Loss qty related Bill of material move to scrap location automaticaly at the time of process order confirmation

Hi experts,
I need one  clarification, i am raise one process order in COR1 - Qty 1000 kg, reservation completed against the process order bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB21 with mvnt.type 311, store person also moved the bill of material main storage location ( 0001 & 0002 ) To Production storage location ( 0004 ) through MB1B.
Issue is at the time of confirmation i am enter the OK qty or packed qty in yield column - 950 kg , remaining 50 kg is enter in loss column.> Go to confirmation bill of material qty calculated at only for related in yield qty. Remaining loss qty related bill of material not consumed it is available in production storage location ( 0004 ),then one by one raw material and packing material qty moved to scrap location through MB1A - 541 Mvnt type.
If any other way for easy reservation and goods issue against the process order main storage location to production storage location.
I need at the time of confirmation enter yield qty related BOM qty consumed in 261 consumption, remaining loss qty related BOM qty taken scrap mvt.type  541 in automatically if it is possible for any customization at the time of loss qty enter related bill of material qty also posted in scrap  ?
Kindly help me for the issue !
Thanks & Regards,
N.Umapathy

Hi
In Standard practice the scrap generated during the production process should be maintaid as negative qty and with differnent material codes which acts as BY Product.
In your case when you maintain the scrap percentage for BOM components , it will copied to the production order with adtditional qty and it will be consumed when you do confirmation and Goods moevement and at the same time the Scrap material is generated/received  with movement type 531( not 541) as by product received out of production.
You can maintain the same BOM component as By product in BOM system will generate the stock to a different SLoc but the cost will be wrong.
Regards,
Anupam Sharma

Similar Messages

  • Validation of material BOM quantity at the time of production order confirm

    Hi,
    I want validation on material BOM ,when i confirm production order.
    Actually when i am going to confirm my production order by tcode CO11, In this screen,i click on "Goods Movement" button. According to confirmed quantity , consumed materials will display. Here i can change material quantities. And here i want some validation. I there any user exit for this screen.

    Hi,
             Exit Name Description
    PCSD0001 Applications development R/3 BOMS
    PCSD0002 BOMs: Customer fields in item
    PCSD0003 BOMs: Customer fields in header
    PCSD0004 BOM comparison
    PCSD0005 BOMs: component check for material items
    PCSD0006 Mass changes user exit
    PCSD0007 Check changes in STKO
    PCSD0008 WBS BOM: Customer-specific explosion for creating
    PCSD0009 Order/WBS BOM, determine URL page
    PCSD0010 Order/WBS BOM, determine explosion date
    PCSD0011 Knowledge-based order BOM, parallel update
    PCSD0012 Customer - Mat. number/mat. number during material exchange
    PCSD0013 Customer-specific processing of an explosion for BOM browser
    PCSD0014 Knowledge-Based Order BOM: Status
    BADI's are
    WORKORDER_CONFIRM
    WORKORDER_UPDATE
    WORKORDER_GOODSMVT
    <b>Reward points</b>
    Regards

  • Set loss quantity to a fixed percentage in Process Order Confirmation - C0R6N

    Hi Experts,
    How it is fixed the loss qty percentage at the time of process order confirmation.
    I want to set the loss quantity to a certain percentage when compared to the Total Process order quantity.
    For Example:
    If the Total processed quantity = 100
                            Yield Quantity = 20.
                             Loss              = 80.
    This kind of scenario should not happen, since Loss quantity is very much higher that the yield quantity.  I want to set the loss quantity  to a particular percentage ( say 20-30 %) of the total processed quantity so that the yield quantity will be higher than the loss quantity by a substantial amount. Are there any possibilities of doing this through configuration. If not what are the other options?
    NB: Scrap quantity is not maintained at the time of  process order confirmation.
    Regards,
    Umapathy.

    Hi Umapathy,
    Yield and Scrap are user entry fields where you can have restriction on entered qty by changing  under delivery and over delivery to error through OPK4 config as shown below. Agree that any qty can be entered in any field (Yield or Scrap)
    OR
    You can define the operation scrap. Read the below doc for more details.
    http://scn.sap.com/docs/DOC-52834
    OR
    Another option is to use exit and write your logic based on input yield and loss.
    Thanks & Regards,
    Ramagiri

  • Error: LK047 Material movement could not be posted in the system via IDOC

    I am trying to create an article document (goods movement doc) for an already created purchase order.
    but this is via an IDOC (WMMBXY). after filling the data in WE19, i shoot the idoc in to the system. in we02 i get the following error message: LK047 Material movement could not be posted in the system . Can someone please help.
    the following fields are filled:
    Segment: E1MBXYH
    Document date        20091124
    Posting date         20091124
    Reference            9999999999
    Doc.Header Text      POS/1110
    Transaction code     MB01
    USNAM                user12
    Segment: E1MBXYI
    Processing ind.      1
    Material             832924
    Plant                1110
    Movement Type        101
    Debit/Credit     +
    Currency             EUR
    Qty in un.entry      250
    Unit of Entry        PAK
    Qty OPUn             90
    OrdPriceUnit         KG
    Purchasing Doc.      9100000141
    Item                 1
    Profit Center        11090
    G/L Account          22706
    Movement Type        101
    SLED/BBD             20091231

    Hello Shankar,
    Glad to hear from you!
    In your question, please make sure you use leading zeros for the MATNR field.  In header segment field E1MBXYH-BKTXT, we use header text. Hope you are using inbound posting function L_IDOC_INPUT_WMMBXY.
    Please try with this and it works for us.
    Thanks a lot,
    Venu

  • Status 51 -- Error: LK047 Material movement could not be posted in the sys

    I am trying to create an article document (goods movement doc) for an already created purchase order.
    but this is via an IDOC (WMMBXY). after filling the data in WE19, i shoot the idoc in to the system. in we02 i get the following error message (status 51): LK047 Material movement could not be posted in the system . Can someone please help.
    the following fields are filled:
    Segment: E1MBXYH
    Document date 20091124
    Posting date 20091124
    Reference 9999999999
    Doc.Header Text POS/1110
    Transaction code MB01
    USNAM user12
    Segment: E1MBXYI
    Processing ind. 1
    Material 832924
    Plant 1110
    Movement Type 101
    Debit/Credit +
    Currency EUR
    Qty in un.entry 250
    Unit of Entry PAK
    Qty OPUn 90
    OrdPriceUnit KG
    Purchasing Doc. 9100000141
    Item 1
    Profit Center 11090
    G/L Account 22706
    Movement Type 101
    SLED/BBD 20091231

    Hello Shankar,
    Glad to hear from you!
    In your question, please make sure you use leading zeros for the MATNR field.  In header segment field E1MBXYH-BKTXT, we use header text. Hope you are using inbound posting function L_IDOC_INPUT_WMMBXY.
    Please try with this and it works for us.
    Thanks a lot,
    Venu

  • Loss % in process order confirmation

    Dear all,
    During process order confirmation,loss should not to take above 10%.
    It should be within 10%.
    Kindly let me know hat customization to be done for this scenario
    Regards
    Rajasekaran

    Hi,
    In the confirmation parameters in OPK4 in the checks option in the under delivery maintain error when quantity falls below under delivery tolerance and in the material master in work scheduling view in tolerance data maintain under Underdely tol as percentage and check...
    Thanks
    Kumar

  • HT1338 Problem. iMovie final cut OSx 10.8.2. Can't DVD the movie. IMOVIE quit unexpecedly all the time. Nothing wrong with the movie. What to do?

    I have done this many times and aqlways works, however, this 20 minutes movie I created keeps crashing in the DVD prepare process. What can I do.

    Good morning.. buon giorno..
    What a shock..I have had Norton for more than 10 months in my MAC..
    Anyway Thanks Silly Rabbit I took it allllllllll out!!!
    For "ClamXav", I didn't understand on the site which one I should download..
    Will you tell me the right one for me??
    Thanks also Karsten,
    yes it says "MAC OS extended", Is that the way it should be, ne?
    FAT32.. how can I know if my mac is formatted in FAT32 or no???
    (but I don't think I would have done such a complicated thing, maybe
    I don't need to check?)
    Umm I've found something else.. Quick Time..
    I had downgraded it from 7 to 6 this summer as I heard lots of
    discussion here, but it was upgraded by mistake when I have forgotten to
    check off the box. Now it is 7.0.3.
    For i movie HD, and i movie 4 (I still use it for old projects) what Quick time
    should I use?? Do I have to downgrade it??
    Endless love is better than endless discussion, but
    it at least gives us quite a few chances to greet each other,, (maybe endless lovers don't greet any more in the end..)
    ARIGATOU DANKE SHEN?? GRAZIE!
    minobu
    Power PC G4   Mac OS X (10.3.9)   RAM 640

  • At the time of Purchase order creation Material specification how to trace

    Dear all,
    I have an one issue,
    when ever i am creating Purchase order for any material to vendor, the particular material quality specification or Ins plan automatically to flow to purchase order.
    how to address this issue, wheather it is possible or not
    Regards,
    s.sakthivel

    Hi,
    For your requirement only for viewing the data I suggest you to go for below options
    1) In mtrl master itself there is one option Inspection text, here u can maintain the main values so thst during PO
    you can refer these values (To find this click on aditional data tab in mtrl master and inspection long text)
    2) Prepare one report by fetching all the inspection values from below tables so that u can aslo refer this report
       PLKO Inspection plan Header 
       MAPL Material Assignement 
       PLPO Operation Details 
       PLMK Inspection plan characteristics 
       PLMW MAPL-Dependent Charac. Specifications (Inspection Plan) 
    Regards
    Shiva

  • Material Class 001 - Characteristics not comming at the time of GR

    Hello,
    I am trying to use material class 001 in material.
    I have created Characteristics and assigned to Class (001) and have attached this class to Material.
    But when I do Goods Receipt of PO, I do not see any tab with classifications.
    I have also tried activating batch (as some say that I have to activate batch to get the characteristics at the time of GR) but this does not help.
    Please let me know, how can I get the characteristics to get populated at the time of GR.
    Regards
    Prabhjot Singh
    Edited by: Prabhjot Singh Nayyar on Sep 9, 2010 5:35 PM

    Prabjhot,
    I have a group of materials "Bicycles".  Within this group, there are 5 material numbers, BIKE1, BIKE2, BIKE3, BIKE4, BIKE5. Each one of these is sold as a separate item to the customers.
    Now, my customer service group is having a hard time entering orders.  They can never remember which one contains which combinations of colors and Derailleurs.
    I create a class 001 BICYCLES and assign two characteristics, "COLOR" "DERAILLEUR".  Possible color values are "RED", "BLUE", "SILVER".  Possible DERAILLEUR values are "10SPEED" and "12SPEED".  I then assign the materials to the class, and enter values for each of the 5 material numbers.
    Now, when Customer service wants to find out which MATERIAL to enter into their sales orders, they can look up all the MATERIAL numbers that have specific MATERIAL based characteristics:  Blue/10 speed; Red/12 speed, etc etc.
    Later on, my Quality manager approaches me.  For one material BIKE1, which is a Blue/10speed,  I have 3 different factories where I build them.  The resultant bikes are virtually identical from each factory.  However, the manufacturing methods in each factory are different.  My Quality manager wants to determine accurately the source of each manufactured bicycle, so that he can track warranty liability and issue recalls if necessary.
    I create a BATCH class type 022 and assign 2 characteristics "MAN_PLANT" and "YEAR" I create several batches: "PARIS2010", "ROME2010", "LONDON2010":  In the batches I assign the appropriate values:  MAN_PLANT "PARIS", in another "ROME", and another "LONDON"; in all three I enter the value for year as "2010",  I activate Batch management.
    Now when I complete my Production orders, the three plants each receive their production into stock, but now they must enter a batch.  The batches they enter upon receipt identify the manufacturing plant and year of manufacture.  In my central warehouse, I now have BIKE1 stocked and sold under 3 batches: PARIS, ROME, LONDON.  My quality manager is pleased.
    I am rewarded with more work.
    Best Regards,
    DB49

  • How to control the volume of all sounds in the movie (even if they were in the time line (no instance name)

    Hi,
    I need to control the volume of all sounds in the movie even
    if they were in the timeline so they do not have an instance name,
    by AS3.0 code?
    thanks a lot.

    :
    var st:SoundTransform=SoundMixer.soundTransform;
    st.volume=whatever;
    SoundMixer.soundTransform=st;

  • Get Process Order Confirmation&Counter from material document/goods receipt

    Hi @ all,
    i´m looking for a way (the tables) to get the order confirmation and the counter from a goods receipt. I have the material document number und the position of the goods receipt.
    Kind regards,
    Axxter

    Hi,
    we don´t have the goods receipt material documents in AFRU. I don´t know the reason why.
    Message was edited by:
            Sebastian Becker

  • Can I move my mmorpg game over to the time capsule and play it from there?

    I have a MacBook Pro with a 256 SSD. I play World of Warcraft and it is taking up a lot of room on my macbook. I was wondering if I would be able to move the  game folder over to the airport time capsule and play it from there. Or would if not work cause the time capsule isn't fast enough? The apple guys on my base don't know enough to answer my question and there is no apple store here on the island I am stationed on.

    If you do not have enough space on the SSD, do not move the gamefolder to the TimeCapsule: this is much to slow; instead move something else there or use an external HDD or SSD.

  • Process order confirmation related issue

    When a confirmation is of the process order executed the open reservations for this order should be closed but it will only do so for a limited number of items.
    When looking at process order xxxxxx it will show a final issue for materials say A, B and C but it will leave all the other items open and will therefore generate requirements for these items in MRP.
    How to solve this?

    Dear Sosal,
    use Mr. Bramhankar's proposal, if u want system to propose by default in confirmation screen. if u set this for partial confirmation also it will be final and confirmation and reservation gets cleared.
    one more option is while confirming the order either in CORK/COR6N select manully automatic final confirmation and clear reservations. ur issue will be resolved
    sree

  • Order related billing for manufacturing

    Can anybody explain to me the effects of order-related billing in manufacturing? What if deliveries is not the same as sales order. Or should i just make another order type for this?
    Thanks in advance!

    Dear Joker,
    -->Why you want to go for sales order related billing with out delivery reference !!
    -->Are you not creating any delivery after sales order !!
    -->Delivery is entirely different from sales order.
    -->As per the satnsard service related activities will be billed with reference to the sales order because here there will not be any physical movement of goods.
    -->When ever there is physical movements of the goods you need to create delivery.
    -->When ever there is delivery you better to create billing document with reference to the delivery.
    I hope this will help you,
    Regards,
    Murali.

  • Its throwing an error with order related billing

    hi,
    sap gurus,
    in order related billing configuration settings its throwing an error like this
    "the items is not relevant for billing".
    plz show some way on this its urgent
    tommorrow is my delivery time
    regards,
    balaji.t
    09990019711

    Normal Sales Order Cycle for Order Related Billing:-
    Step 1: Sales Document Type
    IMG > Sales and Distribution > Sales > Sales Documents >
    Sales Document Header:
    1. Sales Document Type:The sales document types represent the different business transactions, such as Inquiry, Quotation, Sales Order, etc. To create new sales order type, always copy as with reference to similar sales order. If possible use standard sales order.
    2. Define Number Ranges For Sales Documents: Maintain number range with discussion with core team.
    3. Assign Sales Area To Sales Document Types:
    A. Combine sales organizations / Combine distribution channels / Combine divisions: Ensure to maintain these, else Sales Order creation will give error.
    B. Assign sales order types permitted for sales areas: Assign only required Sales Order Types to required Sales Area. This will minimize selection of Sales Order Type as per sales area.
    Sales Document Item:
    1. Define Item Categories: If possible use Standard Item Category. Incase if required to create new, copy as from standard & maintain New.
    Check Billing relevance for Item Category being used
    2. Assign Item Categories: If possible, use standard. Formula for deriving item category: Sales Document Type + Item Category Group + Usage + Higher Level Item Category = Item Category
    For Order-Related-Billing, use Item Category TAD & Item Category Group in Material Master as LEIS.
    Schedule Line:
    1. Define Schedule Line Categories: If possible use Standard Schedule Lines. Incase if required to create new, copy as from standard & maintain New.
    2. Assign Schedule Line Categories: If possible, use standard. Formula for deriving Schedule Line: Item Category + MRP Type / No MRP Type.
    Step 2:
    IMG > Sales and Distribution > Billing >
    1. Define Billing Types: If possible use Standard Billing Type. Incase if required to create new, copy as from standard & maintain New.
    2. Define Number Range For Billing Documents: Ensure to maintain number range.
    3. Maintain Copying Control For Billing Documents: Maintain relevant copy controls such as Sales Order to Billing, Deliver to Billing, etc.
    Note: Ensure that Copy Control settings are done
    Sales Order to Billing (OR --> F1): VTFA
    Regards,
    Rajesh Banka
    Reward points if helpful

Maybe you are looking for

  • I cannot open a specific website on my MacBook Pro.

    About two weeks ago, I started having an issue where I cannot connect to a particular website from my MacBook Pro. Until this time, I had no problem connecting to the site and did so at least once each day. Environment: Running MacBook Pro Retina 15"

  • Play DVD with audio sound via Airport Express speakers

    Is it possible to play my DVD with audio sound via my Airport Express speakers? I can play music with iTunes trough these speakers, it would be nice if I can hear my DVDs aswell. iMac intel core duo   Mac OS X (10.4.7)  

  • Help ! (video clips)

    Im just editing my video footage, and would like to put some video clips downloaded from the internet, which websites can i download them from ? =and what video are compatible

  • MacBook Pro display defect?

    Hi! I brought my first gen core2duo 15" MacBook Pro (March 2007.. I think) to an Apple store genius bar today. It has the SAME defect as shown in pics in this thread: http://discussions.apple.com/thread.jspa?messageID=9955601 Unfortunately, I did not

  • IDCS2 Error when install 4.0.5. update

    Win XP. I never have been able to install 4.0.5. update. It either asks for a disk or gives an error. Can someone direct me to the solution? Thank you.