How to generate single move order for same components amongs different job using component pick release

Hi all,
       I am new in manufacturing and we want to implement functionality of generating single move order for same component among different job using component pick release. Can any one help in this.
we are using oracle R 12.1.3 version.
      For example. We create finish good XYZ which is build in WIP item. We create discrete jobs for XYZ suppose JOB1,JOB2,JOB3 multiple job we can create for XYZ item. in these JOB suppose component abc is similar with 5 quantity. so our goal is to generate 1 move order for all three JOBS with 15 quantity of abc component.
please help me to achieve this goal. Immediate  Reply will be appreciated.
Thanks & Regards
user11152750

PranitSaha
        Thanks For your reply. Can you please tell me in detail how can I group as I am new. How using MRP we can group same component from different job in single move order for delivering that component to shop floor.
Thank you..

Similar Messages

  • How do we do production orders for same item code in different sizes

    Hi,
    We have Items which we buy as a single sheet of material and our customers can ask for us to cut the complete sheet into different sizes before despatching it. i.e
    Item Code Sheet1: Sheet size 100mm x 100mm
    Customer asks for sheet to be cut into 10 off 10mm x 10mm sheets, which we presently put on the sales order as a line note
    We then generate a production order for this item and indicate on the production order printout the line note
    We've recently had a customer who has asked for Item 1 in two different sizes on the same sales order ie
    Order Line 1 Sheet1 Qty:1 Line note: cut into 10mm x 10mm sheets
    Order Line 2 Sheet1 Qty:1 Line note: cut into 50mm x 50mm sheets
    When generating the Production order SAP combines the items into
    Product No: Sheet1
    Planned Qty: 2
    Where as we want it to create 2 production orders 1 of each different sizes items.
    I know I can create BOMs for those two sizes, but customers can ask for the sheets to be cut to whatever size they want. Is the best method to create BOMs on the fly for each different sizing option or are there alternative methods that are easier to manage ?
    Thanks
    Carl

    Hi Carl Rutter,
    You have to creat 2 special production order for this item. when issue the component make sure you issue the stock as per the cosumption becaue one have 10mmx10mm and the another item have 50x50 in this case you issue component by square inch wise. for example 10*10 = 100 squre inch.
    50*50 = 2500 square inch so the cost will be approtionate. you can Use multiple uom method to obtain this, other wise you have covert into stock then you issue the component. If you want traxk size wise ,you can use batch option for Finishe goods.
    Regards
    Sridharan

  • APM how to create APM application group for same application but different application paths

    Hi all,
    We have few applications which are of same name but different application path.
    Please check the screenshot. When we create different application groups using APM wizard, we still get errors mentioning the conflict. How to resolve this issue.
    Thanks
    Manish
    Manish

    I cannot see any screenshot here, what do you mean same application name but different path?

  • How to display two movement type for same PO no.in same row in alv grid.

    Hi All
          I have one PO no suppose 1812006400 which have 2 movement type(BWART) suppose 101 & 351 i want to show the both movement
    type in one row.now in my case its showing two different row.i made 1 seperate column in final internal table i.e. movement type2.Plz help us.
          Kindly see attachment..

    Hi Samadhan,
    Try the following code for merging the Movement type into single row using Control Break statements(AT END OF...AT END).
    "Sort the internal table based on PO Number and movement type
        SORT IT_TABLE BY PO_NUMBER BWART.
    "Process the LOOP.
       LOOP AT IT_TABLE INTO WA_FINAL.
         WA_FINAL-PO_NUMBER = WA_TABLE-PO_NUMBER.
         "Merge Movement type
         IF WA_FINAL-BWART IS INITIAL. 
          WA_FINAL-BWART = WA_TABLE-BWART.
         ELSE.
         CONCATENATE WA_FINAL-BWART '/' WA_TABLE-BWART INTO WA_FINAL-BWART.
         ENDIF.
         AT END OF PO_NUMBER
          FLAT_END = 1.
         ENDAT.
         IF FLAG_END = 1.
          APPEND WA_FINAL TO IT_FINAL.
          CLEAR: WA_FINAL,
                       FLAG_END.
         ENDIF.
        ENDLOOP.
    Regards
    Rajkumar Narasimman

  • Component Pick Release - Source Subinventory, Move Order

    I am using component pick release screen for push components.. Is there any possible way to select source subinventory prior to creation of move order ?

    Hi,
    Yes, please enter the Sub inventory & locator at BOM level.
    So it will be available in WIP Job & Job mover order.
    Thanks
    ND

  • Component Pick Release for Partial Discrete Job Quantity

    I'm on 12.0.6 and we currently do not use component pick release, but we are considering doing so.
    My employer currently creates a single discrete job (say 120 items) and then completes that discrete job over several days.  Say they plan to produce 30 a day over 4 days.  Is there a way to use component pick release to release that partial quantity?
    So if we have three shifts running and we want to produce 30 a day, 10 each shift.  We want to run component pick release 3 times a day for four days, only releasing the components needed for 10 assemblies each time? Possible?
    Is the only alternative to create 12 different Work Orders?

    when the move order is created..update the allocation and then perform transact move order
    ex if for 10 qty move order is created..but if u wish to issue 5 qty to the job..then update the allocation..for the remaining u can just backorder the move order
    HTH
    Mahendra

  • Component pick release for partial quantity

    Hi All,
    For R12 environment , customer needs move order to be created for partial quantity using component pick release.
    As far as I know component pick release cannot be done for partial pick release and only possible when onhand qty is not available.
    Can any one pleas elet us know if we can have any alternate solution or easy customization so that client can edit the quantities before going to move order creation?
    Thanks
    Vasudha

    when the move order is created..update the allocation and then perform transact move order
    ex if for 10 qty move order is created..but if u wish to issue 5 qty to the job..then update the allocation..for the remaining u can just backorder the move order
    HTH
    Mahendra

  • How to create multi garnishment order for the same garnishment document

    Hi,
    Can anyone tell me how to create multi garnishment order for the same garnishment document. I tried to copy the entry in IT0195 but the sequence field is grayed out so it will just delete the old record. What configuration should I do to make this possible?
    Thanks a lot in advance.

    hi,
    As far as I got it.
    You cannot have multiple Garnishment order but if a need arises you have to maintain it in IT216.
    For that follow this path goto PA30->pernr->194->change->Garnishment->adjustment.
    Since like order you cannot maintain adjustment also directly.
    Regards,
    Amit
    Reward all helpful replies.

  • Single planned order for different sales order of same material

    hi frnds
    my client want that if there is two  or more sales order of same material in a specific period than he require single planned order during mrp run for that material or when if he enter same material in two different line in single sales order than mrp doesnt considered it line item aand produce single planned order for both sales order
    please help me out its very urgent
    thanks

    Hi,
    In Mrp 3 view set the availability check as 01 and in Mrp 1 view
    Keep the lot size as periodic lot size and try the same.
    Thanks,
    S.Nandhakumar

  • Invoice request based on multiple sales order for same customer

    Hi Team,
    I just wanted to know if we can create manual invoice request based on multiple sales order for same customer?
    For project based invoice request i have create based on single invoice request.
    Appreciate your input here.
    Thanks,
    Nitin

    Dear Ratish,
    Thanks for yr reply.
    I already did that but it is not serving business purpose.
    Comm payment  - comes diff time than sales payment.
    so ,I will post one entry customer will get hit with total amount Sales + commission
    like below
    Let say 10, 000 is the sales value and 500 is the commission
    So , This entry will get posted
    Customer Db- 10,500
    Sales Cr- 10,000
    Comm Income Cr- 500
    But, As I said sales amt will be paid before so We need to clear it partially and some time customer pays also diff amount due to some defect.
    So, We wont be knowing for which case we have or havnet received the payment against commission.
    As , Customer account is got hit with total amount( Sales+ Comm..value).
    Pls advise how to solve this.
    Regards,
    Sukh

  • Single Purchase Order for different Plants of Different Company Codes

    Hi Experts,
    I have a scenario, My Client has 3 Company Codes (1000, 2000, 3000 )
    Company Code 1000 has 2-Plants    ( A001 and A002 )
    Company Code 2000 has 1-Plant      ( B001 )
    Comapny Code 3000 has  3-Plants   ( C001, C002, C003 )
    All these 3-Company codes has centralised purchase organisation.
    My Client requirement is to raise a single purchase order for external vendor, for all the plants A001, A002 which is in one company code and similarly in same Purchase Order for B001 plant which belongs to 2000 Company Code and Similarly for same purchase order for C001, C002, C003 plant which belongs to 3000 Company Code.
    1)Is it possible to raise a Single Purchase to External Vendor for plants of Different Company Codes ?
    2)Does it affect the accounting document ?
    3)How to inward and where to inward these goods ? with respect to plant wise ?
    Please Guide with Valuable inputs.
    Thanks in Advance
    Best Regards
    Javeed
    Best regards
    Javeed Ahamed

    1) How about Profit Centre ? We have Framed each Profit Centre with respect to Plant
    Why should there be a problem?
    2)In Case of Migo does we have to be careful and do stepwise MIGO with respect to different Plants ?
    of course people have to be careful when performing transactions.
    if you have multiple items in a PO then you can easily receive all items in one go. So people have to careful and need to check if they really received each of the PO items. Especially if people have authorization for many plants, then the user who is usually performing the receipts for plant A can easily post the receipts of plant B too.
    3) How to Process MIRO ? Can we process Partial MIRO"S with respect to Line-items of those particular Plants ?
    MIRO allows to post the invoice like it is send to you from your vendor. If it is just for a part of your PO then this is just a fact and MIRO allows to post this kind of invoices too.

  • How to Maintain two different prices for same material in different qty?

    Dear all,
    How to maintain two different prices for same material in different batch quantities in purchase order(ie.,info record)?
    (Vendor is supplying quantities in 2 different batches & also in different prices)
    Expecting valuable reply.
    Jeyakanthan

    In a PO you can create 2 items, and each item can be maintained with a different price in the conditions.
    In info record it is not possible to have different prices for the same period, except for scales.
    so if you have a price of e.g. 2 USD for 1000 kg and 1,90 USD for 2000 kg then you can maintain this in scales, but you still have to have 2 items in the PO so that each one can individually find its price.
    Alternative you can create contracts (as well with more than one item) to reflect the different prices and batches.

  • How to generate an XML file for an animation of IK armature

    Can someone please tell me how to generate an XML file for an animation of IK armature.
    I have a 5 keyframe/16 frame animation of a human character made up of a series of moveiclip symbols that is animated with an IK armature.  I need the XML information from the animation. 
    When I go to Commands > Export Motion XML I get the error message "There is more than one object on frame 1" and then nothing happens.
    Thank you,
    c

    I hope that's not the case.  I want to write to adobe about it.  I think it's a great feature and it functions really well even though it is not a very developed IK tool.  My biggest issue with it is ouput options and integration with motion tweens.
    I have seen a lot of examples of animators using it online, just no one talked about output.  I just feel it hasn't been developed.  It can generate a sprite sheet but only for a single pose frame of the animation, and not all the key frames or pose tweens.  I find that functionality quite odd, as if adobe just forgot about IK when added in sprite sheets, etc. and the reason it half works is just an accident.

  • Single production order for many materials

    Dear Experts,
    We can create a single purchase order for many materials. Like wise can we create a single production order  for many materials which is produced from single raw material in same operation?
    Thnaks,
    Chetan

    Chetan,
    You can not create a single production order for multiple materials.
    However, the workaround would be create one material as BOM header and and assign the remaining materials (for which you want to have production order) as BOM components with by-product or co-product. With this you can receive all the materials against one single production order.
    This will have implication in many areas like planning and costing.
    Evaluate the option with your FICO consultant also, before going ahead.
    Regards,
    Himanshu

  • Single Transfer Order for Multiple Handling Units

    I have been researchig the ability to create a single transfer order for multiple handling units.  My assumptions are if it can be done that:
    1) A transfer order can have a single source, so if the source document for the handling unit (delivery) is different, that means different transfer order
    2) A TO can have multiple materials (line items) with different destination bins and quantities per bin
    I looked at the configuration for TO Split, but it's not clear that this will handle my requirement.
    I also saw this http://aq33.com/material-management/Articles-005798.html and it also says that my requirement can't be meant.  I'm just checking before I tell my customer this cannot be done.

    Yes you are right, if Source document is different, you need to go with different TO.
    But you can choose the Handling unit split, while creating a TO itself. i.e., You can quantify the goods for each handling unit.
    Edited by: Ganesh M on Feb 29, 2012 6:20 AM

Maybe you are looking for

  • Supplier site open interface

    Hi, I am working on supplier site open interface. I succesfully loaded data into 'ap_supplier_sites_int' interface table. After submitting supplier site open interface program, it's giving '*Operating Unit Info is null*' error. But, i have operating

  • Server "Freezes" at least once a day

    Hello I have a Xserve G5 with OS X 10.4.9 I run a Forum with vBulletin (Mysql). My problem is that almost every day, the server freezes, if i do ping, it works, but nothing else. No ARD, No server Admin, no SSH, NOTHING... Sometimes it came back... a

  • Error while reading template file

    Hi, i have successfully created a template file from a domain(weblogic server 11.3.5).now i have to use this template file to configure a new weblogic server(11.3.5) domain. i have installed the new instance of weblogic server and successfully ran th

  • BACKGROUND execution - Intimation

    Hi Friends, I am running a report program in BACK GROUND. This program contains an Internal table with 10 reords. I'm sending those 10 records an EXCEL sheet as attachment to the USER who executed the program. After sending mail to the USER, I have t

  • Looking for Areca RAID HW Recommendations