Maintenance Activity Type Assignment (PM)
Good Morning!
I know this is the PP forum, but I can not find a PM forum.
Is it possible to assign multiple maintenance activity types to an order or a PM? Possibly assigning the mainteance activity type to the operation...?
I have a PM with three operations, one operation is to lubricate, one operation is to inspect and one is to verify safety guarding.
My maintenance activity types are Safety, Quality, Environmental, Delivery, Morale, Cost (these are from an old Ford system, I don't know why we still have them), Preventative Maintenance, Predictive Maintenance and Lubrication.
Can I assign the Lubrication MAT to the operation that is for lubrication, the Preventative Maintenance MAT to the operation for inspection and the safety MAT to the operation for safety guarding?
Currently I can only assign one maintenance activity type (MAT) to a work order / PM/ PdM order as a whole, not on an operational basis.
Similar Messages
-
Message error in trx CA01 "No activity types assigned to cost center &contr
Hi,
I'm getting the message error CR091 "No activity types assigned to cost center &controlling area & on &" from trx CA01.
How can I link the cost center to an activity ?
Thanks
Best Regards
Moderator: Please, avoid asking basic questionsCost center to an activity is linked through KP26.
-
Maintenance activity type and order type for plant maintenance order
How can i get the maintenance activity type and order type for a given plant maintenance order. Please let me know the table where i can get these two fields
In AFIH i can only get the MAT for an order numberMaintenance activity type -
AFIH - ILART
Order Category Indicator Plant Maintenance -
AFIH - AKKNZ
reward if heplful -
Maintenance activity type - PM order
Hello,
I have to configure the field "activity type" on PM order (tcode IW31).
I want to make this field obrigatory and It can't come with default values. It must comes empty.
In SPRO, when a take off the link between the Order type and the default value for activity type (table T350), occurs the error bellow, on tcode IW31:
"No maintenance activity type could be determined"
After that, occurs a runtime error, and I can't enter in the IW31 to create the PM order.
Somebody knows how can I do what I need?
Tks, Camila.Message 2 (second part):
Source Code Extract
Line SourceCde
1 FUNCTION t350_read.
2 *"----
3 ""Lokale Schnittstelle:
4 *" IMPORTING
5 *" VALUE(AUART) LIKE T350-AUART
6 *" VALUE(LANGUAGE) LIKE SY-LANGU DEFAULT SY-LANGU
7 *" VALUE(MTYPE) LIKE SY-MSGTY DEFAULT ' '
8 *" EXPORTING
9 *" VALUE(ILART_TEXT) LIKE T353I_T-ILATX
10 *" VALUE(T350_WA) LIKE T350 STRUCTURE T350
11 *" EXCEPTIONS
12 *" NO_T350_ENTRY
13 *"----
14
15
16 *--- Pufferung übergeben -
17 t350_wa = t350.
18 ilart_text = t353i_t-ilatx.
19 *--- nur weiter wenn noch nicht gelesen -
20 CHECK t350-auart <> auart.
21
22 *--- Lesen Vorschlag ILA zur Auftragsart -
23 SELECT SINGLE * FROM t350
24 WHERE auart = auart.
25
26 IF sy-subrc <> 0.
27 if mtype <> space.
MESSAGE ID 'I0' TYPE mtype NUMBER '226'
29 RAISING no_t350_entry.
30 endif.
31 ELSE.
32 *--- Übergeben T350 Workarea -
33 t350_wa = t350.
34 *-> nur wenn nicht im Puffer und Sprache spezifiziert
35 IF t353i_t-ilart <> t350-ilart and
36 not language is initial.
37 *--- lesen Text zur ILART -
38 SELECT SINGLE * FROM t353i_t
39 WHERE spras = language
40 AND ilart = t350-ilart.
41 *--- Übergeben Text zur ILART -
42 ilart_text = t353i_t-ilatx.
43 ENDIF.
44 ENDIF.
45
46 ENDFUNCTION.
Edited by: Camila Peralta on Jun 22, 2010 2:17 PM -
Settlement PM WO in Maintenance Activity Types (within a WO type)
Dear PM master,
i have a new requirement here, facing the issue in settlement rule (limiting and defaulting the specific maint act type to settlement receiver)
I already set-up default settlement rule by Work Order type is a standard functionality, but my company implement new accounting standard, that a major repair overhaul and Turn around (major maintenance, with a huge cost), must be settle to a deferred cost (i.e. WBS).
In My company business configuration, Work Order Turn around and Overhaul covered by maintenance activity type, which are linked by same WO type (preventive maintenance):
WO type:
PM02 (preventive maintenance), consists:
Mtc. Act Type:
001 (Turn around)
002 (Overhaul)
003 (Time Based)
004 (condition based)
005 (Plant Stop)
Now i want to default the settlement rule, in that PM02 order type which is within maint act type '001' or '002' to WBS or other costing receiver. when others maintenance act type remain same (defaulted by configuration in settlement rule profile in WO type)...
I just guessing, there will be a customer or user exit playing role in my case, but which one and how, that what i must figured it out.
Please do me a favour.
thanksOK....
this will be my starting point to discuss with my ABAP team.
looking forward to discuss the progress further more.
thanks -
Maintenance Activity Type and Service cost
Hello friends,
Is there any relationship between Maintenance Activity Type[MAT] and Service Cost ?
Actually all the PM02 - Preventive Maintenance Order with MAT as Cost collector are actually accounted under service cost unlike other MATs.
Please let me know more information regarding the above.
Rgds
PrasadScenario in our company is something like below:-
1.All the maintenance activity is done internally and no Serivces involved in the order
2.Some of the Non-codified materials for order consumption are Purchased.
With above, When I do the Cost Analysis MCI8 for all PM02 - Preventive Maintenance Orders for last year I could make the below observations:-
1. Till Jun08 there is no service cost [which is normal]
2. From Jul08 there is Service Cost involved , which am not able to understand.
Could you please help me out? -
Assignment of default activity type to individual person
Hi All,
I have following scenario.
One maintenance order is created with one operation. Three persons are assigned to the same operation. All these three persons are having different per hour rate and so having different activity types.
I have mentioned all these 3 activity types in assigned workcenter.
But while executing in maintenance order I can assign only one activity type in operation tab and so the same is appearing during time confirmation as default.
I need respective activity types to be appeared by default for each of persons. How can be achived this?
SundarHi,
As 3 different activity types are having 3 different per hour rate, it would better to define sub operations based on the activity type & assign the activity types separately for each sub operations.
Regards,
Maheswaran. -
Assignment of Activity Types to Cost Centre
hi,
i am creating a work centre and for costing purposes i need to give the activity type and the cost centre.
even though i have defined an activity type and in it used an allocation cost element which in term is assigned to a cost centre,in the work centre when i search for the activity type the system shows an error.....No activity types assigned to cost center X, controlling area Y on 07.02.2007 where X and Y are variables ofcourse.
what could be the possible reason?
thanks and regards
shekharHi shekhar,
Check using KL02 or KL03 again, especially the validity dates of the activity type and may be the coster center KS02, KS03 as well. I hope, that controlling area is fine.
There must be some settings wrong, ...
Please reward, wenn it is useful.
Kind regards,
Zhenbo -
How to assign activity type to cost center
hi Gurus,
Sir i have got error during the T.Code: CRC1. in which i have to assign Activity type to cost center. which is as follow: ( I have also made tickmark in cotrolling area for Activity type)
( Error :No activity type assigned to cost center #1301,Controlling area ABCD on 01.02.2008)
Pls provide me the solution where the activity type should be assign to cost center.
Than'x & Regards,
DhananjayHi,
Planning at KP26 for Activities itself is integration between Activity and Cost center.
Once you do this, your problems is solved.
Assigned points suitably
Best Regards
surya -
PM Order Confirmation using Personnel's Cost Center and Activity Type
Hi All,
Is it possible to have PM Order confirmation (IW41) using Cost Center and Activity type from Personnel instead of default from Work Center? If it is, can it be done with some configuration or user exit? Please advise. Thank you.
DaiHi friend,
Order confirmation will be done for order operations.While doing confirmation we post the actual work done by the repective work center and respective activity type assigned to the same workcenter.
But these activity types are assigned to cost center for cost calculation.confirming the respective operation in maintenance order through workcenters gives the report of planned work and actual work done by the respective workcenter.
We cannot confirm the operation using costcenter and activity type directly through transaction IW41.
If you want to develop new confirmation screen and making confirmation of the respective order operation with only costcenter and activity type fields, you can do it .
Regards,
Pardhreddyc
Edited by: Pardhreddyc on May 17, 2011 12:45 PM -
What is Cost Center and Activity type
Can any one make me understand Conseptually, what is Cost Center and Activity Type
<b>Cost Center:</b>A cost centers is an organizational unit within a controlling area that represents a clearly delimited area of responsibility where costs are monitored against a budget.
Cost centers represent areas of responsibility (management areas) that generate and influence costs.
Cost centers are the locations at which the costs are incurred
<b>Activity types</b> describe activities produced by a cost center. They are measured in units of time or quantity. Activity quantities are valuated using a price.
For example: the maintenance department provides maintenance service at a labor hourly rate of SAR 2000 or USD 1000.
When the activities produced by a cost center are used by other cost centers, orders or projects, this means that the resources of the sending cost center are being used by the receiver objects.
By recording the planned and actual quantities consumed, you reallocate cost incurred on the sender into the receivers.
Activity Types can be grouped to facilitate reporting and cost allocation.
Hope it clears your basic doubt on Cost center and Activity type
Assign points if helpful.
Regards,
NareN. -
Multi Resource Scheduling MRS - How to exclude certain Maint Activity Types
is there a way to exclude orders that have a specific maintenance activity type. We have standing work orders that in reality we should not have appear on the planning board. Well, we really shouldn't have any standing orders but we do.
Has anyone had this issue and been able to solve it. thanks, LindaWhile a lot of MRS configuration includes maintenance activity type as a way to refine the circumstances in which something occurs (e.g., stretched assignments), that is not the case for defining which demands will be brought into MRS. However, while not positive, I believe "BAdI: Integration of Maintenance/Service Order with MRS (ERP)" can be used for this purpose.
Mark -
IW41: automatic update of activity type when changing the work center?
Hello colleagues,
when doing a time confirmation with IW41, we have following problem:
In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
Thanks for your ideas!
Regards,
PatrickHi Maheswaran,
yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
Thanks for your efforts so far!
Patrick -
Activity type int processing activity
Dear All
I have creat activity type & assign this activity type to work center in "ActTypeProc." IN KP26 , i maintain activity price & all other things but when i maintain this activity type & work center in WBS for respective internal activity system not shown me plan cost as well as when i confirm the activity system not shown me actual cost also. Pl gave some input on this
RegardsHi nivruti,
check ur work center whether u have put formula sap008 in other formula in capacity tab page. in schedulling tab page formula sap004 . check whether in costing tab page ur entries are correct regarding activity type and cost center.
In activity type put * in cctr catagory , activity type catagory 1, give secondary cost element (this can b a reason of ur problem) in allocation cost element.
Apart from this also check costing variant whether actual and planned has been maintained properly or not.
Regards
Abhishek Sinha
Idhasoft, India -
How to Book Activity Type to the Cost Center
Hi Guys
How should I put Activity type and a value to it in the cost center.
In the Assessment Cycle I am getting the error as the reciever : Cost Center has Activity type assigned to it but there is no value in the Activity type.
Can some one help me out on how the activity is initially linked to the Cost Center.
and how will we put activity value in the cost center.
Thanks in advance
kranthiHi,
Use T.code KP26.
Here enter the version as '0' & then enter the activity type, cost center & then click the overview icon in the top.
A new screen will appear, here you can enter the fixed/vairable price.
This activity type is to be assigned in the work center (T.code cr02), costing tab.
Hope this helps, pl. reward.
Regards,
SDS
Maybe you are looking for
-
Hyperion EPM Installation in a distributed environment...
Hi all, I am planning to install Hyperion products in a distributed environment. I have three machines say, Machine A, Machine B, Machine C. All of the machines have Windows 2003 operating system. And only Machine B and Machine C have Application Ser
-
IPhoto Freeze on full screen Editing - Lost threads ???
Hi all, as I'm one of those experiencing multiple problems with iPhoto 9 and Snow Leopard, with freezing the complete OS in full screen editing and displaying repeatedly scrambled or corrupt images, I wanted to subscribe to one of the many multipage
-
I Cannot download Adobe flashplayer. it seems like it downloads but I can't play any games.
-
Has anyone lost the info from games with the new iOS7? My games reset to level zero! Argh!
-
Hi Experts, While running SPROXY transaction I am getting the below dump. An exception occurred that is explained in detail below. The exception, which is assigned to class 'CX_SRAPI_PRECONDITION_VIOLATED', was not caught in procedure "GET_REP_VERSIO