How to know - For a schedule line if delivery is already created
Hi Gurus,
I have a sales order with one line item - 10.
For the line item 10 , I have 2 schedule lines.
How can we know if delivery is created for a schedule line.
Which table we need to refer ? VBEP !!!
Please help.
Regards
Avinash.
Hi,
There is no way to check that but you can check the status of sales order line itam is delivered or not in table VBUP
and filed RFGSA.
Not Relevant
A Not yet processed
B Partially processed
C Completely processed
Thanks.
Similar Messages
-
How vendor get info of schedule lines
Hello Gurus,
I am creating schedule lines from scheduing agreement. Now how does vendor come to know about these schedule lines.
How vendor will be communicated about the new requirement? Schedule lines are generated in our system not in vendor's
system.
Regards,
VM - Learning MMThe scheduling lines can be transmitted to the vendor means that the output type can be triggered as per the requirement in SAP. check the configuration node.
Materials Management - > Purchasing -> Messages -> Message Determination Schemas - > Define Message Schema for Scheduling Agreement Release/Expediter
hope this helps you. -
How to delete the old schedule line release?
Hello,
How to delete the old schedule line release in apo?
Generally GR has to be carry out schedule line release in r/3 which reduces the Schdule line release.
But i do want do GR against old schdule line release instead i want to delete the old schdule line release.
Please suggest.
Regards,
Sunil PatilSunil ,
/sapapo/cmds_del is the tcode to deleted sales scheduling agreement confirmations and releases
/sapapo/display_conf is the tcode for displaying sls. sch.agr confirmations and releases
The above two are in the supply chain collaboration menu
/sappao/cmds_sc02 is the tcode to delete sales scheduling agreements . This tcode is in the application specific master data menu
Thanks
Saradha -
How to add a new schedule line?
Hi folks,
Please help to tell me is there any user exit can be used for adding a new schedule line? I want to keep the old first date data, add new shedule line with new updated schedule line date. Pls. help to advise how to do it in VA01/VA02 ?
If i simply use the following update statement in MV45AFZZ, then the first date will be updated by the new Schedule line date, which is not what i want. (Since new order always the First line "0001" will get updated)
xvbep-edatu = t_temp-edatu .
modify xvbep TRANSPORTING edatu "UPDKZ
where posnr = t_temp-posnr
and ETENR = '0002'.
if SY-SUBRC <> 0.
modify xvbep TRANSPORTING edatu "UPDKZ
where posnr = t_temp-posnr.
endif.
Tks,
Jenny
Message was edited by:
Jenny ZhuangHi Ferry,
Many thanks for the reply. But i still have the question, seems the user exit 'USEREXIT_CHECK_VBEP' in 'MV45AFZB' is used for addtional checks on the schedule line, my questions is how to add a new schedule line? It maybe very difficult. so is it possible to change the configurable Sales order's Finish Date for it's production order, and force it to generate a new schedule line?
Tks,
Jenny -
Split delivery for each schedule line
Hi,
We have a requirement to split deliveries for each schedule line in the order.
For example: I have an order with one line item which has 2 schedule lines. If the schedule line date on one is 01/29 & the other is on 01/31, and the delivery due list VL10A is run with a range 01/29 - 01/31, it picks both the schedule line & combines them into one delivery.
Is there a way by which we can force them to create 2 different deliveries (as it would if the delivery due list was run for each day at a time).
We created a data transfer routine (deliveries), and populating ZUKRL with schedule line date & that doesnt solve the problem since the routine is triggered once for each sales order line and not for schedule lines.
SAP reverted back that this is standard SAP behaviour to cumulate all due schedule lines into one delivery, but I would like to know if anyone has any other solution ?
Thanks in advance!First of all you have to use VL10E to create deliveries, since it creates one delivery item for each schedule line.
Then play with your own delivery role copied from standard profile 0201:
you can trigger 3 different flags to reach your goal:
Cumul. Rule: Rule for calculation of quantity to be delivered
There is a field that contains a cumulated quantity in delivery lists
with item or schedule line views. The quantity at which the list line
(document item or schedule line) is delivered is defined in this field
when it is selected and the delivery process is started in the
background. The value is a default and can be changed by manually
processing the delivery list on the item or schedule line level.
SplitSchedLine: Rule for creating one delivery item per schedule line
In a delivery list in item view with multiple schedule lines, you can
decide for the same document item whether you want to generate one
delivery item per schedule line or whether you want to deliver the
cumulated quantity of the last schedule lines selected.
LimitSchedLine: Allow constraints on schedule line level
You can use this indicator to limit selection o
delivery when
o Delivery due date and/or
o Planned goods issue date and/or
o Route schedule
does not fall within selection range.
This should help you to solve your problem.
pls. reward points if helpful
Regards
Roberto -
User exit for va01 (schedule line )
hi all,
Pls tell me how to use user exit in va01.when user add material and select schedule line for that material he has to add CP/CN .but when user put CP it will give message that CN is default pls enter CN.like these msg i have to give.pls give me solution.
Thanks,
NitinHi Nitin
Try userexit_move_field_to_vbep in MV45AFZZ
or userexit_check_vbep in MV45ZAFZB.
check vbep-ettyp for the schedule line category and write the logic.
Kuntal -
How to delete the old schedule line release in apo
How to delete the old schedule line release (from current date) in apo which is having schedule firmed?
Please suugest.
SunilHow is it possible to delete old purchasing schedule lines in APO (that do not exist in R/3)?
Though used successfully before, /SAPAPO/CCR will not reconcile our discrepancy in this case.
Thanks in advance,
Jim -
Delivered quantity for each schedule line
Hi,
Our scenario is that we have an order for each order's each item we can have multiple schedule lines, when any of the schedule line is delivered the delivered quantity colum is updated, the schedule lines table in VBEP but the thing is it doesnot have the delivered quantity, system calculates it at runtime or may be it is keeping it in some other table.
I hope some body can help in this regard.
Thanks
Khusro HabibIt is a calculated value, not a value of a table field. Also, it may lead to wrong results if you don't pay attention to this description of the field here under in bold.
Delivered quantity in sales units
The quantity from the schedule line that has already
been delivered.
Use
When there is more than one schedule line for an item,
the system distributes the total delivered quantity for
the item across the schedule lines according to the
sequence of their delivery.
Example
A sales order item has three schedule lines, each with
an order quantity of 50 pieces. You make two subsequent
deliveries: the first for 20 pieces, the second for 60
pieces. The delivered quantity for the first schedule
line is 50 pieces, for the second 30 pieces, and for the
third zero.
If you delete the first delivery (20 pieces), the
delivered quantity for this schedule line is still 50
pieces. However, the system reduces the delivered
quantity for the second schedule line to 10 pieces. -
Change shipping dates/times for confirmed schedule line
Hi,
I am having a problem changing the confirmed schedule line in a Sales Order VA01.
I have added my code into the user-exit
* FORM USEREXIT_MOVE_FIELD_TO_VBEP *
* This userexit can be used to move some fields into the sales *
* dokument schedule line workaerea VBEP *
* SVBEP-TABIX = 0: Create schedule line *
* SVBEP-TABIX > 0: Change schedule line *
* This form is called at the end of form VBEP_FUELLEN. *
FORM userexit_move_field_to_vbep.
vbep-ezeit = '235900'.
vbep-wauhr = '235900'.
vbep-lduhr = '235900'.
vbep-mbuhr = '235900'.
vbep-tduhr = '235900'.
However, in the above code I manage to only change the first schedule line in case I choose a delivery proposal. I need to change the line with a confirmed quantity. Instead I change only the first shedule line without a confirmed quantity.
Question: Which user-exit can i use to change shipping times dates for all schedule lines or just confirmed schedule lines?
ThanxHi,
Use form routine "USEREXIT_SAVE_DOCUMENT_PREPARE" in MV45AFZZ. Update VBEP as well as XVBEP Structures.
Regards
Vinod -
Mapping between Sales Order-Schedule-Line and Delivery-item
Hi together,
I want to extend the Datasource 2LIS_12_VCITM (Delivery-number, -item, Order-number,-item is available) by Sales Order Schedule Line.
Could not find any ERP table (VBEP and LIPS allow a mapping only on item level) for the mapping between Sales Order Schedule Line and Delivery item yet. The use of the extractor 2LIS_12_VCSCL for the extention (e.g. infoset) afterwards is no option.
Thanks for your help in advance!!
Assign full points!!
SvenHi Reddy,
thanks for your answer.
I know that I have to add this field.. but the problem is, how to fill this field. I don't know how to map the delivery-item with the schedule line-item. -
Difference between Scheduling lines and Delivery schedule
Hi SD Experts
can u say me the clear difference between Scheduling lines and Delivery schedule.
where we will maintain deliver schedule. whether delivery schedule is automatically created along scheduling agreements..
with regards
JamesHi James,
Schedule Lines: Has basically information realted to delivery scheduling in Sales Order level.
Delivery Scheduling: Is a process using which system will determine what are the different activities which need to be performed and time taken for each activitiy only after which the material can be delivered to the customer.
Delievry scheduling will be started only from the material availability date i.e., system will first determine the material avail date and then do scheduling. By default Standard SAP system does Backward Scheduling in case material availability falls beyond the required delivery date system will do forward schedluing
Delivery Scheduling consists of the following Basic activities:
We give deatils while creating order:
Order Creation Date
Required Delivery Date
Order date - Material availability date - Transportation Planning Date - Loading date - Goods Issue Date - Required Delivery Date
Time Between GI Date and required Delivery Date is called Transit Time
Time Between LoadingDate and GI Date is called Loading time
Time Between Material Availability Date and Loading Date consists of 2 components - Pick / PackTime and Transportation Planning Time
System has to calculate all this before it determines the confirmed delivery date.
Give your mail Id I have some Presentation I will send you across.
REWARD POINTS IF IT HELPS
Regards
Srini -
How to create diferents deliveries for each schedule line
Dear gurus,
I have sales orders with many schedule lines in order to deliver in diferents dates. We need to create all the deliveries together but each schedule line needs to be in a diferent delivery with the corresponding delivery date.
I analiced the customizing about pool for delivery creation (VL10) but all I can change is for display and can not change the way the delivery is created. If we select two schedule line with diferent dates, the proccess create only one delivery with the total quantity and the first date of delivery.
Anybody knows some way to make the proccess create individual deliveries from diferents schedule lines?
Tanks in advance!
Marina.Hello Marina
I hope you are using VL10E. Did you try working with Delivery creation date (range) and Delivery Date calculation rule? For example if you go for a value of 2 for the CalcRuleDefltDlvCrDt ('Rule for determining default value for deliv. creation date), then system will consider only those sched lines which are to be delivered today and tomorrow.
You also have the possibility of setting up your own routine for CalcRuleDefltDlvCrDt.
Thirdly SAP has suggested a solution for Scheduling agreements ( valid for releases upto 4.7). In this SAP has suggested solution 4 for ensuring all schedule lines are not delivered together. You can customize the code to include Sales orders ( in stead of Sched Agreements) in your case. Though it is for release 4.7, I think you can use the smae concept in ECC also.
137937 - SD scheduling agreement: Delivery split for each schedule li
Check it out and let me know how it goes. Good luck. -
How can i show item schedule line details in Tableview for each line item
Hai all,
I need to display schedule line details in Tableview for each line item.for example in each row i need to put one column along with button , if i click on this table that row should be expand vertically and must show all schedule line details in that.if i click my button again the visible expanded row should disappear...
if anybody works on this previously plz send some sample code...
leoiz....To modify rows the best way is with the Iterator (do a search in the weblogs for "Iterator")
However for what you want to do I've only seen this really work successfully with a standard HTML table not using the tableView. -
Show Order Qty, Shipped out Qty, Open Qty for each SCHEDULE line of Orders?
HI Experts,
I need to show the
Order Qty
Shipped Qty
OPEN quantities(Un Shipped quantities)
at each SCHEDULE line level for all Sales orders.
So, am pulling the date like,
Order qty from VBEP-WMENG and
Open Qta from VBBE-OMENG
Then am calculating like,
Shipped Qty = VBEP-WMENG - VBBE-OMENG
But, still some SCHEDULE lines r missing in VBBE table!!
so, pls. let me know that,
1) Is there any other alternative ideas for my requirement?
2) Why some SCHEDULE lines r missing in VBBE table?
thanqTry this function module:
CALL FUNCTION 'RV_SHIPMENT_VIEW'
EXPORTING
shipment_number = tknum
option_tvtk = 'X'
option_ttds = 'X'
language = sy-langu
option_items = 'X'
option_stawn_read = 'X'
option_segments = 'X'
option_partners = 'X'
option_messages = 'X'
option_package_dialog = 'X'
option_flow = 'X'
activity = 'V'
IMPORTING
f_vttkvb = vttkvb
f_tvtk = tvtk
f_tvtkt = tvtkt
f_ttds = ttds
f_ttdst = ttdst
TABLES
f_vttp = i_vttpvb
f_trlk = i_vtrlk
f_trlp = i_vtrlp
f_vtts = i_vttsvb
f_vtsp = i_vtspvb
EXCEPTIONS
not_found = 1
delivery_missing = 3
OTHERS = 99. -
How to add a New schedule line and update the order quantity?
Hi all,
I have to add a new schedule line in VA01/VA02 so that when ther is partial confirmed quantity against a schedule line, we have to create a new schdule line based on the existing so that it will contain confirmed in one and unconfirmed in the other.
The schedule line will split once the user go to Header data screen in VA01/VA02. So I used USEREXIT_MOVE_FIELD_TO_VBAK user exits in MV45AFZZ include program.
I splited the order quantity against the confirmed quantity and added it as new schedule line in the XVBEP internal table and update UPDKZ flags for XVBEP & YVBEP.
Could anyone tell me is there any other way to do this without updating XVBEP? Because it is affecting some other place because of index table is not updating. How to you think use if update xvbap-etenr_high and update index table IVBEP1 for new line insert into XVBEP instead directly inseritng it into?
My code as follows:
xvbep-WMENG = t_temp-WMENG .
modify xvbep TRANSPORTING WMENG.
t_temp1- ETENR = '0002'.
if SY-SUBRC <> 0.
t_temp1-UPDKZ = UPDKZ_NEW.
modify xvbep TRANSPORTING WMENG UPDKZ.
endif.
With Regards
RajHave you got thru this one if so please provide me with the solution as i got the same req' ..
Maybe you are looking for
-
Apple Aluminum Keyboard slow responding after reboot
I have Leopard installed on my external firewire drive, and 10.4.1 installed on my PowerBook. Whenever I boot from one to the other I get a very slow response from my new Apple Aluminum Keyboard and my USB trackball. I have the trackball connected to
-
Belkin N+ Wireless router and MacBook Pro 15" Unibody
Will this router work with this laptop? Will it connect via N speed or G speed? Specs: Networking Connectivity Technology Wired, Wireless Integrated Switch 4-port switch Data Transfer Rate 300 Mbps Frequency Band 2.4 GHz Data Link Protocol Ethernet,
-
Provider not compatible version of Oracle client after upgrade 4.112.1.2
I had an ASP.NET 3.5 website running on intranet small business server as production with: OS Win2008 Standard 32-bit Oracle Database 11g107 32-bit Oracle DataAccess 2.111.60 32-bit On a development laptop, I upgraded the website to ASP.NET 4.0. The
-
Is it possible to pay for iCloud storage plan with money from iTunes?
Is it possible to pay for iCloud storage plan with money from iTunes?
-
Sending PDF attachement via OUTLOOK
Hello All, I am sending the output of a sales order as a PDF attachment via outlook mail. It wokrs fine. but only worry is the Chinese characters are appearing strange and not the characters what we need. The function module used to convert OTF to PD