KKF6N - Cost estimate on cost collector

When I cost a product cost collector with MF30 or KKF6N, the BOM of the finished product is not exploded as if all the components were raw material or the BOM was monolevel - despite the BOM is multilevel. I don't understand why...
Thanks for your help

In the same time i found OSS note 717592
The system response in the preliminary costing of a product cost collector
is different from the previous behavior in releases as of Release 40B . Up
to and including Release 40B, assemblies were broken down and costed
further. The cost estimate was created in multiple levels. In the following
releases, the system does no longer break down the incoming components and
carries out a material valuation.
This system response is correct. However, you can check whether you can set
up again the prior behavior with a modification. In this case, contact the
Remote Consulting.
Christophe Le Bail

Similar Messages

  • COPA cost estimate from costing for COGS

    Hi,
    we are using sales order costing (variant config), discrete(Prdn Order) and repitative (Cost collectors) in production costing.
    Need to update COGS under COPA based on cost component structure using mat cost estimate. All mat uses mat type as ZINE for all cases.
    There is separate costing variant for sales order and others. created 2 costing key in COPA and costing key 001 that is sales order costing to mat type ZINE. and assigned valuation class in next step so that discrete and repitative can get captured.
    But it resulted in error during billing as system could not find sales order costing for discrete material.  So i assgned costing 2 with discrete and repitatve  costing variant to mat type ZINE aftter sales order costing variant.
    Error got resolved but cost component split happens for sales order costing only and not for others. Please advice and also note that it is not possible to add material type or change valuation class due to complexity.
    Regards,
    Atu

    Hi Paul
    What is your purpose?
    1. If you just want to fetch the material cost estimate (std cost) in COPA, then what you are doing is not correct...For this,
    a. KE4U - Valuation Strategy 001 - (DETAILS Tab) assign 001 to Qty Field ABSMG and tick "Mat Cstng" indicator
    b. KE4U - (Assignment Tab) Assign 001 to PV=01 and Record Type = F
    c. Create a Costing key in KE40
    d. Assign Costing key to mat types in KE4J or KEPC
    e. Assign Cost Comp Split to Value Field in KE4R
    2. Costing sheet in COPA is used for doing some calculations during billing and updating the same to COPA... For eg: you want to add 2% of your Std cost as Freight to COPA (Statistical value)... This can be done using Costing sheet...
    In order to use Costing sheet in COPA,
    a. Create a Costing sheet - (You already did this)
    b. KE4U - Val Strategy 001 - (DETAILS Tab)  Against Valuation Strategy 001 - Assign this costing sheet against "Application = KE"  and Qty Field = ABSMG.. Do not check "Mat Cstng" against this indicator..
    So, if you want to use Costing sheet in COPA, your KE4U may have 2 entries under the "DETAILS" tab..
    (1) As per 1.a and 1.b above
    (2) As per 2.b above
    Regards
    Ajay M

  • COPA cost estimate using costing sheet

    Dear Experts,
    I have done the relevant copa configuration related to Material cost estimate using costing sheet. I have maintained all the condition type required in the costing sheet.
    Can anyone plese help me out with the Transction code which I should run to do the material cost estomate using costinbg sheet. And also how I can link the estimated material cost in my Profitability analysis report.
    Thank you
    Regards
    Paul
    Edited by: Paul01 on Dec 20, 2010 1:31 AM

    Hi Paul
    What is your purpose?
    1. If you just want to fetch the material cost estimate (std cost) in COPA, then what you are doing is not correct...For this,
    a. KE4U - Valuation Strategy 001 - (DETAILS Tab) assign 001 to Qty Field ABSMG and tick "Mat Cstng" indicator
    b. KE4U - (Assignment Tab) Assign 001 to PV=01 and Record Type = F
    c. Create a Costing key in KE40
    d. Assign Costing key to mat types in KE4J or KEPC
    e. Assign Cost Comp Split to Value Field in KE4R
    2. Costing sheet in COPA is used for doing some calculations during billing and updating the same to COPA... For eg: you want to add 2% of your Std cost as Freight to COPA (Statistical value)... This can be done using Costing sheet...
    In order to use Costing sheet in COPA,
    a. Create a Costing sheet - (You already did this)
    b. KE4U - Val Strategy 001 - (DETAILS Tab)  Against Valuation Strategy 001 - Assign this costing sheet against "Application = KE"  and Qty Field = ABSMG.. Do not check "Mat Cstng" against this indicator..
    So, if you want to use Costing sheet in COPA, your KE4U may have 2 entries under the "DETAILS" tab..
    (1) As per 1.a and 1.b above
    (2) As per 2.b above
    Regards
    Ajay M

  • In standard cost estimate the cost of alternative items flowing in full

    Hi,
    when i calculate the standard cost estimate in repetitiv manufacturing the
    complete cost of all alternative items in alternative group is flowing  to it.
    how to restrict  it
       thanks in advance
    regards
    madan

    Solution
    1. make one of the materail in BOM, as not releavent to costing....depeding on which alternative is better to get the correct std cost
    2. Use stargergy 1 usage probnability may be 50% and 50% for alternatives...depending on usage of that material.

  • Primary cost estimate/ stad. cost estimate

    Hi gurus,
    Please advise in REM, what is the difference between std cost estimate and preliminary cost estimate. when we should go for preliminary cost estimate and in which scenario should we go for std? please advise.

    Hi
    To make things simple, please note the below difference.
    Standard cost estimate: -
    If you select this in REM profile, then if u make any changes in routing or BOM which could have impact in material cost, then the costing run and updating the assembly with new cost is mandatory beofre MFBF could be done.
    Preliminary cost estimate: -
    Here once Preliminary cost estimate is done then the back flush could be done with preliminary cost and costing run is not mandatory.
    The scenario depends on situation where company does chnages in routing or BOM frequently but it has no or negligible impact in final costing of material.

  • How to get report for cost estimates material cost only

    Hi Gurus,
    We have requirement in sales order costing that we need to develope report which shows only Material cost for all BOM levels.
    Normally at lower levels cost of Material and activity cost will be treated as Material cost for next level. Here I want to consider only material cost not activity cost at lower levels
    Pls suggest the logic and tables for exploding BOM and fetching material cost only.
    Thanks
    Sneha

    Sneha
    If you tick the "Roll up" indicatorfor each cost component  in Cost Comp Str OKTZ, then overheads do  not get added to the material cost... This is my understanding about it.. Is it behaving some thing different in your case??
    br, Ajay M

  • Backflush with Prel cost estimate still considering standard cost estimate

    Hi,
    Trying to do back flush with Prel cost estimate . Flagged in REM profile " Post Activities " / Using Data from Preliminary Costing".
    However,  FG rate is considred as per standard cost estimate and not as per preliminary cost estimate.
    Kindly advise whether any other specific setting is needed.
    Regards,
    Mrinal

    HI
    check these links:
    standard / preliminary cost estimate
    Significance of Preliminary cost estimate,
    preliminary cost estimate for product cost collector
    Hope it clarifies.
    Regards
    Anupam Sharma

  • Report for Cost Estimate

    Hi,
    Our client require a report for Planned Cost Estimate, where costing run will be on FG product and Client want Activity Hours and Cost for that FG product.
    (for all the FG products we have multilevel BOM and Routing hence, Activity Hours are maintained at assembly level).
    Regards,

    As far as I know there is no report that gets you data for multiple materials at a time. You have to develop a Z report for this.
    Logic is you have to go to KEKO and pick up the cost estimate and date for the particular material
    and then go to KEPH table and pick up all the cost components for that material.
    Then only you will have a report sapnning across multiple materials.
    Revert back if you need more info.
    Thanks
    Naveen

  • Valuation using material cost estimate

    Ciao a tutti,
    We have create a material cost
    estimate without standard structure(unit costing) not FOR ALL MATERIALS, but only for ONE
    VARIANT of generic material (retail solution) (because the other variant have the same price, and because we have to reproduced 5000 BOM in unit cost for just
    one variant with transaction KKPA LSMW)
    So, now we have to valuated the material cost estimate when the customer create the billing document and put the split of the cost estimate in co-pa
    Our prolem is : we have calculate standard cost estimate for 5000
    variant not for all variant (because our customer crete the BOM in unit
    costing with transaction KKPA and LSMW, and they refuced the idea to
    calculate 30000 cost estimate with lsmw) so when we crete a billing
    document with a variant that haven't cost estimate created the system doesn't
    valuated the cost estimate (the system works well), but how I can change the variant in the valuation and put the variant that have the cost
    estimate calculate?
    Wiht the transaction "Assign Costing Keys to Any Characteristics" I think
    is not possible.
    I must to use enhance COPA0002?
    Thank you very much
    Paolo Artini
    tel: +393299223804

    Hi All,
    I am also facing the problem for Sales Order Cost Estimate. and the Costing Status is VO(Marked without errors).
    I have done the following
    created the Costing Key (sales order cost estimate)
    assigned costing key to the material type.
    assigned to the respective value fields
    sales order cost estimate,
    Run the RA
    Settlement done.
    But in COPA, cost estimates are not being split up based on the cost component (like Material, Labour and Over head) and it is getting posted to COGS only.
    Do we need to change the costing status to FR, if yes, but how to do ?
    Regards
    Ramesh KR
    +91 9884020411

  • Cost center doubt in Itemization of Material Cost Estimate

    Hi,
    I have one doubt. I creating a material cost estimate of a header material.A new overhead rate ZCDD has been maintained in the costing sheet. An existing crdit key ZC9 has been assigned to the overhead rate ZCDD. The cost element and cost center row has been added in the credit key.
    When I run the material cost estimate, the cost element it is coming, but the cost center it is picking is not the one which has been maintained in the credit key.
    Can you please clarify my doubt, I am stuck up on this. Please let me know if you need any more information roe clarifications.
    Thank you very much.
    Prithwiraj.

    Hi Rau,
    Thanks for the reply.
    Can u tell me, is it mandatory to have only one to one Cost Center-Cost element mapping in a Credit Key?
    I mean to say is it like that we can assign a cost element of a credit key only to one cost center?
    Thanks,
    Prithwiraj.

  • Valuation with material cost estimate: error with product "117122"

    Hi people,
    We have the error:
    =====================
    Valuation with material cost estimate: error with product "117122"
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "117122" in plant "UBE1".
    We have the follow configuration in trans.: KE40:
    . Determine material cost estimate
       . Transf. Standard Cost Estimate
    . Costing Variant
    . Control Data for Standard Cost Estimate
       . Period Indicator = "Current Standard Cost Estimate acc. to entry in mat master
    . Addiitonal data CO-PC
        . Transfer cost estimate in controlling area currency  "activated"
    We think the reason about our error is because the field above is activated and some configuration more is necessary for this case. For examplo: Trans.: OKYW and this one was not configurated yet.
    Do you know what happend?
    If we need to configure some transation, or sonly process the cost estimate?
    Thanks,
    Rosana.

    Hello Guido
    Thank you very much for your return.
    It is happenning in a Client that some people are doing the configuration.
    Before we didin't have in KE40, the fiel "Transfer cost estimate in controlling area currency" activated.
    And now, the people activate that in this new Client and I don't know the impact about that.
    I think we have to make the configuration in OKYW.
    The other transation you told me, we don't have any information.
    Could you tell me some other idea what happend?
    Message error is just "Message no. KE350"
    Abou claculate the cost:
    It was calculated by trans.: CK11N for future planning and the real wasn't not possible to release because this material already have moviments.
    Could you tell us is there is some thing more to do?
    Thanks,
    Rosana.

  • Valuation with material cost estimate: error with product " 200038 "

    Hi,
    I am getting an error:
    Valuation with material cost estimate: error with product " 200038 "  (Message KE350).
    Kindly assist on the same?

    If this material is mto material go to t.code KE40 and maintain define access to standard cost estimate define cost key with
    "Transfer sales orde cost estimatex".
    If it is mts material define costing key with Transfer std cost estimate  and in costing data
    costing variant : ppc1
    costing verstion: 1
    period  indicator:  Release std cost estimate matching with goods issue or material costing matching posting date.
    This will resolve ur problem.

  • Material Cost Estimates

    HI GURUS
    Product A Details
    Material type = ZXXX ( customized ) ,  Plant = 1500
    Bom Componet =  G & H     ( where product G is non - valuated  , no costing view maintained with material type = Z111, while H is valuated product )
    Production type =   PP-PI
    Product B Details
    Material type = ZYYY ( customized ) ,  Plant = 2000
    Bom Componet =   k & s     ( where product k is non - valuated , no costing view maintained , with material type = Z111 while S is valuated product )
    Production type =   Repetitive Manufacturing
    we are already Creating  material cost estimates for material  A. through  ( Ck11N ) successfully . with a Costing varient = ZC11 .
    also while creating cost estimates , in costing structure ( explorer ) ,  Non-valuated material G is not being shown there.
    But when we create cost estimate for for material B throgh CK11N . with costing varient ZC11. it gives error
    " No price could be determined for material \ batch  K / plant 2000.   Non-valuated material K is shown in costing structure.
    How we can restrict the Non-valuated material not being showing in costing structure in case of  B material. as it is being happen in case of material A.
    thanks \ thomas

    Check the BOM for material A   -   product G on status/long text tab shows as "not relevant to cost"  (this is why it doesn't show in the CK11n cost report
    Check the BOM for material B - product K - is it checked "on" for relevant to cost? - if so remeove the check
    Althea

  • Cost estimate/costing run

    Hi
    What is the difference between cost estimate and costing run?
    Thanks,
    Nivi

    Hello Ram,
    There are 3 steps in Costing Procedure. They are
    1. Creation of cost estimate
    2. Marking of cost estimate
    3. Release  of cost estimate
    Once you release cost estimate, then only system will update the required fields in the database and can be used for transactions.
    Hence, cost estimate means, it is just estimated total cost of the product and Costing Run means which inclusive of all the above three steps to complete the total process.
    Please let me know if you require any further clarifications.
    Thank you,
    Regards,
    Santosh
    Reward points if helpful.

  • CK24 Cost Estimate Release Log wrong message variables returned.

    We are testing our upgrade to ECC 6.04 from 4.7.   I've created a cost estimate via CK11N.  I then use CK24 to mark and release the cost estimate.  At the completion of the release, a log is returned with the correct price change document and the correct number of materials and cost estimates updated.  I then select the green arrow to go back a screen.  It then shows an ALV grid with the new cost estimate std cost, price unit, and price change document.  If I select the log icon from this screen, it shows me a price change document that is several months old and the associated number of materials and cost estimates updated.  If I go back to CK24 screen and select log, it also will return this several month old document.  Has anyone else experienced this inconsistancy and know how to resolve?

    Seems like a system issue where the document though generated as not been updated. Looks like upgradation related issue.
    BR / SG

Maybe you are looking for

  • Can't update IPhoto because application not found?

    I have had the latest iPhoto until yesterday when I did something dumb? then I couldn't open iPhoto anymore. I did create a new library, but discovered that the version of iPhoto I can now open is only a 2. Whenever I try to update to iPhoto 5 or 6,

  • How to enable copy and paste in Firefox

    I have tried over and over and over and I CANNOT FOR THE LIFE OF ME figure out how to configure Firefox to allow me to copy and paste. I've downloaded EVER SINGLE EXTENSION YOU HAVE and some I found online!!!! HOW DO I COPY AND PASTE??? And please do

  • -Xmx JVM parameter is not working as defined

    Hello, I am running BEA with Tomcat servlet engine & i have set the -Xmx setting to 1.2GB & the application data footprint is 700MB. But the weird thing is that as the application starts up & as it starts loading data into memory & grows the max sett

  • IPhone 3GS shuts down randomly when SIM card is in

    without SIM card it works properly! I have updated to iOS 5.0.1, also got a new SIM card from our provider, without results. iPhone shuts down and reboots every 5 minutes when SIM is in. Does anyone has the same problem? What can I do besides sending

  • Getting this DeadLock Error...Hava look friends

    java.sql.SQLException: [IBM][SQLServer JDBC Driver][SQLServer]Transaction (Process ID 53) was deadlocked on {lock} resources with another process and has been chosen as the deadlock victim. Rerun the transaction. I am getting this error in my Applica