How to manage exceptoinal cases in PMS processess

HI Experts,
We are facing problem in  managing exceptional cases in PMS cycle for transfer cases and promotion cases.
How generally we maintain the procedure when we have multiple appraisal documents for the same employee in different dates
How work flow get triggers when transfer takes place before midyear apraisals.
Also let meknow how work flow triggers when promotiopn takes place after start of annual review process.
Please advice me to proceed.
Regards,
Sairam

the following cases needs to be included in Query.
1.Wants to appear Project as well as WBS with and without respect of chosen profit center(Condition-WBS does and does not belongs to chosen Profit center).
2.Wants to appear WBS with chosen Profit Centre(Condition- Project does not belongs to chosen Profit center).
what are the necessary actions to be taken for this cases.
Thanks in advance.
Edited by: S MB on May 8, 2009 11:08 AM

Similar Messages

  • How to manage a case structure Untill a value is reached

    Dear all,
    I am collecting data with DAQmx and after a value is reached i want to do smthg else, for this reason i created a case structure and i put to the case selector that if a value is smaller than "10" then it is true. If it is false it should stop and do what i say even if the value gets under "10 again". 
     So how can i make this: "once the value is reached then do what i say  even if  the case selector value is back to true state after a while"
    Thanks.
    Kind regards.
    Solved!
    Go to Solution.
    Attachments:
    False-CaseStructure.png ‏15 KB
    True-Case-Structure.png ‏19 KB

    You can use the shift register to make a condition so once it enters into the value greater than limit case then it will not go to the other case even if the value goes below.
    The best solution is the one you find it by yourself
    Attachments:
    Case Selector.vi ‏7 KB

  • How to export test cases into oracle test manager

    hi
    present i am learning this tool help plz
    how to export test cases into oracle test manager
    Edited by: 799636 on Oct 5, 2010 7:11 AM

    Create a script in openScript and save it to a workspace (a shared directory on the OTM server). To add an Oracle OpenScript test to OTM:
    1.Select the Tests tab.
    2.Click the Add button.
    3.Enter a name for the test.
    4.Select Oracle OpenScript in the Type field.
    5.Click Find to display the Select Script dialog box.
    6.Select the Repository and Workspace.
    7.Select the Oracle OpenScript script that you want to add.
    8.Click OK.
    9.Select the owner and priority and enter any descriptive information in the Functionality and Description fields.
    10.Click Save.
    Regards,
    Jamie

  • How to manage one wsp and dll for multiple clients in farm environment

    1. There is a product which is developed using C sharp , jquery,CSS and sharepoint object models which have been packaged into .wsp file. Whenever we introduce new functionality to the product we used to branch the
    previous code as a version , say Version 1.0 and new functionality of the product will in another solution. This is how we are managing the code in TFS as versions. Each newer version will have new functionalities. We do not give latest functionality for all
    the clients. Each client is having its own version of functionality. Technically in order to access the functionality, the wsp solution should be present in the solution repository which is available in SharePoint central administrator site. This solution
    will be deployed on the client’s site. We are following the above process in SharePoint standalone installation where we used to purchase dedicated server per client and installed sql, SharePoint foundation 2010 as standalone installation and adding the client
    related version of the code to the solution repository. Later host on the site which is created for that client purpose. This process is same for all the clients where we purchase individual server for each client .
        Now we want to host our product in farm environment of sharepoint foundation 2010 where we are going to try 3 level architecture. 
    • SQL Server-In this sever we are going to install sql server 2008R2 standard edition. Which should serve the database service for all the web applications/sitecollections which we are going to create in Web front end server.
    • Application server- In this server we are going to install the sharepoint as farm and will install search server express for serving search functionality for our product
    • Web front end server- In this server we are going to add this server to Sharepoint farm which we have created in application server. Here we are going to create web applications and site collections for all the clients.
    In this scenario how to manage multiple versions of same wsp solution?
    Another major issue w.r.t the architecture of the product and new approach for client deployment as follow.We have CSS, jquery files for serving the functionality.These files have been mapped to 14 hive folder.If any changes we do one of the jquery file or
    css file which is meant for latest version and not for old version, then how to manage this new functionality for that particular css or jquery file in 14 hive folder, since there is only one 14 hive folder. What is the best practice to make this happen? Another
    thing is, how to manage dll files for individual client?

    It sounds like you have a farm scoped solution at work. In that case you can only have a single instance of it per farm, you'd have to branch each version so they appear to be seperate solutions entirely (thus ruining your clients upgrade process).
    Bluntly i don't think a single farm can manage all your user environments.

  • HOW TO MANAGER APPROVE LEAVE REQUEST AT A TIME MORE THEN TWO

    Hi Experts,
    This is Kalyan.I am working on ess/mss . How to manager approve four work items at a time .
    And how to add  Custom Fields in UWL .Can u please help me.
    Regards,
    Kalyan

    Hi Kalyan
      Suppose if multiple persons raise workflows like Leave, Travel, Claims, Loan every workflow is different. You cannot have single workflow and single work item. The work item comes to UWL for the approver. In the UWL you can customize the screen put a radio button in the screen such that only approve and reject button. So every wprk item can be just selected with approve and reject radio button on the UWL itself. Finaly update button will update the entier page with the approvals. But this is very very very difficult.
      Think logically Y the approver wants to do mass approval. Suppose the approver receives the leave work item without seeing the leave quota will he approve?. Similiarly for travel without seeing the expense amount will the approver approve the trip.
    UWL is for all the module like Travel, Leave, Claims, Loan etc. Every module the approval screen itslef different. So mass approval is not possible.
    If ESS is implemented only for Leave or Travel or Payroll then its possible. In that case customize the UWL with radio button and after mass approve or rejection finally need to update. But this is absolutly not advisable since every person the data are different.  So mass approval is not advisable.
    I think am logically correct?
    Regards
    vijay

  • How to manage large database records in enterprise application

    Hi All,
    I am working on a large enterprise application relating to Capital Market. I am working in Java and with its extended technology. I am facing one critical problem which needs solution from your side. I have a database table which contains approximately more than 5 millions of records, I want to display the records with proper pagination. Here I am using Hibernate for database related stuffs. I am using a query which contains a join query to load the records. After the query the filtered records come to approcimately 80,000. I am unable to make proper pagination, everytime for next or previous set of 10 records I hit the database which is a time consuming affair. I do not know what I will do , should I cache the data for pagination. Everytime I load more than 80,000 records, think that in an web based application, the no of users are 5000, then how to manage. I need core java level solution not in the JSP level. Please help me in this regard.

    After the query the filtered records come to approcimately 80,000. I am unable to
    make proper pagination,Just a thought. If you display 50 per page, that's 1600 pages. Say it takes the user
    15 seconds to read the page: total 400min=6 2/3 hours and probably a bad case of RSI.
    The proper pagination would possibly be no pagination.

  • How to manage the "no data" loading in process chain

    Hi,
    I want to load some master data in delta mode with a process chain. The treatment works good except in one case.
    If I have no data selected during the extraction ( cause the system doesn't find any data matching with the delta field ), the process chain appears in red as if some problems was encountered instead of giving a traffic light green.
    How is it possible to manage this case of treatment as a normal treatment ?
    Thanks for your help.

    Marc,
    in RSMO ,
    Using Settings -> Evaluation of Requests ->
    if no data is available in the system, the request
    select Green (is Judged to be successful). this will cause the load to be successful if Zero records are fetched and the Process chain will not fail.
    Cheers
    Tushar

  • How to manage physical sample in SAP?

    Hi,
    How to manage physical sample in SAP?
    Regards
    Ashish Jain

    Hi
    Physical sample is to keep the sample of a product till its shelf life expiry date. E.g. In case of any shelf life applicable product, the inspected sample will be retained till its expiry date. If any customer complaints are received, on inspecting the complaint, result may be compared with the existing physical sample.
    In SAP, Material master should have inspection type 15.
    To create physical sample, sample drawing procedure has to be created and attached to the header of inspection plan. With this set up when the lot is created, physical sample will also be created. Result recording should be done for physical sample. Physical sample storage information has to be updated through transaction code QPR2
    Regards
    Nikhilesh Ray

  • How to create a Case Hierarchy

    Hi Friends,
    Can you pls guide me on how to create a Case Hierarchy?
    It's very much urgent.
    Thanks in advance and warm regards
    Purnendu

    Hello,
    Please have follow below steps for case hierarchy,we have implemented for service scenario
    General paths:
    CRM/Case Management/
    CRM/Interaction Center Web Client/Business Transactions/Case Management
    Transaction:
    SCASE_CUSTOMIZING
    Basic Settings
    Number range defined
    Case type emergency defined
    Status Settings
    Case status profile defined with values as below
    Case attribute settings
    Case priority defined (general for all case types)
    Case reason defined
    Case Category defined
    Create function profile and assign to Case Type
    ICWebclient settings
    Define and Enhance ICWeb client profile for Case processing
    Case Search added to Z_XXXX Nav Bar and new Z_XXXX_Case defined. New Nav Bar has Case Management Entry added.
    Additional ICWeb client profile defined. Assign new Nav Bar assigned and Case function profile to the new profile.
    Assign function profile for ICWebclient
    Create new runtime profile and assign to new ICWeb client profile. Also replace appropriate controllers for Case Management. Pls refer to Technical Specification for details.
    Case Record Model (transaction scase)
    RMS ID
    Case Record Model – Cycle0 activity. View for linking business objects to Case record.
    Set Up Registry
    Include new record model and service provider for record model in Case Type
    Maintain filters in ICWeb
    Column headings
    BOL paths, mapper classes and search help for CSRs.
    Define Filter profile
    Maintain entries to Filter profile.
    Assign Filter profile to Case Type
    New Business activities for Case
    Transaction type Case activity , partner determination and status profile created. 
    Status profiles for new business activities
    Partner Determination procedures for new business activites
    Regrds
    Shanmuga

  • How to manage Rescue and Recovery Backups

    Hi I've been using disk image backup solutions since the days of powerquests Drive Image. And have had my days with Ghost and Acronis Trueimage. I recently built a clean Vista image on my T400, and I'd like to take advantage of the Lenovo Rescue and Recovery 4.21 tool since it the recovery technology is already part of my system and I have tested it once.
    I'm used to the idea that a backup tool will produce an image file, which I can manage myself, moving to various media....hiding under my bed etc. With RnR, I've noticed it prefers to control the directory's where backups are placed (this is a bit annoying to me, but I can live with it, as long as it's isolated to the RRBackup directory - which it appears may not be the case). I do appreciate it's ability to specify various backup media locations (network, CD, 2nd HDD, USB) and recognize that it's a simple approach for basic usage.
    Recently I've backed up my image to USB drive, and also to the local disk. I'd like to take that back up and split it up into DVD's and burn it to disk. I know there is a built in RnR feature which lets us copy backups from the local drive (why only local drive ??) to USB/Network/CD, but unfortunately the CD copy feature burns directly to my thinkpad burner...which is a CDR device, not a DVDR device. I'd like to use the DVDR device on my desktop...
    Anyway, I'd like to know if there is more resources on how to manage RnR Backups. I found the following guide http://www-307.ibm.com/pc/support/site.wss/MIGR-70344.html (which is hard to get on Lenovo's site...google finds it better), I'm still reading it, but so far it appears more focused on the pre-desktop area than backup management.
    Any insight would be appreciated.
    Thanks!

    Hi Danielle,
    Consider this allegory; factory settings will make your thinkpad like a never driven 0 meter car [with reference to software]. Hence it will be far-flung from it's previous state. Apart from what you have already saved on memory stick, all settings and the software you have installed on the notebook will be lost.
    I hope this helps.
    Maliha (I don't work for lenovo)
    ThinkPads:- T400[Win 7], T60[Win 7], IBM 240[Win XP]
    IdeaPad: U350
    Apple:- Macbook Air [Snow Leopard]
    Did someone help you today? Compliment them with a Kudos!
    Was your question answered today? Mark it as an Accepted Solution! 
      Lenovo Deutsche Community     Lenovo Comunidad en Español 
    Visit my YouTube Channel

  • How to manage Execution of APO-DP planning on portal ?

    Hi all,
    See the scenario is like this :-
    -There is a planning area, in that planning area there are planning books.
    -If I select a particular one it is giving me screen which is proper.
    -On that screen I have two drop down selection fields which are the main concern of this issue(take them as group and subgroup).
    -So if I do selection from subgroup first it is showing me details of subgroups.
    -But after this selection if I go to group selection it is wiping the subgroup selection and only givin info about groups. It is not showing hierarchy as Group->Subgroup-> Data.
    -I want the above execution (<u><b>Group->Subgroup->Data</b></u>)after going 1st to subgroup and then to group will this is possible???
    Its urgent If anyone has idea about how to manage the execution of DP planning books please revert back.
    note- it is working properly on backend but it is showing this problem on portal screen.
    Should I go for new transaction iview for that???
    Regards,
    Aditya

    Dear Vijay,
    I doubt if there is any standard settings or configuration is there for this functionality. What i can suggest is either you add seperate key-figures for displaying total of all the periods and write macros to populate key-figure values in it. The second option is initiallize the key-figures for an extra bucket which is really required by the business and populate the total in that extra period by writing macro. By second method there will not be extra key figure required. Apart from writing macros you can use BAPIs for reading the key-figure and adding it and finally populating the key figure values in the key-figure but this is not required as macro is sufficient for populating the key-figure in both the cases.
    Please let me know if you think any other better way of doing it.
    Regards,
    Mukesh Pandey

  • How to manage slow and fast moving goods in Demand Planning

    Hi All,
    Kindly let me know how to manage slow and fast moving goods in Demand Planning.
    1. First how to detect slow and fast moving goods
    2. which DP model to use
    3. Any Best practice while dealing with slow and fast moving goods
    Thanks
    Arun

    Arun,
    There are two main concerns with forecasting slow moving goods. For fast moving, yes, trend, level and seasonality combined with a decent demand level gets you through.
    So, either you don't have demand in the market for that product; if the product is not critical (like go/no go spare parts) I recommend just averaging out the demand over a period and going with that. Any errors incurred there won't have a significant business impact. On the other hand if it is critical, safety stock and/or contractual obligations come to play.
    OR, if there is market demand but your market share is too low for whatever reason, then it gets tricky because you need a predictor variable(s) for which you have good knowledge off (such as CPI index, demand for related products, etc). The forecast is then done on the predictor variable(s) and the low market share applied to 'translate' the expected demand to the product in question. Unfortunately, the case of low demand/low market share I have no idea of how to implement it on SAP. Since forecasting is just the tip of the iceberg, it may pay to do it outside of SAP (say in Excel) and manually input it (unless the products are many and varied).
    Hope this helps. Please let me know if this makes sense and/or applies to your question.
    Rodrigo

  • Cross Site Publishing and Variations: how to manage assets?

    We have a Cross-Site Publishing scenario:
    - an Authoring site collection with variations enabled, in order to manage content in English and Italian
    - two Publishing site collections
    - an Intranet Site Collection
    Intranet and Web site are feeded from Authoring site collections.
    We have some assets (Video and Photos) with their own metadata (title, description, ...) that we need to localize in each Language.
    We followed TechNet best practices: we saved these assets in a separate site collection with Anonymous access enabled.
    Where do we have to compile metadata?
    In a list in the Authoring site collection where we build an entry for each digital asset we want to describe (of course, a list in each variation site)? Or is it better to associate metadata in the Asset Library (in this case how we manage translations)?

    Did you find a solution for this issue? I have the same problem. Thank you very much
    We have a Cross-Site Publishing scenario:
    - an Authoring site collection with variations enabled, in order to manage content in English and Italian
    - two Publishing site collections
    - an Intranet Site Collection
    Intranet and Web site are feeded from Authoring site collections.
    We have some assets (Video and Photos) with their own metadata (title, description, ...) that we need to localize in each Language.
    We followed TechNet best practices: we saved these assets in a separate site collection with Anonymous access enabled.
    Where do we have to compile metadata?
    In a list in the Authoring site collection where we build an entry for each digital asset we want to describe (of course, a list in each variation site)? Or is it better to associate metadata in the Asset Library (in this case how we manage translations)?

  • How Transaction Manager work with Resource Manager, like Connection pool?

    hi,
    I'm using BEA Webloigc8.1 Stateless Session Bean/DAO/Oracle stored proc.
    but I'm not quite clear how Transaction Manager work with Resource Manager, like Connection pool.
    my understanding is that, in a weblogic transaction, a stateless session bean interact with several DAOs, and for each method of DAO a connection is acquired from connection pool. I've heard that the connection will not return to pool until the transaction commits.
    My question is that, does it mean that for a weblogic transaction, multiple connections might be allocated to it? and if multiple connections are allocated, then how many oracle transactions would be started? or multiple connections share the same oracle transaction?
    I didn't feel it make sense to start multiple oracle transactions, cause deadlock might be incurred in a single weblogic transaction.
    any help appreciated!

    Xin Zhuang wrote:
    hi,
    I'm using BEA Webloigc8.1 Stateless Session Bean/DAO/Oracle stored proc.
    but I'm not quite clear how Transaction Manager work with Resource Manager, like Connection pool.
    my understanding is that, in a weblogic transaction, a stateless session bean interact with several DAOs, and for each method of DAO a connection is acquired from connection pool. I've heard that the connection will not return to pool until the transaction commits.
    My question is that, does it mean that for a weblogic transaction, multiple connections might be allocated to it? and if multiple connections are allocated, then how many oracle transactions would be started? or multiple connections share the same oracle transaction?
    I didn't feel it make sense to start multiple oracle transactions, cause deadlock might be incurred in a single weblogic transaction.
    any help appreciated!Hi. If you configure your WLS DataSource to use keep a connection for
    the duration of a tx, it will do that, and in any case there can be
    no deadlock however many connections operate for a given XA transaction.
    Here is the best coding form for DAOs or any other user-written code
    for using WebLogic DataSources. This is important for two reasons:
    1 - Thread-safety is maintained as long as the connection is a
    method-level object.
    2 - It is crucial to notify WebLogic that you are done with a connection
    ASAP, by your calling close() on it. We will then put it back in the
    pool, or keep it under the covers for your next request if it's in a
    transaction etc. The pool is optimized for quick get-use-close scenarios.
    public void one_of_my_main_JDBC_Methods()
    Connection con=null; // Must be a method level object for thread-safety
    // It will be closed by the end of the method.
    try {
    con = myDataSource.getConnection(); // Get the connection in the try
    // block, directly from the WebLogic
    // datasource
    // do all the JDBC within this try block. You can pass the
    // connection to subordinate methods, but not to anywhere
    // that thinks it can use the connection later.
    rs.close(); // close any result set asap
    stmt.close(); // then close any statement asap
    // When you're done with JDBC
    con.close(); // close the connection asap
    con = null; // nullify it so the finally knows it's done
    catch (Exception e) {
    // do whatever catch stuff you want. You don't
    // need a catch block if you don't want one...
    finally {
    // It is important to close a JDBC connection ASAP when it's not needed.
    // without fail, and regardless of exit path. Do everything in your
    // finally block in it's own try-catch-ignore so everything is done.
    try { if (con != null) con.close();} catch (Exception ignore){}
    return ret;
    }

  • How to manage Inventory

    Hi All,
    Is anyone tell me how to manage inventory by size and color in stock with same code. If you have solution then send me.
    With Regards
    Thanks
    Bibha

    Hi Bibha,
    One code can only manage one kind of item. In you case, only if you don't care the differences between those sizes and colors, you may use one code.
    Otherwise, you have to create different codes for each type to control inventory. You may use some kind of coding system to group the similar items.
    Thanks,
    Gordon

Maybe you are looking for

  • Erro no cenário de CTe 1.04

    Bom dia! Pessoal, acabamos de aplicar o SP09 no GRC 10. Com a aplicação deste support package veio junto a versão de CTe 1.04, mas ao executar o cenário, recebi como retorno a mensagem abaixo: Verifiquei na SE80 e percebi que a Service Interface CFB2

  • Updated my ios to new version, and now my apps won't open

    Anyone else have problems with opening apps after new software update is done.  I updated my software to the 4.3.3 version and now can't open my apps.  No problem with the original apps, but stuff like facebook, words with friends, hanging with frien

  • Derivation of Business Partner as Customer

    Hi, I am an abap developer and I have made changes to a smartform wherein I need to get the values of business partner from table BUT000. I used the select statement as below: Select SINGLE * from BUT000 into WA_FS_BUT000   where partner = v_partner.

  • QM Digital Signature SAP System's Personal Security Environments (PSEs)

    Hi All, We want to introduce the Digital Signatures for Quality Management Result Recording and Usage Decision. (Transaction Codes :QE01,QE02,QA11,QA12). We have made some studies.Still we need some suggessions to achieve the final goal. ============

  • Preparing my FCP Quicktime movie for iDVD

    Hi out there, can someone please explaine in detail what I have to do to a FCP Quicktime movie to prepare it for iDVD. Its 12 minutes long and 4.8GB. I tried putting it as is into iDVD and burning a DVD and the quality was bad. I presume I have to pu