Make to order automatic generation of schedule lines

I am now designing Make to order (MTO) strategy for repetative manufacturing.
Requirement generates through sales order (Requirement type - KE)
While doing backflushing (Tr. Code- MFBF) I am selecting Make to order tab and putting sales order no,will call planned orders (were generated while MRP run- Tran. code-MD50) and will confirm if sufficent sales order stock is available.
Every time I ahve to move from regualr stock to sales order stock by 412 movement.
Is there any link which will enables the shortfall of sales order stock will generate the schedule line enable to procure the material?
I have found one solution- will have to create Purchase order item having account assignment- M. and have to maintain the source and quota. It genertaes schedule line. But on daily basis I am generatin sales order and there are thousands of items to be procured. Practically it very difficult to creates new po or add new item in purchase order by putting assignment M
Regards,
Thanks in advance
Shrirang Gore

Hello,
Planning of child items in MTO senario can be handled by using appropriat planning stategy.
Or
There is another way of using individual and collective indicator
field on the MRP 4 view.
Here following are possible entries.
blank ---
1 -
Individual requirement only
2 -
collective requirement
Here if you give indicator as 2 , then for many sales orders the component requirement will get clubbed.
For example you have five sales orders for a parent material of qty 100 each, and in BOM you have specified the required quantity as 1 for the child material.
Then you will get a dependent requirement of 500 for the component.
Now , you have to decide whether you want five individualdependent  requiremants  of 100 quantity each for components or you want collective dependent requirement of
500 quantity for component.
Hope the above explanation is clear.
Reward if useful.
Please revert back if you need any input on component  planning strategies.
Regards,
Ravindra

Similar Messages

  • Open Sales Order  table with multiple schedule line....

    YUSUF BHORI wrote:
    Hi Experts,
    In Sales Order there are multiple schedule line for single item.
    Where and in which table i can find open qty for order ,material, item and schedule line items.
    I Want open items for each schedule line. For One vbeln, posnr there multiple etenr.
    Urgent,
    Yusuf.

    Hai,
    Join VBAK & VBAP and store data in an internal table GT_VBAP to get Sales order numbers, items, materials.
    Get Open Sales order items from VBUP into GT_VBUP  where VBUP-GBSTA  NE  'C'.
    LOOP at GT_VBAP.
    Read table GT_VBUP with key vbeln & posnr.
    If sy-subrc <> 0.
      delete GT_VBAP.
    endif.
    ****Fill your Final Report Internal table with required field values **Append into that internal table
    ENDLOOP.
    Now Select WMENG BMENG from VBEP into GT_VBEP for all entries in GT_VBAP.
    LOOP AT  GT_VBEP.
    *******Again Modify your Final Report internal table with these values
    ***VBEP-WMENG is Ordered Qty
    ***VBEP-BMENG is Confirmed Qty
    ************Open Qty     = Ordered Qty      = Confirmed Qty***
    ************Open Qty     = VBEP-WMENG = VBEP-BMENG.***
    ENDLOOP.
    Edited by: Eswara Rao Aakula on Dec 24, 2007 9:56 AM
    Edited by: Eswara Rao Aakula on Dec 24, 2007 9:57 AM

  • How we can restrict generation of schedule line if Target Qty is reached.

    Dear Gurus,
    What is the Exact Role of Target Qty in Scheduling Agreement.
    I have an issue here is even if the Target Qty is reached , system generates schedule lines through MRP.
    How we can restrict the generation of schedule line if Target Qty is reached.
    One way is to control though source list. But this option is ok if I am handling few items. But If there are more than thousand items , then it will be difficult to remove from source list one by one .Also I have to track all those items whose target qty is over.. If u get any other way to handle this please let me know.
    Please help in resolving the issue.
    Thank you
    regards
    Amar

    Hi,
    I have checked ,and aslo saw Note 83343 -but no solution yet.
    But I thik system will generate schedule line or PR (through MRP) if there is requirement.
    Since if in  the material master is MRP relavant field are maintained and source list is maintained with proper in indicator .
    Then whenever there is any MRP relavant Change (Goods issue , Receipt etc)  , an entry will be made in planning file entry (NETCH,NETPL) and system will generate schedule .
    Hence to resolve the subject issue ,it is better to remove the the item from souce list and MRP (No Planning -ND).then system will not genrate Schedule.
    Thank you
    regards
    Amar

  • How can we restrict generation of schedule line if target qty is reached

    Hi,
    I have an issue, even if the target Qty is reached , system generates schedule lines through MRP.
    How can i restrict the generation of schedule line if Target Qty is reached.
    Regards,
    Satish.

    Hi ,
    1]Set  u201CUnlimitedu201D field unchecked in item detail screen in SA/Contract.
    2] Set Message 06067 and 06078  for Target Qty from Warning Message to Error message
    3] Through Source list :remove the MRP indicator 2 from the source list.
    4]Set validity date as required date in Scheduling agreement/Contract , from this date schedules will not be generated against the SA.
    Thank you
    Regards
    Amar

  • Automatic confirmation of schedule line in order

    Hi Guru
         I have requirement to configure, While craeting a sales order of 500 TO I have only 400 to in stock so i can only confirm schedule line pertaining to 400  TO, after creating a order another 100 TO has been logged as production. How auto confirmation of schedule line for rest of qty. can be done in system
    Edited by: AMIT CHOUBEY on Feb 23, 2010 9:40 AM

    solved by own

  • Reg: Sale Order short close at Schedule lines level

    Dear Gurus,
    Requirement is to close all open schedule lines beyond one month.
    In detailed. User Enters Manual Schedule Lines as per the requirement of the customer say for 6 months.
    for Eg . Sale order entered on 1st of august to Dec with 500 qty, schedule 100 qty/Month, manually in sale order.
    Now if business delivers only 90 out of 100. they need to short close that particular schedule line only not the entire sale order or line item. I tried with Delivery block at schedule lines level. but it is not working.
    If any one has come across this scenario please share with me.
    Regards
    Praveen

    If we apply a delivery block the pending qty will automatically add to the last schedule date. Ex. if there is 3 dates in the schedule lines, and there is some 50 qty pending in second date, and if u apply delivery block it will carry forward that pending 50 qty to the third schedule line and adds up with it.
    But in my case i just want to close that pending 50 qty in second line item.
    Regards
    Praveen
    Edited by: Praveen_PG on Sep 15, 2011 1:28 PM

  • Automatic creation of Schedule line after MRP RUN

    Hi,
    Till now we are  using only PO for placing orders to vendor, now we want to use the functionality of scheduling agrement,  so that after MRP run,  we can get automatic schedule line creation,  for this ,  what are settings required, how system create the automatic schedule lines based on which criteria, second thing while creating on eschedule agrement i found that the conditon which i can add for a vednor in ME21N  that all condition are not coming while creating schedule agrement  even my vendor is same for PO and Schedule agrement,  so what are  the setting required for this.
      regards,
       zafar

    Hi
    1.In material master purchasing view data auto PO is to be flagged.If scheduling agreemet with release documentation.
    Then flag JIT indicator 1.
    2.maintain MRP views in material master
    3.In source list for fix vendor,source list usage 2 is to be maintained.
    4.Vendor master purchasing data auto PO indicator is to be flagged.
    5.Then when you run MRP automatically schedule lines are generated.
    For JIT and forecasting maintain creaton profile in OMUP transction.
    Assign the creation profile in scheduling agreement.

  • Sales order we have made schedule line category catCN but still reqt coming

    Dear Sir,
    Sub : For sales order 5000060 line 10 we have made schedule line category as CN but still system is giving requirement against this order (while running MRP T code MD50)
    Details:
    One user has made one FG material delivery with PGI without putting the picking quantity. He had put zero picking qty. When we click PGI button System does not allow to do PGI without putting the picking qty but how he could do it we do not know. Now there is no goods issue material document instead one confirmation of service document is there in doc flow .we can not open this document. if we click display by selecting this document in document flow system gives error - NO document created for confirm service/cancel transaction
    All the delivery fields are gray out. Delivery qty is there in this delivery hence at sale order schedule line tab against the schedule line system is showing delivered qty -2.
    Goods movements status is B- partially completed.
    Also system is not allowing to reverse the delivery- it is saying-no data available for this selection criteria. Hence we are not able to do delivery against this item. Hence we have created sale order line item 20 & transferred this stock to line item 20 & did subsequent transactions.
    Now system giving requirement for line item 10 .We have made schedule line category CN still system is giving requirement against delivery number  in T code -MD 50 against sale order line item- there is customer order ,delivery, production order .delivery number never comes in MD50 .it is giving requirement against delivery.
    Kindly let us know how to stop the requirement to generate from this sale order line item
    Also kindly let us know how user could make this & how this might have happened & how to restrict this in future.
    Regards

    Dear Sir,
    When we create a sale order default sch line category is CN after few days (there is a specific reason) we change it to CP & run MRP
    In this case we made the product by doing this but while doing delivery .user did some mistake & did PGI without picking qty in delivery.Now this qty is in delivery but there is no material document that stock has not yet moved .Since there was a problem in the delivery we have trasfered this stock to sale order line item 20.& did further transactions.
    Afte this we did schedule line cat from CP to CN
    But in MD50 system is giving the requirment against sale order ,delivery
    Regards

  • Scheduling Agreement - Automatic Release Individual Schedule Lines

    Dear all.
    I've create a "LPA" scheduling Agreement and its release type is "JIT". So, I use to ME38 to maintain the individual JIT delivery schedule lines.
    The problem I have is this method requires the person to manually release each individual delivery schedule line document on the due date before GR is allowed. Hence, is there a SAP system function that can automatically release any due delivery schedule line document without having to manually track and release using ME38 each day/week/month?
    Thanks.
    Steven

    Hello
    use t.code ME84 then system release the sch.lines automatically those maintained with me38.
    Laxman

  • My sales order is having two schedule lines

    Hi sap gurus,
    my sales order quantity is 36 pcs.
    the same sales order has two schedule lines in that the material availability date is 05/02/2010 for quantity 22 and for second is 15/02/2010 quantity is for remaining 14 quantities.
    so here delivery can be created for quantity 22 becasue the MAD is on 05/02/2010.  upto here no issues.
    here in my production server user is able to create only one delivery document for total 36 quantity which includes the 14 quantity also for which the MAD is at a far date that is 15/02/2010.
    (2).  i opened the delivery there two picking requests has been generated one on 04/02/2010 & for 07/02/2010.  how it is possible by the system.
    how is it possible for a material which is available in the future date that is 15/02/2010.
    can any help on this.
    regards,
    balaja

    Hi,
    Though the MAD is different, same delivery is possible for the two Schedule lines.
    But for the picking request creation for the future MAD (15/02/2009), please check your sales order. That is, go to VA02, and in to the schedule line level and then to the Shipping button and look for the various dates...
    Regards

  • Automatic creations of Schedule lines

    Hello Everybody,
    My client requirement is, Once we run the MRP, the schedule lines has to be converted automatically.
    What are the steps needs to be carried out .
    Is there any backend settings needs to be done.
    Plese reply me as early as possible.
    With Regards,
    Bhaskar.

    Hi,
    - Plant should be MRP active.( SPRO)
    - Maintain material master MRP views with MRP type , correct procurement type( External).
    - Source list to be created for the SA with MRP indicator 2 and fixed indicator check.
    - Requirements of the material should fall in the planning horizon, else the schedule lines will not be created.
    - On the selection screen of MRP run, select the option 3- Schedule lines for the field Delivery schedules.
    Thanks and Regards,
    Maheshwari

  • Issue on Purchase order creation with Delivery schedule line items per PR

    Hi
    Note->Developed inbound FM to create PO's in SAP through IDOC.
    We are creating purchase orders from vendor which is coming from Inbound IDOC. Here we are using as BAPI_PO_CREATE1
    to create PO's. before that i am passing all the inbound data of the IDOC and getting some Purchase requisions for plant and material wise from EBAN table where we have open PR's and split the inbound line item qauntity as per Open quantity in Purchase requisions. Problem here we are modifing schdule line data as per purcahse requisitions and post the all the shehduline data into above functional module, we are using creation date as delivery date in the scheduling line for each line.
    Set1- If we have multiple requisions for each material and plant in the inbound IDOC item , while creating PO using  above BAPI
    creating PO with delivery date is taken from Purchase requesion date, this only will happend in the first schudle line item always, second line scheulde has taken correctly from creation data as delivery date.
    Set2-If we have one requisition for each line item, it will creating correctly for schulding line item as with correct delivery , whcih is not taken from requstion delivery date.
    Set 2 is working correctly, but Set1  has problem with delivery date  in the scheduling lines particulary for first schduling line item.
    Please help me on this issue.
    Advance wishes

    Hi Satish
    Thanks for the reply.
    I checked the parameters and it is creating 2 PO when the Indicator Ordering address is set.If I uncheck this Indicator then only one PO is created.
    But now my question is from where is the Ordering address taken because for both line items Vendor is same and ordering address is also same.
    Then why the system is creating new PO?
    Regards
    Vaibhav Mahajan

  • Production order: Automatic Generation of settlement rule .......

    Hi Gurus,
    I am trying to settle a production order to a cost center. I have already define a settlement profile with Cost center as the default reciever and assigned it to the Order type but when I tried to settle it, I have to create a distirbution rule manually every time. Is this some thing to do with the strategy sequence? I have done a lot of research but the system doesnt give me any option for autmatically generating a settlement rule or assigning strategy sequence to order type for production order. I found some thing for Internal orders, but still i cant do it. Would any of you please help me. I would appreciate if you put the steps with the trxn codes.
    Thanks

    Dear.
    As I know, there're no way to generate settlement rule of production order automatically such as that of WBS(network).
    In settlement profile, If you want automatic fuction, you can only set PA segment as receiver addionally.
    What you want to do is the price difference(PRD-PRF) of production order be settled? then, why don't you make automatic account assignment(OKB9)?
    Generally, assumed using PA segment as receiver, we don't make price difference account as cost element, But, In your case, If you want to settle all amount of that to fixed cost center, specify that cost element to cost center by OKB9 instead of adding cost center in settleme rule.
    Regards.

  • Sales Order Stock - Problem with Schedule line

    Hi guru,
    I have a problem with my schedules line.
    We use the Sales order stock ( using MB1B with good movement  412/E) for some specific customers.
    Even if the sales order reservation works well, there is an issue with the schedule line in the order.
    Indeed when i enter the material in the order the schedule line display an availibily in 8 days even if the material is out of stock or available now....
    When i enter the same materila in a standard order(with item category without special stock E) the schedules line are good...
    What is it the most weird is that i have done the customizing by copying the standard item and i have just added the special stock E in the item category.
    If anyone can help me!!
    Thanks a lot

    hello Lakshmipathi,
    Thanks a lot for your reply.
    I tried to change the requierement class in order to put one with special stock E as you explained, but i still have my weird schedule line. When i put the item in the order it is 0 stock for today, but stock find in 12 days either if there is stock or no(unrestricted stock i mean).
    If i change the RDD in more than 12 days the stock is available for the date requested.
    If you have an idea of what could be wrong because on my case i want the schedule line to be at 0 while the sales order reservation has not been processed (via MB1B/412/E) and once the stock movement is done the schedule line has to be find.
    I dont know if im clear enought..
    To be more clear,  i want the schedule line based on the "sales order stock" and not on the "unrestricted stock".
    thanks for your help!
    Guillaume

  • Sales Order Credit Status Block with Schedule Line ATP Confirmed Quantity

    I would like to keep the Credit Status Block on a Sales Order when it is created and over the credit limit and at the same time be able to Confirm the Order Quantity (if inventory is available) on the Schedule Line.  Has anyone done this?  I'm using ECC 5.0
    In the IMG --> Sales and Distribution --> Basis Functions --> Credit Management/Risk Management --> Credit Management --> Define Automatic Credit Control --> If I remove the Status/Block indicator the schedule line does confirm the sales order quantity but the sales order is not blocked and a delivery can be created.
    Thanks.
    Donna

    Hello Donna,
    I think I solved your problem.
    There are two ways to block the sales order - one is to not confirm the Schedule line i.e. block delivery... block further action that can be taken. The second is to not let the person save the sales order.
    Another option is to get Just a warning message, that the credit limit has been exceeded, but able to save the sales order with a confirmed schedule line.
    The setting will be in OVA8.
    For the Document Value you make the setting C or A. and make sure the block is not set.
    Don't worry about the Open order or open delivery unless you want the system to perform a credit check considering the orders that are already existent. Same with open delivery. It will take into account all the cost of the orders that are open for delivery.
    Now here some options:
    Either consider a 'warning' by the system good enough and still be able to confirm the schedule line.
    (ii) Put in a Delivery Block in the Sales Document Types, in the Shipping tab. That way, you will be able to save the sales doc. but not be able to deliver it.
    (iii) Put a Billing Block in the Sales Doc type, in the Billing tab. You will be able to deliver but not bill.
    (iv) Create a new routine (with the help of an ABAP guy) and place it in the auto credit check, 'Reaction' field where it will place a Delivery Block.
    Do let me know what your thoughts are and what you decided to do.
    Thanks
    Noel

Maybe you are looking for

  • My iPhone 4 is stuck in recovery mode after attempt to upgrade iOS.

    Help, I have tried to update my iPhone 4 iOS to iOS7 and the iPhone is stuck in recovery mode. I tried to hold the home button and the power button and restart it as it was written in may support forums but it did not help. When I connected the iPhon

  • Specific Event ID for all computers

    Hi, We are using SCCM 2012 SP1. We need to know, how many users in our environment used remote assistance from their desktop to which other computers. Is there any way of discovering this using SCCM 2012. The built-in report in SCCM 2012 [Remote Cont

  • How to consume OData service in  sapui5

    hi,     how to consume Odata service  in sapui5 (table).   If any idea  please share with me.

  • Standby Database from a RAC instance

    Good Day, I have two 10gR2 Enterprise Edition RAC Instances. Is it possible to make two standby database using 10gR2 Standard Edition? Thanks in advance Alessandro

  • FaceTime does not connect to network

    Why do I get a message "could not sign in.  Please check your network connection and try again." when other apps over network do work?