Issue with Data at Infoset Level

HI All,
I have an Infoset designed above an DSO and a Cube.
Plant between the DSO and Cube are linked in the Infoset.(Inner Join...Also Tried Left Outer Join)
Dso has got a Capacity Keyfigure and the data in DSO is as below..
Company code    Plant     Capacity
CC1              P1     7000
CC2              P2     28000
CC3                       P3     5000
CC4              P4     2000
When I execute the report on Infoset the data displayed as follows:
Plant     Capacity      Stock Pal           In-Transit                      Utilisation
P1     1,89,000     108              2          0.1%
P2     1,484,000     647              1          0.0%
P3     10000     18              0          0.2%          
P4     358,000     654,771            57          182.9%
The Capacity Data is incorrect..
At the Cube level I have got material level data, which I think is the culprit.
At Infoset level If I view the Data, I can see capacity of the ware house at every material..so when aggregated in the report at plant level the values are wrong..
Can you let me know where can I do a change to overcome this problem.
Appreciate your Help in Advance.
Regards,
Harika

HI
Thanks for your replies.
I tried changing the Excception Aggreation wth First, Last , minimum, Maximum Values.. But there is no change in the report.
I also tried creating a multiprovider. I can see data at Multiprovider level . But when coming to report level i dont see data for capacities. The query is run based on Calday. But the ODS doesnt have Calday. It has got Calmonth only. I can't  view the data in the report on Multi provider for capacities. I can't include the calday in the ODS as it is in live being used in many other infoproviders.
Regards,
Harika.

Similar Messages

  • Issue with Data Provider name in variable screen for BEx Analyzer

    Hello all,
    We got an issue with Data Provider name in Variable screen in BEx Analayzer.
    We want to change the DataProvider name there to Description of the report instead of its Technical name.
    Any inputs are appreciated.
    Thanks
    Kumar

    You have to create a workbook to do this.
    Refresh your query/report. In Bex analyser, there is one toolbar named BEx design toolbox, If you are not able to see it in analyser, right click on the toolbar space of BEx analyser and click on BEx design toolbox. Here, goto to design mode, by clicking on a sysbol like 'A'. after that place the curser where you want to see the Query description. and click on insert text (T) in BEx toolbox. click on it and check "Query description" in constant tab. in the general tab you need to assign a dataprovider, for that assign your query name in workbook settings (in Bex design toolbox). also check the "display caption" in general tab.
    Pravender

  • Issue with data dictionary -Table maintanance generator

    Hi all,
    I have an issue with Data dictionary, table maintenance generator. I have entered some records in a custom table (ZBCSECROLETOGRP) and changed the delivery class from C to A. When I create the table maintainance generator, I am encountered with the following errors:
    1)Field ZBCSECROLETOGRP-PORTALGROUP shortened (new visible length: 000032)
    2)0012 could not be generated
    3)In TCTRL_ZBCSECROLETOGRP field LENGTH has the invalid value 01
    My main motto is to create the table maintainace generator and transport to the furthur systems .
    Please help.
    ThnX in advance,
    Vishal..

    HI,
    Regenerate the table maintenance by selecting the checkbox of "Modified field structure" => new entry & then save.
    Also ensure that the new changes are not affecting old data bcz of data type changes. If that is the case, then delete the old records, regenerate table maint. & re-enter those records which you had deleted.
    Thanks,
    Best regards,
    Prashant

  • Issue with Date Format

    Hi All,
    I m facing an issue with Date format in the prompt. I have used date presentation variables in my column formula as shown below:
    FILTER("SKU Order Details"."Fulfilled Quantity" USING Time."Calendar Date" <= DATE '@{todate}{2900-01-01}')
    The report returns data when I don't select any date range for start & end date prompts on the page. But when I select the start & end date values in the prompt, I m getting the following error:
    Error Codes: OPR4ONWY:U9IM8TAC:OI2DL65P:OI2DL65P
    State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 46047] Datetime value 10/22/2009 12:00:00 AM from 10/22/2009 12:00:00 AM does not match the specified format. (HY000)
    I included the following formulas for start & end date prompts:
    Start Date prompt: case when 1=2 then License."Ips Creation Date" else cast ('1.1.1900' as date) end
    End Date prompt: case when 1=2 then License."Ips Creation Date" else cast ('1.1.2900' as date) end
    Can you please help me resolve the issue.
    Thanks,
    Kartik

    Hi Nico,
    I tried putting the format that you mentioned, I m getting an error message.
    My prompts have the following formula :
    Start: case when 1=2 then License."Creation Date" else cast('1.1.1900' as DATE) end
    End: case when 1=2 then Time."Calendar Date" else cast('1.1.2900' as DATE) end
    My column formula has the following syntax:
    FILTER("SKU Order Details"."Fulfilled Quantity" USING Time."Calendar Date" between DATE '@{start}{1900-01-01}' AND DATE '@{end}{2999-01-01}')
    Error Message:
    Error Codes: OPR4ONWY:U9IM8TAC:OI2DL65P:OI2DL65P
    State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 46047] Datetime value 11/17/2009 from 11/17/2009 does not match the specified format. (HY000)
    Can you please let me know if something needs to be changed.
    Thanks,
    Kartik

  • Issue with DATA RETENTION LEVELS PARTNER

    HI I am having an issue
    The issue is in contract where I have a data retention partner level .I have partner retention level at purchase organization level and want to copy it to a plant level where in when I try to copy the other partner functions are being copied but the partner function VN is not being copied .
    Could any one tell me why this is happening and how I could overcome this issue .

    Hi,
    set the propety "display" to medium text for this charateristic either in the BEx report itself either in the query definition.
    Ensure that the text are well loaded (run tran RSDMD with this IObj in norder to display master data)
    Only having meduim texts will prevent you to display "key and texts" in reports.
    You could enhance your IObj and enable short/long texts as well; in the transfer rules just load the medium text in short (truncate its length to 20) as well as in the long text.
    hope this helps...
    Olivier.

  • Issue with date reporting level

    guys,i need help with a field. ok so i have a date like 04/09/09 and i have another field which contains '3' now i need to subtract this 3 from the date on reporting level.  so my result should be 04/06/09. how can i accomplish this task? thanks.

    Hi,
    You can do it by using Formula variable on Date Field.
    Create Formula variable on Date Field
    Process by = Replacement path
    Reference Cha = Your date field
    In Replacement tab:
    Replace variable with = InfoObejct
    Replace with  = Key
    Use interval = This you need to set properly       " This is importent for you
    Offset setting = From & TO = check it and set properly. " This is importent for you
    Then display it in columns and do teh substracion with another formula.
    Thanks
    Reddy

  • Issues with data usage Samsung S5

    Over the past few months I have been paying outrageous bills due to one of my lines eating all my data when there is no one even touching the phone. I have 3 phones and a tablet on my plan and I am paying 288.00 a month and last month they charged me 15.00 for overage usages because it went over on the last day of the billing cycle. Once again that one line ate up all the data even though it's connected to our wifi or just sitting dormant. I am getting sick of paying these outrageous prices and am about to go somewhere else. I was tricked into the 10.00 a month tablet fee when I signed two phones up under the verizon edge plan. the sales clerk did not tell me I could not cancel the 10.00 a month fee because it would be under a year contract nor did I sign anything saying that, but when I went back in to change the 3rd line over to the Edge plan they told me it would be a $300 or so disconnect charge. So of course I am still paying 10.00 a month for no reason because I have wifi in my home and I only use the tablet in my home. so i need help with trying to figure out the data issues with just one of my lines. I do not have bluetooth on or location. I have went to the play store and uninstalled everything I could. I constantly close out of my applications and clear history etc.,,

    So you thought they would just give you a free tablet at $10 a month and it didn't need to be in a contract like phones?  I took the free tablet too but common sense told me it was locked into a contract, I didn't even ask as I just knew that would be the case but I didn't care.  Mary

  • Performance issues with data warehouse loads

    We have performance issues with our data warehouse load ETL process. I have run
    analyze and dbms_stats and checked database environment. What other things can I do to optimize performance? I cannot use statspack since we are running Oracle 8i. Thanks
    Scott

    Hi,
    you should analyze the db after you have loaded the tables.
    Do you use sequences to generate PKs? Do you have a lot of indexex and/or triggers on the tables?
    If yes:
    make sure your sequence caches (alter sequence s cache 10000)
    Drop all unneeded indexes while loading and disable trigger if possible.
    How big is your Redo Log Buffer? When loading a large amount of data it may be an option to enlarge this buffer.
    Do you have more then one DBWR Process? Writing parallel can speed up things when a checkpoint is needed.
    Is it possible using a direct load? Or do you already direct load?
    Dim

  • Issue with Date showing Null in interactive report

    I created an interactive report for a customer and was confused to see blanks or more specifically dashes where there should be dates in one of the fields. I knew this field should have data so I did some testing and this is what I have found:
    The sql I am running is:
    select
    assigned_to_company,
    last_resolved_date,
    incident_id
    from
    rhpd0009_im_adherence_rpt2_vw
    When I run the command in SQL workshop I get the following results with data in the last_resolved_date field:
    [http://i83.photobucket.com/albums/j299/yogibayer/apexdateissuesqlcommand.jpg]
    I copied and pasted the SQL from SQL workshop and created a new interactive report and got the following results with no last_resolved_dates showing up:
    [http://i83.photobucket.com/albums/j299/yogibayer/apexdateissueinteractivereport.jpg]
    For some reason the order is different, but the first one INC1117629 shows up in both of them and has a last_resolved_date in SQL workshop, but not in the interactive report. Any help would be appreciated.
    Thank You
    Scott

    Varad,
    It seems to be related to the function we use to convert Remedy dates to Viewable dates. Remedy dates are stored as an integer that represents the absolute number of seconds from Jan 1, 1970 at 12:00 AM. We use a function that converts this number into a human readable date. I have tried encapsulating the result of the function in a TO_DATE and a TO_CHAR with the same results as before. There is something about the resulting data from the date convert function that Apex doesn't like. It would be interesting to isolate what exactly the issue is, but right now I'm just trying to find a work around.
    Thank You
    SCott

  • Issue with PO release (multi level approval)

    Hi,
    Need help regarding PO release. I am working with 4 level  approval process.
    Information:
    it is sequential release as I can see in workflow log, a new workflow gets generated for next level only after previous level executes the workitem.
    Facing following issue at 2nd Level :
    Level 2 releases item and it goes to Level 3, but workitem doesn’t disappear from inbox.Once Level 3 releases item, an acceptance mail goes to Level 2. But along with the mail, updated workitem (i.e. showing release by 3rd level) also appears in inbox of Level2. Now two work items appear in Level2 Inbox.
    In Workflow Log, this is how its behaving:
    WORKFLOW STARTED-->
    1st WF appears in WF log.
    Level 1 releases WI ->
    2nd workflow appears in WF log +
    1st workflow with (in process status)
    Level 2 releases WI ->
    3rd WF appears +
    2nd workflow with (in process status) +
    1st workflow with (in process status)
    Level 3 releases WI ->
    3rd WF appears +
    2nd workflow with (in process status) +
    1st workflow with (in process status)
    ISSUE: As soon as Level 3 sends back acceptance to Level 2, updated WI item appears( i.e. with latest release status which in this case is: released by level1, Level2 and Level3) along with the mail.
    Level 4 releases WI ->
    4th WF appears +
    3rd WF appears (in process status) +
    2nd workflow with (in process status) +
    1st workflow with (STATUS COMPLETED)
    ISSUE: As soon as Level 4 sends back acceptance to Level 2, updated WI item appears( i.e. with latest release status which in this case is: released by level1, Level2, Level3 and Level 4) along with the mail.
    Result:
    PO gets released.
    In workflow log 2nd, 3rd and 4th workflow appear with IN PROCESS STATUS. All of them show process stopped at LEVEL2.

    Hi Kjetil,
    Release strategy is being used. Configuration for release strategy is given as following.
    RGroup Rcode   Workflow     Agent
    Z6          R1         1                Blank
    Z6          R1             1                Blank
    Z6          R1             1                Blank
    Z6          R1             1                Blank
    Release is sequential.
    For column 'Agent' mentioning position or User is not really useful because we are getting agents through Z table. Reason is: current org structure supports 1 position with multiple users from same department. In our scenario we need to find initiators department then find relevant approval levels for that departemnt. So I cannot mention any position in 'Agent' Column as release code will be locked against one position and one departetment.
    Agents picked through Z table. Table has fields  Agent/ UserID , level, department.
    Logic to pick agents( Object and method created ): 
      When workflow starts, it finds department of the initiator.
      For that department-> find approval levels available(L1, L2,  L3).
      For these levels -> Find Agent mentioned for that level.
      Onece Agents are found for all levels -> Pass them to WF  container.
      In task activity, These agents are passed back to the rule and  the task comes to know which agent it should go to.
    Result : Four workflows start in sequence. When last level releases, only 1st workflow shows COMPLETED status. Rest three hang at level 2. If I see Me29N , release for that item is shown completed. To me it seems triggering of only first workflow is enough for release. Is there any way I can avoid trigerring of other three workflows?
    Edited by: User112 User112 on Jan 25, 2008 6:30 AM
    Edited by: User112 User112 on Jan 25, 2008 6:31 AM

  • Issue with Date and Time Picker on Windows 8.1 and Office 2013

    We are having a issue with the Developer tool in Excel called the Date and Time Picker which puts a calendar field into the spreadsheet where you can select a date from the calendar popup
    If we change this date field and then save and close and reopen it reverts back to the previous date before the change was made
    If we do the same process on a Windows 7 machine with Office 2013 it saves the changes we made to the Date and Time picker field

    Hi jdono2,
    I'm using Windows 8 and Office 2013,and I can't reproduce this issue.
    Please make sure you have already upgraded to the latest version of excel, try to reregister the MSCOMCT2.OCX.
    Also you can try to use another date picker add-in to test this issue.
    http://social.msdn.microsoft.com/Forums/office/en-US/36f83f24-cd76-4f8e-aa7b-5f166666e7d3/excel-2013-popup-calendar?forum=exceldev
    Wind Zhang
    TechNet Community Support

  • Issue with Date format - ABAP to XML

    Dear Users,
    We are currently facing an issue with the date formats in XML.
    We have a system (.Net), which has a webservice that we are calling for information from SAP. We created a Proxy class in SAP from the WSDL file and have attempted to use the method that gets us required information based on the Timestamp passed from SAP. However, the timestamp that the INPUT structure uses has a data element XSDDATETIME_Z.
    All we can send from SAP is a simple TIMESTAMP, but the .Net system doesn't accept it since it wants the timestamp in XML format i.e. <dd-mm-yyyy>T<hh:mm:ss>Z. SAP documentation says that the field should automatically do conversion from ABAP to XML format, but that doesn't happen. We don't want to build a string from Timestamp in the XML format and send it out since we might surely miss out on the different cases involved.
    Can anyone please suggest a way for us to send the date out in the required XML format?
    Many thanks!

    Hi Vijay,
    Look at the below sample code and it works fine, i guess there is something wrong in your code or conversion, post the actual code if you are still not able figure it out with the below example.
    DATA: l_xml_string TYPE string,
          l_dat_time TYPE xsddatetime_z.
    CALL FUNCTION 'CACS_DATE_GET_TIMESTAMP'
    EXPORTING
       I_DATE                         = sy-datum
       I_TIME                         = sy-uzeit
    IMPORTING
       E_TIMESTAMP                    = l_dat_time
    EXCEPTIONS
       DATE_NOT_FILLED_BUT_TIME       = 1
       DATE_HAS_NO_VALID_FORMAT       = 2
       OTHERS                         = 3.
    IF sy-subrc <> 0.
    * MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
    *         WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
    CALL TRANSFORMATION id
      SOURCE root = l_dat_time
      RESULT XML l_xml_string.
    IF sy-subrc EQ 0.
    write: l_xml_string.
    ENDIF.
    Regards,
    Chen

  • Issue with Data Load Table

    Hi All,
           i am facing issue with apex 4.2.4 ,using the  Data Load Table concept's and in this look up used the
          Where Clause option  ,it seems to be not working this where clause ,Please help me on this

    hi all,
        it looks this where clause not filter with 'N'  data ,Please help me ,how to solve this or help me on this

  • Issue with Date Format for Presentation Variables

    Hi,
    I am using dashboard prompts to capture begin date and end date in presentation variables. The dates selected from calendar are in the format mm/dd/yyyy.
    In Asnwers I need to get a count of days between begin and end dates. I am using the column formula as shown:
    TIMESTAMPDIFF(SQL_TSI_DAY, DATE '@{pBeginDate}', DATE '@{pEndDate}')
    When ever I run the report from dashboard I get the following error:
    State: HY000. Code: 10058. [NQODBC] [SQL_STATE: HY000] [nQSError: 10058] A general error has occurred. [nQSError: 46046] Datetime value 1/1/2005 does not match the specified format. (HY000)
    SQL Issued: {call NQSGetQueryColumnInfo('SELECT "Transaction Dates"."Transaction Date", TIMESTAMPDIFF(SQL_TSI_DAY, DATE ''1/1/2005'', DATE ''1/2/2006'' FROM "Dates"')}
    SQL Issued: SELECT "Transaction Dates"."Transaction Date", TIMESTAMPDIFF(SQL_TSI_DAY, DATE '1/1/2005', DATE '1/2/2006') FROM "Dates"
    Can anyone help me to reolve this date format issue?
    Thanks,
    Aravind

    Hi,
    see this below links
    Issues with Prompts calender date
    Regards
    Naresh

  • Issue with data source after deploying

    We are experiencing an issue with our data source after deployment of a cube. On the datasource properties in Visual Studio 2012, we have the max connections set to 0 before the deployment. Once the cube is deployed, I can navigate to the <name>.0.ds.xml
    file and open it and see that the <MaxActiveConnections>0</MaxActiveConnections> is indeed set to 0. At some point over the next couple days, a process of the cube or some other action causes that value to get updated to some number too large to
    be converted to an int, and makes the datasource invalid. At that point we cannot view the datasource properties in SSMS, we cannot open the cube project from Visual Studio, and we’ve even had failures when trying to process the cube.  Is there a config
    somewhere that would cause this value to get overwritten, or some other behind the scenes process that we can look at?
    Our server information is:
    Microsoft SQL Server 2012 (SP1) - 11.0.3153.0 (X64)
                    Jul 22 2014 15:26:36
                    Copyright (c) Microsoft Corporation
                    Enterprise Edition: Core-based Licensing (64-bit) on Windows NT 6.2 <X64> (Build 9200: ) (Hypervisor)
    Chad Dotzenrod SWC | TECHNOLOGY PARTNERS 1420 Kensington Road, Suite 110 Oak Brook, Illinois 60523-2144 http://www.swc.com

    Typically you would import the metadata from the source location and either use that location as the data source (and so not need to redeploy), or deploy it to a separate target location.
    The replace action is destructive as you've found, and effectively performs a drop table followed by create table. Hence any data in the table is lost.
    If you just want the Control Center Manager to correctly display that the table is deployed, try setting the action to "Upgrade". This will try to upgrade the deployed object to match the definition in OWB, but as the two are identical this will result in no changes. However, it will update the deployment records to indicate that the object is deployed.
    Nigel.

Maybe you are looking for