How to Transport LSMW to development server to Prodution server
Hi all,
I would like to know how we transport LSMW(project, sub-project, Object) from development server to Production server.
Thanks
Vipin Nagpal
Hi Vipin,
Actually, it depends based upon the requirement. There are some advantages and disadvantages with both of the methods.
See the following documentation. I think this would be helpful for you and based upon your requirement you proceed further.
<b>Transport LSMW Projects</b>
The LSM Workbench provides data transport for a project via both the SAP transport system and down-/upload. (Excluded are the presettings for IDoc inbound processing. These presettings should be manually created in every SAP system and every client.)
<b>1. Generate Change Request</b>
Choosing this function creates an SAP change request containing all information about an LSMW project. This SAP change request can be exported / imported with the usual means of SAP correction and transporting. You can find this function in the initial screen under Extras -> Create change request.
When transporting LSMW data this way, you can trace the transports any time in SAP correction and transporting.
<b>Note 1</b>: When importing such a request, the complete project is deleted from the target system first. It is then created again.
<b>Note 2</b>: When exporting the transport request, all changes to the selected project made until the time of export are entered (not only until the time of creation of the transport request.)
<b>2. Export Project</b>
In the initial screen, select Extras  Export project. This first displays the structure tree of the selected project. Via Select / Deselect you can select whether the entire project or parts of the project are exported. Then select Export. The program then creates an ASCII file.
Note: The selected elements are exported together with their documentation
<b>3.Import Project</b>The exported mapping and rules can be imported into another SAP system.
On the selection screen, select Extras -> Import. The program then prompts you to enter the name of the PC file. The file is imported and the contents are analyzed. After the analysis, a list of the subprojects and objects found is displayed.
You can now mark the objects to be imported. Project data existing already are check-marked. They are overwritten by the import.
You can prevent a project already existing in the target system from being overwritten by using function "Import under different name".
Note: The selected elements are imported together with their documentation.
If you feel this is helpful, don't forget to reward points.
Similar Messages
-
How to transport requests from development to production server
hi gurus
i am new to SDN
can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
regards
suryaHi
Transporting
There are help pages that discuss creation of transports.
In simple terms, you: create a transport package
add objects to the package export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it test the contents on the QA system copy the .EPA file to the import folder of your production system and import it Create a transport package file
Here is the step by step procedure to create a transport package:
For Export
1. Go to system administration, and click on transport?export.
2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
For Import:
Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration. -
How to create production and development enironment in same server
Hi All,
We are using OWB10.2.0.1 version and we have only one database which has two schema.we are using default control center to run the mappings.
We don't have separate servers for development and production.So we use same control center for running the mapping for production and development, cause of this we are getting some problem while changing the existing mapping.
So we are planing to separate these environment like production and development with in one server and both environment should have the same database and we need to lock the some mapping to development environment which is in live.
Please suggest me how can i follow because i don't have EXP in these area.Hope you understand the situation.
Thanks,
Kumar.Hi,
I am not sure if we can lock the mapping according tot he env. you log into. I can provide an alternate solution by using different project names and store the mapping into them or using different mapping names to indicate them as prod or dev maps.
From a developer perspective i would suggest u have different environments for dev and prod and as a manager i would like to inform that u have have many audit issues if this goes on.
Regards,
Bharath -
Can LSMW project be transported? If the answer is yes, how ?
<a href="http://help.sap.com/erp2005_ehp_02/helpdata/en/da/a22506a3291b418b759524b278dcde/frameset.htm">Steps are here!</a>
Step 1 Create a request SE10
Step 2 Export from client where LSMW is recorded
Step 3 Import in the client where LSMW is to be transported to. -
How to migrate from development server to prodution server
Hi,
I’m working in obiee 11.1.1.5.I have a development server in which I developed all the dashboards and I have a production server.Now I have to move everything to production server.Production server is pointing to a different database schema with a different port number.
Method followed:
1)Took a copy of catalog and rpd from the development server
2)Copied the catalog to production server
3)Deployed rpd in the production server enterprise manager
Now the problem is Im getting the following error when I tried to open the dashboard
Error Codes: OPR4ONWY:U9IM8TAC:OI2DL65P
*State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 43113] Message returned from OBIS. [nQSError: 43119] Query Failed: [nQSError: 17001] Oracle Error code: 12170, message: ORA-12170: TNS:Connect timeout occurred at OCI call OCIServerAttach. [nQSError: 17014] Could not connect to Oracle database. (HY000)*
Is there is any further thing that I need to do?Am I missing some steps?Can anyone please tell me?did you changed the connection pool entries according to your Production Environment Database details,please check this first.
check the Data source name,User,PWD are according to ur prod DB or not? -
Problem transporting Request from Development to Quality Assurance Server
Hi All,
I m facing a problem of Transporting requests from one System to other.
When adjusting the Request ,the error message reads as follows :
<b>RFC system error in system/destination
[email protected]_HSE</b>
Now,when I check the RFC Connection for <b>[email protected]_HSE</b>,,
i get the message :
<b>" License Check required "</b>
Please respond to this query urgently.....
Thanks in advanceHi!
I think it's better to call SAP support, if you have problems with the licenses...
Maybe your company forget to pay their fees since a while
Regards
Tamá -
Transporting requests from development server to production server
Hi gurus,
can anyone tell me how to transport requests from development server to production server.You can use SAPGUI now instead of calling tp at OS level.
Serious: Totally wrong forum! -
How to Transport Workflow Development to another client in the same system
Hi ,
I have created a Workflow in DEV 010 Client. But I have all the test data in DEV 020 Client. Please let me know how to transport this workflow development from DEV 010 to DEV 020.
Immediate response will be highly appreciated.
Thank you,
Best Regards,
VishHi Imitiaz,
Thanks alot for your reply, I have the authorization for WF and it sloved my problem. Thanks .
Note: I have aloted full points to you.. Keep Rocking..
Best Regards,
Vish -
Transporting General ledger master record to QA server-urgent
Dear all,
Can anyone say how to transport General ledger master record to QA server?
I will award good points.
Thanks in advance.
Regards,
ArHi
Using TCODE : BD18
Use the Message type GLCORE / GLMAST to upload
you can transport the GL master data - - - this is through the ALE set up. ABAPer has to set up the ALE set up
As a testing part before setting up the client you just try this in the sending server you will get created with IDoc for the above Messge type
VVR -
Hi,
When we do LSMW system does'nt prompt for the request then,
how to transport LSMW.
Rgds,
fattesinghHi,
There are two methods for this. Can choose any one.
1)<b>Extras>Export Projects>(</b>Give the Project name)
In next screen(Choose what subproject, routines, etc.. you wan to copy then, <b>Export Rules-->Export</b>((Will prompt for file name)
A text file will be downloaded.
In the Target System
Goto LSMW <b>Extras-->Import Projects</b> and give the text file done.
2)<b>Extras-->Generate Change Request</b>
Assign a change request can then transport.
Regards,
AS -
How can we move LSMW from Development server to Production
Hi
pls give me idea on
1) how we can test lsmw
2) how we can move from one server to another server
3) how we can do you it to use periodically
4)What is use of radio buttons once and periodic in maintain attributes screen
thanks1. By running the actual conversion. I dont understand the question.
2. Depends on how your server is configured. If this is configured to move LSMW projects through transports, then you can create a transport and move it. If not you can just export the project and import it into PRD.
3.Run the program /SAPDMC/SAP_LSMW_INTERFACE
4.Not sure what you are asking.
Albert -
Dear Abapers,
I request the Abapers kindly reply for this blog
I want to retrieve the sapscript layout changes for a particular transport request in development server after that many transport request created and moved to quality ?
I checked in SE03 transaction the transport request was there. But I want to retrieve the existing transport request which is not moved to Quality?
Is it possible to retrieve the existing transport request in development which is not moved to quality ?
Like how we retrieving the programs using versions in development server, In the same way I want to retrieve the sapscript layout in development server ?
Thanks & Regards
Muzeebur Rahiman.SHi,
There is no version management for SapScript or Smartforms .
When you write "transport request in development which is not moved to quality" - was the transport ever released and exported from the development system? If yes, and if the "Transport files" are still available in "Transport directory" (or if the transport files were backed up and could be retrieved), the transport could be imported again. If the TR was not exported, you are out of luck, I believe...
I would not recommend you do it on your own even if you happen to have enough authorizations (consult with Basis and/or Transport Admin, if you have one in your organization). I would not recommend that it's imported on a development system or QA system, even if the transport contains no other objects - only the SapScript form in question. Import it on a "sand-box" that gets overwritten by system copy from time to time... Once the transport is imported, you should have the old version of SapScript in that system and could analyse the changes and perform manual merge.
cheers
Jānis -
How can i copy ztable from development server to ides server?
how can i copy ztable from development server to ides server?
Hello Suresh
The simplest way is to use a transport request.
Another possibility is to check for SAPLINK plugins which allow to download table definitions (including data elements and domains) into a flat file. Upload on IDES again via [SAPLINK|https://wiki.sdn.sap.com/wiki/display/ABAP/SAPlink].
Regards
Uwe -
How to transport objects from one server to another server?
How to transport objects from one server to another server.ie..from development to testing sewrver....
Hi Manoj,
Check these links
http://help.sap.com/saphelp_nw2004s/helpdata/en/93/a3a74046033913e10000000a155106/frameset.htm
http://help.sap.com/saphelp_nw2004s/helpdata/en/a8/5e56006c17e748a68bb3843ed5aab8/frameset.htm
Transporting Objects IR ID using CMS
https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/f85ff411-0d01-0010-0096-ba14e5db6306
http://help.sap.com/saphelp_nw2004s/helpdata/en/e1/69a740aa053a13e10000000a155106/frameset.htm
You can choose either File transfer methor or CMS. File transfer method is the simplest.
Sachin -
How to transport form one server to another server
hai friends,
when basis consultants transport the data from development server to testing server. they will test it and tested well
Now How to transport the same to producation server
is it from development to Production or Testing to Production server
throw a few answers.
kumariLohar
has given some good explanation adding to that
use T-Code SE09 or SE10 for transport request
but wht is meant by request
wht ever u are doing in the development will saveing right
will saveing it asks for create own request so in that u have to create ur own request and pass the same request to ur basis people
Maybe you are looking for
-
Acrord32(acrobat reader) loads up for no reason when i use firefox 4.
(4-15-11) i just started using firefox 4(new release) two days ago, i noticed it started to hang and freeze up, so i open up my windows task manager and saw that 2 files was running "AcroRd32.exe"(acrobat reader) , i'm using the most updated version
-
Error saving connection factory
I was trying to create a JCA connection factory so that I can use the user module to convert IDOCs to flat file. But I was encountering this problem when saving Saving JCA Connection Factory: CF_ID1_800 failed due to: Can not add connection factory I
-
Secret confirmation questions do not appear in dialogue box
When trying to buy an app Apple asks for identity verification but when the Secret Questions Confirmation dialogue appears there are no questions?
-
Exported HTML not work in my host.
Exported HTML not work in my host. The program works fine. Looks good in the browser preview and published in businesscatalyst, but when i exporting as html and upload it to my server is bad, all misplaced.
-
I have upgraded to ios7 but the speed is a big issue wat apple is doing now
I have upgraded to ios7 but the speed is a big issue wat apple is doing now