrade which, would need the logical system.
Or do you feel, we still can use the old logical system for the one week and after completing the upgrade, we can do the logical system conversion on the PRD to maintain naming consistency across the landscape?
Thank you.

Similar Messages

  • How to deal with validation errors from DAO layer.

    I have been pondering on how to deal with validation errors from DAO layer.
    Lets say you have a DAO that can save a car object. A car has a year, make, model, vin and so on. During the save operation of this DAO, it validates the car attributes to see if they pass some business rules. If it does not it throws some validation exception that contains all the validation errors. These validation errors know nothing about jsf or my components it just knows what attributes on the object are invalid and why.
    If I just want to show those errors at the top of the page that would be no problem I could just create some FacesMessage objects and add them to the FacesContext messages. But if the DAO layer is telling me that the make attribute is invalid it would be nice to map it to the make field on the screen. I am wondering if any of you have tackled this problem or have some ideas on how to tackle it?
    Brian

    Let it throw an exception with a self explaining message, then catch it and embed that message in a FacesMessage.
    Or let it throw more specific exception types (InvalidCarMakeException extends CarDAOException and so on) and let JSF handle it with own FacesMessage message.

  • How to deal with relation

    Hi
    I am trying to import two beans(TestBean and HelperBean)into my Web Dynpro project to create a model. These beans are dealing with a List(ArrayList). This List is considered as a Relation. I am facing problem in handling this relation.
    I am having both the TestBean and HelperBean in the same package. Below is the code of TestBean. This bean is in turn calling HelperBean ,which is returning a List.
    I am getting an error while creating model -
    <b>[Error]: There are one or more relations unresolved. Importing the model without resolvoing the relations might result in erratic output.</b>
    <u><b>Code For TestBean</b></u>
    public class TestBean implements Serializable{
         private List customerList= null;
         HelperBean helper = new HelperBean();
              public void execute(){
              try{
                                            customerList = (ArrayList)helper.getCustomerList();
                   catch(Exception ex){
                        ex.printStackTrace();
          * @return
         public List getCustomerList() {
              return customerList;
          * @param list
         public void setCustomerList(List list) {
              customerList = list;
    I am new to Web Dynpro and don't know how to deal with relation.Please inform if there is some solution.
    regards,
    Sujit

    Sujit,
    Not every bean becomes model class during import. So your HelperBean is irrelevant here. But you miss other bean, namely Customer bean. You must add it as model class during import, then select problematic 0..n relation and resolve it to model class Customer.
    Valery Silaev
    SaM Solutions
    http://www.sam-solutions.net

  • How to deal with deadlock on wwv_flow_data table when http server times out

    There are some threads about a deadlock on the wwv_flow_data table. None of them contain a real explanation for this behaviour. In my case I will try to explain what I think is happening. Maybe it helps somebody who is hitting the same matter.
    In my case with APEX 3.2.1 I am navigating from one page to another. Doing this APEX will lock the table wwv_flow_data. As soon as the other page is shown the lock will be released. But now this other page contains a bad performing query (standaard report region). After 5 minutes the http server (modplsql) will time out and present the message "No response from the application server" on the screen. In the meanwhile the query is still running on the database server and the lock stays on the wwv_flow_data table.
    Normal user behaviour will be that the user will use the back button to return to the previous page and tries it again to navigate to the other page or
    the user will try to refresh the page with the bad performing query.
    And voila now you will have a deadlock on the wwv_flow_data table since a second session is trying to do the same thing while the first hasn't finished yet.
    How to deal with it?
    First of all. Have a good look at the bad performing query. Maybe you can improve it that it will succeed before the http server will timeout.
    In my case the 11gr1 optimizer couldn't handle a subquery factoring clause in the best way. After changing it back to a classical inline query the problem was solved.
    Secondly you could increase the timeout parameter of the http server. Although this not the best way.
    Maybe it would better if APEX in a next version would release the lock on the table wwv_flow_date earlier or do a rollback just before the moment that the http server is timing out.
    regards,
    Mathieu Meeuwissen

    Hello Shmoove,
    I saw your reply here and you probably understand the problems the HTTP 100 response may cause.
    I am trying to send image that was taken by getSnapshot. The problem is that the server respond with this HTTP 100 message.
    I suspect that the reason that my server doesn't recognize the file that I'm sending from J2me is that the "server to client" response to the 100 message comes after the second message of (see what the TCPIP viewer shows down here):
    POST /up01/up02.aspx HTTP/1.1
    Content-Type: multipart/form-data; boundary=xxxxyyyyzzz
    Connection: Keep-Alive
    Content-length: 6294
    User-Agent: UNTRUSTED/1.0
    Host: szekely.dnsalias.com:80
    Transfer-Encoding: chunked
    400: Client to Server (126 bytes)
    78
    --xxxxyyyyzzz
    Content-Disposition: form-data; name="pic"; filename="david.jpg"
    Content-Type: application/octet-stream
    400: Connected to Server
    400: Server to Client (112 bytes)
    HTTP/1.1 100 Continue
    Server: Microsoft-IIS/5.1
    Date: Wed, 23 Mar 2005 00:47:02 GMT
    X-Powered-By: ASP.NET
    Any help will be appreciated,
    David

  • How to deal with OpenCL grey out issue.

    First off, I'm not native english speaker.
    I have Nvidia GeForce 550 Ti video card, and its support OpenCL v1.1.
    I'm also face a "random" OpenCL grey out issue like other people here, but I found the "issue" and how to deal with.
    open a command windows (using WinKey + R, and type cmd <enter>)
    type "cd C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)" <enter>
    type "sniffer_gpu" <enter>  -->> to check your GPU has OpenCL in Photoshop?
    When GPU is in power-saving mode (core running in 51Mhz, using MSI Afterburner monitor), I running sniffer_gpu, got this report
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>sniffer_gpu
    Device: 0000000000328D68 has video RAM(MB): 1023
    Vendor string:    NVIDIA Corporation
    Renderer string:  GeForce GTX 550 Ti/PCIe/SSE2
    Version string:   3.0.0
    OpenGL version as determined by Extensionator...
    OpenGL Version 3.0
    Has NPOT support: TRUE
    Has Framebuffer Object Extension support: TRUE
    OpenGL ok
    Return code: 1
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>
    No OpenCL support
    Then, I switch GPU back to normal status (core running at 900Mhz)
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>sniffer_gpu
    Device: 00000000001F8D68 has video RAM(MB): 1023
    Vendor string:    NVIDIA Corporation
    Renderer string:  GeForce GTX 550 Ti/PCIe/SSE2
    Version string:   3.0.0
    OpenGL version as determined by Extensionator...
    OpenGL Version 3.0
    Has NPOT support: TRUE
    Has Framebuffer Object Extension support: TRUE
    OpenGL ok
    OpenCL ok, version=1.1 CUDA 4.2.1
    Return code: 3
    C:\Program Files\Adobe\Adobe Photoshop CS6 (64 Bit)>
    OpenCL support !!
    Nowadays, most of new GPUs were support power-saving, but when sniffer_gpu running at GPU power-saving state, the OpenCL computing report maybe "time-out", cause the detector "guess" the GPU does not support OpenCL. This is why many people says "OpenCL" sometimes work, sometimes grey-out.
    I hope this bug can be fixed, or at least people can understand how to "enable OpenCL everytime when you launch photoshop".
    Bye.

    Do check the following link
    http://blogs.oracle.com/soabpm/2010/01/soa_suite_11g_weblogictransact.html

  • How to deal with "Error 1001. The specified service already exists" when install a service using installer package?

    Hi everybody,
    I wrote a "Class Library" project which is a service using Visual Stodio 2008 recently, then tried to use a Visual Studio 2008
    Setup Project to install it.
    Here is what I did for the "Class Library":
    1. Finish the program.cs, Service.cs
    2. Add Installer
    3. Change the serviceInstaller so that "StartType" to be Aotumatic
    4. Change the ServiceProcessInstaller2 so that "Account" to be LocalSystem
    5.
    6. Click in F5 (Start Debugging)
    Here is what I did for the Setup Project:
    1. Add the exe file built from the "Class Library" project to the Application Folder
    2. On the Custom Action Editor, add the exe file from 1 to Install and Commit
    3. Change the property of the project so that "RemovePreviousVersion" to be true
    4. Click on F6(Build Solution)
    Then I tried to run the msi file from the built of the Setup Project. Because I modified the two projects serveral times, I uninstalled the Class Library using "Control Panel->Add or Remove Programs" before I reinstall. Two things I notived:
    1. After unstall, the registry was not cleaned up about the installed program
    2. After several rounds install/uninstall, I got "Error 1001. The specified service already exists"
    My questions are:
    1. How to cleanup the registry when uninstall a program?
    2. How to deal with the "Error 1001. The specified service already exists"?
    3. Did I do anytbing wrong with the "Class Library" or the "Setup Project"?
    Thanks a lot!
    Helen

    Hi Simon, not a problem!
    I spent some more time on this and here are few more notes:
    it is called Major Upgrade, when you are installing new version of the product upon a previous one and
    MSI supports 2 strategies:
    Strategy 1. Install a new version and uninstall previous one. (Install a new version right upon previously installed version (file merging is performed based on dll version number) and the delete previously
    installed files)
    Strategy 2. Uninstall previous version and install a new one (Delete all previous files and install from scratch new files.)
    From the first look it seems that 1st strategy is weird and buggy. But, remember, MSI is great because it's transactional!!! That means that if once some of the phases (Installation, Uninstallation, Rollback, Comit) fails, your machine
    will be reverted to the previous state and it'll be still functional. 
    Let's consider both strategies:
    Consider you have installed product_v1.msi and you want to install product_v2.msi.
    Strategy 1
    1. MSI engine copies files from Product_v1 directory to TEMP directory
    2. MSI engine merges files based on the assembly version (between v1 and v2)
    3. Once merging is completed successfully it removes files in TEMP (RemoveExistingProducts  action triggers it) and you got product_v2 installed, otherwise if it fails MSI engine revert machine to V1 and copies previous files from TEMP.
    Strategy 2
    1. MSI engine tottaly removes all files from v1.
    2. MSI engine installs v2 files and if something goes wrong you cannot revert back, because RemoveExistingProducts  allready worked out and MSI doesn't have files to revert machine back
    I recommend to everybody to use Strategy 1 and leverage MSI transaction functionality. And you can set this strategies by defining sequence of RemoveExistingProducts action. See more info
    here.  So, I think it's not even a bug in VS as I said in the upper post it is default recommened behaviour.
    AND, you got "Error 1001. The specified service already exists"
    because if we follow Strategy 1 MSI engine tries to install Windows Service on top of the existing service and OF COURSE it fails MSI engine (StopServices, DeleteServices actions are executed before actual
    installation and  they look at ServiceControl table). In order to stop service first and delete them you have to fill ServiceContol table of the MSI (and then StopServices, DeleteServices actions will recognize what to they have to stop
    and delete), like this:
    *clip*clip*clip*
    ' see http://msdn.microsoft.com/en-us/library/windows/desktop/aa371634(v=vs.85).aspx for more info
    ' Update the Service Entry to stop and delete service while uninstalling
    query = "INSERT INTO ServiceControl (ServiceControl, Name, Event, Arguments, Wait, Component_) VALUES ('MAD_Service', 'Service name', '160', '', '1', '"
    + componentName + "')"
    Set view = database.OpenView(query)
    : CheckError
    view.Execute : CheckError
    ' Update the Service Entry to stop and delete service while installing
    query = "INSERT INTO ServiceControl (ServiceControl, Name, Event, Arguments, Wait, Component_) VALUES ('MAD2_Service', 'Service name', '10', '', '1', '"
    + componentName + "')"
    Set view = database.OpenView(query)
    : CheckError
    view.Execute : CheckError
    *clip*clip*clip*
    We can uninstall service first by following Strategy 2, but then we lose transactional support.
    So, Simon did I encourage you to change your code a bit?:)
    And, btw, if you don't want to change the strategy, please don't rely on SequenceID in MSI table, it can be change, you have to get the at the runtime.
    Hope it will help to everybody!
    See also more advanced explanation of how MSI works
    here.
    Truly yours, Marat

  • How to deal with credentials for external applications using a Java Client/

    Hi Guys,
    This is the case. I am integrating an external application with an ADF Application. I have implemented some programmatic ViewObjects that are being filled up by a REST Java Client Wrapper. Everything is working fine but the issue is that the credentials the wrapper is using are hard coded inside the java class. I am thinking to ask for the credentials at the beginning of my taskflow and then store them somewhere and use them then to create my client wrapper (passing them in the constructor).
    However, I don't know if my approach is good and I would like you to share your experiences or how to deal with this.
    Regards

    You can use Credential Store Framework to store the credentials securely in the weblogic server instead of hardcoding in the java class.
    The Credential Store Framework:
    - enables you to manage credentials securely
    - provides an API for storage, retrieval, and maintenance of credentials in different back-end repositories
    Check the documentation on CSF API -
    http://docs.oracle.com/cd/E29505_01/core.1111/e10043/devcsf.htm
    Major Steps -
    1. Create a credential map and key in em console to store the password (http://docs.oracle.com/cd/E25054_01/core.1111/e10043/csfadmin.htm)
    2. Use CSF API to retrieve the stored password
    3. In jazn-data.xml give permissions to access CSF key and map

  • How to deal with payment of vendor to us (credit notes I guess)

    Normally I use F07 for outgoing payments, it's linked to vendors, but how to deal with incoming payments of vendors?
    We got paid two invoices(credit notes I guess) and I want to put them under the right vendor, but how do I do it?
    I can't use F07 I think because I need to use positive amounts (for normal purchase invoices) and can't use negative amounts in this transaction. F08 is for ingoing payment but that session is linked to customers I thought..not for vendors?
    How to deal with this kind ot transactions? What transaction can I use the best for payments like this
    (we got paid an amount , no invoices yet, but I know the vendor).

    whith F-02 it is possible I noticed.

  • How to deal with file(for example .xml)? what format of dir should be?

    I'd like to operate the file in disk, and want to use relative directory?
    How to deal with file dir? what format of dir should be?

    Hi Kamlesh,
    Thanks for your response.
    Actually, In the "Process External Bank Statement" window, i see that there are few entries which is for the previous year and which has not been reconciled. I have never worked practically on BRS and hence, i am scared to make any changes in the clients database without being confident on what i am doing. I need to reconcile for one of their Bank a/c for the month of April '08. I have the copy of the statements for the month ending 31st Mar 08 and 30th Apr 08. The closing balances are as below:
    31/03/08 - 2300000.00
    30/04/08 - 3100000.00
    Now my OB for Bank a/c for April '08 in SAP is 2300000.00 Dr.
    When i go to External Bank Reconciliation - Selection Criteria Screen (Manual Reconciliation), here are the detail that i enter:
    Last Balance: INR -7,000,000.00000 (Grayed out by the system)
    Ending Balance: INR -3,100,000.00000 (Entered by me)
    End Date: 30/04/08 (Entered by me)
    "Reconciliation Bank Statement" Screen opens up and shows the below balances in the screen:
    Cleared Book Balance: INR -7,000,000.00000
    Statement Ending Balance: INR -3,100,000.00000
    Difference: INR 3,800,000.00000
    As per the Bank statement, i have found all the transactions listed out here for the month of Apr '08 but, i also found that the open transactions for the previous month from April '08 have been lying in "Process External Bank Statement" window.
    Could you please help me solve my issue as to what needs to be done or could you also get me some links from where i can get few documents for processing External Bank Reconciliations?
    That will be of a great help for me. I need steps as to what needs to be done first and then the next so that i can arrive at the correct closing balance for the month April '08.
    Thanks in Advance....
    Regards,
    Kaushal

  • Organizational unit transfers ,how to deal with the person in it ?

    Hi,All,I need your help!
    if an organizational unit has been transfered to another upper organizational unit ,and there are already persons assigned to different positions of it,so how to deal with this problem?are those person's IT 0000,0001should be changed too?and how to maintain this kind of change?is a personnel action necessary?or there is some other more efficient way for it?

    Hi
    In IT0001 You have a Position which is linked to a Org unit. If you want to change the org units reporting relationship then you have to change it in OM by creating a new relationship with the upper org unit.
    All the person are assigned to position so nothing needs to be done in  PA.
    Reward points if useful.
    Regards

  • IMac SSD full - how to deal with the two drives

    Greetings all,
    I've been using an iMac i7 with two drives SSC and HDD.  Recently, I've been having issues with the SSD being close to full.  I use it for applications only, although some apps need lots of space (iTunes, iMovie, Photoshop, etc.)  I use Lightroom and have all the images on the spinning drive.  Does anyone know how to deal with this issue?  Any way I can move the music from iTunes to the separate drive, or any way to figure out what exactly is using most of my space?
    Thanks in advance for your help.
    erlkonig

    Here's some utilities for analyzing disk space:
    DiskInventory
    GrandPerspective
    OmniDiskSweeper
    WhatSize
    You might want to consider putting your home directory on the HDD.
    How to Move the Home Folder in OS X – and Why
    Moving your home folder in OS X

  • How to deal with the barcode?

    i'm developing a file storage system in java, there're two barcode on each file(one is pdf417, the other one is code128) , but now ,there's a problem confused me :
    i use the barcode scanner to scan the file and get images of these files from the scanner , but i have no idea how to deal with these images,
    i need the barcode information on the images, and i know there're some java components can help me to read the barcode from images , for example : BarcodeReader from Barcode Library, but these components were too expensive for me , is there any other way can solve this problem?

    yes, look for a cheaper component...
    Or write your own...
    Or save up until you can afford the more expensive ones...

  • How to deal with the growing table?

    Every tables are growing in any applications. In some applications, tables become larger and larger quickly. How to deal with this problem?
    I am developing an application system now. Should I add a lot of delete commands in the code for each table?

    junez wrote:
    Every tables are growing in any applications. In some applications, tables become larger and larger quickly. How to deal with this problem?
    I am developing an application system now. Should I add a lot of delete commands in the code for each table?Uh, well, yes if you continually add rows to a table the table will grow ... sooner or later you will want to delete rows that are no longer needed. What did you expect? You have to decide what the business rules are to determine when a row can be deleted, and make sure your design allows for such rows to be identified. This is called ..... analysis and design.

  • How to deal with the rejected stock if it is rjected by QC

    Dear All,
    please let me know how to deal with the rejected  stock from Quality point of view.i.e., for incoming materails and Finished if returned from customer
    Regards,
    P.Vijaya

    hi
    if material is rejected for incoming material then you can create Notification for incoming material due to  you can return back material with print for that you have to record defects in result recording. in T-code QM02 if result is recorded with defects. or you can create with Qm01.against vendor
    if material is returned from costumer you can create inspection lot for that for that you have to maintained inspection type 06 in material master. you can result record for that you can create notification for that. or rework for this material as per quality check or can scrap
    if have any problem please come back
    regards
    Pravin

  • Pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

    pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

    pages 5.5 output PDF is not have pages number interlinkage ,why?How to deal with?

Maybe you are looking for

  • ACS 5.3 Accounting

    Hello all, I need to help with accounting in ACS 5.3. When I setup accounting on WLC 440x / 5508 ACS takes them as an authentication request and fail. Here are some logs what I see in acsview: Dec 9,11 6:05:11.783 PM Radius authentication failed for

  • Hard disc died - how to restore iTunes from external hard drive

    My son's Windows PC has died and needs a replacement hard disc. Fortunately he had backed up iTunes to an external hard disc. However, this is not an iTunes backup - but a straight copy of the PC's music folder. This folder contains an iTunes folder

  • How to install mac OS on a blank HD

    Just bought a new (2012) mac mini and the hard drive is blank. I don't own any other mac's so I'm lost about how to install an OS. What do I need to do and No, it didn't come with any discs. 

  • ATI Catalyst 4.9 problem

    I searched for this problem with this board in this forum but didn't find anything.  I just upgraded the driver for my built by ATI 9600XT to Catalyst 4.9 without the .NET Framework thing from Catalyst 4.4.  I tried running Aquamark and got a reboot

  • Unloading point is not copied from PR -PO,when i change account assignment

    Hi All, unloading point is not copied from PR -PO,when i change account assignment from 'K' to 'F' in PO. unloading point field should be in display for both 'K' & 'F' Account assignment category in SPRO because we r using this field to acknowledge m