Component / Semi Finshed rejection during Production

How can we configure the following Business Scenerios :
1. Material is Transfer to production floor with reference to BOM /  Production Order from main store
2. During production - Some material is rejected because found faulty
3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
Pl let us know the steps how this can be configure into the system.
thanks
harish

Hi
1. Material is Transfer to production floor with reference to BOM / Production Order from main store
2. During production - Some material is rejected because found faulty
Solution:Here for the rejected material take back that material through reversal movement type.
3. Rejected Material is sent to Quality for inspection ( the same material is inspected by the Quality at the time of GR ,but may be found faulty in production floor)
Issue this material to quality through transfer posting (from unrestricted to quality inspection) using movement type 322.
4. Quality Department do the inspection and found some quantity may be used after some rework and remaining quantity is rejected and send to Main stores to return to Supplier
Once it's cleared from quality department here create inspection lot & thorugh usage decision clear that stock as unrestricted stock & again issue that material to production.
Regards
Ravi Shankar.

Similar Messages

  • Component Availabity Check during production order creation

    Hi All,
    During production creation, I donu2019t want to include/ check the reserved stock of component (stock which has been assigned for other prod order)
    Where I required to make the changes in config.
    Regards,
    Shailendra

    Hi,
    Deactivate Include Reservation in T.Code OPJJ. But make it sure you are doing it for correct Checking Rule which you have maintain in your checking Control OPJK for Order Type and Plant Combination.
    Regards,
    Dhaval

  • Rejection and scrap during production

    hi
    During production process many child items get wasted and the finished product received is lesser than the planned.in system where we can reduce the child items during receiving?and also the the scrap or rejected items should go in other wharehouse.Please solve it.
    Thanks

    Dear Sir,
    At the time of Report Completion, instead of complete ,  you can choose the option reject the parent item. Here you can also select different warehouse.
    Please see following documentation on production process:
    https://websmp106.sap-ag.de/~form/sapnet?_FRAME=CONTAINER&_HIER_KEY=701100035871000371280&_OBJECT=011000358700004837182004E&_SCENARIO=01100035870000000183&
    Regards,
    Preety Goel
    SAP Business One Forums Team

  • Error during OIM schema upgrade during product ugprade from 9.1.0.2 to 11g

    Hi All,
    We have received following error during product upgrade from 9.1.0.2 to 11g.
    Error occurred during fourth step ( Task 4: Use Upgrade Assistant to Upgrade the Oracle Identity Manager Schema)
    On the screen while running upgrade assistance (ua.bat)
    Following message came on screen.
    Schema Version registry >> succeeded
    Oracle Identity Manager Schema Upgrade >> Failed
    I could see only following error in the log file.
    \middleware_home\Oracle_IDM1/server/db/oim/oracle/Upgrade/Oracle_upg_91_92_x2ell_92.sql
    [2012-06-28T09:34:51.147-06:00] [FrameworkMR] [NOTIFICATION] [] [upgrade.FrameworkMR] [tid: 14] [ecid: 0000JWnikOB6qIvyKWYBSQ1Fv7Zd000005,0] finalize() instance 1 of 2
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] UPGCMP-00924: SQL error [{0}]
    [2012-06-28T09:35:00.863-06:00] [OIM] [INCIDENT_ERROR] [] [upgrade.OIM] [tid: 13] [ecid: 0000JWnijRj6qIvyKWYBSQ1Fv7Zd000004,0] [[
    java.sql.SQLSyntaxErrorException: ORA-00955: name is already used by an existing object
    ORA-06512: at line 31
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:457)
         at oracle.jdbc.driver.T4CTTIoer.processError(T4CTTIoer.java:405)
         at oracle.jdbc.driver.T4C8Oall.processError(T4C8Oall.java:889)
         at oracle.jdbc.driver.T4CTTIfun.receive(T4CTTIfun.java:476)
         at oracle.jdbc.driver.T4CTTIfun.doRPC(T4CTTIfun.java:204)
         at oracle.jdbc.driver.T4C8Oall.doOALL(T4C8Oall.java:540)
         at oracle.jdbc.driver.T4CStatement.doOall8(T4CStatement.java:202)
         at oracle.jdbc.driver.T4CStatement.executeForRows(T4CStatement.java:1074)
         at oracle.jdbc.driver.OracleStatement.doExecuteWithTimeout(OracleStatement.java:1466)
         at oracle.jdbc.driver.OracleStatement.executeUpdateInternal(OracleStatement.java:2123)
         at oracle.jdbc.driver.OracleStatement.executeUpdate(OracleStatement.java:2067)
         at oracle.jdbc.driver.OracleStatementWrapper.executeUpdate(OracleStatementWrapper.java:306)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.loadScript(SchemaUpgrader.java:303)
         at oracle.ias.mrua.plugin.oim.SchemaUpgrader.doUpgrade(SchemaUpgrader.java:139)
         at oracle.ias.mrua.plugin.oim.OIMSchemaUpgradePlugin.doUpgrade(OIMSchemaUpgradePlugin.java:302)
         at oracle.ias.mrua.MRUA.executePlugins(MRUA.java:3672)
         at oracle.ias.mrua.MRUA.internal_driver(MRUA.java:2448)
         at oracle.ias.mrua.MRUA.driver(MRUA.java:1710)
         at oracle.ias.upgrade.gui.UAUpgradeThread.run(UAUpgradeThread.java:390)
    Any Idea ?
    Ritu

    Hi All,
    We are also trying to upgrade OIM 9.1.0.2 which is present in our environment to OIM11g. Request your help.
    Now how do we achieve the upgrade? Should my source of OIM9i software  and target of OIM 11g software  be installed on the same server?
    I did install OIM11g and OIM9i on the same server  and tried to do schema upgrade based on the link:
    Upgrading Oracle Identity Manager Environment
    But during examine phase I get error the below error
    UPGAST 00091- ERROR DURING EXAMINE OF COMPONENETS
    UPGAST 01004- UPGRADE IS UNABLE TO DYNAMICALLY LOAD COMPONENET SPECIFIC SOFTWARE MODULES.
    When i check in the log in internet it says :
    Cause: Repository upgrade framework was unable to dynamically load the Java classes of its component-specific software modules. mrua.xml file might have been corrupted.
    Action: This is an internal error. Verify that the Java classpath has been correctly set, the mrua.xml file is correct, and that the .jar files for all component-specific software modules are present in the jlib directory. Contact Oracle Support Services for assistance
    What is the javaclasspath to be set?how to check if mrua.xml and jar files are fine
    Pls help.Any help is much appreciated.

  • Inspection during production

    Hi All,
    Please clarify  my doubt on Quality inspection during production.
    We are using inspection type - "04 - Goods receipt inspection from production" for inspection during production.
    Once after inspection if we reject a sub assembly for rework and move the part to block stock, we raise a notification to the concern department.
    Now after production does a rework, how can we receive the sub assembly back to unrestricted used through Quality route and reflect the same in my notification.
    If there is some other standard process of inspection during production and rework then please throw some light on it.
    Thanks & Regds,
    Ritesh

    QM>Qualty Notif.>Notif. processing>Additional notif. Functions>Define Action Box
    In the next pop-up screen select Define functions for the Action box
    To research this I would look at notification Q1.  Select Q1.  Double Click on Activities.
    Double click on 0035 - post goods movement.
    you will see this action uses FM QM06_FM_TASK_GOODS_MOVEMENT_2.  It is configured to run a second module upon saving called QM06_FM_TASK_GOODS_MOVEMENT_STEP2.
    Click on the blue information button to read more about these FM's.
    Copy these FM's and have an APAB'er modify them for your use.  Add an action to your particular notification using these the new Z FM's.
    FF

  • Rejections during in-process inspections

    hi, is any std report available to find what are the produts rejected during in-process inspection,(at which operation) against each prod order? also can we know how many products passed without defect (after in-process insp) during in-process inspection against prod order?

    Dear,
    Do the defect  recording at that time craete automatic notification then you will get this report in QM10 and QM11.
    Else use the report  QA33.
    Regards,
    R.Brahmankar

  • Change Work Center during production order confirmation

    Dear All,
    I must to modeling this situation:
    I created an production order. In routing I used an work center A.
    After I confirmed a half of quantity, the work center A was damaged and I must to change it, with the work center B.
    The system allow this change, but when I checked the costing, the situation isn't real. The system counted the costs just for the work center A, and no for work center B.
    My question is: it's possible to change the work center, during production order confirmation and the costs updated with new cost?
    Thank you for your answer!
    Regards,
    Marian

    once a Order is released, the Process order detaisl for that order is frozen.
    however if you want to do it, change the order status to CRTD after reversing the Movements done.
    Do READ MAster data , this will copy the new Work center , redo the previously done Moevements.
    if the change is long term.
    or
    Just manually add the new work center and do the processing. if the change is temporary.

  • Restrict Authorization at Material level during production confirmation

    Hi SAP Gurus,
    I would like to ask if its possible to restrict authorization at Material Level during production confirmation.
    Our scenario is we have SFG and FG which are handled by different group of people but it has the same Order Type. Now we want to restrict authorization such as one department can only confirm SFG and the other department can confirm FG only.
    Is it possible to set authorization at material type or production scheduler level. IF not possible, is there other way except creation of new Order Type?
    Thanks,
    Raymond

    Hi Raymond,
    DO you mean I should create a customized table for this?
    Yes
    Are there no standard way?
    As per my knowledge, you can control through production order type, so you need to create seprate order type for this
    Thanks,
    Sankaran

  • Return vendor rejection from production line

    Hi,
    Guru,
    How to return vendor rejection from production line and it should be vendor wise.
    regards,
    rakesh patel

    Hi..
    To achieve this requirement there are some developments are required.
    e.g.:- One different movement type should be there for handling vendor rejection from production line to transit store.
    One different transit store should be there  for handling the rejections.
    And you must know that particular material has come from which vendor e.g. 10nos are from xyz vendor and 7 nos from abc vendor.
    Now you can do the transfer posting thru MIGO from production line to transit store. and can select supplier from partner tab.
    Different movement type and storage location would be very helpful for reporting part. And maintain discipline.
    Regards
    Vivek.

  • How can read BOM component date before save the production order??

    Hi Experts,
    In our company, we need to develop a program to read the BOM component data of the production order
    before we save the production order.
    That for example ,when we create and release a production order , before we save the production
    order,we want a porgram to read the BOM component data. If some component data can meet our
    requriement (may be if there is material requirement quantity>100 EA),then the system will pop up a
    small dialog box to remind us.
    There is user exit PPCO0007 and PPCO0007.But it seems they only can read the head data of the
    production order before we save the production order. And the BOM component data of the production
    order are saved in the RESB(Reservation Table).So if we do not save the production order,all the BOM
    component data are not saved in the RESB table.
    So how can slove the problem??
    How can read component date before save the production order??
    Are there any other user exit we can use???

    Hi Just wanted to check am I right that you are trying to check if you have enough Materials Available before you release or Save the order right ? if this is your business objective then when you create order you have material availability tab which checks and gives error if shortage is there. Please let me know if is this wht you asking for ?

  • QM inspection at various quality gates during production

    Hi All,
    We need clarification on how to plan inspection during production at various stages.
    1. How to trigger and use inspection point planning at various inspection stages??
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    3. How to define different characteristic at different inspection stages?
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    If possible, please provide the process flow.
    Thanks & Regards,
    Ritesh

    First questions
    1. How to trigger and use inspection point planning at various inspection stages??
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. How will the characteristic be activated, processed and closed at various inspection stages??
    .. When user define new inspection point at result recording, system activates the characteristics automatically based on inspection plan.
    3. How to define different characteristic at different inspection stages?
    .. Not possible with inspection point function in SAP standard
    .. You have to define all characteristics at inspection plan or use add characteristic function at result recording.
    4. Will a single inspection lot be generated for entire production of a machine or separate lot will be generated at all the inspection stages??
    .. It depends on production order process because inspection lot for production is generated based on production order.
    Second questions
    1. How can we define partial inspection points within production processes?
    .. QCC0 > Quality Planning > Inspection Planning > General > Define Identifier for Inspection Points
    2. Process to activate and process characteristics at every inspection points?
    .. Yes
    3. Is it possible to allot score against those characteristics during inspection?
    .. Allocation is not possible, only add is possible.
    4. How is partial check points processed and closed?
    .. You can define it in operation header detail of inspection plan.
    5. Is defect recording done at every inspection point or at the end?
    .. Every inspection point
    5. How to summarize the result and close the inspection lot finally??
    .. System summarize the result automatically when you execute usage decision transaction.
    Regards, DoWook Kim.

  • Accounting entries during production cycle

    Hi
    Can someone tell me what are the accounting entries that take place during production from one process to another? Where is the accounts configured?
    Thanks

    Anyone?

  • Error during Production Order Confirmation

    I get a real wierd error during production Order confirmation.  The error message is
    "Additional items are not allowed
    Message no. ZOAL010"
    Can anyone throw some light on this?
    Regards
    Raj

    it is not std SAP message.
    you can check the user exit for confirmation.
    check in transaction code CMOD/SMOD for CONF*

  • Co products and by products during production process

    hi,
    I have a production scenario where in both co products as well
    by products exists during production process.
    We can maintain co products by choosing the indicator in material master and in BOM but how should i maintain the by products?
    And also, co products and by products produced will undergo further production process with different operations, in this scenario how I can include these operations and products in my production planning? and how the costs are calculated?
    Can any one please help in this regard.
    Thanks and Regards,
    Pavan

    Hi
    For Co-product just by choosing the indicator in material master and in BOM.
    So when ever u confirm the production order co- product GR done automatically through 101 movement type.
    For By-product
    1) u have to enter the byproduct code in the BOM with -ve sign if ur by-product is fixed qty.
    2) If ur by-product is varying qty then u have to post the by product qty through MIGO 531 movement type against the production order.

  • How to make component semi-transparent?

    Hi,
    I want to make a component semi transparent so that i can see through component below that? is it possible in swing? if it is how can i do that?
    Thanks,
    Sato.

    I've had limited success by specifying a background color using an alpha value.
    setBackground( new Color(123, 123, 123, 128) );