HI MM Gurus,
We are issueing materials against movemnt type 261 (against order) .Say order no 4000001 .
Now I want to see the list of materials issued against that account assignment ,where i can see that ?
Regards
Project Team1

Hi,
You can use ME2K to get a list of Purchasing Documents for that particular Account Assignment and then in ME2M, you can input the list of all the documents you got from previous list. And you will get a list of materials.
Please let us know if it worked. I am not sure about direct report for your requirement.
Thnx.

Similar Messages

  • In service order Issu:No account assignment found for this service process

    Issue:No account assignment found for this service process
    An error has occurred in the system RT1400LS while copying the document
    Message no. CRM_ORDER_MISC 020
    Diagnosis
    Errors have occured while transferring the document into another system. Remove the error messages from the enclosed log.
    Transmission log
    No account assignment found for this service process (Notification E CRM_SRV_LOG_EXT_OLTP 008)
    While we created the service order as a fallow up document of the quotation system unable to create the PR. System showing the above error in the service order.
    We created the service order with same items directly not as fallow up document to quotation PR created with out any fail.
    As per my analyses above error because system unable to find out the Internal order to create the PR hence we created service order as a fallow up document of the service quotation.
    Revert require data to understand the issue more.
    Best Regards,
    Prakesh

     Dear Gurus,
    Thanks for your update. we checked as per your suggestion but the issue is PR is not determining the IO while creating the PR.
    We used the different item cat in quotation and service order system generating the PR, But our Clint want to use the same item cat in the both service order and quotation.
    If we created the quotation after that service order with the service line item and spare part line item system creating the IO (internal order) but PR not generating.
    Please help me in this scenario what should we do.
    Best Regards,
    Prakesh.

  • Material type and account assignment group relation

    Hi,
    Getting an error while creating material master save. Account assignment Zx can't be with Material Type Zxxxx.
    Please advise where is the link maintained between material account assignment group and material type.
    My material is Z service material.
    As I no for plant,industry, material type valuation class quanity update tick required but that is for stockable materials which is not the case above.
    Thanks

    HI,
    You can make the field Account Assignment Group of Material Master as inactive.
    But it depends up on Plant, Industry Sector Type and Material Type.
    You can do this in IMG --> Logistic General --> Material Master --> Field Selection
    Or
    use SHD0.. give T-code MM01. and you can deactivate the field.
    Hope this helps you.
    TC
    BR
    AKS

  • Issue with Account Assignment Model - FI - GL Account

    Hi SAP Guru's...
    We are facing an issue while trying to post F-02, by selecting an account assignment model. This issue started when we updated the Production client with Support Packs (SP-12 and SP13)..this weekend.
    While going for F-02, and selecting Account Assignment Model. A message Pop up with the following information - " Screen template VNU06 of acct assignmnt model Changed"..
    _In the HELP Screen the following details are appearing :-_**
    Screen template VNU06 of acct assignmnt model changed.
    Message no. FX260
    Diagnosis :-
    The entry screen VNU06 of the selected account assignment template has been changed inappropriately.
    System Response:-
    The account assignment template can only be loaded when screen VNU06 has been corrected.
    Procedure:-
    If entries exist for a screen variant, the relevant entry screens must contain all fields that have already been filled (technical note: In this case, at least field AUFNR on screen VNU06 is missing).
    Carry out the following activities:-
    Add the fields to screen VNU06 (In the following transaction, choose Posting -> Account Assignment Template
    Proceed)
    Only then can you assign a new screen to the account assignment template or delete the fields not required.
    1.) Interestingly i went and check whether any value  is there in field (AUFNR - ORDERS) in the Table KMZEI...No Value is seen.
    2.) Also this field (AUFNR) is not selected in the VNU06 Screen varient templete, by us.
    Please help us.. This being a Critical Issue.. any of your valuable suggestion, is awaited.
    Thanks
    VinodRao

    Hi Ravi,
    Tks for response. I'm looking for ME_REQ_POSTED but it doesn't exist in se18. The only BADIs I can see starting with 'ME*' are:
    ME_CIN_LEINRF2R    
    ME_CIN_LEINRF2V    
    ME_CIN_MM06EFKO    
    ME_CHANGE_CHARACTER
    ME_CHECK_ALL_ITEMS 
    ME_DEFINE_CALCTYPE 
    ME_HOLD_PO         
    ME_PO_SC_SRV       
    ME_REQ_HEADER_TEXT 
    ME_TAX_FROM_ADDRESS
    ME_TRIGGER_ATP     
    I'm using 4.6C version... any other suggest???
    Edited by: George Navarrete on Dec 21, 2007 4:40 PM

  • A list of Purchase Requisition whith Account assignment category = A

    Hi All,
    could anyone tell me a report which shows a list of Purchase Requisition created since 2010.10.10 whith Account assignment category = A
    Thanks a lot

    Hi,
    Use the report ME5A, mainatin account assignment category 'A' , go to header, select Dynamic selections (SHift F4), enter date range in requisition date.
    Regards,
    Piyush

  • Issue copying account assignment from SO to PR

    I have one issue : The SO has Internal order and Profit center information. When a PR is created for the SO it only copies PC but not IO for some SO types.
    Our client uses a Z transaction which releases the requirement + automatically updates the PR information in SO schedule lines. I feel that the requirements release is done using the standard user exit but updation of PR information in sales order is developed in the program.
    Is there any standard customization at SO type or some other place where we define which account assignments get copied from SO to PR ?
    Thank you
    Raghu

    Thanks sir, but I still can't get the point. Our problem is when we copy the document from Sales order to delivery, the discount column which can be found below the 'total before discount' of the SO document has an amount, let say 2% and I expect that if I use the copy to Delivery dcument functionality, the same information must appear to the target document. The problem is after it was copied to DR, the discount has been lost.
    Thanks,
    DY

  • Print of GR without material no and with Account assignement K / Q

    Dear Freinds,
    I want make Print out of Material Document with Material text (without  Material code with account assignement K or Q Project). I made out put setting for WE03, Transaction event type WE Print version 3 and Print Item 1, Material document.
    But i am not able to print in after MIGO. In MIGO Disply, it is showing error as "The system could not create any outputs"
    But I can able to make print out for Material document with material no. i am facing this problem only for text without material no with account assignement like K and Project refernce.
    Please guide me.
    Rgds
    Madhavan

    Hi Madhavan
    Go to MN22 , put WE03 , prsee enter , if u r alrady created any condition record , that will be diplayed , now select one line item , and clik communication . then after going in second screen , u will find box as " LOGICAL DESTINATION " ,  put the logical destination ( LP01 ) and check the tick box " print immediately , and save the condition record ...
    after donig these things ur problem will be solved , as i was also facing same problem , after doing this i got solution

  • Material PR transfer from ECC to SRM without Account Assignment

    Hello,
    When a material PR without account assignment is transferred to SRM. The scenario is determined as direct procurement and system will behave in extended classic scenario.
    I would need the PO to be posted in backend ie Classic scenario.
    We are in SRM 7.0 using SOA PR transfer from ECC EHP 4 system.
    I believe there is  consulting note available for this scenario. If any body has the note number please share it.
    Thanks,
    Rohith

    Symptom
    While running Materials Replenishment Planning (MRP) purchase requisitions (PR) will be created in SAP ERP (e.g. after creating a Planned Order in MD10).
    Before SAP SRM 7.0 these requisition got the field EPROFILE assigned which enabled the system to extract the PR document to SAP SRM by using report BBP_EXTREQ_TRANSFER. As of SAP SRM 7.0 and SAP ERP 6.04 you configured Business Add-In ME_REQ_SOURCING_CUST to trigger SOA message PurchaseRequestERPSourcingRequest_Out.
    After running MRP you notice that no sourcing request SOA message got generated.
    Other terms
    SOA, MRP, Sourcing, external sourcing,
    BBP_EXTREQ_TRANSFER, EPROFILE
    MD10, MD14, MD04
    Reason and Prerequisites
    Program error.
    Solution
    Due to complexity it is not possible to provide a SAP core correction. However PP-MRP application provides a BAdI interface that gives the possiblity to trigger this functionality of external sourcing.
    If you need to use the external sourcing with SAP MRP create a new implementation for BAdI MD_PURREQ_POST and inherite from the class provided in attached correction instruction.
    Note 1546980 - MRP PReq: PurchaseRequestERPSouricingRequest_Out not send
    1263876 - SAP SRM: Configuration of Procure-to-Pay Scenario
    Note 1504247 - ME54/ME55 does not trigger sourcing SOA message
    Note 1436550 - Multiple PR scenario PurchaseRequestERPSourcingRequest_Out

  • Purchase Requisition / Order: Account Assignment Category for material type

    Hi,
    When creating a PR or PO for one specific material I would like the system to propose a specific account assignment Category for this material. It shouldn't allow the user to change this account assignment category.
    Is it possible? How should I proceed?
    Thanks in advance.
    Luis.

    I dont think there is any standard procedure for doing this.
    My idea would be to use a user exit say EXIT_SAPLMEREQ_010 for PR and a similar exit for PO and code a Error message check for Material type and account assignment combination.
    For ex : EXIT_SAPLMEREQ_010 is a exit which is called during check in a PR . SO when the user enters a combination of Material type and Acc assignment u can check for the requirements.

  • Account assignment group is different in Intercompany Billing from Material Master

    Hello,
    Account assignment group is different in Intercompany Billing from Material Master.
    Account assignment group in Billing and Intercompany Billing is feched from Material Master.
    In Material Master, account assignment group is assigned as 12.
    In Billing, account assignment group is 12 but in Intercompany Billing, account assignment group is 13.
    Please help me to understand why in Intercompany Billing, account assignment group is 13.
    Best Regards,
    Debashri Dutta

    Check the table MVKE for the values maintained for field KTGRM. You can see the sales org-DC combinations for which the AAG is maintained as 13 for this material. This may give you clues for investigation.

  • How to add entries in possible fields in Account assignment model/Note 2596

    Hi Friends,
             I want to know How to apply OSS Note 2596, The basic requirement is to to add entries in the list of possible fields in Account assignment model( Exactly in program SAPDFKA6 in screen 120).
    I found the note 2596 to achieve this, and the field that I want to add is KMZEI-PAOBJNR.
    I gone through the note and it is very confusing for me .. If any one knows how to achieve this or how to apply this note, please let me know.
    Thanks,
    Rk

    I got this myself.
    Thanks,
    Rk

  • Unable to change account assignment field in PO

    Hi Experts!
    We are using SRM 7.0 with extended classic scenario.
    We are facing an issue with account assignment category field in a PO.Here is our scenario.
    User created a PO with costcenter account assignment field and this PO transffered to backend system i.e R/3.
    When the user again tried to edit the PO in SRM and change the account assignment field from costcenter to Internal order that is not possible because the
    account assignment field is grayed out .Then the user has to create a new PO with Internal order as the old PO didn't allowed him to change.
    Can any one help me in this regard with  some OSS note or any other possible solution and what might be the reason for the same?
    Thanks in advance!
    Regards,
    Kalyani.

    Hello Kalyani,
    Just to understand, Is your PO has Good Receipt or Invoice receipt processed? If so then PO do not allow to change the account assignment as charges are booked already.
    If not i would recommend to check if your BBP_GETSTATUS_2 job is running with proper interval? Sometime old PO's do not get refresh status if BBP_GETSTATUS_2 variant is set based on SAP recommendation (i.e. 7 days or so). In that case please execute manually BBP_GETSTATUS_2 and validate.
    Thank you
    Ritesh

  • Service order-Error during account assignment

    HI experts,
    I am facing a problem in CRM when saving Service Orders.
    Issue:No account assignment found for this service process
    An error has occurred in the system XXX while copying the document
    Message no. CRM_ORDER_MISC 020
    Diagnosis
    Errors occurred while transferring the document into another system.To view the error messages,see the enclosed log.
    Transmission log
    No account assignment found for this service process (Notification E CRM_SRV_LOG_EXT_OLTP 008)
    Actually,We have a problem about service order,how to integration with WBS element.
    We can see Account assignment in service order item from GUI,but search help is nothing.
    Account assignment is missing in UI.
    If anyone know it,please share with me.
    Thank you.

    Hi Fan Ding,
    1. Would you please check the Controlling integration settings in CRM and ECC systems.
    Most importantly, Replicate service characteristics relevant to controlling
    Assigning cost centres to service org units
    Establishing controlling type, controllin glevel and scenarios
    Assigning plant and storage location to service org units
    etc.,
    2. Please check whether Sales/Service organization assigned to Billing unit and in turn the Billing Unit is assigned to company code or not.
    Regards,

  • PO account assignment : blank vs P vs Q

    Hi,
    I'm a newbie in MM. recently, there's a need to make PO material stock which is the inventory posting should be directly to inventory account, but it also needs to trace the cost into WBS.
    i've already tested some ways below:
    1. create PO material stock with blank account assignmet.
      ==> the mapped GL account is correct (inventory account) but impossible to input the WBS
    2. create PO material stock with account assignment is set to P.
      ==> WBS can be inputted, but the mapped GL account is wrong (mapped to Expense)
    3. create PO material stock with account assignment is set to Q.
      ==> both of GL account and WBS are possible to be inputted, but when i want to post, error message "Enter WBS element" always pop up, although i've already input the WBS.
    anyone could help me?
    Thanks a lot
    Nasikhin

    Hi
    In the PO material stock with account assignment Q you need to specify the WBS elemnt in the account assignment tab of the PO Line item.
    At the time of MIGO for GR using 101 the Stock will be posted into the Inventory account & with Special Stock indicator P - Specifying as project Stock.
    The same can be checked out using MMBE
    Once the material is consumed using 221 Q in MB1A then the consumption accounts get trigerred.
    Thanks & Regards
    Kishore

  • Exact difference between Item category and Account assignment category

    Can anyone plz give the exact difference between account assignment category and Item category
    Thanks inadvance

    Hi,
    Account Assignment Category: Key indicating whether an item is to be assigned to an auxiliary account (such as a cost center). The account assignment category determines which account assignment data (e.g. cost center, account number, etc.) is required for the item.
    Item category: Identifier indicating the characteristics of an item. The item category determines whether the following are necessary or allowed with regard to an item:
    Material number, Additional account assignment, Inventory management in the R/3 System, Goods receipt, Invoice receipt.
    Prase

Maybe you are looking for