As part of an ISE implementation, I want to test ISE failover for Admin, MnT, and PSN personas.  Does anyone have an ISE failover test plan or ISE failover test best practices documentation to share?
Thanks much,
David Daverso

Steps for Administration persona failover testing
1. Stop ISE services on Primary Admin
Primary Admin# application stop ise
2. Log in to the Secondary Admin GUI and manually promote to Primary
3. Wait 10-15 minutes before process is complete
4. Verify ISE services are up on promoted Secondary Admin
Secondary Admin# sh application status ise
5. Promoted Primary Admin checks
Deployment pages shows all nodes are green and in synch
6. User testing to verify successful authentications and logging
Note:
After you promote your secondary Administration node to become the primary Administration
node, you must reconfigure your scheduled Cisco ISE backups in the newly promoted primary
Administration node
because scheduled backups are not replicated from the primary to secondary Administration
node.
7. After step 6 testing is complete restore original Primary Admin
8. Start ISE services on original Primary Admin
Primary Admin# application start ise
9. Verify ISE services are up on original Primary Admin
Primary Admin# sh application status ise
10. Promoted Primary Admin checks
Deployment pages shows original Primary Admin green and in synch
11. Stop ISE services on Promoted Primary Admin
Secondary Admin# application stop ise
12. Log in to the original Primary Admin GUI and manually promote to Primary
13. Wait 10-15 minutes before process is complete
14. Verify ISE services are up on original Primary Admin
Primary Admin# sh application status ise
15. Promoted Primary Admin checks
Deployment pages shows all nodes are green and in synch
16. User testing to verify successful authentications and logging
Note:
After you promote your secondary Administration node to become the primary Administration
node, you
must reconfigure your scheduled Cisco ISE backups in the newly promoted primary
Administration node
because scheduled backups are not replicated from the primary to secondary Administration
node.
17. Start ISE services on original Secondary Admin
Secondary Admin# application start ise
18. Verify ISE services are up on original Secondary Admin
Secondary Admin# sh application status ise
19. Primary Admin checks
Deployment pages shows original Secondary Admin green and in synch
20. User testing to verify successful authentications and logging

Similar Messages

  • N+1 5508 WLC failover test

    Good day all,
    I have a question about the N+1 5508 failover test:
    Should I shutdown one of the primary WLC to test failover?
    I just setup the N+1 bakcup WLC (5508). B
    Based on: http://www.cisco.com/en/US/docs/wireless/technology/hi_avail/N1_High_Availability_Deployment_Guide.pdf
    We have two production WLCs both 5508 and one 4405.
    We just purchased another HA-SKU WLC 5508.
    All our four WLCs had been setup into one mobility group in version 7.4.100.6.
    Their neighbors are all up.
    But our test AP could not register to the Backup N+1 WLC. ( We are using option 43 in our DHCP server for all the AP boot.)
    Here are the log screen:
    ================ From test Access Point============
    *Mar  1 00:00:53.099: %CDP_PD-4-POWER_OK: Full power - INJECTOR_CONFIGURED_ON_SOURCE inline power source
    *Mar  1 00:00:53.842: %DHCP-6-ADDRESS_ASSIGN: Interface BVI1 assigned DHCP address 10.255.1.3, mask 255.255.255.0, hostname wo11-test-ap1
    *Mar  1 00:00:54.188: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to up
    *Mar  1 00:00:55.188: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to up
    *Mar  1 00:00:55.279: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to up
    *Mar  1 00:00:56.280: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio1, changed state to up
    *Mar  1 00:01:03.820: %CAPWAP-5-DHCP_OPTION_43: Controller address 10.254.240.5 obtained through DHCP
    *Mar  1 00:01:03.820: %CAPWAP-3-ERRORLOG: Did not get log server settings from DHCP.
    *Mar  1 00:01:13.823: %CAPWAP-3-ERRORLOG: Go join a capwap controller
    *Aug  2 02:30:55.000: %CAPWAP-5-DTLSREQSEND: DTLS connection request sent peer_ip: 10.254.240.5 peer_port: 5246
    *Aug  2 02:31:25.003: DTLS_CLIENT_ERROR: ../capwap/base_capwap/dtls/base_capwap_dtls_connection_db.c:2051 Max retransmission count reached!
    *Aug  2 02:31:55.001: %DTLS-5-SEND_ALERT: Send FATAL : Close notify Alert to 10.254.240.5:5246
    *Aug  2 02:31:55.001: %CAPWAP-3-ERRORLOG: Go join a capwap controller
    *Aug  2 02:30:55.000: %CAPWAP-5-DTLSREQSEND: DTLS connection request sent peer_ip: 10.254.240.23 peer_port: 5246
    *Aug  2 02:30:55.490: %CAPWAP-5-DTLSREQSUCC: DTLS connection created sucessfully peer_ip: 10.254.240.23 peer_port: 5246
    *Aug  2 02:30:55.493: %CAPWAP-5-SENDJOIN: sending Join Request to 10.254.240.23
    *Aug  2 02:30:55.493: %CAPWAP-3-ERRORLOG: Invalid event 10 & state 5 combination.
    *Aug  2 02:30:55.493: %CAPWAP-3-ERRORLOG: CAPWAP SM handler: Failed to process message type 10 state 5.
    *Aug  2 02:30:55.493: %CAPWAP-3-ERRORLOG: Failed to handle capwap control message from controller
    *Aug  2 02:30:55.493: %CAPWAP-3-ERRORLOG: Failed to process encrypted capwap packet from 10.254.240.23
    *Aug  2 02:30:55.874: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to down
    *Aug  2 02:30:55.931: %LINK-5-CHANGED: Interface Dot11Radio0, changed state to reset
    *Aug  2 02:30:55.987: %CAPWAP-5-JOINEDCONTROLLER: AP has joined controller WG-WLC1
    *Aug  2 02:30:56.041: ac_first_hop_mac - IP:10.255.1.1 Hop IP:10.255.1.1 IDB:BVI1
    *Aug  2 02:30:56.041: Setting AC first hop MAC: ccef.481f.14bf
    -test-ap1#sh int bvI 1
    BVI1 is up, line protocol is up
      Hardware is BVI, address is e8b7.489e.4645 (bia e8b7.489e.4645)
      Internet address is 10.255.1.3/24
    ===================From backup N+1 WLC===
    *spamApTask4: Aug 02 11:41:09.842: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58470).
    *spamApTask4: Aug 02 11:41:01.889: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58470).
    *spamApTask4: Aug 02 11:40:57.912: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58470).
    *spamApTask4: Aug 02 11:40:55.924: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58470).
    *spamApTask4: Aug 02 11:18:50.553: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58469).
    *spamApTask4: Aug 02 11:18:42.600: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58469).
    *spamApTask4: Aug 02 11:18:38.623: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58469).
    *spamApTask4: Aug 02 11:18:36.636: #CAPWAP-3-DTLS_DB_ERR: capwap_ac_sm.c:7305 64:a0:e7:40:eb:42: Failed to create DTLS connection for AP  10:255:1:3 (58469).
    *mmListen: Aug 02 10:43:38.637: #LOG-3-Q_IND: spam_lrad.c:1676 Ignoring discovery request from AP e8:b7:48:9e:46:45 - maximum number of downloads (0) exceeded
    *spamApTask0: Aug 02 10:43:38.500: #LWAPP-3-DISC_MAX_DOWNLOAD: spam_lrad.c:1676 Ignoring discovery request from AP e8:b7:48:9e:46:45 - maximum number of downloads (0) exceeded
    ==================== From one of our Primary WLC=====================
    (WLC-5500) >show advanced backup-controller
    AP primary Backup Controller .................... ODC-WLC1 10.254.240.5
    AP secondary Backup Controller ..................  0.0.0.0
    (WLC-5500) >show redundancy summary
    Redundancy Mode = SSO DISABLED
         Local State = ACTIVE
          Peer State = N/A
                Unit = Primary
             Unit ID = 54:75:D0:DE:DE:40
    Redundancy State = N/A
        Mobility MAC = 54:75:D0:DE:DE:40
    Redundancy Management IP Address................. 0.0.0.0
    Peer Redundancy Management IP Address............ 0.0.0.0  
    Redundancy Port IP Address....................... 0.0.0.0
    Peer Redundancy Port IP Address.................. 169.254.0.0
    (WLC-5500) >show license capacity
    Licensed Feature    Max Count         Current Count     Remaining Count
    AP Count            250               203               47
    ==============From the Backup N+1 WLC in DR =====================
    (Cisco Controller) >show redundancy summary
    Redundancy Mode = SSO DISABLED
         Local State = ACTIVE
          Peer State = N/A
                Unit = Secondary - HA SKU
             Unit ID = 6C:41:6A:5F:4C:80
    Redundancy State = N/A
        Mobility MAC = 6C:41:6A:5F:4C:80
    Redundancy Management IP Address................. 10.254.240.3
    Peer Redundancy Management IP Address............ 0.0.0.0
    Redundancy Port IP Address....................... 169.254.240.3
    Peer Redundancy Port IP Address.................. 169.254.0.0
    (Cisco Controller) >show license capacity
    Licensed Feature    Max Count         Current Count     Remaining Count
    AP Count            500               0                 500

    Current AP High Availability Configuration:
    2nd Step, shutdown the LAN Switch ports on which the Primary WLC is connected so I force the AP going to HA SKU WLC.
    DC-WiFi-SVC1-LAB(config)#inter
    DC-WiFi-SVC1-LAB(config)#interface por
    DC-WiFi-SVC1-LAB(config)#interface port-
    DC-WiFi-SVC1-LAB(config)#interface port-channel 3
    DC-WiFi-SVC1-LAB(config-if)#shut
    DC-WiFi-SVC1-LAB(config-if)#
    Log in the AP after shutdown:
    Jan 15 15:52:15.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 2)
    *Jan 15 15:52:15.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:18.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 2)
    *Jan 15 15:52:18.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:21.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 3)
    *Jan 15 15:52:21.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:24.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:24.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:27.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:27.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:30.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:30.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:33.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:33.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:36.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:36.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:39.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 4)
    *Jan 15 15:52:39.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:42.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 7)
    *Jan 15 15:52:42.307: %CAPWAP-3-ERRORLOG: Retransmission count exceeded max, ignoring as the ethernet is overloaded
    *Jan 15 15:52:45.307: %CAPWAP-3-ERRORLOG: Retransmission count for packet exceeded max(CAPWAP_WTP_EVENT_REQUEST
    ., 8)
    *Jan 15 15:52:45.307: %CAPWAP-3-ERRORLOG: GOING BACK TO DISCOVER MODE
    *Jan 15 15:52:45.307: %DTLS-5-SEND_ALERT: Send FATAL : Close notify Alert to 172.23.111.23:5246
    *Jan 15 15:52:45.371: %WIDS-6-DISABLED: IDS Signature is removed and disabled.
    *Jan 15 15:52:45.371: %LWAPP-3-CLIENTERRORLOG: LWAPP LED Init: incorrect led state 255
    *Jan 15 15:52:45.383: %LINK-5-CHANGED: Interface Dot11Radio0, changed state to administratively down
    *Jan 15 15:52:45.383: %LINK-5-CHANGED: Interface Dot11Radio1, changed state to administratively down
    *Jan 15 15:52:45.395: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:46.015: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to up
    *Jan 15 15:52:46.383: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:46.423: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to down
    *Jan 15 15:52:46.431: %LINK-5-CHANGED: Interface Dot11Radio1, changed state to reset
    *Jan 15 15:52:47.167: %CLEANAIR-6-STATE: Slot 0 down
    *Jan 15 15:52:47.167: %CLEANAIR-6-STATE: Slot 1 down
    *Jan 15 15:52:47.415: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:47.423: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio1, changed state to down
    *Jan 15 15:52:47.451: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to up
    *Jan 15 15:52:47.459: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:47.467: %LINK-5-CHANGED: Interface Dot11Radio0, changed state to reset
    *Jan 15 15:52:48.451: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio1, changed state to up
    *Jan 15 15:52:48.459: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:48.487: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:49.487: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:56.011: %CAPWAP-3-ERRORLOG: Selected MWAR 'DC-WiFi-WLC1-0'(index 1).
    *Jan 15 15:52:56.011: %CAPWAP-3-ERRORLOG: Go join a capwap controller
    *Jan 15 15:52:44.000: %CAPWAP-5-DTLSREQSEND: DTLS connection request sent peer_ip: 172.23.111.20 peer_port: 5246
    *Jan 15 15:52:44.467: %CAPWAP-5-DTLSREQSUCC: DTLS connection created sucessfully peer_ip: 172.23.111.20 peer_port: 5246
    *Jan 15 15:52:44.471: %CAPWAP-5-SENDJOIN: sending Join Request to 172.23.111.20
    *Jan 15 15:52:44.471: %CAPWAP-3-ERRORLOG: Invalid event 10 & state 5 combination.
    *Jan 15 15:52:44.471: %CAPWAP-3-ERRORLOG: CAPWAP SM handler: Failed to process message type 10 state 5.
    *Jan 15 15:52:44.471: %CAPWAP-3-ERRORLOG: Failed to handle capwap control message from controller
    *Jan 15 15:52:44.471: %CAPWAP-3-ERRORLOG: Failed to process encrypted capwap packet from 172.23.111.20
    *Jan 15 15:52:44.927: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:44.995: %LINK-5-CHANGED: Interface Dot11Radio0, changed state to reset
    *Jan 15 15:52:45.003: ac_first_hop_mac - IP:10.219.96.1 Hop IP:10.219.96.1 IDB:BVI1
    *Jan 15 15:52:45.007: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:45.075: %CAPWAP-5-JOINEDCONTROLLER: AP has joined controller DC-WiFi-WLC1-0
    *Jan 15 15:52:45.223: %WIDS-6-ENABLED: IDS Signature is loaded and enabled
    *Jan 15 15:52:45.927: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:45.971: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to down
    *Jan 15 15:52:45.979: %LINK-5-CHANGED: Interface Dot11Radio1, changed state to reset
    *Jan 15 15:52:46.007: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio1, changed state to down
    *Jan 15 15:52:46.959: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:46.999: %DOT11-6-DFS_SCAN_START: DFS: Scanning frequency 5520 MHz for 60 seconds.
    *Jan 15 15:52:47.003: %LINK-6-UPDOWN: Interface Dot11Radio1, changed state to up
    *Jan 15 15:52:47.015: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:47.023: %LINK-5-CHANGED: Interface Dot11Radio0, changed state to reset
    *Jan 15 15:52:48.003: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio1, changed state to up
    *Jan 15 15:52:48.015: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to down
    *Jan 15 15:52:48.047: %LINK-6-UPDOWN: Interface Dot11Radio0, changed state to up
    *Jan 15 15:52:49.047: %LINEPROTO-5-UPDOWN: Line protocol on Interface Dot11Radio0, changed state to up
    APe4d3.f11e.a8e1#         
    3rd Step, verifying the LOG on the AP and check if it can connect to the HA SKU WLC
    *Jan 15 15:52:45.075: %CAPWAP-5-JOINEDCONTROLLER: AP has joined controller DC-WiFi-WLC1-0
    *Jan 15 15:52:45.223: %WIDS-6-ENABLED: IDS Signature is loaded and enabled
    CONCLUSION:
    I needed to activate the EVALUATION LICENSE in the HA SKU WLC which had status = EULA NOT ACCEPTED. I will test the SSID's in order to confirm that redundancy using HA SKU WLC works fine.

  • VIP Failover Testing

    Hello,
    Am new to Oracle RAC. We have a 2 node 11gR2 Cluster and we are in the process of doing some failover testing. For database deployments we use an internal third part tool called the deployer which has tokens for DB configurations and the DBHost token in the deployer has the Hostname for either Node 1 or Node 2. In this way we are not actually utilising the HA feature because the connection is either to Node1 or Node 2 and if something happens to either the deployment cannot connect to the database on the respective Node which treats as a single Node instead of a Cluster.
    Instead of mentioning the DBHost value to point to the Physical Hostname of the Server in a Cluster I was thinking if I can use the VIP address i.e ipaddress-VIP for either of the Node. So after making changes I would like to do some failover testing manually and I am stuck here. How do I go about the testing scenarios.
    For Eg: if DBHOST token value is VIP for Node 2, connections are coming in to Node2 via deployer how do I proceed with the testing
    Should I bring down Node 2? If I reboot how can I see if it failed over or not to the surviving Node?
    Any help/suggestions much appreciated.
    Thanks!

    What you describe is having a RAC cluster, possibly working possibly not, and no actual use of the value of the licensing you paid for.
    My first advice to you is to read the docs and learn what RAC is, how it works, how to define and use services, and how a properly configured LISTENER.ORA and TNSNAMES.ORA should be constructed so you can compare that to what you have. With 11gR2 you should connect to the SCAN not the VIP.
    Here's how I would test RAC:
    1. Walk up to one of the servers while half the users are connected to each instance and do a SHUTDOWN ABORT. See what happens. Restart the killed node. Try it with the other node.
    2. With everything running properly and load on both machines disconnect the switch that provides the cache fusion interconnect or pull one of the cables out of the server. When you reestablish the connection what happens?
    3. Repeat #2 but this time with the connection to storage.
    The above should get you started.

  • Dataguard switchover & failover testing

    i want to build new physical & logical dbs just for testing & learning, as per menalink notes 736863.1 & 748595.1
    wondering that configuration will let me test switchover & failover testing?

    Hi there,
    Those notes help you to build a proper data guard configuration in both Physical and Logical Standby enviromnment.
    I would also recommend to check:
    - [The Oracle online documentation|http://download.oracle.com/docs/cd/B19306_01/server.102/b14239/toc.htm]
    - [Oracle Maximum Availability Architecture site on OTN|http://www.oracle.com/technology/deploy/availability/htdocs/maa.htm]
    These documents can provide a big picture of Data Guard configurations from different approaches as well as I would also recommend to learn and practice more advanced techniques and features such as Flasback database, Fast-start-failover or Cascaded destinations.
    Hope this helps,
    Good luck and regards,
    Jozsef

  • Redundancy/failover testing

    My company is a relatively small enterprise (about 800 people scattered across 45-50 branches) and we are planning on setting up a periodic failover/redundancy testing schedule for our routers. Basically, we want to test the secondary WAN links at our branch offices and test our redundancy in our data centers.
    I'm sure there is plenty of documentation out there in regards to best practices, but what I find has more to do with a full DR test of a enterprise's systems, as opposed to a simple failover test of an office's WAN link.
    Does anyone have good suggestions for how often you should run these tests? My original thinking is to do this every quarter, but this would involve some travel for us and our resources are slim. The branch offices can be done remotely without any issue, but our DR site (which is actually used for some production traffic) would probably require one of our staff to be on site during a redundancy test.
    Thanks!

    Yep, that's what I did now.
    But keep in mind this is not really explained, even if crossing all the documentations.
    There is no document explaining what behaviour to expect in Jabber in case of redundancy of all the UC components.
    For the CUCM, it's not clear, and nothing is mentionned in case of MRA.
    IM&P is documented, but nothing for MRA.
    Expressays states about redundancy, but the behaviour to expect is not. Same for XMPP federation, no idea.
    UnityConnection as well, nothing is explained.

  • JMS queue| failover test question

    HI gurus,
    We are planning a failover test to migrate from prod to contingency environment.
    What happens to transactions that may be sitting in the JMS queue when the prod jvms are stopped? Is there a way to migrate them to the cont jvms?We are using jdbc stores and the supporting tables for both prod and cont will exist in the oracle DB, but with different names. Since the CONT jvms will be using different tables for the JMS queues, is there a way to migrate those queued transactions from prod to the CONT side?
    Details of environment
    1) OS for App Server
    Linux x86-64.
    Linux va2xpre03.gdsososos.com 2.6.18-128.1.6.el5 #1 SMP Tue Mar 24 12:05:57 EDT 2009 x86_64 x86_64 x86_64 GNU/Linux
    2) App Server type and version
    WLS 10.3.0
    JDK version
    jrockit_160_11
    3)
    Clustered and it is a Prod environment.
    Details:
    UI cluster has 5 servers. There are 4 jvms in each server. Altogether there are 20 jvms in UI cluster
    Recon cluster has 3 servers. There are 4 jvms in each server. Altogether there are 12 jvms in Recon cluster
    regards,
    Thiago Leoncio Guimaraes

    A common practice for handling this type of fail-over is to ensure that the main environment's domain name, server names, store, transaction logs (default store), and JMS configuration all all the same in the contigency environment (basically, differences, if any, are confined to things like URLs and Data Source configuration of DB location). Recovery is accomplished in the fail-over environment by copying over each server's default file store, as well as its JDBC store backing tables, prior to booting the fail-over servers.
    Transaction logs don't need to be copied over if you don't use XA (JTA) in your applications...

  • Recreate standby after failover test

    Hi -
    I'm doing a failover test for the customer:
    1. Disconnect all network between Primary and Standby
    2. On the Standby - do a failover and open it to perform application tests.
    3. After finish we need to re-create Standby again.
    Is there a way to re-create Standby again without bringing it all from backup? it's a large 2TB database and it will take hours.
    Is there a way like using flashback or other technology to do it?
    We are talking 10.2.0.3 here...
    Thanks
    Edited by: 912294 on 04:07 06/02/2012

    Is there a way to re-create Standby again without bringing it all from backup? it's a large 2TB database and it will take hours.
    Is there a way like using flashback or other technology to do it?
    We are talking 10.2.0.3 here...Its called "open the Standby database in read write mode for any reporting or testing and then move it back to standby database using the flashback technology".
    In detail check this MOS note *How To Open Physical Standby For Read Write Testing and Flashback [ID 805438.1]*
    Thanks.

  • Sap not starting during manual failover testing

    Dera friends,
    We are performing manual failover testing between CI(sap central instance) and DB(oracle database)
    the environment is ECC6.0 on AIX server
    CI is running on one server and DB is running on another, during manual testing we have failed the DB, so now DB file systems has got mounted on CI server.
    So when i log into CI with user as shown below  (sid-irp)
    su - irpadm
    and the execute the command as shown below
    irpadm 6> startsap
    i get the following message
    PRDCIXI:irpadm 6> startsap
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    Checking IRP Database
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    ABAP Database is not available via R3trans
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    Starting SAP-Collector Daemon
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    15:03:05 26.09.2008   LOG: Effective User Id is root
    This is Saposcol Version COLL 20.94 700 - AIX v10.35 5L-64 bit 070123
    Usage:  saposcol -l: Start OS Collector
            saposcol -k: Stop  OS Collector
            saposcol -d: OS Collector Dialog Mode
            saposcol -s: OS Collector Status
    The OS Collector (PID 1101932) is already running .....
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    saposcol already running
    tee: 0652-044 Cannot open /home/irpadm/startsap_.log.
    ABAP Database IRP must be started on remote server
    ===============================================
    why am i getting this "ABAP Database IRP must be started on remote server" message.
    What could be the cause for my database not comming up & why is it looking for remote server, when all the DB filesystems have got mounted on CI server (the server that has CI installed)
    We are in a bad shape and the issue is quite crticial.
    Your reply would be highly appreciated.
    Regards
    Ayush

    > how can i check wether the directories are missing or not...
    mount?
    > Also how can i check it wether they are assigned to failover group or not.
    Ayush, no offense, but I suggest you contact your AIX guy and check with him together. It's very cumbersome to write down command by command, get the outpu t back and you have no clue what you are doing. Again, no offense.
    Markus

  • Failover test programs

    Hi all,
    I am creating a failover test script that is simple and is doing insert 1 row every 2 seconds.
    Then we fail the node1 and check if it will continue to insert on node2.
    My script is using sqlnet client connect. for example :
    connect scott/tiger@TEST
    So I still need to install oracle client on my laptop.
    I want to create a script that will not need Oracle client or tns names.ora in my laptop. How do I do it?
    I want it to behave like what the sqldeveloper do in which no tns names is needed and uses the parameter: hostame: port: SID
    Thanks a lot,
    zxy
    Edited by: yxes2013 on 19.4.2013 2:11

    yxes2013 wrote:
    I thank you all :)
    But I dont want anything to be installed in my laptop. I only want the program to use or ride on the functionality of sqldeveloper which you just cut n paste.
    You could write a Java program that uses JDBC to connect - that would be one way.Can you share a sample java program that behave like sqldev? and rides on it? becuase I do not want to install other tools.
    ThanksHere's a simple Java program. Just compile it with javac, set your CLASSPATH to include ojdbc.jar, and run it with java:import java.sql.*;
    class Conn {
      public static void main (String[] args) throws Exception
       Class.forName ("oracle.jdbc.OracleDriver");
       Connection conn = DriverManager.getConnection
         ("jdbc:oracle:thin:@//localhost:1521/orcl", "scott", "tiger");
                            // @//machineName:port/SID,   userid,  password
       try {
         Statement stmt = conn.createStatement();
         try {
           ResultSet rset = stmt.executeQuery("select BANNER from SYS.V_$VERSION");
           try {
             while (rset.next())
               System.out.println (rset.getString(1));   // Print col 1
           finally {
              try { rset.close(); } catch (Exception ignore) {}
         finally {
           try { stmt.close(); } catch (Exception ignore) {}
       finally {
         try { conn.close(); } catch (Exception ignore) {}
    }OK?

  • 11i/10g RAC Failover Test

    Hi,
    Anybody did 11i/10g RAC Failover test. How to do the test and what steps involved. What is expected when one node down?
    my config
    web, admin, form - appsnode1
    concurrent / db (rac1) - dbnode1
    concurrent /db (rac2) - dbnode2
    Thanks for your help.
    Regards

    You can check the below
    1. VIP Failover - VIP should failover when node gets rebooted.
    2. When one of the node is down you should still be able to logon to applications.
    3. Since you have only one node and do not use PCP you CM processes will die.Make sure you start them.
    4.Once you bring the node back , test your load balancing is happening fine across both the db nodes.
    Let me know if this is helpful/correct and if you need more information.
    Regards
    Nitin Arora

  • SQL failover test for reporting

    I have setup a mirror and failover for sql appv reporting.
    does anyone know of a good way to test if the failover is working?
    Thanks
    Dave Kozlowski

    Note that SQL Mirroring is not supported for the Reporting database (only for the Management DB):
    http://technet.microsoft.com/en-us/library/dn343758.aspx
    In this thread someone tried to do the same for Reporting as for Management, but this didn't work;
    http://social.technet.microsoft.com/Forums/en-US/20b1d02d-7b94-4b9d-8dfe-d81df93dc65e/appv-5-reporting-database-sql-mirroring?forum=mdopappv
    And here is an article that explains how to configure mirroring for the Managemnt DB a little bit more detailed (but also not for Reporting):http://www.sbcprojects.com/blog/93-how-to-get-your-app-v-5-database-high-available-with-sql-mirroring.html
    So I'd say that it perhaps doesn't work that easy. Actually I didn't try how the client behaves if the Reporting Server can't talk to the DB. I'd expect that the Reporting Server returns an error to the client if RepSrv can't access the database - so the
    client gets the info that the reporting data was not uploaded successfully. In that case, the client stores the usage data loally and just tries to upload it durig the next schedule... HA for the Reporting DB should not be necessary.
    Falko
    Twitter
    @kirk_tn   |   Blog
    kirxblog   |   Web
    kirx.org   |   Fireside
    appvbook.com

  • Deauthenticate User on WLC w/ ISE for Testing

    ISE v1.1.1.268
    WLC v7.2.110.0
    We have a wireless deployment using ISE and WLC's configure for LWA. Seeing that CWA has fewer "moving parts" I was trying to migrate to that. When testing my deployment under LWA, I could de-authenticate a user simply by finding the association on the WLC and removing it. Then, when that device would reconnect to the WLAN, it would prompt them for credentials through the WebAuth pages.
    After configuring a WLAN for CWA I noticed that when I remove an association from the WLC in the same manner that the upon reconnecting to the WLNA the user never gets redirected to the WebAuth pages. I'm assuming this is because since the authentication takes places on the ISE server, rather than on the WLC (in LWA mode) that the authentication is still active (since I only removed the association on the WLC).
    I looked around on ISE, but couldn't find a place to view active user authentications let alone remove those authentications. Can this be done? It'd be great for testing to make sure the WebAuth pages function as I need them to.
    I used this guide to set up CWA: https://supportforums.cisco.com/docs/DOC-26442. The only exception to following that guide is that I used an authorization profile that sets the auth timeout to 36000 seconds.

    I don't have profiler.
    I can see all of the profiled endpoints, however. I've tried removing the endpoint I was testing with, but it doesn't help. When the client reassociates, the Policy Manager State goes straight to run even though ISE has only responded with the initial Authorization profile and not the CoA.

  • Dataguard switch/failover tests notes

    version 9i-11g
    somebody can share different scenarios for this testing?

    version 9i-11g
    somebody can share different scenarios for this testing?It would be precious to go through all:
    1. [Oracle10g: Data Guard Switchover and Failover Best Practices|https://metalink2.oracle.com/metalink/plsql/f?p=130:14:8262553999369510259::::p14_database_id,p14_docid,p14_show_header,p14_show_help,p14_black_frame,p14_font:NOT,387266.1,1,1,1,helvetica]
    2. Assuming you don't have dataguard broker. [Performing Switchover in a Data Guard Configuration without the Data Guard Broker|https://metalink2.oracle.com/metalink/plsql/f?p=130:14:8262553999369510259::::p14_database_id,p14_docid,p14_show_header,p14_show_help,p14_black_frame,p14_font:NOT,232240.1,1,1,1,helvetica]
    Regards,
    S.K.

  • UCS Failover test plans

    I am wondering if anyone would have a UCS failover check list, used to test the component failovers.
    Including the FI, IO modules, chassis, blades, ports etc
    Thanks for any assistance.

    Dear Lisa,
    Currently the SMP does offer some helpful documents for implementation like
    1. SAP Business One best Practice  and sizing guide : https://websmp207.sap-ag.de/~sapidb/011000358700001151332007E.pdf
    2. SAP Business One Requirements : https://websmp207.sap-ag.de/~sapidb/011000358700000310652008E.pdf
    and ofcourse the Accelerated program which you arlready know about.
    but as of right UAT is not available.
    May be if you give us some examples of the same we could find out some relevant documentations for it?
    Regards
    Arshdeep

  • ACE and GSS failover testing

    I need to know the best way to test the ACE failover setup. Should i shutdown the primary ACE or can change the roles.
    If i change the roles then what is the command to confirm whether traffic is passing through the standby not from primary.
    I need confirm the traffic not the role. I know the command "show ft group detail on ACE.
    I need to know the same for GSS setup.
    Thanks

    On ACE the failover is context based (not Vip based).
    ACe can be configured to track and detect failures in the following items in the
    Admin context and any user context:
    • Gateways or hosts
    • Interfaces
    • Hot Standby Router Protocol (HSRP) groups
    You need to configure a tracking priority for each tracking event.
    from ACE Admin guide
    "Suppose that on ACE 1 you configure the active FT group member
    with a priority of 100 and on ACE 2 you configure the standby FT group member
    with a priority of 70. Further, assume that you configure the FT group to track
    three critical interfaces, each with a unit priority of 15. To trigger a switchover,
    all three interfaces must fail so that the priority of the active member is less than
    the priority of the standby member (100 - 45 = 55)."
    Please read ACE Admin guide for more details