Hi,
We have setup DBMS_SCHEDULER Job that is supposed to run every 5 minutes.
During each execution, Complex SQL gets executed.
We found on some rare occassions, Complex SQL exceeds 5 minutes to execute.
Would like to know how Oracle Scheduler (10gR2) handles this scenario:
Let us say we started first execution at 10:00 and Complex SQL is still executing at
10:06. Have few questions:
1)
What would happen at 10:05. Will Oracle attempt to launch second instance of
that query (Frequency=5 minutes) or would it not spawn second instance since
the Job started at 10:00 is still running?
2)
Is there any possible way (or syntax) to instruct Oracle not to start second instance
when one is already running.
Any help or suggestion would be appreciated.
We are looking at improving SQL Performance, however would like to maintain Job Frequency
at 5 minutes
Thanks
user641521

I know this type of question has been asked/answered in the last year on this forum but I can't find it right now. The quick answer is
1) Oracle (by default) will not start a second instance of the Scheduler item if it is still running at 10:05. Oracle will wait for the 10:00 instance to finish before it runs the job that was scheduled at 10:05. It will wait up until 10:10 when it will then try to run the instance that is scheduled for 10:10. So this means your first instance could start at 10:00 and finish at 10:08 and then Oracle will start running the 10:05 instance at 10:08. You can limit this using the Scheduler attribute of schedule_limit. The lowest allowed value for this is 1 minute so you can set it and tell Oracle that after 1 minute of waiting on the 10:05 instance to run, give up on it and wait for the next scheduled occurrence (in your case 10:10)
2) See answer to #1.

Similar Messages

  • Background Job execution enabled via pro-active monitoring

    Hi community,
    We're interested in CPS Redwood to help us in proactive monitoring of background jobs (Ad Hoc and Periodic) and impacts in system performance.
    The idea would be to have somehow a tool that monitor the number of available working process and system performance. When the system workload reaches a certain level, ex: 95%, this tool would intercept new jobs execution. After this, when the system workload goes down and the resources are free, the system would release all jobs to normal run again.
    Is it possible via CPS Redwood?
    Is there any other way to have something automatic like this?
    Thanks,
    Jose Antonio.

    Hi Jose,
    This is possible indeed using CPS. CPS can monitor various load metrics of your system, then adapt the scheduling logic if thresholds are exceeded.
    In your scenario, you would basically always intercept all jobs, but normally not enforce any limits so effectively that means all jobs still run immediately. If the load is too high, CPS would enforce a limit, so then jobs will be delayed until the load is lower again.
    Regards,
    Anton.

  • Schedule Job Execution problem

    Hi All,
    The schedule jobs are taking more time.... to complete
    We have schdule jobs which will run for every hour,soo to execute the job sometimes it is taking 1hr and sometime 30mins
    please help me to have the Job execution total time to be constant to near 30mins.

    preethi wrote:
    Hi All,
    The schedule jobs are taking more time.... to complete
    We have schdule jobs which will run for every hour,soo to execute the job sometimes it is taking 1hr and sometime 30mins
    please help me to have the Job execution total time to be constant to near 30mins.Thread: HOW TO: Post a SQL statement tuning request - template posting
    HOW TO: Post a SQL statement tuning request - template posting

  • Sql Server Agent Job Execution

    Hi All,
    I want to run a sql agent job (one job is execution one package) in such a way that as soon as job1 completes , it should be run again (without any time loss)
    I am folowing Below approach:
    Job 1 has 2 steps , in both the steps I am calling same package to execute . After that on Success/Failure action. I am selecting the same step.it is running in an infinite loop and continue fetching data.
    is there any dis-advantages on the above approach?
    Is there any other approach to achive the Same?
    Thanks in Advance....

    Hello,
    The two-step recursive (on success) technique should be fine.  I would just recommend the introduction of short-circuit”techniques that stops a runaway job in the event of logical issues (the “on failure” action will still catch the general error issues).
    Other patterns that are sometimes used for continual-execution requirements:
    Service Broker (for example, continually watch the queue and act on new messages)
    T-SQL home-grown job that runs in a loop and then executes the job based on some condition – and would require you to check job execution state
    For a continuously running package watching for new files in a folder, one example is detailed in the following blog post:
    Continuously watching files with WMI Event Watcher Task
    Best Regards, Joe Sack, MVP, SQL MCM | SackHQ.com

  • Enable server group in BPC job execution

    Dear Experts
    [Note 1476057 - Enable server group in BPC job execution|https://websmp130.sap-ag.de/sap/bc/bsp/spn/sapnotes/index2.htm?numm=0001476057&nlang=E]
    After upgrade, the server group logic will be :
    1, Create a correct server group with server assigned,
        job will be executed in specified server group;
    2, Create a server group without server assigned,
         job will be successfully submitted to BW,
         but will not be executed until server is assigned to the server group;
    3, Incorrectly specify a server group in web admin,
         client will get error message when run package.
    As I understand the group server is defined in BW Server. Where should I specify this group server in BPC. I could not find the parameter in BPC Web Admin - Appset Parameters or BPC Server (.Net Server) - Server Options.
    Appreciate if somebody can help ?
    Thanks
    Ashish
    Edited by: Ashish Narway on Oct 14, 2010 2:55 PM

    HI John,
    The group settings in WGM SL and Leopard are different.
    Yes, they are. I booted to my eval copy of SL Server and ran through the settings in WGM, Server Admin and Server Preferences; as you pointed out, all the mail list admin tools I could find are in the Mail service in Server Admin.
    The only thing that may be of interest that I could find is that for the group mail list, the email address for the group is group_shortname@ServerDNSname, not groupshortname@yourdomain (this is in the Mail Services Admin Guide for 10.6). This might explain why your email to the group may have been rejected?
    -Doug

  • Got error in job execution, but the standalone procedure runs fine.

    I got error in job execution. But it runs fine as standalone procedure. Where could it be wrong?
    _>exec dbms_job.run(145373);
    BEGIN dbms_job.run(145373); END;
    ERROR at line 1:
    ORA-12011: execution of 1 jobs failed
    ORA-06512: at "SYS.DBMS_IJOB", line 481
    ORA-06512: at "SYS.DBMS_JOB", line 275
    ORA-06512: at line 1
    I checked the alert log file
    ORA-06550: line 1, column 101:
    PLS-00103: Encountered the symbol "RPTIMPORT" when expecting one of the following:
    := . ( @ % ;
    Thu May 2 12:59:34 2013
    Errors in file /oracle/admin/PDAMLPR1/udump/pdamlpr11_ora_15574.trc:
    ORA-12012: error on auto execute of job 146925
    ORA-06550: line 1, column 133:
    PLS-00103: Encountered the symbol "" when expecting one of the following:
    := . ( @ % ;
    The symbol ";" was substituted for "" to continue.
    The trace file:
    *** ACTION NAME:() 2013-05-02 12:43:48.261
    *** MODULE NAME:(SQL*Plus) 2013-05-02 12:43:48.261
    *** SERVICE NAME:(SYS$USERS) 2013-05-02 12:43:48.261
    *** SESSION ID:(1811.10644) 2013-05-02 12:43:48.261
    *** 2013-05-02 12:43:48.261
    ORA-12012: error on auto execute of job 145373
    ORA-06550: line 1, column 133:
    PLS-00103: Encountered the symbol "" when expecting one of the following:
    := . ( @ % ;
    The symbol ";" was substituted for "" to continue.
    *** ACTION NAME:(********* Schedule Job: Report C) 2013-05-02 12:47:58.178
    *** MODULE NAME:(PATIENT_REMEDIATE_JOB) 2013-05-02 12:47:58.178
    *** 2013-05-02 12:47:58.178
    ORA-12012: error on auto execute of job 145373
    ORA-06550: line 1, column 133:
    PLS-00103: Encountered the symbol "" when expecting one of the following:
    := . ( @ % ;
    The symbol ";" was substituted for "" to continue.
    *** 2013-05-02 12:52:43.409
    ORA-12012: error on auto execute of job 146924
    ORA-06550: line 1, column 101:
    PLS-00103: Encountered the symbol "RPTIMPORT" when expecting one of the following:
    := . ( @ % ;
    *** 2013-05-02 12:59:34.651
    ORA-12012: error on auto execute of job 146925
    ORA-06550: line 1, column 133:
    PLS-00103: Encountered the symbol "" when expecting one of the following:
    := . ( @ % ;
    The symbol ";" was substituted for "" to continue.
    ~
    ~
    The job was created as the following with 30 min interval:
    The job number: 145373
    DECLARE
    X NUMBER;
    BEGIN
    SYS.DBMS_JOB.SUBMIT
    ( job => X
    ,what => 'RPTIMPORT.pr_exec_pop_ddl21_data_irt'
    ,next_date => to_date(sysdate)
    ,interval => '/*30:Mins*/ sysdate + 30/(60*24)'
    ,no_parse => TRUE
    SYS.DBMS_OUTPUT.PUT_LINE('Job Number is: ' || to_char(x));
    END;
    Thanks for help!

    the issue is resolved. I missed to put ";" at end of what statement. Thank all.

  • Last one month jobs execution time in sql server 2008 r2

    Dear Friends,
    We configured replication between three servers two are publishers and one subscriber for two publisher.
    my question is daily basis one job running on subscriber end it truncate and insert the data every night .
    unfortunately today job was failed I observed in jobs view history. but client requirement manually run the job and data dump into the table. but I want know its previous execution time as per that I will run the job in production hours but in jobs view
    history showing only today's fail job history. how to find the last execution time .
    note: yesterday job was successfully completed.
    Message
    Executed as user: NT AUTHORITY\SYSTEM. Cannot initialize the data source object of OLE DB provider "SQLNCLI10" for linked server "server name". [SQLSTATE 42000] (Error 7303)  OLE DB provider "SQLNCLI10" for linked
    server "server name" returned message "Unable to complete login process due to delay in opening server connection". [SQLSTATE 01000] (Error 7412).  The step failed.
    mastanvali shaik

    But what about to that particular job ? what is the name of the job ? Please assign that job name in the below script and check .. Its sure that history is not exist for that particular job anyway for your confirmation please use the below scripts and try...
     make sure to add the name .. when was the last backup taken for your system databases ?
    WHERE    JOB.name = 'Your JobName'  -- Add your job name..
    SELECT      [JobName]   = JOB.name,
                [Step]      = HIST.step_id,
                [StepName]  = HIST.step_name,
                [Message]   = HIST.message,
                [Status]    = CASE WHEN HIST.run_status = 0 THEN 'Failed'
                WHEN HIST.run_status = 1 THEN 'Succeeded'
                WHEN HIST.run_status = 2 THEN 'Retry'
                WHEN HIST.run_status = 3 THEN 'Canceled'
                END,
                [RunDate]   = HIST.run_date,
                [RunTime]   = HIST.run_time,
                [Duration]  = HIST.run_duration
    FROM        sysjobs JOB
    INNER JOIN  sysjobhistory HIST ON HIST.job_id = JOB.job_id
    WHERE    JOB.name = 'Your JobName'
    ORDER BY    HIST.run_date, HIST.run_time
    Raju Rasagounder Sr MSSQL DBA

  • JOB execution fails due to Access failure to procedures and views using certificates (encryption)

    Job execution fails using SQLServerAgent account but runs successfully under another windows personal account.
    Both have same security access on server and DB.
    The Windows account is mapped to dbo on the database .
    The package uses procedures and views which are using encryption by certificates.
    Please advice on how to provide security so that job runs from the agent

    Hi Prady26,
    If the SQL Server Agent Service account and the proxy account generated based on a Windows user account have the same permissions on both the SQL Server database and the File System of the server, it may be related to the protection level of the package.
    If the package is set to encrypt with UserKey, the job will fail unless it runs under the security context of the Windows user that designs the package in BIDS/SSDT. You can check the
    ProtectionLevel of the package in the BIDS/SSDT to see if it is EncryptSensitiveWithUserKey or EncryptAllWithUserKey, if it is, re-deploy/reinstall the package and set the package protection
    level to “Relay on server storage for encryption”.
    If the issue persists, post the error message in the job history for further analysis.
    Regards,
    Mike Yin
    If you have any feedback on our support, please click
    here
    Mike Yin
    TechNet Community Support

  • Find aging of concurrent jobs execution for last one year in R12

    DB:11.2.0.3.0
    EBS: 12.1.3
    O/S: Red Hat Linux
    Hi all,
    Could anyone please share the resolution for the below question in R12 ?
    1)      Considering only 3 weeks of data is maintained in FND tables, which means we cannot use fnd_concurrent_requests to get list of jobs submitted in last one year. Is there any other way what we can get to find out aging of jobs execution for last one year?
    Thanks for your time!
    Regards,

    Locking this thread - Pl continue the discussion in your original post - Identifying customizations in R12
    Unless you have backups of the deleted data, this is not possible

  • Job name and Job frequency

    Hi All,
    Can any one help me out in finding the Job name and Job frequency.
    I wanted to know the Job name and Job frequency for eash & every message type specified in particular Partner Type in we20.
    For example:
    Let suppose my partner profile name is some country name like 'INDIA'.Ok. For Partner Name 'INDIA" we have some message type, message variant as Outbound and Inbound Parameters.
    Now,there might be some Job running on background to process these message type.
    I want the exact name of the Job Name and Its frequency.
    Thanks

    Hey
    Please ask the function people what is the business logic they have configured.usually we activate change pointers for any IDOC and as soon as any changes are made for that IDOC,it is triggered.the functional person will tell you at what stage they are posting this IDOC.
    RBDMIDOC is the report which is used for creating IDOC's based upon the change pointers.but there are other ways too in which IDOC's can be triggered,so you would be better off asking the function person.
    Thanx
    Aamir

  • Error on 11g 2 during external job execution using credential

    Hi,
    I need a help from you.
    I am getting below error on 11g 2 during external job execution using credentials -
    EXTERNAL_LOG_ID="job_805812_412409",
    ORA-27369: job of type EXECUTABLE failed with exit code: Arg list too long
    STANDARD_ERROR="Launching external job failed: Invalid username or password"
    Find credentials creation & other required details -
    EXECUTE DBMS_SCHEDULER.create_credential(credential_name =>'SYS.SCRIPTS',username =>'scripts',password => 'u5342222');
    BEGIN
    DBMS_SCHEDULER.CREATE_JOB(
    job_name => 'AUTOLOAD_JOB',
    job_type => 'EXECUTABLE',
    job_action => '/qpshell/dev/scripts/autoload.sh',
    repeat_interval => 'freq=MINUTELY;interval=5;byhour=1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,18,19,20,21,22;',
    enabled => true,
    auto_drop => false,
    credential_name => 'SYS.SCRIPTS');
    end;
    -rw-r--r-- 1 root oinstall 1571 Nov 11 14:42 /u01/app/oracle/product/11.2.0/dbhome_1/rdbms/admin/externaljob.ora
    content of externaljob.ora -
    run_user = nobody
    run_group = nobody
    run_user=scripts
    run_group=qvcscript
    -rwsr-x--- 1 root oinstall 3068424 Nov 11 13:13 extjob
    -rwxr-xr-x 1 oracle oinstall 3068424 Nov 11 13:13 extjobo
    root@knudwdbs2:/u01/app/oracle/product/11.2.0/dbhome_1/bin> ls -ltr extjob*
    -rwx------ 1 oracle oinstall 3068424 Nov 11 12:45 extjoboO
    -rwsr-x--- 1 root oinstall 3068424 Nov 11 12:45 extjobO
    -rwxr-xr-x 1 oracle oinstall 3068424 Nov 11 13:13 extjobo
    -rwsr-x--- 1 root oinstall 3068424 Nov 11 13:13 extjob
    Kindly suggest how it can be fixed. Early response much appreciated.
    Thanks
    Ajay
    --

    Hi,
    When you are logged in to the OS, can you do an "su" to the "scripts" user using this exact password (passwords are case-sensitive) ?
    Also make sure that you have libpam.so located somewhere in $LD_LIBRARY_PATH and that it points to a real file.
    external jobs with credentials use jssu, but I don't think permissions on jssu are the problem here (it should be setuid to root).
    Hope this helps,
    Ravi.

  • Job executions lost in EM Grid Control

    Hello,
    We have lost all executions from the job execution pane except the backup jobs. We have lost also all scheduled jobs. Any idea about ?
    Thanks,
    Manuel.

    Did you create the email Notification Schedule?

  • How to suspend (all) job execution ?

    Can I define jobs but suspend their execution (until I enable job execution again) ?
    If yes, how do I suspend them ?

    Hi,
    You can visit here:
    http://download-uk.oracle.com/docs/cd/B19306_01/server.102/b14231/scheduse.htm#i1009724
    and also visit here:
    http://download-uk.oracle.com/docs/cd/B19306_01/server.102/b14231/scheduse.htm#i1009725
    Adith

  • Is there a way to generate job execution scripts from the command line?

    The customer is planning to change DI production server configuraiton and needs to regenerate job execution scripts for hundreds of jobs. Their question is - instead of going through web admin and doing it one by one, is there a way to run a batch command and generate all jobs with the same job server information from one repository? I looked at the "al_engine" command but didn't find the options to do so. Did I miss something? This is for a DI 11.5.3 on HPUX.
    Thanks,
    Larry

    I also suggested that but the customer was so afraid of messing things up that they wanted to find out if there is another way. Thanks a lot for the confirmation.
    Larry

  • Notification Email/Alert - Including Job execution details(step output)

    Hi,
    I am using Oracle 10g R2 GRID Control on Windows. I would like to add the execution details to the default notification (Long)emails. Is there any possibility without adding any code in current version or later version to include step output(failed/Passed details)?
    Thaks for your help.

    I am already getting notification email/alert with just status failed/succeded. But I want to include the step output(job execution details) to that default email given by Oracle. I could write PL/SQL block to manipulate this,but looking for default way to include these details in any version?

Maybe you are looking for

  • Dropped sales order report from SAP

    Team, There is a specific requirement regarding sales order..to analyze the  dropped /undelivered order for a period. Currently we are entering only those sales orders in the system which can be shipped/delivered to customer..all those SOs which can'

  • Is there a way of using the ProRes codec.

    Hi, in our working setup we have a copy of FC studio, and FCE (both current versions). Sadly FCE is the one on my machine, and I have been struggling with the Intermediate Codec not handling the quality that Quicktime can handle and play, with the fi

  • No Output after Migrating to 6i

    Hi I am migrating a report from 3.0 to 6i (6.0.8.20.1). When I now start the report at the default printer (Canon BCJ-8500) with tray = 'manual tray' ans destype = 'printer' the printer feeds the paper without printing something through the printer.

  • Can I remap the EJECT key as say Shift+Eject?

    I keep hitting my eject button when I type fast. Is there anyway I can remap the key as something other than just pushing the EJECT key? I looked in Keyboard etc in Prefs, but nothing.

  • Palm HotSync manager includes outlook conduits?

    I'm assuming that the newest versions of palm desktop and hotsync manager that are available to download already include the Palm Outlook Conduits? I distinctly remember in previous versions the huge caution statement saying that they were only avail