MB1B 311 triggering LT06

Hello everyone
I am currently facing an issue in our WM environment
Plant ABCD is having 2 stor. location viz sto1 & sto2
Now sto1 is tied to warehouse WM1 & sto2 to WM2
Currently I hv configured the "LE-WM Interface to Inventory Management"
WM1 - 311 --- Auto TR creation --- Imm TO creation (A - Create in BG)
Same config is done for WM1 - 312, WM2 - 311 & WM2 - 312
Now when I execute MB1B with movement type 311 for moving stock from STO1 to STO2, the screen auto navigates to LT06 after saving MB1B for the creation of WM TO manually. This happens only when there are multiple line items in the Material Document.
When I perform the same for only 1 line item, it does not navigate to LT06. Instead the TO is posted in the background automatically.
I am very confused about this.
Can anyone shed their thoughts about the behavior and possible provide a fix.
Thanks
Vinit

I am afraid this is standard system behavior. Please refer to help.sap.com for detail: http://help.sap.com/saphelp_erp60_sp/helpdata/en/c6/f83f154afa11d182b90000e829fbfe/content.htm
In your case, more than one item in material document with different warehouse number, this leads to no immediate TO creation.
Hope it helps.

Similar Messages

  • MB1B (311)

    All,
    I need a print out for transaction MB1B (311 Mvt ) .I need individual slip.
    Whether for this output type is WA01 ?
    I have maintained condition records for WA01 , but after doing this transaction , it is not coming in MB90.
    I have maintained '3' ie 'send with application own transaction'.
    Kindly advise.
    regards

    Hi sandeep
    While doing MIGO, ensure that in General Tab, you get "3 Collective Slip" beside the Print Indicator and you tick mark the field.
    1. Now depending on the setting in 5a, the Matl doc is printed. If it is 3, you have to print it using MB90. If it is 4, it is printed immediately.
    2.Check up in NACE
    Regards.
    Haree

  • While doing mb1b 311 ( when wm is implemented) this error

    Dear all,
    please tell the solution for this error
    HP1 922 u zone does not exist
    Thanks and regards,
    Balakrishna

    You could call storage bin U-ZONE as "XYZ" or "John" or "Flower", it doesn't matter. It is only  a storage bin in interim storage type and SAP uses it to place quants in it when you post goods movement in IM by  mvt 311.
    So, this bin got its name by SAP, and this name is set in SPRO > LE > WM > Activities > Transfers > Define Movement Types - here choose mvt 311 of your WH and you will see that this bin is set as destination storage bin. If you want to call it "flower", you have to change it here and create it in LS01N.
    Edited by: Csaba Szommer on May 2, 2009 10:34 AM

  • MB1B 311 Mvmt Type not completing goods receipt on inbound delivery

    I have existing warehouses that complete this transaction (non-HU managed SL to HU managed SL).  I have created a new warehouse, however this process is not working the same in the new warehouse.  Can someone tell me what configuration I am missing?  The TO is created and confirmed automaticly, but the inbound delivery is not posted.  I can open the inbound delivery and post it without any messages.
    Thank you,  Julie

    Hi,
    For creating inbound delivery , Confirmation tab must be entered in PO. It is must.then only you can post GR wrt Inbound delivery.
    Try it and any quries let me know.
    Regards,
    Smitha

  • Inspection lot triggering !!

    Hi Experts,
    In my project scenarios, Whenever I post some quanity(say 45) to scrap or blocked(and do the UD of the lot) a separate inspection lot should be triggered with inspection quantity as 45.
    Please suggest how to map this scenario.
    Thanks in advance.
    Saurabh

    Hi
    As followup actions are on UD level & not at stock posting level ,Its not applicable here.
    Now few things could be
    1.Create a Manual lot when move the material to block stock or scrap through QA01-01 inspection type.
    2.Create one Quarentine Storage Location(like QRNT) & put the material in this storage location manually through UD screen.
    You can dynamically change the storage location while doing stock posting.
    Now Activate 08 inspection type & maove material form QRNT to respective storage location of GR through MB1B-->311.
    I hope this will add some value
    regards
    Sujit

  • Stock transfer between two St locs of same warehouse

    Hi All,
    I am new to WM and trying to config/simulate st loc to st loc transfer 311
    one step between two st locs that belong to same warehouse number.
    What should be the config and under
    LE->WM->Interface->IM->movement types -> assign WM Movement Type
    References to IM Movement Types. In my system for 311 movement type entry with
    only the quantity check box checked and no other spl stock I see that there are
    three columns mentioned below
    For mvt types on WM side first one “Reference movement type for WM from
    material movements” = 311
    Second one “Reference movement type for transfer in warehouse mgmt.” =312
    Third one “Reference movement type for posting change in whse mgmt.”=309
    The reason I am confused is when I do a MB1B 311 from one st loc to another
    st loc from unrestricted to unrestricted on IM side it is triggering 309 on WM
    side where as I am expecting 311 to trigger with TR to pick from issuing St loc
    and another TR/TO with (312 or 311 I am not sure) to putaway the stock in to
    the receiving st loc. Can someone help in explaining how should the stand SAP
    IM/WM interface work and what should I be doing to make it work that way
    Thank you in advance
    J

    Hi J,
    To explain you in simple way,
    When Sloc is Wm managed and stock is transferred at IM level using 1 step within plant, stock is directly transferred from one sloc to other sloc(no TR/To is created to pick and putaway unless configured)  Due to this difference is created between IM & WM level, Hence mvt type 309 is triggered for PCN . This Mvt 309 is picked based on std config at
    LE->WM->Interface->IM->movement types -> assign WM Movement Type
    References to IM Movement Types
    If you want to create TR immediately then put x in 9 column against mvt 309 and w/h combination.
    LE->WM->Interface->IM->movement types -> LE-WM Interface to Inventory Management

  • Need information on the transfer posting from WM To IM

    Hello All,
    Is there any scenario in WM and IM, where you are doing the transfer posting in MIGO_TR and creating the material doc for it. Now the stock moves in IM but when u create TO for the material doc and confirm the TO. That's where the stock moves in WM.
    1) MB1B-311 Movt type---create TO for the mat Doc---i am moving the stock from one storage location to another location...then it moves the stock in IM, but i create TO and confirm in LT06...that's where, the stock moves in WM.
    2) MB1B---321 MOVT TYPE...LT06...the stock category changes in IM and WM respectively...
    I know the above scenarios work fine but there is any scenarios in SAP, where the posting happens first in WM and then in IM.
    i need the clarity on the below scenarios, which is similar in case.
    transfer-WM to IM
    Backflushing of WIP to an interim storage location?
    Thanks,

    As Manish mentions above, when you are performing a posting change in a WM-managed SLOC, the preferable method is to use LQ02.  This is because you already know the exact quant involved in the posting change and if your configuration is set properly, it is a single transaction for the end user.
    If you start with MIGO, you must then follow on with LU04 as a second step to convert the Posting Change Notification in the foreground - otherwise you risk carrying out a posting change on the wrong quant!
    You will first need to create custom WM movement types for the constellation of movements you want to perform these posting changes with (e.g., U > S, S > U, etc.).  For the examples I just named you can copy the appropriate 3xx WM movement as a template.  I would recommend that you set these movement types for automatic creation, automatic confirmation and post to the same bin.
    In the IMG you can go to WM > Interfaces > IM > Define Posting Changes and link the IM and WM movements and also the source/destination stock categories (or special stock).  Then in LQ02 you can simply enter the warehouse, storage type, bin and WM movement involved and you should be able to tick the quant(s) to change and post.
    One limitation of using LQ02 for initiating the posting change in WM is that you must transform the entire quant.  If, for example, you have a quant with 100 EA and only 41 EA are to be blocked, you should first quickly perform a bin-to-bin movement of the stock to be blocked to some other bin, perform the posting change, and then move it back.  This has been my experience.  If someone knows a way to do a partial posting change using LQ02 I'd love to know how to do it. 
    Good Luck!
    Jason

  • Inter plant to plant transfer inspection !!

    Hi Gurus,
    For a material I have activated inspection type 08 to inspect the goods while transfer from one plant to other.
    But inspection lot is getting triggered when same material is issued for production although i have not activated inspection type 02.
    What will be ther reason ?
    What is the movt type for Goods issue inspection so that i can deactivate the same?
    What is the movt type for stock transfer from one plant  to other plant ?
    Plz suggest.
    Regards

    Hi
    But inspection lot is getting triggered when same material is issued for production although i have not activated inspection type 02.
    THis Inspection lot must be of 08 as you are using MB1B-->311 mvt type to transfer from one staorage location to other,
    08 will also create for storage location to storage n the same plant.
    What will be ther reason ?
    What is the movt type for Goods issue inspection so that i can deactivate the same?
    This is due to 08 inspection type only
    What is the movt type for stock transfer from one plant to other plant ?
    It is depends upon which mvt type you are using for plant to plant transfer & how you are doing it.
    Like for 301 mvt type ;08 only will create.
    If you are using 303 -305 method then 02 lot will be created for 303 & for 305 Inspection lot of 05 will be made.
    I hope its clear now
    Regards
    Sujit

  • Rejected Items

    All,
    Please see the scenario  :
    I dont have QM Module here . Batch Management is active here .
    So while doing goods receipt the Raw materials will go to Quality Ispection SLoc(unrestricted status)  and after quality Inspection ( physically ) , if it is accepted they will move to Raw material SLoc (unrestricted status)(MB1B-311) and if it is rejected they will move to Rejection SLoc (Blocked status)(MB1B-344)  .
    Whenever the material is moved to Rejection SLoc(Blocked status) , MRP will trigger a new requirement in the form of planned order and convert it into PR then PO.
    After some days they will do MIGO (122) , then PO will be open again .
    So for the same material there exists two PO  .
    So they will go to ME22N and click delivery completed indicator hence close the PO.
    This is the design .
    1. Whether this is the good practice in this type of scenario ?
    Now business wants , it shud not be delivery completed clicked because it is rejected items .
    2.Whether in PO any other option is there for closing the PO and to show it is rejected?
    3.Can anyone please suggest or advise me a right solution and good practice.?
    regards

    Hello Sandeep,
    In your query, you asked for best practice, so accordingly I replied.
    "It is always challenge for a consultant to make the client understand the best practice and ask them to follow, because no one likes changes"
    You can ask them that if you will make business process as per the best practice you will have very good business process as per the standard industry and visibility during these business processes.
    <b>- Regarding the visibility of Quality stock</b>
    As you know we can easily identify the different stock types (i.e Un-restricted, Quality, Blocked) within the same storage location. You can receive material as Quality stock in the Quality Storage location (if you have defined different Location), now when you move Quality stock with 321 at that time you have option in which storage location you want to receive at that time you can post this stock in Unrestricted stock.
    <b>Regarding Rejection</b>
    When you reject any material with 122 mvt type, it will open the purchase order and the document will be recorded in purchase order history. Now when you receive the replacement quantity you can receive it against original purchase order.
    Hope this helps.
    Regards
    Arif Mansuri

  • Storage location selection for variable size item

    Hi All
    There is a BOM of finished good Material "XYZ" and there is a component "A" in the BOM. This Component A is a variable size item, its a metallic bar of length 4 meters.  In BOM XYZ, only 1.5 meters is consumed.
    Now when a production order is made for XYZ and the confirmation is done with movement type 261. All the materials are backflushed along with component A . The client's requirement is to transfer the remaining length of component A (i.e. 4 - 1.5 = 2.5 meters ) to a different storage location at the time of confirmation.
    Please let me know how is it possible.
    Thanks in Advance
    Rohit

    FULL STEPS:
    1.first do mb1b 311 mvmt transfer posting  for the components from raw-stor location to prod stor location. you can do for A
    2.  do GI for the components. for A for that final product . consume 1.5 so. the remaining component will be (3 ) there in the stor. location as per sap. (check in mmbe)
    3. then do mb1b 311   transfer posting for the A component to raw-stor location. from the prod stor location.
    or rever the  transfer posting mb1b 312.

  • Sub contracting Process ( MTO)

    Dear All,
    One of the my client using Sub contractig process MTO.Defined process like
    1. Create process order based on Sales order  ( Auto PR generate)
    2. Sub contracting purchase order creation agaisnt PR
    3. Material consumption againt 261 Movement
    4. GR for service expenses
    5. Process settlement for 101 Finished goods.
    Now my business would want consumption posting along with GR ! But we sre unable to transfer goods ( Sales order assigned stock ) to Vendor SC stock through 541 Movement type. Is there any special way to transfer the same ?
    Rgds
    Suma

    Hi,
    The process we have used is and suggested by SAP is-
    Prerequisite:
    -Create vendor's place as a storage location.
    -assign 311 E,312E, 543 E to movt type grouping for subcontracting challan.
    - Make vendor field(LIFNR) mandatory at MB1B 311 E .
    Process:
    1 Create PO for material. with item category L
    2 transfer the goods through 311 E to storage location created for vendor's stock.
    3 Create Subcontracting challan with reference to 311E material document.
    4 Make GR after goods recieved from vendor.
    5 Consumption will follow from storage location against PO.(need to give vendor's storage location for consuming material)
    regards,
    sujit borse
    Edited by: SNB on Dec 13, 2010 10:18 AM

  • HU Configuration for Storage Location

    Hi everyone.
    In the following point of config, there is something I do not understand.
    I hope somebody can explain it to me.
    HU Requirement for Storage Locations and Default Values for Deliveries
    Are the Vendor and Customer needed in this table?
    If they are, what purpose do they serve? What are they needed for?
    And again, if they are, do they represent the Plant? or what?
    Should they be created with special characteristics?
    I know a lot of questions, But I do not understand.....
    Thanks,
    Alain

    Hello Alain,
    When you are making the storage location is HU managed, and when you try to execute any IM transactions like stock transfer, transfer posting, system doesn't directly post a material document unlike in regular non HU managed locations.
    For example if you try to execute MB1B-311 from HU managed location to non HU location, system tries to create an outbound delivery document. And to create this outbound delivery document you need a customer and this is the place where system gets that customer information. Same is the case for vendor in inbound delivery.
    And it doesn't require to create deliveries all the time if you want to execute these inventory transactions. VLMOVE transaction can be used to posting material document without deliveries.. But not all business scenarios will use VLMOVE as it has its own limitations.
    Regards
    Gopal

  • Decentralized WM

    Hi All,
    We try to find out solutions for some unknown subjects on decentralized warehouse management system.
    1. After setting connection between ERP and DeWM systems, When we shut down the ERP system for maintenance for an interval time, could we able to process erp transactions like purchasing, sales nearby warehouse transactions on the decentralized warehouse? This time, (When ERP is
    closed) how can i proceed operations after creating some documents like purchasing or sales from DeWM to ERP? Does we have any chance to create and go on operations on decentralized warehouse management in the time of ERP's closed? If yes, How can we send operation informations to ERP system from DeWM, when we open ERP system. Does it provided again with same BAPIs?
    2.When i create inbound/outbound delivery document on ERP system and after that processing this delivery on DeWM, is it possible to process the delivery different from current quantity? For example, when i create an inbound/outbound delivery as 10 pieces quantity on ERP
    system, how can i operate this delivery document processing just 8 pieces quantity on DeWM system.
    3. Between ERP and DeWM systems, is there any trans. code to see data consistency. Or how can we see the datas went correctly through other ERP system from DeWMS?
    4. What is the accurate system basis requirements to work decentralized system in a high performance (empty space req.ec)
    If you help me about DeWM usage related those issues, i will be very
    pleased.
    Thank you so much.
    M.Ayhan Çak&#305;r

    Hello Dear Venu,
    Firstly, i've got your solutions and thank you so much for your quick reply. But to make more clear problems, i will explain below again,
    1.I try to expain on a and b scenario, i mean;
    a) Normally, i use on ERP for material incoming (MIGO/501), purchasing (ME21n --> VL31N), sale (VA01n --> VL01n), direct saleing (MB1B/311) transactions and after that i create deliveries and process this deliveries on WMS server (ERP and WMS servers are open). After create transfer order and confirm it on WMS, i do posting change and see the changing MM stock level on ERP.
    b) But if i close ERP server for a-7-days, it's possible process warehouse applications (picking, packaging, creating transfer orders with delivery numbers..etc) on WMS server.
    Also, Is there possible to do same ERP operations (like 1-a clause) like forming material incoming (MIGO), purchasing(ME21n>VL31n), saleing (VA01>VL01n), direct saleing(MB1B) on WMS server and after, create deliveries and transfer order again and confirm it and doing posting to change MM stock level for ERP. This application is possible? If possible, how ERP system can recognize ERP movements from WMS.
    2.Thanks for solution. I just wonder that if you indicate which adjustment transaction i do correction. (like reverse posting transaction?)
    3.Thank you for your solution.
    4.I try to make clear spesifically,
    I mean basis server requirements like sizing.
    For example, a WM system that works on Windows NT system, database is Oracle, WM user numbers are about 30, and WM server is independent from ERP server. So,What must be server's RAM, CPU, Harddisk and other specifications/requirements ?
    Thank you so much for your cooperation.
    King Regards.
    Ayhan Cakir

  • Bin Number for the First Time Putaway

    Hi,
    At the time of warehouse management go-live, we move tne stock from non-wm stock to wm-stock via tcode MB1B/311, then the system create transfer orders with proposed bin number according to the settings and material master data.
    The problem is, for some materials which are not set as "Fix Bin" in the material master, the bin number proposed by the system  are not as same as actual ones when we put away the materials at the first time.
    So, after WM go-live, what's the best way to keep the actual bin number for each material consistent with actual ones, is there any good ways except stocktaking?
    Kindly please advise.
    Thanks.

    Hi, Jürgen,
    Thanks a lot.
    If so, is it OK to do as follows?
    suppose I will acticate warehouse management for the following storage location:
    Plant: P001
    Storage location: SL01
    1) to keep the original stock in the storage location SL01, do not move the stock out to non-WM managed storage location before go alive.
    2) transport the WM settings to production system
    3) because the warehouse was managed via an external (third-party) warehouse management system before, so I have a detailed  list including  material, exact bin number and quantity.
    So I create transfer orders  with movement type 561 according to above list, and this can make the WM stock consistent with IM stock. is it OK to do like this?
    Kindly please advise again.
    Thanks.

  • Actual material consumed by the produciton order

    Hi guys,
    This one is interesting
    we have an order for 100 Rolls(Material A - Finished product)
    Material B is one of the component that is used to make Material A
    Now required qty is 100 Rolls of B,Quantity withdrawn is 50 Rolls
    Where as delivered qty of Material A is 10 Rolls
    Requirement is i need to know the actual amount of Material B consumed to make 10 Rolls of Material A
    Do we have this information in any standard report in SAP
    I'm not sure we  have one,this we need to know for whole set of orders with complex conversion factors
    Note :- Goods Movement is posted for 50 rolls of Material B,so qty withdrawn field is updated as 50
    Pls revert
    Thanks,
    SVP

    SVP,
    You are right there are no standard reports available, for that matter in this case you have not entered in SAP system that for Delivery 10 Rolls of A, I have consumed 10rolls of B.
    Couple of questions,
    1. Why 50rolls of B was Issued to make 10rolls of A?
    2. Is the Goods Issue a manual one? No Backflush? Is delivery also a Manual GR?
    Probably I think of couple of options,
    If Backflush and Auto GR is active, when you are confirming Yield for 10rolls of A, GR automatically happens for 10 Rolls of A, and Backflush happens for 10rolls of B(This can be changed). - If this was done you can take the report from COOIS itself.
    Another options is if you are doing manual GI, then introduce a new Storage location(Logical to represent your workarea), so when goods are withdrawn from Stores, do a MB1B- 311 movement from Stores to this storage location. When you are doing GR for the product, you can make a manual GI for the actual consumed quantity,
    This is my thought..
    Regards,
    Prasobh

Maybe you are looking for