Material Rejection At Production Floor

Hi,
We are a Manufacturing house, and the below mentioned scenaio is common for us:
We receive Material against a PO, say 10000 PCS,  SLoc 1000, Batch 200701.
As per the QC Norms, we pass the entire 10000 PCS,
The MIRO & Payment is done for 10000 PCS.
Material is issue to Prod Stor Loc 1001 for Production.
While doing Assembly, we come to know that 100 PCS are actually rejected.
We want this 100 PCS to be sent back to Vendor as REJECTION with a DEBIT NOTE.
Our Views:
We want to create Damage Stor Loc 1003.
The Material 100 PCS to be moved to S Loc 1003 with Quality Inpection Lot.
The QC Head will give the final UD (can be OK/ REJECTED).
Based on the QC Decision, the OK Material to be moved back to Prod S Loc 1001, and the REJECTED Material will be send back to Vendor.
Pls. guide to solve this issue. Also try to mention the Mov Types.
Regards,

Hi Karn
Please look at the process steps given below, may suits to your requirement.
1) Make goods receipt against PO in to main storage location 1000 managed by stores department (mvmt type:101, stock type: Unrestricted)
2) Transfer the goods to production floor storage location 1001 into quality stock and with generation of inspection lot (mvmt type: 311)
3) Processing of inspection lot and usage decision by QA.
Here we have to see, whether systems supports for 122 from sloc 1001 or not.
warm regards
sairam akundi

Similar Messages

  • Component / Semi Finshed rejection during Production

    How can we configure the following Business Scenerios :
    1. Material is Transfer to production floor with reference to BOM /  Production Order from main store
    2. During production - Some material is rejected because found faulty
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Pl let us know the steps how this can be configure into the system.
    thanks
    harish

    Hi
    1. Material is Transfer to production floor with reference to BOM / Production Order from main store
    2. During production - Some material is rejected because found faulty
    Solution:Here for the rejected material take back that material through reversal movement type.
    3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
    Issue this material to quality through transfer posting (from unrestricted to quality inspection) using movement type 322.
    4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
    Once it's cleared from quality department here create inspection lot & thorugh usage decision clear that stock as unrestricted stock & again issue that material to production.
    Regards
    Ravi Shankar.

  • Return vendor rejection from production line

    Hi,
    Guru,
    How to return vendor rejection from production line and it should be vendor wise.
    regards,
    rakesh patel

    Hi..
    To achieve this requirement there are some developments are required.
    e.g.:- One different movement type should be there for handling vendor rejection from production line to transit store.
    One different transit store should be there  for handling the rejections.
    And you must know that particular material has come from which vendor e.g. 10nos are from xyz vendor and 7 nos from abc vendor.
    Now you can do the transfer posting thru MIGO from production line to transit store. and can select supplier from partner tab.
    Different movement type and storage location would be very helpful for reporting part. And maintain discipline.
    Regards
    Vivek.

  • How does Roll up of cost of scrapped material to the product happens

    Dear Friends,
    We are using ECC6.00 (EHP4) with CO module also implemented. in QM module we use notification type Q3 to scrap material which is rejected in the production order. Using transaction CO11N, we book scrap in the order and using the function module in the notification we carry out reverse order qty and scrap which is nothing but 262 and 551 combined.
    To be more specific if i create a notification for material M1 then when i use the function module (action box) system will reverse the material (262) from the production order  and the  scrap using  551 movement.
    The variance is booked in the order. Now that for some of the materials users have done 551 alone without reversing the material from the production order. According to the 262 and 551, the same is configured so that the value of scrap occuring in the production order should inflate the product cost during the costing run (roll up of the cost)
    Now user wants to be explained on the differences in the cost between both the type of scrapping done (262&551)and 551 alone. i.e., for periods where 262 and 551, the material cost should have been increased and for the other 551 posting there should not be any effect of the material cost.
    Kindly tell me how this can be explained. Also provide the complete steps for carrying out the costing run to do actual costing and standard costing run.
    Experts help will be very useful.
    Regards,
    M.M

    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/5f/1faba54aee11d189740000e8322d00/frameset.htm]

  • Returning the material from shop/production to vendor

    Dera friends,
    Material rejection from shop/production to vendor directly ,is there any movement type.
    or through--MIGO-Return delivery --262  ;
    and then 122 to vendor.
    Please suggest,
    Canand

    dear,
    u have to do he same thing as you have decided but for the sake of bifurcation (tracking)u have o make new movment types say 962 for 262 and 922 for 122
    thats all 
    regards,
    snb

  • Material Qty. of Shop floor material

    Hi,
      I want to make a report with certain dat along wiith this I also want material qty. of production florr  means  material isue agains production order or any order to production but partial return or not retun in which table i can get those qty.
    regards,
      zafar

    Dear Zafar,
    You can get in table AUFM
    Else report COOIS, in list just input as components & give plant & basic dates as from & to ( 1 month )
    You can get required qty & issued qty
    Regards
    Madhu

  • Best practice - material staging for production order

    Hi Experts,
    could any of You pls, support me with some hints of best practice how to handle material staging WM-PP interface in a certain case?
    Up till now we had a system, where production had no separate location in IM, but one location existed including raw material wh and production. In the same time in WM we had separate storage types for production and raw materials u2013 hence we did material staging transferring goods only inside one IM location between different WM storage types. The material staging should be done based on separate prd. orders.
    Now this need to be changed and separate location need to be handled in IM for production u2013 which means the staging should be done between different IM locations and WM administration also need to be handled.
    Up till now we used LP10 for staging, then LB13 for TO creation etc. We can keep going like that, but if do so, there is another step required in IM u2013 movement 311, where material numbers and qty need to be added manually to finish the whole procedure. I would like to avoid this u2013 which makes the administrational procedure quite long.
    I have been checking the following possibilities:
    1.     Set released order parts-staging at control cycle and use MF60 for staging u2013 but I can not select requirements based on pro ordders here (only able to find demand if component including into selection)
    2.     Two step transfer 313/315 u2013 but this not a supported procedure u2013 313 TI /TO / 315
    3.     Try to find solution how to create 311 movement based on TO or based on WM stock at certain storage type / dynamic bin.
    I have failed.
    So, could any of You pls, support me with some useful ideas, how to handle material staging where 311 included and definetly the last step of procedure, but administrator does not need to enter items manually one by one in MIGO.
    All answers will be appreciated

    Hi,
    Storage location control should be able to take care of your problem.
    If you want to stage the material to a different IM location then the WM location then make the following settings
    If location xxxx is your WM location and location yyyy is your Production location.
    You have defined Production storage type ZZZ for production storage location YYYY and have maintained the supply area for the same
    In WM configuration - For interfaces - IM interface-Control of Assignment "Plant / Stor.Loc. - Whse Number"
    Assign location XXXX as the Standard Location. Maintain entry donot copy sloc in TR for location YYYY
    In WM configuration - For interfaces - IM interface-  Storage Location control for WH
    This entry ensures that there will be a WM tarnsfer Posting between your WM and Production storage Location automatically when you confirm your TO. You can have this done via a btach job also if you want cumulative posting. (schedule job RLLQ0100)

  • Batch Traceability for Sugar as raw material during the production process

    Dear Colleague ,
    I need your support for a traceability issue in a customer on beverage sector
    See the case below:
    Batch Traceability for Sugar as raw material during the production process
    In AMSB the batch traceability in some production processes is very difficult, especially in case of sugar where tanks wherein more than one batches of the same material can be mixed. For example, in a single day almost 17-20 batches of the same material can be mixed and as the result is a composition of water and sugar the normal FIFO rule strategy cannot be applied during the component consumption.
    The raw material (sugar) is received in tank S5 at different points of time, and its content is transferred to tank B1 for storage purposes as well as for mix the sugar with other material such as water.
    At a specific moment the S5 tank contains only a single batch, while the tank B1 contains more than one batch. Tank B1 is used in order to supply the production line and the corresponding material consumption is triggered in backflush as soon as the production activity is declared (production confirmation). Along with the material consumption the batch determination takes place and a complex algorithm is applied: at a very high level, the single batch is consumed depending on its percentage inside the mix of composition and in case the this
    percentage is under a threshold level the current batch should be full used in order to avoid that it will exist for ever.
    Moreover, the good movement reversal (reversal of material consumption) and its correction lead to a complete new calculation of all the batches consumed after the original movement date/time. This means that the algorithm for batch determination should be reapplied for all the consumptions subsequent to the original movement.
    On the other hand it’s not possible to identify the mix of batches at the exit point of silos B1 because the total consumption of the material in the tank will never happen. As long as the tank level decreases it will be filled up from the tank used for receiving of sugar (S5).
    As requirement AMSB needs to post the material consumption starting from EWM, this means that EWM should be the master system in this case and the correspondingmovements have to be  transferred to ECC afterwards. This mainly because EWM  should guarantee the business continuity in case the ERP system is not available.
    AMSB asked if the scenario depicted has been implemented in some customer, in EWM system or in any other SAP solution.

    Hi ,
    At the time of consumption you can put ' * ' aestrix sign in the batch field.
    You will get list of batches of that material.select ur batch and consume the quantity.
    Regards
    Piyush

  • PO Text from R/3 Material Master to Product Master in SRM

    Hello Forum,
    I want to replicate the PO Text from r/3 material master to Product master in SRM to be seen in commpr01..
    I am not sure if this text can be seen in SC even if it is not seen in commpr01..
    how can i achive this?
    Thanks
    Arshad

    Hi,
    You need to create a customer field or a new text in the documetnos brim at item level and to look for that text of the request through RFC using the badi DOC_CHANNGE.
    Rgs,
    Pedro Marques

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran

  • Sending material back to production line

    Hi all,
    Can I send a material back to production line once the GR is done after production,UD is taken(inspection type 04 active) and the material is now in unrestricted stock.

    Sherya,
    I hope you are working on REM process of SAP -PP, in transaction MFBF you can click the "Neutral Reversal", now the quantity field would be with negative quantity, enter the required reversal quantity and then perform the backflush.
    Once the above is done, you can again perform Backflush using MFBF for the new Serial number.
    If you are'nt working on REM, then you can use transaction MB31 movement type 102 for reversing.
    You cannot reverse the Backflush document or Material document using MBST, since QM is active and UD is over, but certainly you would be allowed on the above process suggested by me.
    Regards,
    Prasobh

  • Material determination with Product selection

    Hi SAP Gurus
    We are using material determination with product selection. The process is that customer will send in one product in a sales order. At the time of doing ATP we have to look for about three or four possible alternatives and confirm that alternative which has the highest stock level depending on the ATP situation. We have configured material determination with SAP standard substitution reason’0006’ to take care of this. The problem with this is that this creates two line items in sales order as the item substituted is shown as a sub-item of the material entered. We do not want to have two line items in a sales order for this. Is there a way we can do material determination with product selection (Based on ATP) and have the item substituted replace the item entered in a sales order? In other words we do not want to see two line items in a sales order. The substitute item should simply replace the original item and the material entered could be stored in field VBAP-MATWA. I have gone through all the standard SAP documentation which clearly states that in order to material determination based on ATP we have to use outcome A or B both of which create a sub-item.
    I was wondering if there is any workaround or if there is any user exit in which we can replace the original item with the substituted item?? Any help or any direction will be highly appreciated.
    Another question is if we were to use APO for doing global/Rule based ATP is it possible to get rid of the double line items. We have also tried to use rule based ATP in APO and use product/location substitution in our sandbox system to see if we can get back only one line item. But even in that case we do get a sub item. Any help on this issue will be greatly appreciated. You can also send me an e-mail at [email protected]
    Thanks
    SDSAPCON

    >
    SAPCON SD wrote:
    > Hi SAP Gurus
    >
    > We are using material determination with product selection. The process is that customer will send in one product in a sales order. At the time of doing ATP we have to look for about three or four possible alternatives and confirm that alternative which has the highest stock level depending on the ATP situation. We have configured material determination with SAP standard substitution reason’0006’ to take care of this. The problem with this is that this creates two line items in sales order as the item substituted is shown as a sub-item of the material entered. We do not want to have two line items in a sales order for this. Is there a way we can do material determination with product selection (Based on ATP) and have the item substituted replace the item entered in a sales order? In other words we do not want to see two line items in a sales order. The substitute item should simply replace the original item and the material entered could be stored in field VBAP-MATWA. I have gone through all the standard SAP documentation which clearly states that in order to material determination based on ATP we have to use outcome A or B both of which create a sub-item.
    >
    > I was wondering if there is any workaround or if there is any user exit in which we can replace the original item with the substituted item?? Any help or any direction will be highly appreciated.
    >
    > Another question is if we were to use APO for doing global/Rule based ATP is it possible to get rid of the double line items. We have also tried to use rule based ATP in APO and use product/location substitution in our sandbox system to see if we can get back only one line item. But even in that case we do get a sub item. Any help on this issue will be greatly appreciated. You can also send me an e-mail at [email protected].
    >
    > Thanks
    >
    > SDSAPCON
    In the substitution reasons ...mark the OUTCOME as blank for this particular 0006. I am not sure for ATP
    rgds
    Sai
    Edited by: Sai on Mar 27, 2008 10:00 PM

  • Get Material Descrition of Production Order

    Hi,
    Could you tell me how to get material description of production order, I cannot found the field in table of AFKO and AFPO. Thanks.

    Dear Portfolio,
    Inorder to get the Material Description, please follow the following steps:
    (1) Match AFPO-MATNR with MAKT-MATNR.
    (2) Get hold of MAKT-MAKTX (Material Description) filtering by SPRAS = 'EN'
    Regards,
    Abir
    Don't forget to award Points *

  • Material determination Vs Product selection

    Hi
    What is the difference between Material determination and Product selection ?
    Regards
    Mahesh

    Hello Mahesh,
    <b>Material determination or Product selection</b>
    1.     Material determination <b>(sometimes referred to as product selection)</b> is a method in SAP-SD to substitute or swap one material in the sales order for another using the condition technique and is triggered by the material entered in the line item of the sales order. Material determination can also use a pop-up window with a number of products the user can choose from the list.
    2.     Material determination can be automatic or manual and is used
         When an old product is becoming obsolete (outdated) and the business is releasing a new product in its place starting from a specific date. In this case the old item gets automatically replaced by the new item in the sales order.
         You may configure the system to automatically to swap one material for a number of other materials, the one material being determined based on which one is available.
         It is also possible to swap the material for a number of materials, where the user is presented to choose from the list.
         Material determination is specifically useful should you wish to swap your customer’s part number automatically for your own at the time of the sales order.
    <b>The functionality of manual and automatic product selection is available during material determination.</b>
    a.     Reason for substitution 0005: manual product selection (list of default values)
    b.     Reason for substitution 0004 & 0006: automatic product selection (depends on product availability in order and delivery)
    In manual product selection (0005), the system does not automatically replace the product. Instead, it displays a list of all the substitution materials and other information in the master record doing the availability check such as quantity available that can be confirmed on the customers requested delivery date and if the full quantity cannot be met, the system proposes a new date on which the material can be completely delivered. You can then select the required material from the list.
    During automatic product selection (0004 & 0006) the system replaces the entered material automatically if it is not available. When you enter an order, the system tries to fill the quantity of the order with the first material in the material determination master record. If there is no enough quantity available then it fills the remaining quantity with the next material.
    You can choose whether or not to run the material determination during the delivery process for the same material, as the result of the substitution may change due to the new availability situation of the material.
    <b>Reward if helps</b>
    Regards
    Sai

  • Material requisition against production order

    Dear all,
    How do i put material requisition against production order. Kindly give me the t-code and total path till material issue from a particular storage location. i.e
    --> requisition against Production order for a storage location
    --> Transfer posting by movement type
    Thanks

    Hi,
    Procurement of RM: -
    1. MM01 - First of all create materials (RM, SF, FG)
    2. CS01 - Create BOM (FG > SF > RM)
    3. MD61 - Planned Independent Requirement for FG
    4. MD02 - MRP Run for FG (System will create Planned orders and PRs automatically as per procurement key - E, F and X in Material Master)
    5. MD04 - Stock / Requirement List OR ME5A - PR List
    6. ME21N - Create PR w.r.t. PO
    7. MIGO - GR w.r.t. PO (Movement Type - 101, Capture Excise invoice here)
    8. J1IEX - Post Excise Invoice
    9. MIRO - LIV for PO
    Goods Issue of RM: -
    1. CO40 - Convert Planned Order to Production Order (Schedule, Release Order)
    2. MIGO - Goods Issue > w.r.t. Production Order (Movement Type - 261) - You can also use MB1A for GI against Order
    3. CO11N - Confirm Production Order
    4 MIGO - Goods Receipt > Order (Movement Type - 101)
    5. KO88 - Order Settlement

Maybe you are looking for

  • Sending IDOCs from SAP R/3 to XI

    I have ALE set up to send an IDOC on every Material master change or create. This works fine so far - only after creation I do not receive the IDOC on my XI system's IDOC Adapter. In the Transactional RFCs (sm58) I can see the following error message

  • Webpages and videos fail to load

    I have Mac OS X 10.7.5, and I am using Safari 6.1.1. Some webpages do load, but others fail to load. The blue loading often stops after reaching a certain point. Additionally, when I try to play video content within pages I am sometimes told that the

  • ABAP Routine at infopackage dataselection

    I got one scenario to use ABAP Code. In data selections we have CALWEEK. We are loading to from flatfile to cube.Every week we load the data to cube. If the flat file week=present week(sys week) then update to cube or else fail.

  • Project is dropping audio and connections after burning

    A project was created on an Intel machine running Tiger, then modified with all new assets on a PowerPC G5 with Tiger (10.4.11). When burned to disc, some menu audio is missing, and some connections (button links, menu timeouts) are non-functional. T

  • Looking for an all around purpose media player (rather than iTunes)

    Hello Hello In the PC environment there is the Winn Amp player. A good all-purpose free player, or pro version that can play just about any sound file. It would be great top have a good utility player like that for MAC. Apparently the Microsoft Media