Link between PO and Inbound Delivery -  Delivery confirmation

Hi Gurus,
I have a question regarding the link of Purchase Order and Inbound delivery completed indicator.
This is my scenario. I had created a purhase order with qty 10, then i created a Inbound delivery with 8 qty then i did GR with reference to inbound delivery. Then looking at the purchase order , the PO is set to Delv. Completed. Looking also in the doc flow of the inbound delivery, the status is "complete".
Now , my question, if i go to VL31N and input the purchase order , i am still able to see the open qty which is "2". Is there is no way that the SAP will prompt me after i input the PO number in the VL31n as " Delivery completed" message or someting related to that. Since , in the PO its already Delv. completed?
Thanks.

Check the toleance limits set in the delivery tab of purchase order. If the quanytity delivered is with in tolerance limits then system will set delivery completed indicator automatically.
Even though delivery completed indicator set you can further post the GR for remaining qty.
Regards,
B K

Similar Messages

  • Link between Item and delivery

    Hi ,
    I want to know the link between item and deliveyr. Like for example, an sales order item ( no. 10) containing 10 quantities can be delviered 5 times( each containing 2 quantities) and line item ( no. 20) can contain one single delivery. I am working on a report where i have to link all the line item to its delivery number. I am trying to achieve this through GENIl but i am not able to indetify as to how to differentiate the different deliveyr numbers. In other words, can some one help me as to how to link the delivery number to its corresponding items?

    Document flow is stored in the table VBFA in ECC.
    VBELV fied is the sales order number and in POSNV specify the line item number and speicfy VBTYP_N = J (Delivery).
    Regards,
    Bhanu

  • Is there any Link between BNK_MONI and DMEE

    Hi ,
    I have created EXIT Fucntion Module in DMEE Structure for PAYM Tree Type to udpate value of Reference Text node to show Custom value. Stand alone DMEE works fine for Testng purpose. But It does not work with BNK_MONI .
    I am running following sequence of T Codes :
    RVND --> F8REL --> F111 --> BNK_APP --> BNK_MONI ..
    I want to update one of the fields in output file generated by BNK_MONI .
    Is there any link between BNK_MODI and DMEE ?
    Or shall  I have to Debug background job created by F111 like it is done in case of F110 ?
    Please suggest..
    Edited by: Yogesh Gupte on Jan 27, 2012 6:59 PM

    Hi,
    Deliveries that are created without reference to order , contained movement type because to process a delivery you need to have some of the control criteria that are copied from sales document header to delivery document header, as system processes delivery in that way ,that is why you will find default order type is assigned to the delivery document type ie DL. .which helps the delivery document to process without reference to sales document.
    In Addition to above information,
    In VOV4,
    DL+ NORM +   +    -DLN
    In VOV5,
    For Itemcatagory DLN+        --CN
    From this schedule line category CN,movement type 601 is taken during without reference to order –delivery creation.
    MCM

  • Link between vbap and vbrk

    hi folks
    whatt's the link between vbap and vbrk table.
    gaurav

    Hi Gaurav
    VBAP is Sales document item detail table and VBRK is Billing header data table.
    VBRK is linked to VBRP by VBELN (i.e. VBAP-VBELN = VBRK-VBELN).
    VBRP is linked to LIPS(SD document: Delivery: Item data)by
    VBRP-VGBEL = LIPS-VBELN.
    VBRP-VGPOS = LIPS-POSNR.
    And LIPS is linked to VBAP by
    LIPS-VGBEL = VBAP-VBELN.
    LIPS-VGPOS =VBAP-POSNR.
    the flow of the SD tables is like after creation of the sales document the header details of the document is filled in VBAK.THe item details of the sales document is stored in VBAP.After creation of the delivery the delivery documnet number is updated in the LIPS table and than if the INVOICE for the particular delivery is done than the BILLING document is generated the details of which can be looked in VBRK.

  • Broken Link between Base and Target document in 'Copy To' option

    Hi Folks,
    One of our client has been facing a peculiar issue. When the 'Copy To'  function is used to Copy document from Sales Order to Delivery and recently one instance of 'Copy To' from Delivery to A/R Invoice ,the base document got copied to the target document in each case but there was no trace of any Base Ref. left in the Target document( either in row level or Remarks), thereby the link between the Base and Target document got broken.The Base document remains with status as open.The same base document when tried again to 'Copy To', it creates the link between Base and new Target document.
    This instance had occurred recently 3- 4 times in a span of 3 months or so. In normal circumstance this never happens. The client is pretty sure they have used 'Copy To' option to copy the document from Base to Target.
    Any hints or possible reasons if one can highlight would be appreciable.
    The current version used is SAP B1 8.82 PL11 and it was upgraded more than a year back.
    Regards,
    Bharath

    Hi,
    All the data in Sales Order and Delivery are matching one to one in terms of row details,
    and Document header level.
    The missing data was Base Ref. data and Del.Date didn't get copied from base to target as shown in screen shot.
    Also i have checked it earlier regarding change of target document row details like changing item, but this will only remove the link of that particular row and remaining row link remains intact, but in this case there are many items and it doesn't seem user will have changed in all the rows.
    Regards,
    Bharath

  • Link between AP and GL main tables in 11i

    Hello,
    Can anyone please provide the link between AP and GL main tables.
    I need a join between the AP_Invoices_All, AP_INVOICE_DISTRIBUTIONS_ALL, GL_JE_LINES, GL_JE_HEADERS.
    Actually, I found a query that is as below. I want to confirm if that is correct. I need to confirm if the right joins are necessary and are placed correctly.
    Thank you
    select *
    from gl_je_headers gjh,
    gl_je_lines gjl,
    ap_invoices_all aia,
    po_vendors pv,
    ap_invoice_distributions_all aida
    where gjh.je_header_id = gjl.je_header_id
    and aida.invoice_id(+) = gjl.reference_2
    and aida.distribution_line_number(+) = gjl.reference_3
    and aida.invoice_id = aia.invoice_id(+)
    and gjh.je_source = 'Payables'
    --and gjh.je_category = 'Purchase Invoices'                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               

    Hello,
    Any help.
    I have also found out that, in 11i, the Reference_2 column in the GL_JE_Lines table has the invoice_ID in it.
    So, does that mean that we can join the GL tables and the AP Invoice tables using this condition. I dont know if that is right. Please help
    select * from
    ap_invoices_all aia, gl_je_lines gjl
    where aia.invoice_id = gjl.reference_2

  • Link between sd and pp

    hi all,
      i have a problem regarding relation or link between sales and production order. i have to fetch production order number related to sales order number. i have checked in the table AFPO that is production order item table , there is field AFPO-KDAUF and AFPO-KDPOS ie, sales order and sales item. but when i see these two fields there is no data into the field so how can i get data into the table related to production order.can anyone help me on this issue.

    Please refer to the below links -
    https://forums.sdn.sap.com/post!reply.jspa?threadID=309885
    Integration points with MM/IM and PP are some of the following -
    When a Production order is created and released a reservation gets created for the materials in BOM
    When the reservation is created and materials are posted against the reservation with mvt type 311 these are transferred to the respective location.
    When a GR is posted with mvt type 101, the Finished or Semifinished goods are posted to the respective storage location and inventorized.
    When a consumption is posted with mvt type 261 then stock will get reduced in resepective storage location.
    When a batch determination is done in a production order basing on the batch search strategy and sort rule material, quantity and batch are selected.
    If WM is configured an associated internal movement for all the above movement types will be posted.
    During MRP, BOM which is a master data for PP is used to calculate the dependent requirements of materials.
    During availabilty check of a production order basing on the availability check configured materials will be selected and checked.
    Hope the above may help you.

  • 'Is there a link between OLM and iProcurement'

    I have been asked 'Is there a link between OLM and iProcurement'? The person posing the question is wanting to create trainers as suppliers and I know that the supplier information is shared between OLM and the A/P, A/R and G/L modules and I presume that the link to iProcurement will be via one of these modules however is there a more direct vanilla link between OLM and iprocurement?
    Any help would be great
    Thanks
    DM

    I am afraid there is no link between the iProc and OLM.
    The closest that apps can offer you is that your learner/delegates can be of type external i.e. being an Organization or a Customer. Hence there exists a link for your delegate to be a customer(hz_parties).
    However this might be a future integration i.e. Trainers being suppliers. I am saying so because in 11.5.10 there is a table named OTA_VENDOR_SUPPLIES that has reference to vendor_id. Currently this table is not being used by OLM.
    You may look into the code of packages OTA_VSP_API, OTA_TEA_BUS & OTA_PLE_BUS and see if Oracle's future functionality will converge towards your business requirement.
    Thanks,
    Anil Passi
    http://oracle.anilpassi.com

  • Link between Project and Sales Order

    Apart from sales order can we have a link between project and customer master ??
    I know that WBS element assignment can be made in sales order but i want to have link between
    customer master and project. I don't want any user field or text field in sales order.
    Any idea ?
    Regards
    Ashish

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • Link between GTM and FSCM (sales or purchase order hedging)

    Hi all,
    I am trying for a few days to have SAP GTM working (I am in an IDES ECC6 system, and as far as I know in EhP4 version). The main goal in fact is to test the currency hedging, and therefore to the link GTM and FSCM, either single-sided purchase or sales order, or two-sided . The flow I want is the following :
    -     I buy or sell a product, in GTM, through a trading contract which generates a purchase or sales order.
    -     Automatically a currency hedge is generated to cover the risk, in FSCM, I guess in exposure management.
    -     And then the financial products (derivatives) are generated as well.
    No problem to create the trading contract, no problem to generate the sales or purchase order. But in spite of the (very little) customizing I found in u201CSAP GTM => currency hedgesu201D, and some in FSCM, in u201Ctreasury and risk managementu201D, no way to have this link between GTM and FSCM, no additional document is generated like a Forward Exchange Transaction (I guess I should have this, and then a risk exposure in FSCM).
    Would you have an idea ? Is this customizing, or an additional Business Functions or Extension Set not activated ? SAP says : u201Cit worksu201D, but canu2019t find the way.
    Thank you very much for your help, I am quite looking for this link for a few days now u2026
    Best regards
    Patrick

    Yes Mr Ashish!
    As far as iam concern there is no link between Project & Customer Master, you have to link it with SALES order, I had check in XD03,XD01, the complete customer master, i didnt find any field in customer master which links with Project.
    I'll let you know if i find any links.
    Regards,
    ANSAR

  • What is the link between PO and Requisition in database side

    hello friends,
    please can any one tell me that what is the link between PO and Requisition in database side. means after creating the requisition we will go for create the PO based on that requisition.
    want to know that what is the link between both in database side.
    Thanks in advance
    krish.

    Hi,
    The link is at distribution level, between:
    PO_DISTRIBUTIONS_ALL.REQ_DISTRIBUTION_ID
    and
    PO_REQ_DISTRIBUTIONS_ALL.DISTRIBUTION_ID
    Hope it helps.

  • Link Between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL

    Guys,
    I am new to Oracle Financials, can you please let me know if my understanding of link between AP_INVOICE_PAYMENTS_ALL and AP_PAYMENT_SCHEDULES_ALL is correct or not?
    SELECT ai.invoice_id
    , ai.invoice_num
    , aps.due_date
    , aip.accounting_date
    , aip.amount, aip.payment_num
    FROM ap_invoices_all ai
    , ap_invoice_payments_all aip
    , ap_payment_schedules_all aps
    WHERE aps.invoice_id = ai.invoice_id
    AND aip.invoice_id = aps.invoice_id
    AND aip.payment_num = aps.payment_num

    plz look at seeded view AP_DOCUMENTS_PAYABLE
    FROM
    ap_invoices_all ai,
            ap_invoice_payments_all aip,
            ap_payment_schedules_all aps,
    WHERE
    AND aip.invoice_id = ai.invoice_id
    AND ai.invoice_id = aps.invoice_id
          AND aps.payment_num = aip.payment_num
    ...your code a bit different by
    AND aip.invoice_id = aps.invoice_idbut it's ok
    >
    AND aip.payment_num = aps.payment_num
    Is this correct?
    >
    yes

  • Link between PR and RFQ

    Hi all,
    I looking for a table where I got a link between e PR and the RFQ which refeer to that PR. We can see in ME53N in the Status tab the RFQ number. I want to fine a table where is that link between PR and RFQ.
    We can see the link in EKPO with the PO number  only if a PO is done from the RFQ (field BANFN).
    If I look in EKPO with the RFQ number, the field BANFN (PR number) is empty.
    I don't find a table with a link between the PR and the RFQ if the PO is not done (nothing interesting in EBAN)
    May someone help me ?
    Thanks all
    Regards
    Mathieu PAINEAU

    Hi all,
    I found by myself ! This link is done in the Table EKET.
    Regards
    Mathieu PAINEAU

  • Linking between PP and SD tables

    Hai friends,
    I want one link between PP and SD tables. My requirement is i have planned order PLAF table. i want to link Sales table. Please guide me.
    Thanks and Regards
    visvanath

    Hi
    You can simply link the Sales order No and ITEM
    VBAP-VBELN and VBAP-POSNR with the PP order item table
    AFPO-KDAUF and AFPO-KDPOS and get the Pp related info
    or in Sales tables there is a field called AUFNR in VBAP
    use that for PP order number
    SD tables
    http://www.erpgenie.com/abap/tables_sd.htm
    PP tables
    http://www.erpgenie.com/abap/tables_pp.htm
    Regards
    Kiran Sure

  • Install from scratch 3 times Mavericks but cannot used my restore it will just start for ever. After first install and restore mail and link between folder and files didn't work anymore. Now cant see my disk in finder. Help?

    First install through regular update : never finishing the start after automatic restart
    First install from scratch: erase through disk utility, install OS X Mavericks (using Recover mode), restart ok - Used Migration Assistant to restore applications and data only - Mail crashed each 5 inutes and asked constantly for password of my 2 accounts, links between folders and files not OK and attaching a doc was complicated. I downloaded the update same problems
    Second install from scratch: erase through disk utility, install OS X Mavericks (using Recover mode), restart ok - Used Migration Assistant to restore applications and data only and settings : never finishing the start after automatic restart
    Third install from scratch: erase through disk utility, install OS X Mavericks (using Recover mode), restart ok - But no disk available in Finder
    So far no Mac since 3 days ...
    Any help is welcome

    Still struggling to understand why copying the entire root dir to a disk image and then restoring from that image did not, as expected, yield an identical system, and why I even had to reinstall after doing this.
    Because there is a lot more going on under the hood than merely copying files.
    The only way to do what you want is to use cloning software like Carbon Copy Cloner.
    My  advice is to rescue your personal files to a regular non-TimeMachine  external drive, Zero erase the ENTIRE drive and install OS X fresh and  update, then your programs from original sources and files from backup.
    Then, make a bootable clone and you can copy that as many times as you want and each one is bootable.
    Most commonly used backup methods
    How to erase and install Snow Leopard 10.6

Maybe you are looking for

  • Having sync issues with Outlook 2011 since upgrading to Mavericks

    Hi All, My work Macbook Pro 13" is having issues syncing my inbox and sent mail automatically. It's a hit or miss if I recieve emails in my inbox in a timely mannor with out pressing the Send/Recive button (even when i press it takes minutes to updat

  • Date and Time Reset

    I've got my clock set to synch automatically, but everytime I turn on my machine the date is set for Jan. 1970. I'm thinking it has something to do with the firewall on my wireless network, as I have to tell my airport to connect to the network (as o

  • Server not found

    Hi, Wonder if anyone can assist. When attempting to sign in to Formscentral I am receiving the error: "Safari cannot find the server Safari can't open the page 'https://ims-na1.adobelogin.com/ims/authorize/v1?client_id=adobeformscentral&client_redire

  • Where to submit feature suggestions?

    I occasionally have some suggestions for IOS and other OS for commands which I'm certain would be extremely popular, such as a "shut cycle 5" for interfaces which would power down the interface for 5 seconds, then bring it back up (handy for remote w

  • How can i buy iPhone shipping to Russia?

    how can i buy iPhone shipping to Russia?