Microsoft Project and OS X

I'm trying to run Microsoft Project 2010 or 2013 but am receiving error messages- "incompatible with Mac OS X" for both.  I'm running the 10.9.  Is there anyway I can get around this- really need this program to work!

http://mac-project-management-software-review.toptenreviews.com

Similar Messages

  • Interface between Microsoft Project and SAP Project Systems

    Hi,
    When we update SAP Project systems from Microsoft Project, our users want to swap values between project nodes id and description. Is this possible? Which BAPIs are used by OpenPs? I am trying to find a user-exit where I can swap these values.
    Thanks in advance.
    Regards
    Jitendra Pongurlekar

    Refer Note 579761. This can provide you some hint.
    Regards
    Sreenivas

  • Microsoft Project and Oracle Project

    Hi,
    What is the satisfied feature in Oracle projects module to beat Microsoft project other than integration with financial module???

    Hi
    Microsoft Project is a very good planning and scheduling tool.
    It has noting to offer regarding costing, billing, integration with OTL, inventory, purchasing, AP, AR, GL, etc.
    Oracle EBS Projects has limited functionality in planning, and no shceduling capability.
    Dina

  • Project Server 2010 - Error 20010 with a master project and 3 sub-projects during publication

    Hi,
    Here is the situation :
    One master project with three sub projects.
    Sub projects are really similar (Same ressources and nearly same tasks but only the first contain real work for now).
    Sub projects got no sub projects nor links between projects.
    The owner of the master project got read rights through projects permissions on sub projects.
    Sub projects are link in "read only".
    We applied Project Server 2010 SP2 last week end and the issue appeared monday.
    Here are the symptoms :
    When we link only one sub project (Doesn't matter which one), the owner can publish, no problems.
    With 2 sub projects, the error may occur.
    With 3 sub projects, the error always occurs.
    With admin rights, the error doesn't occur.
    Here is the error :
    ID : 20010 (0x4E2A)
    Description : You don't have required permissions to perform the action (Average traduction)
    Detail : <detail><errinfo><general><class name="Project"><error id="20010" name="GeneralSecurityAccessDenied" uid="19515c1d-2624-466f-953a-b7fc67337b81"/></class></general></errinfo></detail>
    I'm unable to determine which sub project is the culprit, if there is one, as it's working when I link only one of them.
    Thanks for your time !

    Fylim --
    If the project manager in question does not need to edit any of the three projects, the PM does not need to have Read/Write access to any of the three projects.  Because you said that the PM needs to set links in all three projects, this means that
    the PM will be editing all three projects.  In order to edit the three projects, the PM must have Read/Write access to all three.  Setting cross-project links constitutes editing of the projects, which is why the PM must have Read/Write permission. 
    Make sense?
    Regarding SP2, I am not aware that this would change anything, but I could be wrong.  The reality is that regardless of which SP you have applied to Microsoft Project and Project Server 2010, the PM in this situation MUST have Read/Write access to the
    projects that he/she needs to edit with cross-project links.  Hope this helps.
    Dale A. Howard [MVP]

  • Project planning board report to microsoft project report

    hi all
    good morning
    i want to convert the project planning board report to Microsoft project and primavera report ...
    please guide me through the steps......
    Thanks in advance
    Surya

    Hi,
    OpenPS for Microsoft project (OpenPS4MSP) is an Add-on to SAP R/3 Project System which enables users to transfer project related data between Microsoft Project and R/3 Project System.
    Refer SAP Note: 579761 for OpenPS.
    Then to integrate SAP and Primavera , you can use various integration tools available. One of them is Primavera Inspire.
    Refer :
    http://www.oracle.com/applications/primavera/primavera-inspire-for-sap.html
    Regards,
    Amit

  • Microsoft Project Send Data Error As of date invalid

    Hi,
    When i try to receive data from oracle into Microsoft project and then i do same changes and then when i send to back to oracle is shows error."The As of Date is Invalid"
    please any tell me how can i correct this error.
    thanks,
    tariq

    Hi,
    You may check whether the "As of date" you entered in the progress information if valid and check whether it is within the project period.
    Regards,
    Bvt

  • Microsoft Project 2013

    Hello. I am very new to Microsoft Project and only have been using it for about a week or so. I am creating a timeline and there is no indication that there is any error with my timeline. But my start and finish dates are not right, but the duration is correct.
    I have my duration as 200 days. My start date is 10/15/2013. My end date, however, is 2 years ahead and is 6/7/2015. The duration between those two dates is 600 days, when the project is only supposed to be 200 days. I somehow have a 400 day gap, which I have
    no idea how that happened. I could really use some help. I have been trying to fix this for hours. If it helps, my schedule is:
    Default start time: 12:00 AM
    Default end time: 12:00 AM
    Hours per day: 24
    Hours per week: 168
    Days per month: 30
    and I have a fixed duration and my work is entered in days.
    Also, I have weekends as working days, so I have a 7 day work week.
    Help would be most appreciated!!

    Duplicate thread, for response see the thread below 
    http://social.technet.microsoft.com/Forums/projectserver/en-US/03fee77b-99c4-4c72-a9ac-1189f652dbb1/microsoft-project-2013?forum=projectprofessional2010general
    Thanks | epmXperts | http://epmxperts.wordpress.com

  • Dropdowns and many buttons disabled in PWA 2007 after Microsoft Project Professional 2010 has been installed

    Hi Team,
    I have Microsoft Project professional 2007 installed and also using PWA for 2007.
    I recently installed Microsoft Project Professional 2010, and since the time i installed 2010 all the button in PWA 2007 have been disabled.
    1. I could not select a project from "Project Center"
    2. I could not select resources from "Manage Resources"
    3. I could not select dropdowns in the project properties even if the project is selected.
    ALl the other team members are able to use both without any issues.
    I also uninstalled IE8 browser and re-installed, that didn't help.
    I could use PWA normally after 2010 is uninstalled.
    Please suggest a solution for this.

    Try running a repair on Project Professional 2007. You always have to do this after installing a newer version of project. Always run a repair on the previous version. What's happening is that PWA is not seeing 2007 on your machine because 2010 overwrote
    some of the shared objects.
    Gary Chefetz, MCITP, MCP, MVP msProjectExperts
    Project and Project ServerFAQs
    Project Server Help BLOG

  • Hello, I need to download Microsoft visio and project on my Macbook pro, can I do that? which site has them?, Hello, I need to download Microsoft visio and project on my Macbook pro, can I do that? which site has them?

    Hello, I need to download Microsoft visio and project on my Macbook pro, can I do that? which site has them?, Hello, I need to download Microsoft visio and project on my Macbook pro, can I do that?

    Viso only runs under Windows, so you'd first have to install Windows, either using Boot Camp or a virtual machine, then purchase Viso. Or, you can purchase this to deal with Viso files:
    http://www.omnigroup.com/products/omnigraffle/feature_comparison/

  • Microsoft Project 2010 Error/Bug Using Filters and AutoFilters

    Dear Community Members/Team,
    I came across an error/bug while using Filter and AutoFilter options in Microsoft Project 2010. The details are as under:
    I have an MS Project 2010 file which has total 3049 activities (IDs).
    The linking process (predecessors and successors) is almost complete.
    In MS Project 2010 software console, in the bottom left most corner, I have right clicked and enabled the options of "Filter" and "AutoFilter".
    In the "View" tab located at top console, I have selected "[No Filter] against the "Filter" icon. Also, from the drop down arrow against the "Filter"
    icon, I have enabled "Display AutoFilter". As a result I can see drop down arrows in front of all columns displayed in the file.
    I have displayed columns "Duration", "Start", "Finish", "Total Slack", etc.
    I used the drop down arrow appearing in front of "Total Slack" column, and I can see some options. At the bottom I can see all the "Total Slack" values with
    scroll option available and all the boxes here are checked. I remove the check box in "Select All" field and manually select any random value such as "-11.17 wks".
    To my surprise, some values when selected, they are displayed correctly with the relevant activities shown. However some of the values which I select are not appearing and the relevant
    activities are not shown and only empty rows are shown. So I use "Clear Filter" and try some other option.
    Now, to find those activities, I have to click on the drop down arrow in front of "Total Slack" column, Go to "Filters", and select the last option "Custom".
    Now I select show rows where Total Slack "equals" and I select any value from drop down arrow appearing in front of "equals", I can see all those values of "Total Slack" and I randomly select the same value for e.g. "-11.17
    wks". This time the relevant activity is displayed correctly which was not shown by using the above method of selecting a certain value by selecting a check box from drop down arrow appearing against any column.
    I hope to have a response from the community.
    Regards,
    Usman

    Hi Usman,
    Strangely we are having the exact same discussion with another member here:
    https://social.technet.microsoft.com/Forums/projectserver/en-US/0ae3530f-6760-4ef9-afd9-6028258a490e/autofilter-feature-malfunctioning?forum=projectprofessional2010general
    Please go through this thread and tell us if it brings some light. Particularly try with a brand new file to reproduce the error. It could see the error on Ahmad's file, but couldn't reproduce it on a brand new file.
    Hope this helps,
    Guillaume Rouyre, MBA, MVP, P-Seller |

  • Sap-ps peoject and microsoft project transfer?

    Hi,
    I think creat a link from sap-ps peoject to microsoft project transfer or from microsoft project transfer to sap-ps peoject ,
    include operate creat/change/delete etc.
    I hope to gain this user manual ,how can I creat  in two system.
    Thanks!

    Hi,
    SAP-PS & MSP interface can be obtained through Open PS. SAP has provided Open PS for downloading & uploading projects from MSP to SAP-PS & vice versa. Open PS can be downloaded from service.sap.com. Please follow the URL to know more details on same. http://help.sap.com/erp2005_ehp_02/helpdata/en/4c/22698846e611d189470000e829fbbd/frameset.htm
    You can also refer various threads on Open PS posted in this group.
    Hope this will help you.
    Regards,
    Rakesh Pradhan

  • CRM and Microsoft Project Server Integration

    Hello,
    Can anyone explain what solutions are available that can help in integrating SAP CRM with Microsoft Project Server? Is there any documentation available on this? Thanks.

    Hello Roberto,
    E-Mail rerouting is possible with an Exchange server. We use an adress [email protected] provided from the Exchangeserver. The mail is then forwarded to [email protected] to be retrieved by our CRM System for further processing. Please ask your Exchange admin again. I think he has to get wome more information about configuration possibilities.
    Regards
    Gregor

  • Using Webi to generate report from Microsoft Project?

    Does anyone know if there a way to create a Webi report from Microsoft Project?  Can put me in the right direction towards accomplishing this task?

    Hi,
    For this use Microsoft .Net with Integration of Business Intelligence(BI/BOBJ). Select web I reports with Crystal Reports generation and use in the .Net Project.
    All the Best
    Madhu.....

  • Office 2013 VL Local Install with Project and Visio 2013 App-V

    Is it supported to have a local install of Office 2013 and deploy a virtual package for Project and Visio 2013 (created via ODT) using App-V 5.0 SP2?I cannot find any reference in the various support articles.

    Hello. Did you manage to get an official statement on this?
    Please remember to click "Mark as Answer" or "Vote as Helpful" on the post that answers your question (or click "Unmark as Answer" if a marked post does not actually
    answer your question). This can be beneficial to other community members reading the thread.
    This forum post is my own opinion and does not necessarily reflect the opinion or view of my employer, Microsoft, its employees, or MVPs.
    Twitter:
    @alexverboon | Blog: Anything About IT

  • Microsoft Date and Time Picker Control 6.0 (SP6) errors

    One of our functioning VBA projects in Outlook 2010, running under Windows 7 Professional (64-bit), unexpectedly stopped functioning a few months ago. When running the VBA macro we started receiving the compile error message:
    "Object library invalid or contains references to object definitions that could not be found"
    PROBLEM FORM CONTROL:  The message was extremely frustrating because it gave no detailed indication of the source of the problem.  With a little research, however, we found that the
    Microsoft Date and Time Picker Control 6.0 (SP6), on a userform accessed by the macro, was generating the error.  A number of older articles, such as the one included below, indicated that we needed
    to re-register the MSCOMCT2.OCX form control, which we did successfully (as did the original author in his question link below).  Unfortunately, as the original author found, simply re-registering the form control did not resolve the problem.
    UNRESOLVED QUESTIONS:
    1. Does anyone know why this functioning control would unexpectedly cease to function?
    2. Can anyone help us restore the functionality of the 'Microsoft Date and Time Picker Control 6.0 (SP6)'?
    3. How come the form control is listed in the object library, is available in the 'Additional Controls' dialog, and can be inserted into a form, without any indication that it is broken?
    SUPPORT ENGINEER RUN-AROUND:  Another frustration is that a responding support engineer, in the prior article, keeps referring the author back to this forum, yet the question is apparently never answered back here in
    the TechNet forum (which ironically refers us back to the original article in the other forum - a game of musical chairs!).
    We suspect that the solution to this problem may be similar to resolving this issue for other similar form controls in other Office 2010 application, not just Outlook.  After several years, and a myriad questions on the internet regarding
    this exact subject, is there someone who can definitively resolve this issue with this control?
    Thank you for any help.
    LINK TO THE ORIGINAL UNANSWERED QUESTION (i.e., regarding the MSCOMCT2.OCX control and reference back to this forum):
    http://answers.microsoft.com/en-us/office/forum/office_2013_release-excel/ms-date-and-time-picker-contol-60-sp-6-w-excel/9b0cc596-5e13-48bc-b03e-13dbfd1c7f9d

    Hi,
    Would you like to tell me your Excel version number (Go to Account>About Excel). I tested in my version :15.0.4569.1504 and the Date and Time Picker Control 6.0 still could be used.
    Then,>> My PC is 64 bit.  I believe my version of Office is also 64 bit.<<  Office 2013 32 bit also could be installed in 64bit operation system. We could check it with Account>About Excel.
    Next, as you said >>After I exited 'Design Mode,' it started working again.  I tested it, along with my 'Clear Form' button multiple times.  It seemed to be working fine.  I closed the document and reopened it.  Enabled Macros. 
    When I tried to use it after reopen, it doesn't work again.<< 
    I recommend we recreate a new blank Excel file and insert the Date and Time Picker Control 6.0 to test.
    If it still does not work well, please try to reinstall and re-registry it. Follow the link:
    https://social.msdn.microsoft.com/Forums/office/en-US/36f83f24-cd76-4f8e-aa7b-5f166666e7d3/excel-2013-popup-calendar
    https://social.msdn.microsoft.com/Forums/en-US/91cf3127-70fe-4726-8a27-31b8964430c5/registering-mscomct2ocx-in-64-bit-windows-7?forum=sbappdev
    If it works well, I suppose this issue is related to macros. I recommend you post the question to MSDN forum to debug them:
    https://social.msdn.microsoft.com/Forums/office/en-US/home?forum=exceldev
    Regards,
    George Zhao
    TechNet Community Support
    It's recommended to download and install
    Configuration Analyzer Tool (OffCAT), which is developed by Microsoft Support teams. Once the tool is installed, you can run it at any time to scan for hundreds of known issues in Office
    programs.

Maybe you are looking for