Dear Gurus,
What is the Exact Role of Target Qty in Scheduling Agreement.
I have an issue here is even if the Target Qty is reached , system generates schedule lines through MRP.
How we can restrict the generation of schedule line if Target Qty is reached.
One way is to control though source list. But this option is ok if I am handling few items. But If there are more than thousand items , then it will be difficult to remove from source list one by one .Also I have to track all those items whose target qty is over.. If u get any other way to handle this please let me know.
Please help in resolving the issue.
Thank you
regards
Amar

Hi,
I have checked ,and aslo saw Note 83343 -but no solution yet.
But I thik system will generate schedule line or PR (through MRP) if there is requirement.
Since if in  the material master is MRP relavant field are maintained and source list is maintained with proper in indicator .
Then whenever there is any MRP relavant Change (Goods issue , Receipt etc)  , an entry will be made in planning file entry (NETCH,NETPL) and system will generate schedule .
Hence to resolve the subject issue ,it is better to remove the the item from souce list and MRP (No Planning -ND).then system will not genrate Schedule.
Thank you
regards
Amar

Similar Messages

  • How can we restrict generation of schedule line if target qty is reached

    Hi,
    I have an issue, even if the target Qty is reached , system generates schedule lines through MRP.
    How can i restrict the generation of schedule line if Target Qty is reached.
    Regards,
    Satish.

    Hi ,
    1]Set  u201CUnlimitedu201D field unchecked in item detail screen in SA/Contract.
    2] Set Message 06067 and 06078  for Target Qty from Warning Message to Error message
    3] Through Source list :remove the MRP indicator 2 from the source list.
    4]Set validity date as required date in Scheduling agreement/Contract , from this date schedules will not be generated against the SA.
    Thank you
    Regards
    Amar

  • How to compare delivery date in schedule lines and PGI in outbound delivery

    Hi,
    I want to create a report to monitor and compare different dates in sales and delivery process.
    One of my key figure is the comparison between date confirmed to the customer, that I can find in the schedule line of the sales order, and the actual goods issue date from the outbound delivery.
    But I can't succeed in making the link between delivery and schedule lines, means between LIKP and VBEP.
    Would you have any idea?
    Thank you.

    It seems there's no exact (table) connection / link between delivery item and schedule line item.
    Those who were searching for this thing (link / connection between delivery item and schedule line) were recommended to use FM "RV_SCHEDULE_CHECK_DELIVERIES".
    This FM calculates the delivered quantity for each schedule line, so it makes link between the delivery item and schedule lines - however if you check the code it's quite sophisticated...
    (if you put a breakpoint in the FM and display a SO in VA03, you can check how the parameters have to be populated with data).
    Schedule Line and Delivery Link
    Edited by: Csaba Szommer on Aug 5, 2011 12:03 AM

  • How We can restrict the max no of Selections in JList

    Hi,
    How We can restrict the max. no of selections (at random selections) in JList (ex. max No of of selections is 3 in a JList of having 50 items.)
    Thanks for your advise in advance.

    Hello Satyaki De.
    Thank you very much for your suggestion but my Private information is totally apart from this question & I already I have changed each and every information from the question.
    Thanks
    Kamlesh Gujarathi
    [email protected]

  • How i can restrict to delete network if PR was assigned.

    Dear Experts,
    How i can restrict to delete network if PR was assigned for that network in CJ20N.

    Hi....
    i assume you have  created a exit project in CMOD and then implement the exit mentioned.
    Could you add the following code in your exit code
    IF SAP_ACTVT = '06'.
       SAP_X_ACTVT = ' '.
    ELSE.
       SAP_X_ACTVT = 'X'.
    ENDIF.
    and please also activate it..
    what happens if you try to delete the network in this case?
    Cheers
    Panagiotis
    ps: activity 06 is the deletion. That means if you try to delete the network the system would popup an error message not allowing the deletion.
    (i have tried it and it works)

  • How we can restrict record in CTL file on the basis of other table ?

    Hello all,
    How we can restrict record in CTL file on the basis of other table ?
    Eg.
    I have following control file to load the records in the table through the sql loader.
    LOAD DATA
    INTO TABLE THIST APPEND
    FIELDS TERMINATED BY "|" TRAILING NULLCOLS
    LNUM POSITION(1) Char "substr(:LOAN_NUM, 4, 13)",
    TSRNUM Char "rtrim:TRAN_SR_NUM)" ,
    TPROCDT Char "to_char(to_date rtrim:TRAN_PROC_DT), 'MMDDYYYY'), 'YYYYMMDD')"      
    I have another table c all TFILE in which I have LNUM. I want to import only those records from input text file using the control file and sql loader in which LNUM is exist in the TFILE.
    So how i can restrict it in the Control File.
    Thanks
    Kamlesh Gujarathi
    [email protected]

    Hello Satyaki De.
    Thank you very much for your suggestion but my Private information is totally apart from this question & I already I have changed each and every information from the question.
    Thanks
    Kamlesh Gujarathi
    [email protected]

  • How i can fetch the template greater than 32000 k size into reach text editor

    how i can fetch the template greater than 32000 k size into reach text editor

    Would this help you?
    - Dynamic Action Plugin - Enkitec CLOB Load

  • Schedule agreement by target qty

    Is there a way to set up Schedule Agreements by Target qty verses by validity date?  We are using LPA (SA's with JIT/FRC) and would like the schedule agreement to stop generating schedule lines based on the Target Qty set up in the Schedule Agreement. Not sure if this is possible.  It only seems to look at the validity date on the source list.

    HI Nicosia,
    I am also facing the same problem. If you resolved this issue or any clue, please let me know.
    Thanks & regards
    Naveen Sharma

  • How can i show item schedule line details in Tableview for each line item

    Hai all,
      I need to display schedule line details  in Tableview for each line item.for example in each row i need to put one column along with button , if i click on this table that row  should be expand vertically and must show all schedule line details in that.if i click my button again the visible expanded row should disappear...
    if anybody works on this previously plz send some sample code...
    leoiz....

    To modify rows the best way is with the Iterator (do a search in the weblogs for "Iterator")
    However for what you want to do I've only seen this really work successfully with a standard HTML table not using the tableView.

  • How do I access the item Schedule line date in VA01?

    Hi,
    I am using userexit_check_vbep to carry out some checks. I need to access the Schedule line date value (RV45A-ETDAT) but it is not available at that point.  How can I read that value from the exit?
    Thanks,
    Kroc

    Thanks Advait,
    ahhh, I asked the wrong question. Yes, xvbep is available in the userexit but my code is being called earlier in the process. This is the call sequence
    VBAP_FUELLEN
    VBAP-VSTEL_ERMITTELN
    VBAP-ROUTE_ERMITTELN
    SD_ROUTE_DETERMINATION
    EXIT_SAPL0VRF_001............This is where I need to access the schedule line data
    Z_CUT_OFF_TIME_CALCULATE............This is where I need to access the schedule line data
    Z_CUT_OFF_DETERMINE_DATA............This is where I need to access the schedule line data
    Do you know if it is available at that stage?
    Thanks,
    Aidan.

  • Make to order automatic generation of schedule lines

    I am now designing Make to order (MTO) strategy for repetative manufacturing.
    Requirement generates through sales order (Requirement type - KE)
    While doing backflushing (Tr. Code- MFBF) I am selecting Make to order tab and putting sales order no,will call planned orders (were generated while MRP run- Tran. code-MD50) and will confirm if sufficent sales order stock is available.
    Every time I ahve to move from regualr stock to sales order stock by 412 movement.
    Is there any link which will enables the shortfall of sales order stock will generate the schedule line enable to procure the material?
    I have found one solution- will have to create Purchase order item having account assignment- M. and have to maintain the source and quota. It genertaes schedule line. But on daily basis I am generatin sales order and there are thousands of items to be procured. Practically it very difficult to creates new po or add new item in purchase order by putting assignment M
    Regards,
    Thanks in advance
    Shrirang Gore

    Hello,
    Planning of child items in MTO senario can be handled by using appropriat planning stategy.
    Or
    There is another way of using individual and collective indicator
    field on the MRP 4 view.
    Here following are possible entries.
    blank ---
    1 -
    Individual requirement only
    2 -
    collective requirement
    Here if you give indicator as 2 , then for many sales orders the component requirement will get clubbed.
    For example you have five sales orders for a parent material of qty 100 each, and in BOM you have specified the required quantity as 1 for the child material.
    Then you will get a dependent requirement of 500 for the component.
    Now , you have to decide whether you want five individualdependent  requiremants  of 100 quantity each for components or you want collective dependent requirement of
    500 quantity for component.
    Hope the above explanation is clear.
    Reward if useful.
    Please revert back if you need any input on component  planning strategies.
    Regards,
    Ravindra

  • How we can restrict remote user to access same URL?

    HI,
    We have two remote sites A and B.
    Site-A    ---  Users accessing application by using this URL: http://frsys.abc.com.pk:7777/forms/frmservlet?config=sales
    Site-B    ---  Users accessing application by using this URL: http://frsys.abc.com.pk:7777/forms/frmservlet?config=market
    We want to restrict the users A and B, to access the login pages vise versa.
    Regards.

    Hi,
    I m not sure how the task would be achieved throughOAS.
    But with the help of developer n DBA,we can restrict the users A and B, to access the login pages vise versa.
    1) Create 2 tables in DB,one table which contains only user A and another only for user B
    2) With the help of Developers,create inital login page(Userrname/Password) for both applications ie Site A and Site B
    3) At Login page validate with the respective table created ie check whether the user is from table A or table B
    Regards,
    Fabian

  • Can't Delete/Change Schedule Line in Sceduling Agreement

    Hi
       I can't delete schedule line in scheduling agreement.
       Actually The PO History has diff data & Scheline screen have diff data.
       In Po History the Delivered Qty is 1520 GI Qty is 1520 GR Qty is 1520 but when I checked in Delivery Schedule screen in ME33L the data is diff.
       The Scheduled Qty 1520  Delivered Qty is 1520 GI Qty 360 & GR Qty 360.Even when I am trying to reduce the Scheduled Qty to GR Qty that is 360I am getting message Quantity 360 less than delivered qty 1520.
        Kindly help me to resolve this problem.

    Hi..
    The Scheduling agreement is one which is created runing MRP not VA31.
    I know that is two transaction data in SAP.
    One is Sales Data other one is Purchasing Data.
    This is second one.
    Thank you your response.

  • How  we can restrict the Measurements in the Archtecture View

    Hi Experts,
    Ex: In the AV main Object Measurents:              Floor Area 10000 m2 
                                                                           Green Area 10000 m2
          In the subordinate Objects :                         Floor Area above 10000m2 is accepting
                                                                           Green Area above 10000 m2 is accepting
    Please guide me how and where we can restrict the measurements. 
    Thanks in advance,
    Jai

    Hi Jayakar,
    You can try this..
    As per your example,
    Create two measurement type:-
    1. A100    Floor Area
    2. A200    Green Area
    Goto  SPRO
    Architecutral View>Architecutral Object Type->Specifiy Measurement Type per Architecutral Object Type
    For Main Object assign A100 and A200 measurement types
    and For subordinate Objects  assign only A100.
    Or you need to look for BADI's

  • How i can restrict one field up to 3 MB in size

    Hi   Friends-
    Basically i have to restrict one field to  3 mb  size .
    Detail of my req :
    In tcode  SE19  if you give classic badi impl  name as  HRRCF_DOC_UPLOAD     and  display  you will find a class   CL_IM_HRRCF_DOC_UPLOAD   just double click and then  select  the second method  CHECK_ATTACH_FILE_SIZE  and up side click on parameters  here one parameter is there called  CONTENT    type is  string   and  i have to ristrict it to  3 MB  how  i can do it ? 
    Pls  guide me for the same .
    Regards
    Meeta

    You can purchase an upgrade, but the only options available as a qualifying previous product are CS5 and CS5 Extended and Acrobat X Suite.  It isn't entirely clear if CS5 also includes CS5.1 or not, so I'd suggest using the Chat Now button over at the side to clarify.
    To get to this listing, you can go to www.adobe.com then click Search and type in Photoshop CS6 then click the Buy button next to Photoshop CS6 in the results Creative Suite 6 then edit your cart to make it an upgrade:
    You can also choose the Extended version of PS CS6 which is more money and can additionally do things with video and sequences of images and maybe 3D, although I'm not exactly sure at this point since I already have PS-CS6 Extended as part of my CC Photography Plan PS-CC+LR for $10/month.

Maybe you are looking for

  • Hard Drive file format woes

    I bought a LaCie portable hard drive and like the idiot I am I was so excited about freeing up space I recorded a bunch of my files onto the portable. Without Mac-formatting it! Now I have a bunch of files I can't seem to access because they were rec

  • I need a form of the type Master Table - Multiple Detail Tables

    I have a BD master table with at least 5 five detail tables to be represent in only one form. I hope you make some suggestions on how to realize it? Thanks

  • 23" Cinema Display VESA adapter... in 2011?

    I need a M9649G/A for my two 23" Cinema displays from 2008ish so that I can mount them via VESA mounts... I've googled the part but no 3rd party seller has them, and it's unclear if the $40 24" and 30" adapters work on the older 23" models.  Anyone k

  • Why can't I download Creative Cloud apps when running Linux?

    Using Linux (Mint), when trying to download any CC app, e.g. Photoshop CC I am told: "You are running an operating system that Photoshop no longer supports. Refer to the system requirements below for a full list of supported platforms." I have an act

  • Lost Network Connection​s after installing new version of "Access Connection​"

    Few days ago, I downloaded through Lenovo System Update, the latest "Access Connections" for my X60. Since then unfortunately I lost all my network connections (i.e.: Wi-Fi and Ethernet connection) to the laptop. Can anybody help me restoring my conn