How to estimate time required by one replicate to process 10 MB trai file

Hi
Consider one trail file of size 10MB. The trail file contains only insert statements. Size of one record is 2KB and total trail file size 10 MB. Under ideal configuration how much time the Replicate would take to read the trail file and apply transactions on target server
Is there any formuale to estimate time required by Replicat process for a trail file ?
Thanks

There are so many variables I wouldn't venture to guess.
I have implemented GG on multiple systems, each had their own performance characteristics depending on operating system, oracle version, makeup of the data being replicated, network latency, load on the source system, load on the target system, etc.
My best suggestion is to set it up and try it out.
In my experience once set up I have had to do very little GG specific tuning to get very good speed (sometimes tweaking BATCHSQL helps for some usage patterns). Many SLAs I have encountered are 15 minutes... I get spoiled sometimes when I report we are getting committed transactions captured transported and applied within just a few seconds. And then they always want their data in 10 seconds :)

Similar Messages

  • How to add time informatio​n to the first column of spreadshee​t file?

    hi all.
    how to add time information to the first column of spreadsheet file?illustrated in the figure below。
    Solved!
    Go to Solution.

    You need to take the time data and convert it to double.  But Excel data is based on days since 1/1/1900 while LabVIEW data is based on seconds since 1/1/1904.
    Take a look at this thread for an example I posted on how to make the conversion.
    One other possibility is to convert your numeric data to a string, and build on an array of time that is also a string version of the timestamp.  Then write your 2-D string array to the Write to Spreadsheet file.

  • How to Combine Time Aliases into One Time Dim in Presentation Table

    Hi,
    As per the requirement I have created 7 time aliases and created joins to the fact in physical layer and the same in the BMM as well. I guess I’m correct till this stage.
    However I want all the aliases to be combined into one time dim table so that only one time dimension will be available in Presentation layer Can I do it if yes what’s the process, now I’m showing all the time aliases in presentation which I don’t want to.
    Please suggest me to solve this.
    Thanks,
    SMA

    HI Arjun,
    Please look at Sample Sales rpd "D0 Time" table(BMM layer) it was coming from different physical alias tables based on that how the hierarchy was built
    Its not creating any attributes under the dimension so hoe to create the levelsRight click on hierarchy add Parent level and child level then pull the columns from your time dim to hierarchy
    thanks,
    Saichand.v

  • How to transfer the requirement from one plant  to many plants(STO)

    hai gurus,
    My scenario is as follows:
    1) Plant "A" is Receiving plant.
    2) Plant "B" ,Plant "C", Plant "D" is three production plant.
    3) All the above 4 plant under same company code 1000.
    4) Now plant "A" gets the requirements and pass on to all the three production plants, which
    is based on forecast.
    5) How the requirement to be passed on from plant "A" to all the three production plants namely B/C/D
    under sap
    6) After production of fert under 3 production plants the final products is transferred to the plant "A"
    ware houses which is situated near by plants of B/C/D.
    7) Only one fert material( Fert 1) is common for all three plants produced based on the capacity at all three plants.
    8) Remaining fert material is plant specific, that is for Example Fert 2,3,4 produced only in plant" B"
    Fert 5,6,7 produced in plant "C" and Fert 8,9,10 produced only in plant "D".
    How to map into sap
    waiting for the positive reply
    Regards,
    sekar chand

    Hi again,
    For more details on stock transfer from alternative plant in MRP, see also the attached link:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d2d5a44af11d182b40000e829fbfe/content.htm
    Regarding FERT1, you can place sales order, but it will not trigger requirements in the manufacturing plant. Also, because all plants are in the same CC it is not a good idea.
    If you are willing to do some manual/external work in determining how much of FERT1 will each manufacturing plant produce, then you can just manually create STOs accordingly. These STOs will generate MRP requirements in the manufacturing plants.
    Regards,
    Mario

  • How many channels are required for one G711 Call on T1 PRI

    Hi Everyone,
    Just have a basic question.
    Lets say i want to make one G711 call which is compressed. below will be the bandwidth required.
    Calculation:
    Total packet size (bytes) = (Layer 2 Ethernet header 6 bytes) + ( compressed IP/UDP/RTP header of 2 bytes) + (voice payload of 20 bytes) = 28 bytes. Total packet size (bits) = (28 bytes) * 8 bits per byte = 224 bits
    PPS = (64 Kbps codec bit rate) / (160 bits) = 409 pps
    Bandwidth per call = voice packet size (224 bits) * 409 pps = 90 Kbps
    From what i know, 1 channel on a T1 has a bandwidth of 64kbps.
    Question:
    Does this call require two channels to start the conversation?
    Will this call be successful?
    How will one channel accommodate this call?

    No, 64 kbps basically matches the payload, and the TDM T1 trunk needs no IP header overhead, so it matches, even if it did not you are trying to compare apples and oranges as when you send the call to channelized T1 circuit it's TDM based (bandwidth is irrelevant), if by T1 you meant data T1 then the circuit would not be channelized and would provide total 1.544 mbps.
    Chris

  • Estimate time to enable all constraints and create all indexes

    Hi,
    To prepare a project to export/import for a whole database,
    How can I estimate time required to enable all constraints and create all indexes
    * Assume one full table scan per one FK constraint
    * Assume one full table scan plus one sort/merge operation per one index
    * Check it out whether we can use parallel DDL feature to speed up enabling of FK constraints
    how can I use core schema (which will be exp/imp) in the production db to get needed metric for the calcualtion?
    thanks
    Jerry

    There is no definative way to find the time it takes to enable a constraint / create a Index
    It toatally depends on the Size of the table / execution plan / resources available (In terms of CPU and Physical Memory ) /
    Amount of Temporary tablespace

  • How to maintain time spec.of operations in routing and work centers

    Dear consultants,
    We dont have any time specifications in routing or work center ..
    we just create an order and the execution of the production involves many operations....
    now we want to be specific about the time of operations as the need is to track the operations.( In the sense which of the operations are delayed).....
    How and where should i do these in the routing and workcenters..
    Please explain in detail....
    Karthick

    Hi Karthick,
    In your work center in basic data page you maintain std. value key eg: SAP1, this has Setup Machine & Labor fields. In the default values page you specify the unit of measure Eg: HR
    Now when you add this work center in your routing operation page, you will find Setup Machine & labor, here you maintain the time required for each of the process.
    Now while doing confirmation via co11n, you inform the user to specify the time actually spent on each of the activity. In OPK4 for order type - plant combination you can specify a few defaults such as propose the value etc.
    Hope the above is clear.
    Regards,
    Vivek

  • TS3981 After migration files are now shared between two user accounts. How can I combine them into one account?

    After migration, from PC, files are now shared between two user accounts.I have to switch users to access files. How can I combine them into one account?

    See Pondini's  Transferring files from one User Account to another, for starters

  • How can I set a default action when I right click on a file in finder

    so that it opens Outlook 2011. This seems to be the only way to email from finder however I can't seem to set the option to remain in the menu and have to go through the steps each time.
    I go through this process now.
    right click file-open with-other-choose outlook in apps, then it opens the new mail with attachment screen and I am right to go.
    I would like to have outlook as the list of options under "open with" currently it offers word, safari, text editor and a couple of others.
    Sometimes I send PDF's JPG, Text etc so never the same type of file.
    Thanks.

    so that it opens Outlook 2011. This seems to be the only way to email from finder however I can't seem to set the option to remain in the menu and have to go through the steps each time.
    I go through this process now.
    right click file-open with-other-choose outlook in apps, then it opens the new mail with attachment screen and I am right to go.
    I would like to have outlook as the list of options under "open with" currently it offers word, safari, text editor and a couple of others.
    Sometimes I send PDF's JPG, Text etc so never the same type of file.
    Thanks.

  • How do I process Fuji XE2 raf files in lightroom 4.4

    New to Fuji cameras! Love the camera, now I need to know how to get Lightroom 4.4 to preview and process my XE2 raf files. My issue starts with a message 'can not preview image' and the raw raf files do not come up at all. Ideas?

    Where did you see this false information--about LR 4.4 supporting the X-E2?
    LR 4.4.1 was released June 2013.
    The X-E2 was announced October 2013, some months after, LR 4.4.1.
    Adobe's raw conversion software needs specific information for each camera, to support raws from that camera.  Adobe needs a production-ready camera in hand to determine this information so there's no way LR 4.4.1 would already have information from a camera not announced until some months later, and available for sale even later.
    If you have simple software that supports the camera, either it is newer, or it is merely reading the embedded JPG preview and not interpreting the raw data.
    The DNG Converter 8.3 or newer should work fine to create DNGs from the camera's native raw files; however, when you specify the source, the usual confusion is that you are selecting a FOLDER and you won't see any image files listed.

  • I cannot get on to my Apple TV.  I know that they are now requiring a one time security code?  What is it How do I find it?

    I know that they are now requiring a one time security code.  How do I find it?  Does anyone know what it is?

    There is no such code required to use the Apple TV. A user can setup a passcode to be required for airplay, and Apple ID is required for use of the iTunes store (or any other subscriptions associated with it).

  • How can I clean up queue one-time on Sun Java system messaging 6.3

    Hi,
    <address>Our Email server have a problem, When I run _./imsimta qm directory tcp_local_, There are about 5 Millions of messages in the queue.</address>
    Now our Email server send messages very slowly, how can I clean up queue one-time?
    the command _./imsimta qclean_ is very slowly.
    What can I do to prevent this problem?
    our Email server version is :
    Sun Java(tm) System Messaging Server 6.3-6.03 (built Mar 14 2008; 32bit)
    libimta.so 6.3-6.03 (built 17:12:37, Mar 14 2008; 32bit)
    SunOS email-1 5.10 Generic_120011-14 sun4u sparc SUNW,Sun-Fire-V890
    Thank you !

    If you have more than 100,000 messages in the queue, then look at the MAX_MESSAGES parameter in [the job_controller.cnf file|http://wikis.sun.com/display/CommSuite/Job+Controller+Configuration+File]. If the parameter is not specified, it defaults to 100000. If you have more than that number of messages in the channel queues, it will take a long time for new/legitimate messages to be sent because job_controller is only considering the first 100,000 messages in the queue.
    If you get into the "imsimta qm" command do do "sum -database", it will show a summary of what job_controller has in its internal cache and therefore what job_controller is working on. If you compare that to "sum -directory" you will probably see a difference.
    If these are all legitimate messages, you need to increase MAX_MESSAGES, cnbuild, and restart job_controller.
    If they are not, then preventing this in the future will require determining how they got into your queue and correcting that.
    As for removing them, the "imsimta qm" commands allow you to select messages by various criteria and then you can "return" or "delete" them. But yes, that will take a long time if there are many messages because it is a single threaded process and it needs to open and examine each message. You may be able to accomplish the task more quickly with a shell script that works on individual channel queue subdirectories and then run multiple copies of that script in parallel. After you have cleaned out the queue, restart job_controller.
    Also, you might want to consider [the subdirs channel keyword|http://msg.wikidoc.info/index.php/Subdirs_and_nosubdirs_Channel_Options].

  • How to estimate recovery time from rman backup

    how to estimate recovery time from rman backup?
    The database is of size 800GB.
    the approximate time to backup is 8- 10 hours.

    "Recovery time" is : RESTORE DATABASE time + RECOVER DATABASE time.
    RESTORE can be done
    a. in parallel with multiple channels if your backup was created as multiple backupsets
    b. using incremental backups
    c. whether the backups are on
    i. disk
    ii. tape
    Alternatively, if you have a Recovery Area with an Incrementally Update backup of the database, you can SWITCH DATABASE almost immediately
    RECOVER depends on
    a. how many archivelogs (in terms of size, not necessarily number) need to be applied
    -- this depends on
    i. transaction volume
    ii. the "freshness" of the backups (how recent the backups are)
    b. whether required archivelogs are available on disk (which can be the case if the database backup itself is a very recent backup and archivelogs since then haven't been deleted {whether they have been backed up or not}) OR whether they need to be restored from
    i. disk backup
    ii. tape backup

  • Any one tell how business planning and requirement specifications would be

    any one tell how business planning and requirement specifications would be in the real time scenarios
    how work would be assigned to development and production
    how would one approach to work
    regards
    bhanu

    Hi
    Check these SDN Links
    You can find a lot of good info here:
    http://help.sap.com/saphelp_nw04/helpdata/en/05/242537cedf2056e10000009b38f936/content.htm
    https://www.sdn.sap.com/irj/sdn/developerareas/bi?rid=/webcontent/uuid/6e01a04e-0a01-0010-dfbe-951c2c39d169 [original link is broken] [original link is broken]
    And of course the Business Planning forum
    You can see related info here:
    https://websmp105.sap-ag.de/~sapidp/011000358700007394712005E
    and
    https://websmp105.sap-ag.de/~sapidp/011000358700003595342004E
    https://www.sdn.sap.com/irj/sdn/developerareas/bi?rid=/webcontent/uuid/6e01a04e-0a01-0010-dfbe-951c2c39d169 [original link is broken] [original link is broken]
    This is interesting:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ce03c6bb-0601-0010-e69d-fb47733fe3b7
    http://help.sap.com/saphelp_erp2005/helpdata/en/53/155c3ce7055a37e10000000a11405a/frameset.htm
    http://help.sap.com/saphelp_sem40bw/helpdata/en/e3/e60138fede083de10000009b38f8cf/frameset.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/44/584041b02e4c0de10000000a1550b0/content.htm
    http://72.14.205.104/search?q=cache:6gBgWDd3W3AJ:https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/a1c91b57-0601-0010-dba2-ac4d24641f9fbwbps(SAP)&hl=en&gl=in&ct=clnk&cd=2
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/a-c/bw-bps%20further%20information.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/16/1e0541a407f06fe10000000a1550b0/content.htm
    ***Assign Points If Helpful***
    Regards,
    Ravikanth

  • A music album is listed multiple times in my library but each listing only has a few songs in it-not the full listing.  How can I combine them into one album and get rid of other duplicate listings?

    Several music albums listed in my IPhone 5 music library are listed multiple times, but each one only has a portion of the songs listed.  How can I combine them to make one album?

    First....Thank you so much for your prompt reply.  I am sorry for not getting back to you regarding your suggestion-I had computer issues that just got resolved.  Also, this is my first foray into online chat rooms so I have a lot to learn to precisely state my issue!  I did as you suggested and all the songs list the same album when I go into each song's "get info".  However, I am not sure how to edit as you suggested. When I downloaded this album originally, for some reason it broke up into several albums each with different songs from the original album.  I am trying to consolidate them back into one album in my library.  I would greatly appreciate further assistance if you can.  Also, I do not use "the cloud" to store any data and would like a good source of info on how to do this.  Thanks so much for your patience!
    SueZoo

Maybe you are looking for