Locking of transports with IMG projects

Hi!
I would like to know whether it is possible to lock all the transports from DEV to QAS system that are not belonging to some IMG projects?
Thank you very much!
regards

Hi Thom Heinemann,
     I am not sure about locking the system for specific transports. You can do that if you are using any thired party tool / z program to perform imports other than STMS into quality system. With the help of STMS transaction code > over view > systems > select the system press F9 like this, we can make the system not to accept imports.... i mean we can lock the system.
Regards,
S.Manu.

Similar Messages

  • Transporting SPRO img project documentation

    Hi,
    We have a system config client copied from another system.
    We currently have a requirement to transport all SAP SPRO project documentation from source system to another without a system export.
    We were able to transport the project with the meta data and have the configuration.We now require the related sapscript notes that relates to the specific IMG configuration settings.
    Please can you advise how to get this documentation over to the new system?
    Kind Regards

    Hi,
    Please check the below link it might help you :
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/81/8c5738ee806b0ee10000009b38f889/frameset.htm
    Regards
    Sreedhar Reddy

  • Locking mechanism while import transports with table conversions

    Hi all,
    quite often, we have the request to import to our PROD FI SAP System a big list of transports which are performing also table conversions (addition of columns, removeal of columns etc).
    During the import of the transports we inform the people not to logon on the system and perform any kind of job.
    However not everyone is respecting the notification.
    Is there any mechanism to prevent all the users from logging onto the SAP system?
    Kind Regards,
    Loukas Rougkalas

    Hi Loukas,
    call SE16, table name = USR02, (get variant that listed only the users they are not in user groups SYSTEM, SUPER, BASIS Admin and so on), F8, Export the list of users to Excel, StrgShiftF7 - is only working in ALV Grid display (Settings - User Parameters - ALV Grid display)
    Then lock the users with transaction SU10 - Authorization data - mutiple selsction - copy the list of users from clipboard (excel Table "B") and paste it into "single value" (ShiftF12 -> F8 -> F8) - Select all (F5) - click to "Transfer" then you can lock the users with CtrlF5
    To unlock the Users repeat step 2 - instead of StrgF5 click StrgF4 for unlock
    Gerd
    Edited by: Gerd Schuster on Nov 17, 2009 2:12 PM

  • Difference between a Solution Manager project, and IMG project.

    Hello,
    We are in process of installing and thereby configuring scenarios for Solman 4.
    While reading about it on help.sap.com, I came across following:
    <b>
    "<i>The Change Tracking function of Change Request Management allows you to track everything that relates to changes within the context of a Solution Manager project, or an IMG project."</i></b>
    Please help me here by clarifying difference between two.
    regards, Shantanu

    Hi Shantanu,
    Let us assume you have captured everything w.r.to an SAP Implementation project in Solution Manager and this project has gone live. Here all details relating to an SAP Project are captured in a Solution Manager Project. Solution Manager project acts as a container to hold all the details relating to the SAP Project.
    Now when this SAP Project comes in the support/maintenance phase, whenever a small change needs to be done to this SAP Solution, it will be raised as a Change Request. This change request will be captured in Solution Manager (starting from the point when the request was raised from an end user as a support message, which eventually might have evolved as a Change Request). All details about this change request, its approval workflow, task control being transferred to different roles(people), movement of the request along the transport path, everything is captured and controlled in the Solution Manager Project.
    So, we are clear about Solution Manager Project now.
    What is an IMG Project?
    For each and every component involved in this SAP project, an IMG project will be created with the same name as the Solution Manager Project in the component systems. These IMG projects in the Satellite systems are the same as the normal Project IMGs which we use in any SAP Project to hold all details relating to an SAP Project w.r.to that component.
    In the context specified by you, it has been told that any changes w.r.to a Solution Manager project or an IMG project can be tracked in CHARM. It is because any change that is requested w.r.to any component(say SRM or ECC) will result in a change in the details captured in Solution Manager project about that SAP Project, and also will result in a change in the details captured in the appropriate Project IMG (say SRM or ECC).
    Hope it is clear.
    Dont forget to reward points for useful answers.
    best regds,
    Alagammai.

  • How do I save Icon templates with the Project files?

    My project files are stored in a folder, say, "My Documents\LabVIEW\My Project", and this folder, in turn, is saved under (Sub)Version Control.  I'd like to include a sub-folder called "Icon Templates" that could contain the icon templates I'm using in this project, but they seem to be "forced" into "My Documents\LabVIEW Data\Icon Templates" (almost the same, but the "owning folder" is different).
    Is there any way to change, preferably on a Project-by-Project basis, the default location for Icon Editor templates?  I tried to figure this out, and saw that one could change where "3rd Party" templates were stored, but that didn't seem to do anything (maybe because I don't understand the concept of a "3rd Party"?).
    An important (to me!) reason to accomplish this is that I want to commit my new icons when I commit the rest of the Project, and have them appear when I checkout the project on another machine (or do an update from the Repository).
    Suggestions welcomed ...
    Bob Schor

    Well, I thought of this as well.  I did change Default Data Documents (which seems to be where Icon Editor expects to find its Templates file) to My Documents\LabVIEW (instead of LabVIEW Data), and that worked (sort of).  But that still doesn't solve my problem.  I have multiple projects -- My Docs\LabVIEW\Project 1, say, and My Docs\LabVIEW\Project 2, and want to have a specific set of icon templates for each stored, say, as Project 1\Icon Templates and Project 2\Icon Templates.
    My problem is two-fold.  First, there is a setting in Icon Editors, Tools, that seems to be designed to let you designate where your "special" templates are located, which I've set to, for example, My Docs\LabVIEW\Project 1\Icon Templates.  However, when using the Icon editor, these templates never appear!  It's as though it's still "locked" into the "3rd Party" sub-folder of the parent Icon Templates folder.  Second, even if this worked (which it doesn't), is there a way to "embed" this setting as part of Project so that the settings "stay with the Project" (and can thereby be customized)?  One important reason to do this is to simplify organizing Projects and folders on disk -- I keep them "together" (use the same structure for both, so a Project is contained, on disk, inside a single set of nested folders), which greatly simplifies and facilitates using Version Control to manage development.
    Thanks for the reference.  I didn't know about all of the symbolic names.  It does appear that they are only used in the VI Search Path entry, correct?
    Bob Schor

  • Error while creating IMG project in solar_project_admin for the CHARM maint

    Dear Experts,
       I  am integrating the r3 system to the charm process.
    I have created the maintainenace project in SOLAR_PROJECT_ADMIN
                                               gave tha logiccal component(TMS is configured ( DEV--> QA --> PRD) .
    Now when i create teh img project for this it is throwing the error as below.
    *S:No authorization to:000 on as a trusted system (Trusted RC=1).
    Message no. No authorization to000
    \I have all the roles to my user id mapped
    Trusted rfc's
    S_RFC
    S_RFCacl
    etc......
    What might be the error................??
    my need to be create in the clients 000 for which i am omplementing the charm..........??
    What are the roles should be given in 000 client.
    Regards,
    Umesh
    jsumesh85  at  gmail

    Hi Umesh,
    Please confirm your problem by as issue with the trusted system, check the link below
    [Trouble trusted system|http://help.sap.com/saphelp_nw04/helpdata/en/8b/0010519daef443ab06d38d7ade26f4/content.htm]
    No authorization to log on as a trusted system (trusted RC = <0 1 2 3>).                                                                               
    Here, the trusted return codes ( = 0, 1, 2 or 3 ) have the following meanings:                                                                               
    1   Calling system is not a trusted system, or security                         
         ID for the system is invalid.                             
         Solution: Create (again) the trusted system (see above).
    as of in trusted system, you supposed to get the same user in both the systemm witht the respected access like S_RFCACL.
    complete explanation of trusted RFCs is in note 128447.Please follow the note
    Thanks
    Jansi

  • Error while creating IMG Project in Solman

    Hi Folks,
    As i'm in the process of implementing Charm process in solution manager. After importing the logical components into my project ( implemention / Maintenance ) .when i'm creating the IMG project for Dev system in project administration i'm getting following error ...
    S:NUMBER_GET_NEXT AEND:000 G INTERVAL_MISSING
    Message no. NUMBER_GET_NEXT AEND000
    But where as i'm able to create it for others like Quality and production systems.
    Please let me know if any one can thorough some lights on it.
    Praveen

    Hi Umesh,
    Please confirm your problem by as issue with the trusted system, check the link below
    [Trouble trusted system|http://help.sap.com/saphelp_nw04/helpdata/en/8b/0010519daef443ab06d38d7ade26f4/content.htm]
    No authorization to log on as a trusted system (trusted RC = <0 1 2 3>).                                                                               
    Here, the trusted return codes ( = 0, 1, 2 or 3 ) have the following meanings:                                                                               
    1   Calling system is not a trusted system, or security                         
         ID for the system is invalid.                             
         Solution: Create (again) the trusted system (see above).
    as of in trusted system, you supposed to get the same user in both the systemm witht the respected access like S_RFCACL.
    complete explanation of trusted RFCs is in note 128447.Please follow the note
    Thanks
    Jansi

  • Problem for the Transport of SXDA Project in SAP R/3 4.6 C

    Hi Gurus
    Our System one Client 012 is not opened for Making changes to Repository objects / Cross Client objects.
    And the Client requirement is that he does not want to open this client.
    We have come across a scenario , Where in we are trying to transport the SXDA projects.
    But it throws us message 'Cross Client Changes / Repository Object Changes are not allowed to be transported'.
    Although this projects are client dependent.
    When we try to change any project in this client, then it allows us but it does not allow us to transport this.
    Can any body help us in this regard ?
    Thanks
    Manish Naharia

    For 6.10 and below you can't use the SMTP interface because it doesn't exist.  There was a technology called the Internet Mail Gateway that was used prior to 6.10.  Here is a blog that I wrote on the subject:
    /people/thomas.jung3/blog/2004/09/07/sending-e-mail-from-abap--version-46d-and-lower--api-interface
    Although it largely focuses on the coding aspects, I also have OSS Notes and screen shots for some of the config.  Look at notes 99965 and 101573.
    On a side note - Karthik - what the hell are you posting.  Did you even read the question.  I've warned you before, as I know that Raja as in the BSP formum as well.
    Input Field with multiple selection
    Simply doing a search and cutting and pasting totally unrelated content doesn't do anyone any good.  It is actions like this that are driving people away from SDN.  Think hard about the impact you are having as well as how this reflects upon you personally and your employeer.

  • IMG Project and Objects

    Hi everybody,
    I have a question concerning how to use a IMG-Project.I'm totally new with this whole SAP and Solution Manager thing.
    My questions:
    1. When do I use a IMG-Project in the Configuration-Folder at a Business Process Part ?
    2. The effectivelly customizing things has to be in the related system or ?
    3. What will I assign then to the project ?
    4. What can be choosen in the Object Part ?
    I hope you don't think that they are strange questions. But I'm really struggeling with that kind of Problems.
    Maybe someone can explain me that on a good exemple ?
    Thanks in advance !
    Guersel

    Hi Guersel,
    1. "But was is not clear for me, can I just use Solution Manager to refer to the corresponding IMG Task ?"
    Yes, you can just use Solution Manager to to perform IMG Task. You can logon SAP Solution Manager, then try the transaction SOLAR_PROJECT_ADMIN to create a new project (The interface of SOLAR_PROJECT_ADMIN is similar to SPRO_ADMIN). In the project, go to tab "System Landscape" -> "IMG Projects", here, you can link SAP Solution Manager with any of the IMG projects. (You can centrally link serveral systems here, so that all of the project work can be performend via SAP Solution Manager)
    2. "So what would happen if the Solution would implementated for a new location ? Has all settings has do be done agan ? If yes, what are the benefits of Solution Manager rather then documentation ?"
    SAP Solution Manager is a central tool for project admin, it provides the function called "Global Roll-out". Once your project has been finished, all of the projct documents, configuration details, test cases maintained in solution manager can be transfered to other branches. In this case, lots of works of project documentations can be saved.
    You should still do the configuration in the new systems, since solution manager dosen't store the detailed customizing BC sets and programs of the satellite systems. But you still have other better options. For example, you can do an system copy from the existing production system to the new development system in other banches. Since all of the documentations are available in solution manager, you can just update the copied solution instead of a new implementation, which you can benefits from saving lots of project efforts.
    Besides, there're lots of benefits:
    1. if you perform the project in solution manager, SAP GO-LIVE check service is much easier, which can reduce the risk of go-live.
    2. If you needs to perform Business Process Monitoring in the operation phase of this solution, that would be much easier. Since all of the core business process and KPIs have already been maintained during implementaiton.
    3. Upgrade risk will be reduced. solution manager has tools to identify the core business process and calculate the upgrade risk and effort. All of the tool is free of charge. But the prerequisites are, solution documentation is maintained.
    4 ..........
    Regarding your fourth question, the selection pops-up, then you need to select the related tree of IMG project of this step. In the realization phase, the configuration work will only see the restricted areas of IMG tree, so that the IMG project view is related to the business steps of current configuration in solution manager.
    My suggestion is that, you can check the knowledge transfer URL http://service.sap.com/rkt-solman -> SAP Solution Manager 7.0  -> click on the role of Solution Consultant on the right of new page, check the documents that you are interested.
    Hope that helps,
    Thanks, Jett

  • Transport overwrites original - although locked in transport request

    Dear all,
    we have a very special system landscape and therefore a very special transport problem.
    An include in the original system was overwritten by a transport although it was locked in a transport request.
    To explain the circumstances:
    We develop and support several releases of a pre-configured SAP Template for BW 3.5 and ERP 2004. After launching a new release we build up new systems as support stream for this release.
    For example BW development system for release 3.1 was TBD, after launching of release 3.1, we copied TBD to TBE. Thus, TBE is the support system for release 3.1 and TBD becomes the development system for the next release 4.0.
    Normally, a correction in release 3.1 (TBE) has to be included in 4.0 (TBD), too. Thus, all support systems are included in one transport landscape.
    It happened that a developer made a correction in an include in TBE and transported it to TBD. Unfortunately, another developer had enhanced this include in TBD and didn’t release the transport. So this changes were overwritten with the import from TBE although it was locked in a transport.
    I investigated this case and found out, that it could be overwritten because TBD is the original system of this include and therefore it has no repair flag when it’s locked in a transport which protects it against overwriting.
    We have to import the transport with the option “Overwrite originals” because in most cases a correction has to be imported in the original system.
    Do you have any suggestions how we can avoid this happening?
    Is there a possibility so set the repair flag in TBD manually?
    Thanks in advance for your help.
    Regards,
    Karin.

    Hi Max
    I tried this already but it doesn't work.
    Following system message occurred:
    Cannot change task type
    Message no. TR857
    Diagnosis
    You can only change the request type if this is permitted by the type of objects in the request.
    The requirement is not met in this case.
    Karin.

  • Is Lock Object transportable to LIVE from development server?

    I had created a customized lock object on a customized table.
    I can only managed to save it to $ENQ package. I tried ZSD1 but no use.
    Now, since I am working in my development server, I had problem getting it across to my "LIVE" environment.
    Can it be transportable?
    I tried to change but no avail.
    Bye

    The lock object transportable is the one created with SE11, not the function modules and group generated.
    IdPgr  : R3TR
    Obj    : ENQU
    Object : Exxxxx
    Regards

  • ABAP Error When Creating IMG Project

    I have just installed Solution Manager 7.0 EHP1 in a Central Instance on Windows 2003 with MSSQL.  Using transaction SPRO_ADMIN, I am trying to create an "Initial IMG-Project" per the Solution Manager Master Guide.  But I get a runtime error.  The following is the first part of the error screen.  Searching the forums, it appears that note 638084 might fix this problem.  Since I don't yet have the service interface working, I tried local download to PC and then Note Upload.  in SNOTE, I got the error "SAP Note does not contain valid correction".  Any ideas?
    ++++++   ERROR SCREEN FOLLOWS (truncated)  ++++++++
    Runtime Errors         MESSAGE_TYPE_UNKNOWN
    Date and Time          21.09.2009 13:00:23
    Short text
    Message type " " is unknown.
    What happened?
    Error in the ABAP Application Program
    The current ABAP program "SAPLSPROJECT_SYSTEM_LANDSCAPE" had to be terminated
    because it has
    come across a statement that unfortunately cannot be executed.
    Edited by: Jonathan Cohen on Sep 23, 2009 3:23 PM
    I uploaded and applied note #1172948.  I also tried rebooting the server.  But this error persists.
    Edited by: Jonathan Cohen on Sep 23, 2009 3:25 PM

    Anjali and Jagan,
    Thank you again for all you help.  I feel that I am making progress.  Using RZ10, I have successfully created and activated a new "Default" profile with the following parameters added per Note
    #parameter created                          by: COHENADMIN   29.09.2009 15:41:47
    icm/keep_alive_timeout = 240
    #parameter created                          by: COHENADMIN   29.09.2009 15:41:36
    icm/conn_timeout = 20000
    #parameter created                          by: COHENADMIN   29.09.2009 15:41:25
    login/no_automatic_user_sapstar = 0
    #parameter created                          by: COHENADMIN   29.09.2009 15:40:25
    icm/server_port_1 = PROT=SMTP,PORT=25000
    #parameter created                          by: COHENADMIN   29.09.2009 15:36:09
    login/accept_sso2_ticket = 1
    #parameter created                          by: COHENADMIN   29.09.2009 15:33:52
    login/create_sso2_ticket = 2
    Plus, the SID parameter is already present as : 
    SAPSYSTEMNAME = PD0
    I restarted the SAP System using Management Console (sapmmc).
    However, the Technical Configuration (step 2 of Initial Configuration in SOLMAN_SETUP) still returns the errors:
    "E::000"
    "System PD0 does not exist"
    Any other ideas?
    Thank you,
    Jonathan

  • Delete CTS Projects not linked to IMG projects anymore?

    Hello all,
    I have a few CTS Projects in my Solution Manager system that I am not able to delete because the corresponding IMG projects have already been deleted.  I know these CTS projects exist still, because they are all listed in the "Project" drop-down list in the Transport Organizer Web UI.
    Any insights on how to do this?
    Thanks,
    Michele

    hi,
    I havent really worked upon this, but has the IMG project been delinked from SOLMAN Project list? Or has it been deleted altogether from the satellite system? Probably you can try and check in the dev system and if it still exists there, then delete the CTS project.
    Regards
    Sneha

  • All transport in a project to be moved to QAS

    Hi,
    We have created a Project in Dev Server and it has created Transport request (PKRk900013)
    Now all configuration done by consultants are being associated with the Project.
    My question is how do i move these request in Quality , if i move the project request PKRk900013 will it move all requests under the project or i need to do the mass import.
    Pls suggest.
    Thanks you.
    Irfan.

    Hi Irfan,
    You need to transport each request created bu the consultants.
    By moving the request all the tasks under the request will be moved to QAS.
    You can ask your consultants to put manu changes under ine request and then release the request so that you will not have to import many transport request.
    Let us know if this was helpful to you.
    Cheers!!!
    Elnino

  • IMG Project in ECC

    When launching IMG objects using Solution Manager (SOLAR02) from the BPH... should an IMG Project be set up for the target ECC system? Whenever an IMG object is launched a message pops up indicating "No IMG projects found".
    Any suggestions folks? We've found that the IMG objects can still be configured without this project. Should 1 be created? Remember, there is no Charm set up.
    Thanks.

    IMG projects are the ones whcih link your Solution Manager system with the satellite/managed system. The landscape that you have defined in the SMSY of SOLMAN, and the System landscape in the SOLMAN project..IMG project connects it with your managed system. THE IMG project that you create in Solar_Proejct_Admin as you know gets created in the development system of your landscape.
    Let me know if you need more explanation/inputs.
    Regards,
    Sneha