Hello everybody,
we want to try a scenario, in which the public key certificate gets invalid.
For this reason we want to have a public key certificate which is only valid for one day. When creating or replacing the application PSE the "valid to"-date (self-signed certificate) everytime is in year 2038.
Is it possible to manipulate this date?
Or can I import a PSE created with another tool (for example the java keytool)? I tryed to import a pkcs#12-file to an application PSE which we want to use with the SSF but I got the error message "PSE could not be opened" (german: "PSE konnte nicht geöffnet werden").
Is it possible to import PSEs which are stored in pkcs#12-format in the file system? Which format is used by the SAP system when exporting a PSE?
Regards
Georg

Hello Georg,
you cannot manipulate the "valid to" date during the creation of the PSE.
This date is adjusted during the certification process by the CA (normally they issue certificates valid for 1 year).
You can create a PSE from a pkcs#12 file by using the "sapgenpse" tool which is delivered with the sapcryptolib. The option "import_p12" is the one you need.
For more information just type "sapgenpse import_p12 -h"
--> the PSE you're creating with sapgenpse you can afterwards import in strust with "PSE -> Import"
Regards, Uwe

Similar Messages

  • Change the validity date in change number

    hi team,
    I want to change the validity date of a change number from 01.01.09 to 01.03.09. I am getting an error "A BOM has already been changed using a change number with the same valid-from date as the selected date 03.01.2009".  I can change the date to before 01.01.09 but cannot after 01.01.09.
    Can you please help me.
    thank you,
    Satish

    Dear Mamiditi Satish Kumar,
    Is it a change number with release key or without release key?
    Do you want to assign a different validity date for the changes made using that change number?
    Try using alternative date field in CC02.and you have to select the object to assign the alternative date.
    Say if you want to assign an alternative date for a processed BOM,you have to select that object and
    enter the alternative date.
    Regards
    Mangalraj.S

  • Changing The Validity Dates In Org Model in CRM- User Level

    Hi
    How can we restrict the Validity Dates in Organisation Structure at User Level.
    I need that the user should be given some specific dates<b> ( Valid till or assigned till )</b> while assigning in the org. And it should be visible always in the Org Model.
    We tried using Delimited Date Function, but the User gets ellapsed if the Validity is expired.With the business point of view, <b>the requirement is that all user should be listed in Org model with respect to any dates.this would mean that if a user is terminated we would want to change the Valid till date in the Org</b>

    Hi Amrita,
    Business partner number and Object ID is automatically determines by system when creating a org unit.
    I dont find any configuration to create org unit with your own BP number and object ID. You have option to make repairs to the existing org unit.
    Please find the below path to repair the org unit
    IMG -> CRM -> Master Data -> Business partner -> Integration Business partner -Org management -> Create Business partner initially
    Select the org unit and execute to get all the org units.
    You can select the org units with errors /warnings and click on start repair to get automatic assignment of BP.
    Hope it helps
    Reward points if it helps
    Regards,
    Madhu

  • How do I manipulate the release date in my iTunes TV shows that I have downloaded myself?

    How do I manipulate the release date in my iTunes TV shows?
    I have downloaded and added them myslef.
    Is there anyway to do this?

    As far as I know you can't change a TV programme's release date, I think that it's a protected field

  • Changing the validity date of a work center.

    Dear SAP Guru,
    We are trying to change the validity date of a certain work center via transaction code CR02, however, we can only see the changed validity date in the validities tab (Costing View) but still the default validity date is the first validity created. We are trying to delete the Cost Center assignment for the unwanted validity date but still it came back to the first validity created. Is this a natural SAP behavior or is there something that we still need to do so that we can default our desired validity date?
    Thank you in advance for your help.
    Best regards,
    JMT

    Dear,
    Go to KS04.. enter the cost center. Enter the time period for which u want to delete the cost center. enter the date upto which u wanted the end date as the start date of the deletion.... it will delete the cost center for the future time period.... this will do....Then create new one and assign to work center and then check.
    There is no validity period for work centers...this will be available as long as you use in the routing.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Change the Validity Date.

    Dear Supports,
    We have tickets more then 1000 in solution manager.  The status is over due ie.  the current date = 3 days validity is passed.  the status is marked as Proposed Solution. and the monitor status is in RED.
    Please confirm how can i changed it to green else increasing the date form 3 days to 365 days for temporary.
    Current Setting under the ticket is as follows.
    Start customer requirement     TU 27.01.2009 00:00 INDIA     Current Date
    End customer requirement     FR 30.01.2009 00:00 INDIA     Start + 3 Days
    Ramesh Jaiswal
    9867936636.

    Ramesh
    You can change the default date and time via configuraiton from spro
    Goto spro->scenario specific>service desk>
    The create a customized date profile and then assign this to transaction type...if u r usin std then it wil be SLFN.
    For more....Goto the Service desk config guide....available on Service.sap
    Regards
    Prakahr

  • Problem importing two service interfaces using the same data types

    Hi,
    I've been playing around with BPM for a while. Now I wanted to add a custom service interface to my starting event. I created the interface in ESR of CE 7.11. After importing I get this error message and I can't use the interface:
    Cannot change XsdSimpleTypeDefinition AcademicTitleCodeContent by importing the document http://sap.com/xi/APPL/SE/Global::src/wsdl/TestInterface.wsdl, because it is already defined in the document http://sap.com/xi/APPL/SE/Global::src/wsdl/rootwsdl_CustomerERPByIDQueryResponse_InService.wsdl in this project. Importing into another project might be possible.
    Of course the problem is clear, but how can I achieve importing two service interfaces that use the same data type without changing the xsd source?
    Thanks in advance,
    Mane

    Sorry for the late answer, but I am really busy at the moment.
    Unfortunately I can't the Interface and data types are already changed.
    But this happened various times. Each time I already had imported a SAP Enterprise Service into NW BPM that contains a bunch of inline data types. While creating my own interface I referenced one of those data types that are stored in a SAP namespace. After import the error message appeared.
    In the wsdl of the created interface there is a import statement for the namespace where the referenced data types origin from. Additionally there is a namespace definition xmlns:p1="SAPnamespace". In the element the type is "p1:ReferencedType". Could this maybe cause the error, because one time it is with this leading p1 in my created wsdl and once without in the SAP Service wsdl?
    Thanks and I am looking forward to next EhP of NW BPM,
    Mane

  • How to find the validity date for material reservation

    Dear All,
      User created the reservation using transaction code MB21 on 2nd December 2008 and 16th Dec 2008, when he is transfering materials he is getting the error message "Document does not contain any selected items" when I check the reservation
    Goods movement for reservation allowed --> checked
    Final issue for this reservation --  compleated (checked)
    Item is deleted                       --  Checked
    Base Date is --> 02-12-2008 check againest factory calender
    in OMBN Transaction  configration setting are as below
    Goods movement for reservation allowed --> checked
    No. of days, if 'movement allowed' is set automatically --> 10
    Retention period, in days, for reservation items --> 30
    Please check and do the needful.
    Thanks & Regards,
    MK

    Hi,
    You are getting the message "Document does not contain any selected items" because, in this Reservation, there are no items available to move from the storage locations. This has happened because of the following 2 indicators:
    1.Final issue for this reservation -- compleated (checked)
    This Indicates that a reservation item is completed. Further goods movements in respect of this reservation item are not anticipated, although they are still possible.
    The indicator is set automatically for a goods movement when the total reserved quantity has been withdrawn or delivered. In the case of a partial delivery, you can manually set the indicator if no further goods movements are expected in respect of the relevant reservation item.
    2.Item is deleted -- Checked
    Specifies that the item has already been deleted and you do not expect any further movements in
    respect of this item.
    Please check if anybody, by mistake has flagged these indicators.
    Regards,
    Narayana.

  • Read the valid Operation/Activity Master Recipe data using an FM

    Dear all,
    Can anyone guide me to a function module, which could read the relevant master recipe data taking the validity date into consideration. i.e. the function module should return the correct valid data based on the Key Date.
    Is there such a function module, and could anyone give an example of using this.
    Thanks & Best Regards,
    Dabre

    Hi Ravi,
    Thanks for the response, but does not seem like this FM would give me the required information, since this seems to be taking the process order number etc as the importing parameters.
    I would need to pass something like the recipe type, recipe group and maybe the recipe counter along with the Key Date inorder to get the valid operations/activities for the period.
    Best Regards,
    Dabre

  • Extend the validity to date for planning calendar

    Hi gurus in md26, iam trying to change the validity dates as they are expired, can some one advise me the correct way to do this, when i am doing that i am getting runtime errors,
    Thanks in advance,
    Regards,
    Gopio

    Dear Gopio,
    Follow following steps;
    (1) Go to transaction code MD26
    (2) Enter your plant and and Planning Calendar
    (3) Select "Periods" (click Calculate Periods or Fn F8 Button)
    (4) Enter new dates (Valid From and Valid To)
    (5) Check and Save
    Hope this info will suffice your needs.
    Regards - Muralidhara

  • Factory Calendar Validity Date Expires 2010

    Hi All,
    In all standard SAP systems Factory Calendars are delivered with a validity date until 2010 at first installation.
    This could lead to follow-up errors at the turn of the year.To overcome the issue we need to extend the validity date of Factory Calender across all SAP system.
    As per my understanding we can extend the validity of calender manually in OLTP system (i.e. ECC etc) but in BW system we mostly transfer these validity using the "Transfer global settings".
    Is there a way to maintain these validity directly in BW instead of importing it from ECC, and is this recommonded to do it directly in BW?
    If we do it directly in, BW will this impact sync between OLTP and BW system etc?
    Any expert advice is highly appreciated...
    Regards
    Dev

    Yes, the settings can be maintained in BW, in the same IMG position as ECC.
    If you have a single ECC system and BW system, I would always 'Transfer Global Settings' in a daily (or weekly - minimum) process chain to insure consistancy between the systems.
    If my BW consolidated multiple ECC systems, I would maintian the BW system manually
    John Hawk

  • Regd : How to find Validity date for a user in central user system

    Hi Experts;
    I want to get the list of users with profile SAP_ALL  with following details like validity ,user type ,user name ,user id..
    I can get through SUIM for each individual systems.Its very difficult to login to each system ,generate the report.So I prefered to go for Central system
    But if I use central user system I have no option to find validity and user type for the system ( SUIM - > Cross system application )
    I have also tried to the table USRO2 ( which gives only the list of users in the central system )
    So is there any possible ways to find the Users with profile SAP _ALL with validity date in the central user system. So that I can easily generate it as one report instead of logging to each and every system
    Regards
    Sanjeev.S

    Hi Ruchit
    Thanks for your reply. I want to find the validity date of all users having SAP_ALL
    profile of all child system connected through central user system .So it is possible
    to do that in Centrals System by executing the report?
    If I execute that report in Central user system will it give the details of all child
    system connected to central system
    I think it will give only the result of Central system and not the child system connected to Central system.Please clarify me.
    I can execute the report by logging to each child system ,but it takes very long hours for me since there are many system in my landscape.
    Awaiting for your reply.'
    Thanks
    Sanjeev.S

  • Mass extention of service entry sheet condition record validity date

    Hi all,
          I have immediate requirement. i need to extend the validity date for condition record related to the Service entry sheet. This has to done mass sheet changes.
         I am looking for Any bapi or Standard function module or any config changes.
    I am looking forward for your valuable inputs.
    Regards,
    Sreenivasa Sarma K

    Arun,
    This doesn't suprise me...
    I'm not sure if there is a standard solution, but you could do this via user-exit/BADI (see [here|http://www.sapfans.com/forums/viewtopic.php?p=648307] under maintenance plans )
    PeteA
    [www.pjas.com]

  • DMS Document Validity date issue.

    Hello All,
    I have an issue in DMS Valid from Date & Valid to date as below.
    In our Document type when our document status is set to OB i.e. obsolete, in front of the status, system is showing two dates like 22.01.2014 to 31.12.9999.
    We are not using change number functionality in this document type. But still system is showing two dates. When document is in RE i.e Release status system is showing 22.01.2104... date in front of the status.
    Could you please let us know why it is showing two dates in front of document status.
    Thanks

    Hi,
    from my point of view I can inform you that these dates are validity dates for the document. Normally these dates are filled when the document is released to show which version of the document is valid or was valid in a specific period.
    By using menu "Extras" >> "Versions". Here a list of all versions should be displayed and the columns "Valid From" and "Valid to" should show the validity dates.
    Normally these date values are only filled when the status has set the "release" flag in transaction DC10.
    Best regards,
    Christoph

  • Changing validity date using BAPI_PROFITCENTER_CHANGE for a profit center.

    Hi Friends
    I need your help to know if we can use BAPI_PROFITCENTER_CHANGE to change the validity period of a profit center.I am using this BAPI in a LSMW program.
    The changes I want to make are something like changing the validity dates from
    1) 01/01/2006 - 12/12/9999 to 01/01/2007 - 12/12/9999
    2) 01/01/2006 - 12/12/9999 to 01/01/2005 - 12/12/9999
    3) 01/01/2006 - 12/12/9999 to 01/01/2006 - 12/12/2010
    or should I use BAPI_PROFITCENTER_CREATE?
    -Thanks
         Mitesh

    change document in profit center change
    Bapi - BAPI_ASSET_ACQUISITION_POST
    need a function module for profit center
    Please give me reward points...

Maybe you are looking for

  • [Solved] Emoji fonts in URxvt

    I'm attempting to get emoji (and ideally the entire utf8 set) working in my terminal and other programs. In my .Xresources I previously had just Terminus, I've found that Symbola is the font that you want to display emoji? So I figured that the follo

  • Whis is better: 8GB RAM with 2TB RAID 0 Scratch or 16GB RAM with 32GB SSD?

    Having read much on performance, I am presented with deciding on which motherboard to purchase.  Given the the CPU is a constant (3.2GHz) and I am using Windows Vista Business 64bit, I am not sure which motherboard would support the most needed funct

  • Page breaks missing

    i have two repeating frames in my rdf. both repeating frames have the maximum records setting set to 1 in their property palettes. i also tried using insert page break before set to 'yes' for the first repeating frame and insert page break after set

  • Load LiDAR data into Spatial 11g making use of Point Cloud Type?

    Dear all, from an aerial LiDAR scan I have approximately 226 million points, spread over 9 files. I would like to load them into Oracle Spatial 11g, making use of the new point cloud data type. I have the book "Pro Oracle Spatial for Oracle Database

  • TAB CANVAS PROBLEM

    hiiii in one of the tabs in a TAB CANVAS ... am trying to insert some fields into a table .. a simple insert statement ... BUT in each time i got in the message bar(UNABLE TO INSERT RECORD) and when i disply the error i got (ORA-00001: unique constra