MM month end periods error..?

Dear all
Can anybody expalin me how to clear this error message,
"Posting only possible in periods 2008/03 and 2008/02 in company code LML"
Thanks
sap-mm

Hi,
Hope New Period ( July month,04) not open in FI side
Check in T.code: MMRV and see which period is open for ur Co.Code LML and back posting is allowed or not.In MMPV close the period last period ( may be 03) and automatically system open the new one.
Now use t.code: OB52(FI side) and open the 04, 2008 period in Account Types A, K, D,M, S and specially Account Type u201C+u201D which stands for valid for all accounts type and save. Better consult FICO consultant for OB52 step.
Regards,
Biju K

Similar Messages

  • Posting Run Month end accruals error

    Hi Guys,
    after running the payroll driver on test mode for period 26 2009...when I look at the log file...I get an error that the employee has been rejected...and the maximum number of search runs exceeded under Month end accruals...
    looking fwd to your comments and suggestions

    Hello Shiloh S,
    The error message "Maximum number of search runs exceeded" occurs in
    function UACGF, which is for the Month End Accruals calculations.
    Below, I've updated information which explains the Month End Accruals
    process, calculations and required table entries:
    1. Tables T549S and T51A1:
    The T549S table needs 3 dates specified for each pay id.  Those 3
    dates and their respective Date IDs are:
      01 = pay date
      04 = posting run
      05 = ACC: Earliest Doc. creation date
    To check if these entries have been made, please go to sm31 and view
    if the entries have been made for the year for example: 2002
    (you should also check consistency of future entries as well!)
    You can create the entries via the IMG paths specified below for the
    respective Date IDs (if you have not already done so).
    NOTE: The tables are only changed if a flag has been set for the field
    'Carry out table change'.  If no flag is set, a test run is performed.
    01 = pay date
        IMG -> Payroll US -> Basic Settings -> Payroll Organization
            -> Generate Payroll Period
               You can view the documenation on this step by doubleclicking
               the title of the step. (NOTE:  first change your Text Display
               by going to 'Utilities - Text Display - SAPscript)
               For further explanation - click 'Report Documentation'
    04 = posting run
        IMG -> Payroll US -> Month end accruals -> Triggering Month End
            Accrual computation -> Maintain Posting Date
             -Create      ('Info' icon provides explanation of how to run.)
    05 = ACC: Earliest Doc. creation date
        IMG -> Payroll US -> Month end accruals -> Triggering Month End
            Accrual computation -> Set latest earliest document creation
             date
    For T51A1 - Final date for HR Postings (Accruals):
    This date determines the final date on which postings may be effected
    from HR for each posting period.  I would advise you to set this up
    for each company code and each accounting period of 2001.  For more
    info, please select F1 in the fields that you are unsure of.
      You can maintain these dates via the path:
       IMG -> Payroll US -> Month end accruals -> Triggering Month End
            Accrual computation ->
    2. Explanation of Month End Accruals:
    First of all there is a switch to say in general if accruals are to be
    computed for an employee or not. This switch is called ACCMO and
    is set to 'ON' (1) in rule UAC0. Unfortuately this rule is deactivated
    in your development system so that accruals are not calculated.
    If this switch is set to 'ON', the system first tries to find out if it
    has to calculate accruals and for which periods this is to be done.
    If you have a payroll period which overlaps two posting periods, you
    will have accruals for this period.
    Generally the system can calculate accruals according to exact/current
    values and or the system can estimate the accruals. The system always
    tries to be as exact as possible which means it always tries to use
    current values.
    So: How does the system decide if for one period current values can be
    taken or if an estimation has to be done?
    If you need to post accruals for a payroll period because it overlaps
    two posting periods, you have to post to both posting periods. So you
    have to make sure, that you are still able to post to both posting
    periods when the posting for the payroll period is done. This means the
    system has to check that the LDCD (Latest earliest document creation
    date) of the payroll period is earlier than the closing date of both
    posting periods concerned. Often one posting period is already closed
    which means that it is no longer possible to post accruals to this
    posting period when the overlapping payroll period is calculated. This
    means the system has to estimate values for this overlapping payroll
    period before. In other words, the system calculates accruals for a
    payroll period in the last payroll period with a LDCD which is is
    earlier than the closing date of the overlapped posting periods.
    Thus during payroll, the system checks for the current and for the
    following payroll periods if things have already been done (because now
    it is too late), if things have to be done now (because when the next
    payroll period is calculated it will be too late) or if it will be
    possible to post accruals after the next payroll period.
    Hoping the above information are helpful.
    Kind regards,
    Graziela

  • Error with month end payroll Accruals

    We have an error when posting month end payroll accruals for our weekly payroll, though the bi-weekly payroll works fine!
    I have checked tables T549S and T51A1 and all of the dates are correct and set as I would expect, however the system did not create a month end accrual for the weekly payroll into the following months posting period.  For the biweekly payroll this worked exactly as expected.
    We had no issues with this for the last calendar year, however for 2009 we have changed our month end closing dates, though I do not see that this would prevent this from happening.  I have checked various things in the IMG and have not been able to resolve this, does anyone have any ideas what might be causing this.
    HELP!!!

    Michelle :
    Month-end accrual determination is based on T51A1, T549S (date type '04' and '05'), and T549Q (field Begda and Endda). Pay extra attention on these dates, as if one is incorrect (e.g. miss-type the year in the future entry with an earlier year) would definitely cause month-end accrual to stop working.
    Rgds.

  • Strange Oracle Behaviour - only month end or high load periods

    Hi SAP Gurus
    In one of our systems I am expreriencing a strange behaviour from Oracle, in that it seems to be in reconnect, but yet it is not, it resets and carries on but do produce Dump and SM21 log messages, the dump is not really helpfull as it is the same dump but with different program everytime.
    I have looked in oracle alert log and found no event tying back to the SM21 log message or dump.
    The following is what I found in the developer trace of one of these insident, but there are many, about 125 - 200 for the day during high load:
    Fri Nov 28 10:05:55 2008
    C  *** ERROR => Failed to register application info: orc=3113
    [dboci.c      3042]
    C  *** ERROR => Error 3114 in stmt_fetch()
    [dbsloci.c    13001]
    C  *** ERROR => ORA-3114 occurred when executing SQL statement (parse error offset=0)
    [dbsloci.c    13002]
    C  sc_p=045B18B4,no=29,idc_p=00000000,con=0,act=1,slen=1291,smax=1536,#vars=4,stmt=34DA78C8,table=CATSDB                       
    C  SELECT "MANDT" , "COUNTER" , "PERNR" , "WORKDATE" , "SKOSTL" , "LSTAR" , "SEBELN" , "SEBELP" , "SPRZ\
    C  NR" , "LSTNR" , "RKOSTL" , "RPROJ" , "RAUFNR" , "RNPLNR" , "RAUFPL" , "RAPLZL" , "RKDAUF" , "RKDPOS"\
    C   , "RKSTR" , "RPRZNR" , "PAOBJNR" , "FUND" , "FUNC_AREA" , "GRANT_NBR" , "S_FUND" , "S_FUNC_AREA" , \
    C  "S_GRANT_NBR" , "AWART" , "LGART" , "KAPID" , "SPLIT" , "REINR" , "WABLNR" , "VERSL" , "WTART" , "BW\
    C  GRL" , "WAERS" , "AUFKZ" , "TRFGR" , "TRFST" , "PRAKN" , "PRAKZ" , "OTYPE" , "PLANS" , "KOKRS" , "ME\
    C  INH" , "TCURR" , "PRICE" , "ARBID" , "WERKS" , "AUTYP" , "HRCOSTASG" , "HRKOSTL" , "HRLSTAR" , "HRFU\
    C  ND" , "HRFUNC_AREA" , "HRGRANT_NBR" , "BEMOT" , "UNIT" , "STATKEYFIG" , "TASKTYPE" , "TASKLEVEL" , "\
    C  TASKCOMPONENT" , "BUKRS" , "ERSDA" , "ERSTM" , "ERNAM" , "LAEDA" , "LAETM" , "AENAM" , "APNAM" , "AP\
    C  DAT" , "WORKITEMID" , "LOGSYS" , "STATUS" , "REFCOUNTER" , "REASON" , "BELNR" , "EXTSYSTEM" , "EXTAP\
    C  PLICATION" , "EXTDOCUMENTNO" , "TASKCOUNTER" , "CATSHOURS" , "BEGUZ" , "ENDUZ" , "VTKEN" , "ALLDF" ,\
    C   "OFMNW" , "PEDD" , "AUERU" , "LTXA1" , "LONGTEXT" , "ERUZU" , "CATSAMOUNT" , "CATSQUANTITY" , "ZCAT\
    C  SPLAN" , "ROUTE" , "KUNNR" , "MVGR1" , "GSBER" , "SNAME" , "MAKTX" , "ZAVGHRS" , "ZQANT" , "ZPERNR" \
    C  FROM "CATSDB" WHERE "MANDT" = :A0 AND "WORKDATE" = :A1 AND "WERKS" = :A2 AND "STATUS" < :A3;
    C  sc_p=045B18B4,no=29,idc_p=00000000,con=0,act=1,slen=1291,smax=1536,#vars=4,stmt=34DA78C8,table=CATSDB                       
    C  prep=0,lit=0,nsql=0,lobret=0,#exec=1,dbcnt=0,upsh_p=00000000,ocistmth_p=345E20EC
    C  IN : cols=4,rmax=1,xcnt=0,rpc=0,rowi=0,rtot=0,upto=-1,rsize=17,vmax=32,bound=1,iobuf_p=045DFFA8,vda_p=3470A8D8
    C       lobs=0,lmax=0,lpcnt=0,larr=00000000,lcurr_p=00000000,rret=0
    C  OUT: cols=105,rmax=58,xcnt=58,rpc=1,rowi=0,rtot=1,upto=-1,rsize=895,vmax=128,bound=1,iobuf_p=0E0A4EC8,vda_p=34F8F7E8
    C       lobs=0,lmax=0,lpcnt=0,larr=00000000,lcurr_p=00000000,rret=0
    C  SELECT "MANDT" , "COUNTER" , "PERNR" , "WORKDATE" , "SKOSTL" , "LSTAR" , "SEBELN" , "SEBELP" , "SPRZ\
    C  NR" , "LSTNR" , "RKOSTL" , "RPROJ" , "RAUFNR" , "RNPLNR" , "RAUFPL" , "RAPLZL" , "RKDAUF" , "RKDPOS"\
    C   , "RKSTR" , "RPRZNR" , "PAOBJNR" , "FUND" , "FUNC_AREA" , "GRANT_NBR" , "S_FUND" , "S_FUNC_AREA" , \
    C  "S_GRANT_NBR" , "AWART" , "LGART" , "KAPID" , "SPLIT" , "REINR" , "WABLNR" , "VERSL" , "WTART" , "BW\
    C  GRL" , "WAERS" , "AUFKZ" , "TRFGR" , "TRFST" , "PRAKN" , "PRAKZ" , "OTYPE" , "PLANS" , "KOKRS" , "ME\
    C  INH" , "TCURR" , "PRICE" , "ARBID" , "WERKS" , "AUTYP" , "HRCOSTASG" , "HRKOSTL" , "HRLSTAR" , "HRFU\
    C  ND" , "HRFUNC_AREA" , "HRGRANT_NBR" , "BEMOT" , "UNIT" , "STATKEYFIG" , "TASKTYPE" , "TASKLEVEL" , "\
    C  TASKCOMPONENT" , "BUKRS" , "ERSDA" , "ERSTM" , "ERNAM" , "LAEDA" , "LAETM" , "AENAM" , "APNAM" , "AP\
    C  DAT" , "WORKITEMID" , "LOGSYS" , "STATUS" , "REFCOUNTER" , "REASON" , "BELNR" , "EXTSYSTEM" , "EXTAP\
    C  PLICATION" , "EXTDOCUMENTNO" , "TASKCOUNTER" , "CATSHOURS" , "BEGUZ" , "ENDUZ" , "VTKEN" , "ALLDF" ,\
    C   "OFMNW" , "PEDD" , "AUERU" , "LTXA1" , "LONGTEXT" , "ERUZU" , "CATSAMOUNT" , "CATSQUANTITY" , "ZCAT\
    C  SPLAN" , "ROUTE" , "KUNNR" , "MVGR1" , "GSBER" , "SNAME" , "MAKTX" , "ZAVGHRS" , "ZQANT" , "ZPERNR" \
    C  FROM "CATSDB" WHERE "MANDT" = :A0 AND "WORKDATE" = :A1 AND "WERKS" = :A2 AND "STATUS" < :A3;
    B  ***LOG BYM=> severe DB error 3114      ; work process in reconnect status [dbsh#3 @ 1123] [dbsh    1123 ]
    B  ***LOG BY4=> sql error 3114   performing FET on table CATSDB     [dbtran#10 @ 7292] [dbtran  7292 ]
    B  ***LOG BY0=> ORA-03114: not connected to ORACLE [dbtran#10 @ 7292] [dbtran  7292 ]
    B  dbtran ERROR LOG (hdl_dbsl_error): DbSl 'FET'
    B   RSLT: {dbsl=99, tran=1}
    B   FHDR: {tab='CATSDB', fcode=225, mode=2, bpb=0, dbcnt=0, crsr=1,
    B          hold=0, keep=1, xfer=0, pkg=0, upto=0, init:b=0,
    B          init:p=00000000, init:#=871, wa:p=0XA000DC88, wa:#=871}
    B  dbtran ERROR LOG (hdl_dbsl_error): DbSl 'FET'
    B   STMT:
    B   CRSR: {tab='CATSDB', id=1, hold=0, prop=0x1000, max.in@0=1, fae:blk=1,
    B          con:id=0, con:vndr=5, val=2,
    B          key:#=4, xfer=0, xin:#=0, row:#=0, upto=0, wa:p=0XA000DC88}
    C  *** ERROR => Error 3114 in stmt_fetch()
    [dbsloci.c    13001]
    C  *** ERROR => ORA-3114 occurred when executing SQL statement (parse error offset=0)
    [dbsloci.c    13002]
    C  sc_p=045B52E4,no=225,idc_p=045C400C,con=0,act=1,slen=184,smax=2048,#vars=3,stmt=35BBB778,table=REPOLOAD                     
    C  SELECT "UNAM" , "UDAT" , "UTIME" , "L_DATALG" , "Q_DATALG" , "SDAT" , "STIME" , "MINOR_VERS" , "MAJO\
    C  R_VERS" FROM "REPOLOAD" WHERE "PROGNAME" = :A0 AND "R3STATE" = :A1 AND "MACH" = :A2 ;
    C  sc_p=045B52E4,no=225,idc_p=045C400C,con=0,act=1,slen=184,smax=2048,#vars=3,stmt=35BBB778,table=REPOLOAD                     
    C  prep=0,lit=0,nsql=0,lobret=0,#exec=29,dbcnt=0,upsh_p=00000000,ocistmth_p=34B9ADD4
    C  IN : cols=3,rmax=1,xcnt=0,rpc=0,rowi=0,rtot=0,upto=-1,rsize=45,vmax=32,bound=1,iobuf_p=0E0A4EC8,vda_p=31361B18
    C       lobs=0,lmax=0,lpcnt=0,larr=00000000,lcurr_p=00000000,rret=0
    C  OUT: cols=9,rmax=1,xcnt=1,rpc=1,rowi=0,rtot=1,upto=-1,rsize=56,vmax=32,bound=1,iobuf_p=045DFFA8,vda_p=345C39B8
    C       lobs=0,lmax=0,lpcnt=0,larr=00000000,lcurr_p=00000000,rret=0
    C  SELECT "UNAM" , "UDAT" , "UTIME" , "L_DATALG" , "Q_DATALG" , "SDAT" , "STIME" , "MINOR_VERS" , "MAJO\
    C  R_VERS" FROM "REPOLOAD" WHERE "PROGNAME" = :A0 AND "R3STATE" = :A1 AND "MACH" = :A2 ;
    B  ***LOG BYM=> severe DB error 3114      ; work process in reconnect status [dbsh#3 @ 1123] [dbsh    1123 ]
    B  ***LOG BY4=> sql error 3114   performing SEL on table REPOLOAD   [dbrepo#6 @ 2657] [dbrepo  2657 ]
    B  ***LOG BY0=> ORA-03114: not connected to ORACLE [dbrepo#6 @ 2657] [dbrepo  2657 ]
    A  TH VERBOSE LEVEL FULL
    A  ** RABAX: level LEV_RX_PXA_RELEASE_MTX entered.
    A  ** RABAX: level LEV_RX_PXA_RELEASE_MTX completed.
    A  ** RABAX: level LEV_RX_VMIT_CLEANUP entered.
    A  ** RABAX: level LEV_RX_VMIT_CLEANUP completed.
    A  ** RABAX: level LEV_RX_ROLLBACK entered.
    C  *** ERROR => OCI-call 'OCITransRollback' failed: rc = 3114
    [dboci.c      3127]
    B  ***LOG BYM=> severe DB error 3114      ; work process in reconnect status [dbsh#3 @ 1123] [dbsh    1123 ]
    B  Reconnect state is entered by connection:
    B  0: name = R/3, con_id = 000000000 state = ACTIVE      , perm = YES, reco = YES, timeout = 000, con_max = 255, con_opt = 255, occ = NO
    B  hdl_error_on_commit_rollback: DB-ROLLBACK detected RECONNECT state
    M  ThShortCommit: db unusable
    B  db_con_reconnect disconnecting connection:
    B  0: name = R/3, con_id = 000000000 state = INACTIVE    , perm = YES, reco = YES, timeout = 000, con_max = 255, con_opt = 255, occ = NO
    C  Disconnecting from connection 0 ...
    C  Close user session (con_hdl=0,svchp=045D7FA4,usrhp=345E67A0)
    C  Detaching from DB Server (con_hdl=0,svchp=045D7FA4,srvhp=045D0174)
    C  Now I'm disconnected from ORACLE
    B  db_con_reconnect performing the reconnect for con:
    B  0: name = R/3, con_id = 000000000 state = DISCONNECTED, perm = YES, reco = YES, timeout = 000, con_max = 255, con_opt = 255, occ = NO
    C  got NLS_LANG='AMERICAN_AMERICA.US7ASCII' from environment
    C  Client NLS settings:
    C  Logon as OPS$-user to get SAPR3's password
    C  Connecting as /@PRD on connection 0 (nls_hdl 0) ... (dbsl 640 250407)
    C  Nls CharacterSet                 NationalCharSet              C      EnvHp      ErrHp ErrHpBatch
    C    0 US7ASCII                                                  1   045CBB38   0E0A4648   0E0A40B0
    C  Attaching to DB Server PRD (con_hdl=0,svchp=045
    SM51 log entries:
         09:00:32     MS                         Q0I     Operating system call recv failed (error no. 10054)
         09:00:32     DP                         Q0K     Connection to message server (on FCMSPROD) established
         09:00:32     DIA     004     040     181JOLENES     VA02     BYM     SQL error 3114 . Work processes in reconnect status
         09:00:32     DP                         Q1C     MsgServer Hardware ID Was Determined
         09:00:32     DIA     001     040     181ANNELINEJ     VA42     BYY     Work process has left reconnect status
         09:00:32     DIA     001     040     181ANNELINEJ     VA42     AB0     Run-time error "DBIF_REPO_SQL_ERROR" occurred
         09:00:32     DIA     014     040     161ADRIV     VA02     BYY     Work process has left reconnect status
         09:00:32     DIA     013     040     140ELECIA          BYY     Work process has left reconnect status
         09:00:32     DIA     003     040     133MIRANDAV     KO88     BYY     Work process has left reconnect status
         09:00:32     DIA     003     040     133MIRANDAV     KO88     AB0     Run-time error "DBIF_REPO_SQL_ERROR" occurred
         09:00:32     DIA     001     040     181ANNELINEJ     VA42     AB1     > Short dump "081128 090032 FCMSPROD 181ANNELINEJ" generated
         09:00:32     DIA     003     040     133MIRANDAV     KO88     AB1     > Short dump "081128 090032 FCMSPROD 133MIRANDAV " generated
         09:00:32     DIA     009     040     120ELIZEP     FB01     BYY     Work process has left reconnect status
         09:00:33     DIA     009     040     120ELIZEP     FB01     AB0     Run-time error "DBIF_REPO_SQL_ERROR" occurred
         09:00:33     DIA     004     040     181JOLENES     VA02     BYY     Work process has left reconnect status
         09:00:33     DIA     002     040     133KOEKIEJ          BYY     Work process has left reconnect status
         09:00:33     DIA     002     040     133KOEKIEJ          AB0     Run-time error "DBIF_REPO_SQL_ERROR" occurred
         09:00:33     DIA     004     040     181JOLENES     VA02     AB0     Run-time error "DBIF_REPO_SQL_ERROR" occurred
         09:00:33     DIA     009     040     120ELIZEP     FB01     AB1     > Short dump "081128 090033 FCMSPROD 120ELIZEP " generated
         09:00:33     DIA     005     040     181CLIVEB     VA02     BYY     Work process has left reconnect status
         09:00:33     DIA     003                    R0Z     The update dispatch info was reset
         09:00:33     DIA     003                    R0Z     The update dispatch info was reset
    Please can you assist in maybe you have seen this before.
    Regards
    Pieter

    Hi
    Yes I have gone through the Oracle Alert log several time, It is huge, but I am pasting an extract for the entire day this was happening into this reply.  Oracle version is 9.2.0.8.0 with the only intrim path I can see being installed : 6130293.
    Following is the extract from Alert Log for the day this occurred, again I must stress that this happens only on high system load days like month end:
    Fri Nov 28 03:43:33 2008
    ALTER TABLESPACE "PSAPBTABI" END BACKUP
    Fri Nov 28 03:43:33 2008
    Completed: ALTER TABLESPACE "PSAPBTABI" END BACKUP
    Fri Nov 28 03:43:37 2008
    ALTER TABLESPACE "PSAPCLUD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPCLUD" BEGIN BACKUP
    Fri Nov 28 03:53:38 2008
    ALTER TABLESPACE "PSAPCLUD" END BACKUP
    Fri Nov 28 03:53:38 2008
    Completed: ALTER TABLESPACE "PSAPCLUD" END BACKUP
    Fri Nov 28 03:53:42 2008
    ALTER TABLESPACE "PSAPCLUI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPCLUI" BEGIN BACKUP
    Fri Nov 28 03:54:36 2008
    ALTER TABLESPACE "PSAPCLUI" END BACKUP
    Fri Nov 28 03:54:36 2008
    Completed: ALTER TABLESPACE "PSAPCLUI" END BACKUP
    Fri Nov 28 03:54:38 2008
    ALTER TABLESPACE "PSAPDDICD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPDDICD" BEGIN BACKUP
    Fri Nov 28 03:55:47 2008
    ALTER TABLESPACE "PSAPDDICD" END BACKUP
    Fri Nov 28 03:55:47 2008
    Completed: ALTER TABLESPACE "PSAPDDICD" END BACKUP
    Fri Nov 28 03:55:50 2008
    ALTER TABLESPACE "PSAPDDICI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPDDICI" BEGIN BACKUP
    Fri Nov 28 03:56:41 2008
    ALTER TABLESPACE "PSAPDDICI" END BACKUP
    Fri Nov 28 03:56:41 2008
    Completed: ALTER TABLESPACE "PSAPDDICI" END BACKUP
    Fri Nov 28 03:56:45 2008
    ALTER TABLESPACE "PSAPDOCUD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPDOCUD" BEGIN BACKUP
    Fri Nov 28 03:56:49 2008
    ALTER TABLESPACE "PSAPDOCUD" END BACKUP
    Completed: ALTER TABLESPACE "PSAPDOCUD" END BACKUP
    Fri Nov 28 03:56:52 2008
    ALTER TABLESPACE "PSAPDOCUI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPDOCUI" BEGIN BACKUP
    Fri Nov 28 03:56:55 2008
    ALTER TABLESPACE "PSAPDOCUI" END BACKUP
    Completed: ALTER TABLESPACE "PSAPDOCUI" END BACKUP
    Fri Nov 28 03:56:59 2008
    ALTER TABLESPACE "PSAPEL640D" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPEL640D" BEGIN BACKUP
    Fri Nov 28 04:03:46 2008
    ALTER TABLESPACE "PSAPEL640D" END BACKUP
    Fri Nov 28 04:03:46 2008
    Completed: ALTER TABLESPACE "PSAPEL640D" END BACKUP
    Fri Nov 28 04:03:50 2008
    ALTER TABLESPACE "PSAPEL640I" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPEL640I" BEGIN BACKUP
    Fri Nov 28 04:04:37 2008
    ALTER TABLESPACE "PSAPEL640I" END BACKUP
    Fri Nov 28 04:04:37 2008
    Completed: ALTER TABLESPACE "PSAPEL640I" END BACKUP
    Fri Nov 28 04:04:40 2008
    ALTER TABLESPACE "PSAPES640D" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPES640D" BEGIN BACKUP
    Fri Nov 28 04:20:17 2008
    ALTER TABLESPACE "PSAPES640D" END BACKUP
    Fri Nov 28 04:20:17 2008
    Completed: ALTER TABLESPACE "PSAPES640D" END BACKUP
    Fri Nov 28 04:20:20 2008
    ALTER TABLESPACE "PSAPES640I" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPES640I" BEGIN BACKUP
    Fri Nov 28 04:36:26 2008
    ALTER TABLESPACE "PSAPES640I" END BACKUP
    Fri Nov 28 04:36:26 2008
    Completed: ALTER TABLESPACE "PSAPES640I" END BACKUP
    Fri Nov 28 04:36:29 2008
    ALTER TABLESPACE "PSAPLOADD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPLOADD" BEGIN BACKUP
    Fri Nov 28 04:36:40 2008
    ALTER TABLESPACE "PSAPLOADD" END BACKUP
    Fri Nov 28 04:36:40 2008
    Completed: ALTER TABLESPACE "PSAPLOADD" END BACKUP
    Fri Nov 28 04:36:43 2008
    ALTER TABLESPACE "PSAPLOADI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPLOADI" BEGIN BACKUP
    Fri Nov 28 04:36:53 2008
    ALTER TABLESPACE "PSAPLOADI" END BACKUP
    Completed: ALTER TABLESPACE "PSAPLOADI" END BACKUP
    Fri Nov 28 04:36:56 2008
    ALTER TABLESPACE "PSAPPOOLD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPPOOLD" BEGIN BACKUP
    Fri Nov 28 04:41:04 2008
    ALTER TABLESPACE "PSAPPOOLD" END BACKUP
    Fri Nov 28 04:41:04 2008
    Completed: ALTER TABLESPACE "PSAPPOOLD" END BACKUP
    Fri Nov 28 04:41:08 2008
    ALTER TABLESPACE "PSAPPOOLI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPPOOLI" BEGIN BACKUP
    Fri Nov 28 04:45:17 2008
    ALTER TABLESPACE "PSAPPOOLI" END BACKUP
    Fri Nov 28 04:45:17 2008
    Completed: ALTER TABLESPACE "PSAPPOOLI" END BACKUP
    Fri Nov 28 04:45:21 2008
    ALTER TABLESPACE "PSAPPROTD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPPROTD" BEGIN BACKUP
    Fri Nov 28 04:47:25 2008
    ALTER TABLESPACE "PSAPPROTD" END BACKUP
    Fri Nov 28 04:47:25 2008
    Completed: ALTER TABLESPACE "PSAPPROTD" END BACKUP
    Fri Nov 28 04:47:29 2008
    ALTER TABLESPACE "PSAPPROTI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPPROTI" BEGIN BACKUP
    Fri Nov 28 04:48:09 2008
    ALTER TABLESPACE "PSAPPROTI" END BACKUP
    Fri Nov 28 04:48:09 2008
    Completed: ALTER TABLESPACE "PSAPPROTI" END BACKUP
    Fri Nov 28 04:48:13 2008
    ALTER TABLESPACE "PSAPSOURCED" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPSOURCED" BEGIN BACKUP
    Fri Nov 28 04:48:46 2008
    ALTER TABLESPACE "PSAPSOURCED" END BACKUP
    Fri Nov 28 04:48:46 2008
    Completed: ALTER TABLESPACE "PSAPSOURCED" END BACKUP
    Fri Nov 28 04:48:49 2008
    ALTER TABLESPACE "PSAPSOURCEI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPSOURCEI" BEGIN BACKUP
    Fri Nov 28 04:49:29 2008
    ALTER TABLESPACE "PSAPSOURCEI" END BACKUP
    Fri Nov 28 04:49:29 2008
    Completed: ALTER TABLESPACE "PSAPSOURCEI" END BACKUP
    Fri Nov 28 04:49:34 2008
    ALTER TABLESPACE "PSAPSTABD" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPSTABD" BEGIN BACKUP
    Fri Nov 28 05:05:16 2008
    ALTER TABLESPACE "PSAPSTABD" END BACKUP
    Fri Nov 28 05:05:16 2008
    Completed: ALTER TABLESPACE "PSAPSTABD" END BACKUP
    Fri Nov 28 05:05:23 2008
    ALTER TABLESPACE "PSAPSTABI" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPSTABI" BEGIN BACKUP
    Fri Nov 28 05:21:15 2008
    ALTER TABLESPACE "PSAPSTABI" END BACKUP
    Fri Nov 28 05:21:15 2008
    Completed: ALTER TABLESPACE "PSAPSTABI" END BACKUP
    Fri Nov 28 05:21:19 2008
    ALTER TABLESPACE "PSAPUSER1D" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPUSER1D" BEGIN BACKUP
    Fri Nov 28 05:21:42 2008
    ALTER TABLESPACE "PSAPUSER1D" END BACKUP
    Fri Nov 28 05:21:42 2008
    Completed: ALTER TABLESPACE "PSAPUSER1D" END BACKUP
    Fri Nov 28 05:21:46 2008
    ALTER TABLESPACE "PSAPUSER1I" BEGIN BACKUP
    Completed: ALTER TABLESPACE "PSAPUSER1I" BEGIN BACKUP
    Fri Nov 28 05:23:03 2008
    ALTER TABLESPACE "PSAPUSER1I" END BACKUP
    Fri Nov 28 05:23:03 2008
    Completed: ALTER TABLESPACE "PSAPUSER1I" END BACKUP
    Fri Nov 28 05:23:06 2008
    ALTER TABLESPACE "SYSTEM" BEGIN BACKUP
    Completed: ALTER TABLESPACE "SYSTEM" BEGIN BACKUP
    Fri Nov 28 05:24:03 2008
    ALTER TABLESPACE "SYSTEM" END BACKUP
    Fri Nov 28 05:24:03 2008
    Completed: ALTER TABLESPACE "SYSTEM" END BACKUP
    Fri Nov 28 05:24:07 2008
    ALTER TABLESPACE "UNDOTBS1" BEGIN BACKUP
    Completed: ALTER TABLESPACE "UNDOTBS1" BEGIN BACKUP
    Fri Nov 28 05:42:06 2008
    ALTER TABLESPACE "UNDOTBS1" END BACKUP
    Fri Nov 28 05:42:06 2008
    Completed: ALTER TABLESPACE "UNDOTBS1" END BACKUP
    Fri Nov 28 05:42:07 2008
    ALTER DATABASE BACKUP CONTROLFILE TO 'C:\Program Files\CA\BrightStor ARCserve Backup Enterprise Option for SAP R3 for Oracle\CONTROL.PRD' REUSE
    Completed: ALTER DATABASE BACKUP CONTROLFILE TO 'C:\Program F
    Fri Nov 28 05:42:14 2008
    Beginning log switch checkpoint up to RBA [0x77f2.2.10], SCN: 0x0000.3c0ae436
    Thread 1 advanced to log sequence 30706
      Current log# 2 seq# 30706 mem# 0: C:\ORACLE\PRD\ORIGLOGB\LOGPRD02_M1.ORA
      Current log# 2 seq# 30706 mem# 1: F:\ORACLE\PRD\MIRRLOGB\LOGPRD02_M2.ORA
    Fri Nov 28 05:42:14 2008
    ARC0: Evaluating archive   log 3 thread 1 sequence 30705
    ARC0: Beginning to archive log 3 thread 1 sequence 30705
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30705.001'
    Fri Nov 28 05:42:27 2008
    ARC1: Evaluating archive   log 3 thread 1 sequence 30705
    ARC1: Unable to archive log 3 thread 1 sequence 30705
          Log actively being archived by another process
    Fri Nov 28 05:42:29 2008
    ARC0: Completed archiving  log 3 thread 1 sequence 30705
    Fri Nov 28 06:11:26 2008
    Completed checkpoint up to RBA [0x77f2.2.10], SCN: 0x0000.3c0ae436
    Fri Nov 28 09:20:59 2008
    Beginning log switch checkpoint up to RBA [0x77f3.2.10], SCN: 0x0000.3c0b739c
    Thread 1 advanced to log sequence 30707
      Current log# 1 seq# 30707 mem# 0: C:\ORACLE\PRD\ORIGLOGA\LOGPRD01_M1.ORA
      Current log# 1 seq# 30707 mem# 1: F:\ORACLE\PRD\MIRRLOGA\LOGPRD01_M2.ORA
    Fri Nov 28 09:20:59 2008
    ARC0: Evaluating archive   log 2 thread 1 sequence 30706
    ARC0: Beginning to archive log 2 thread 1 sequence 30706
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30706.001'
    Fri Nov 28 09:21:18 2008
    ARC0: Completed archiving  log 2 thread 1 sequence 30706
    Fri Nov 28 09:51:06 2008
    Completed checkpoint up to RBA [0x77f3.2.10], SCN: 0x0000.3c0b739c
    Fri Nov 28 10:44:43 2008
    Beginning log switch checkpoint up to RBA [0x77f4.2.10], SCN: 0x0000.3c0bb876
    Thread 1 advanced to log sequence 30708
      Current log# 4 seq# 30708 mem# 0: C:\ORACLE\PRD\ORIGLOGB\LOGPRD04_M1.ORA
      Current log# 4 seq# 30708 mem# 1: F:\ORACLE\PRD\MIRRLOGB\LOGPRD04_M2.ORA
    Fri Nov 28 10:44:43 2008
    ARC0: Evaluating archive   log 1 thread 1 sequence 30707
    ARC0: Beginning to archive log 1 thread 1 sequence 30707
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30707.001'
    Fri Nov 28 10:45:07 2008
    ARC1: Evaluating archive   log 1 thread 1 sequence 30707
    ARC1: Unable to archive log 1 thread 1 sequence 30707
          Log actively being archived by another process
    Fri Nov 28 10:45:09 2008
    ARC0: Completed archiving  log 1 thread 1 sequence 30707
    Fri Nov 28 11:13:20 2008
    Completed checkpoint up to RBA [0x77f4.2.10], SCN: 0x0000.3c0bb876
    Fri Nov 28 11:45:09 2008
    Beginning log switch checkpoint up to RBA [0x77f5.2.10], SCN: 0x0000.3c0bfc29
    Thread 1 advanced to log sequence 30709
      Current log# 3 seq# 30709 mem# 0: C:\ORACLE\PRD\ORIGLOGA\LOGPRD03_M1.ORA
      Current log# 3 seq# 30709 mem# 1: F:\ORACLE\PRD\MIRRLOGA\LOGPRD03_M2.ORA
    Fri Nov 28 11:45:09 2008
    ARC0: Evaluating archive   log 4 thread 1 sequence 30708
    ARC0: Beginning to archive log 4 thread 1 sequence 30708
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30708.001'
    Fri Nov 28 11:45:13 2008
    ARC1: Evaluating archive   log 4 thread 1 sequence 30708
    ARC1: Unable to archive log 4 thread 1 sequence 30708
          Log actively being archived by another process
    Fri Nov 28 11:45:29 2008
    ARC0: Completed archiving  log 4 thread 1 sequence 30708
    Fri Nov 28 12:15:17 2008
    Completed checkpoint up to RBA [0x77f5.2.10], SCN: 0x0000.3c0bfc29
    Fri Nov 28 12:50:23 2008
    Beginning log switch checkpoint up to RBA [0x77f6.2.10], SCN: 0x0000.3c0c3298
    Thread 1 advanced to log sequence 30710
      Current log# 2 seq# 30710 mem# 0: C:\ORACLE\PRD\ORIGLOGB\LOGPRD02_M1.ORA
      Current log# 2 seq# 30710 mem# 1: F:\ORACLE\PRD\MIRRLOGB\LOGPRD02_M2.ORA
    Fri Nov 28 12:50:24 2008
    ARC0: Evaluating archive   log 3 thread 1 sequence 30709
    ARC0: Beginning to archive log 3 thread 1 sequence 30709
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30709.001'
    Fri Nov 28 12:50:40 2008
    ARC0: Completed archiving  log 3 thread 1 sequence 30709
    Fri Nov 28 13:20:29 2008
    Completed checkpoint up to RBA [0x77f6.2.10], SCN: 0x0000.3c0c3298
    Fri Nov 28 14:27:01 2008
    Beginning log switch checkpoint up to RBA [0x77f7.2.10], SCN: 0x0000.3c0c75c1
    Thread 1 advanced to log sequence 30711
      Current log# 1 seq# 30711 mem# 0: C:\ORACLE\PRD\ORIGLOGA\LOGPRD01_M1.ORA
      Current log# 1 seq# 30711 mem# 1: F:\ORACLE\PRD\MIRRLOGA\LOGPRD01_M2.ORA
    Fri Nov 28 14:27:01 2008
    ARC0: Evaluating archive   log 2 thread 1 sequence 30710
    ARC0: Beginning to archive log 2 thread 1 sequence 30710
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30710.001'
    Fri Nov 28 14:27:25 2008
    ARC0: Completed archiving  log 2 thread 1 sequence 30710
    Fri Nov 28 14:57:08 2008
    Completed checkpoint up to RBA [0x77f7.2.10], SCN: 0x0000.3c0c75c1
    Fri Nov 28 15:57:26 2008
    Beginning log switch checkpoint up to RBA [0x77f8.2.10], SCN: 0x0000.3c0cb34a
    Thread 1 advanced to log sequence 30712
      Current log# 4 seq# 30712 mem# 0: C:\ORACLE\PRD\ORIGLOGB\LOGPRD04_M1.ORA
      Current log# 4 seq# 30712 mem# 1: F:\ORACLE\PRD\MIRRLOGB\LOGPRD04_M2.ORA
    Fri Nov 28 15:57:26 2008
    ARC0: Evaluating archive   log 1 thread 1 sequence 30711
    ARC0: Beginning to archive log 1 thread 1 sequence 30711
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30711.001'
    Fri Nov 28 15:57:40 2008
    ARC1: Evaluating archive   log 1 thread 1 sequence 30711
    ARC1: Unable to archive log 1 thread 1 sequence 30711
          Log actively being archived by another process
    Fri Nov 28 15:57:40 2008
    ARC0: Completed archiving  log 1 thread 1 sequence 30711
    Fri Nov 28 16:27:31 2008
    Completed checkpoint up to RBA [0x77f8.2.10], SCN: 0x0000.3c0cb34a
    Fri Nov 28 17:02:12 2008
    Beginning log switch checkpoint up to RBA [0x77f9.2.10], SCN: 0x0000.3c0cc245
    Thread 1 advanced to log sequence 30713
      Current log# 3 seq# 30713 mem# 0: C:\ORACLE\PRD\ORIGLOGA\LOGPRD03_M1.ORA
      Current log# 3 seq# 30713 mem# 1: F:\ORACLE\PRD\MIRRLOGA\LOGPRD03_M2.ORA
    Fri Nov 28 17:02:12 2008
    ARC0: Evaluating archive   log 4 thread 1 sequence 30712
    ARC0: Beginning to archive log 4 thread 1 sequence 30712
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30712.001'
    Fri Nov 28 17:02:25 2008
    ARC0: Completed archiving  log 4 thread 1 sequence 30712
    Fri Nov 28 17:32:17 2008
    Completed checkpoint up to RBA [0x77f9.2.10], SCN: 0x0000.3c0cc245
    Fri Nov 28 18:00:19 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABD" COALESCE
    Fri Nov 28 18:00:19 2008
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABD" COALE
    Fri Nov 28 18:00:19 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABI" COALE
    Fri Nov 28 18:00:19 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUD" COALES
    Fri Nov 28 18:00:20 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUI" COALES
    Fri Nov 28 18:00:21 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICD" COALE
    Fri Nov 28 18:00:23 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICI" COALE
    Fri Nov 28 18:00:23 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUD" COALE
    Fri Nov 28 18:00:23 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUI" COALE
    Fri Nov 28 18:00:24 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640D" COAL
    Fri Nov 28 18:00:26 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640I" COAL
    Fri Nov 28 18:00:27 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPES640D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPES640D" COAL
    Fri Nov 28 18:00:27 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPES640I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPES640I" COAL
    Fri Nov 28 18:00:27 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADD" COALE
    Fri Nov 28 18:00:27 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADI" COALE
    Fri Nov 28 18:00:27 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLD" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLI" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTD" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTI" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCED" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCED" COA
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCEI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCEI" COA
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABD" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABI" COALE
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1D" COAL
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1I" COAL
    Fri Nov 28 18:00:28 2008
    /* BRCONNECT */ ALTER TABLESPACE "SYSTEM" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "SYSTEM" COALESCE
    Fri Nov 28 20:00:17 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPBTABI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUD" COALES
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPCLUI" COALES
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDDICI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPDOCUI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640D" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPEL640I" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPES640D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPES640D" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPES640I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPES640I" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPLOADI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPOOLI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPPROTI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCED" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCED" COA
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCEI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSOURCEI" COA
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABD" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABD" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABI" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPSTABI" COALE
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1D" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1D" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1I" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "PSAPUSER1I" COAL
    Fri Nov 28 20:00:18 2008
    /* BRCONNECT */ ALTER TABLESPACE "SYSTEM" COALESCE
    Completed: /* BRCONNECT */ ALTER TABLESPACE "SYSTEM" COALESCE
    Fri Nov 28 20:00:36 2008
    Beginning log switch checkpoint up to RBA [0x77fa.2.10], SCN: 0x0000.3c0cf8e3
    Thread 1 advanced to log sequence 30714
      Current log# 2 seq# 30714 mem# 0: C:\ORACLE\PRD\ORIGLOGB\LOGPRD02_M1.ORA
      Current log# 2 seq# 30714 mem# 1: F:\ORACLE\PRD\MIRRLOGB\LOGPRD02_M2.ORA
    Fri Nov 28 20:00:36 2008
    ARC0: Evaluating archive   log 3 thread 1 sequence 30713
    ARC0: Beginning to archive log 3 thread 1 sequence 30713
    Creating archive destination LOG_ARCHIVE_DEST_1: 'F:\ORACLE\PRD\SAPARCH\ARC30713.001'
    Fri Nov 28 20:00:44 2008
    ARC1: Evaluating archive   log 3 thread 1 sequence 30713
    ARC1: Unable to archive log 3 thread 1 sequence 30713
          Log actively being archived by another process
    Fri Nov 28 20:00:47 2008
    ARC0: Completed archiving  log 3 thread 1 sequence 30713
    Dump file f:\oracle\prd\saptrace\background\alert_prd.log
    Mon Dec 01 09:03:16 2008
    ORACLE V9.2.0.8.0 - Production vsnsta=0
    vsnsql=12 vsnxtr=3
    Windows 2000 Version 5.2 Service Pack 2, CPU type 586
    Mon Dec 01 09:03:16 2008
    Starting ORACLE instance (normal)
    LICENSE_MAX_SESSION = 0
    LICENSE_SESSIONS_WARNING = 0
    SCN scheme 2
    LICENSE_MAX_USERS = 0
    SYS auditing is disabled
    Starting up ORACLE RDBMS Version: 9.2.0.8.0.
    System parameters with non-default values:
      processes                = 120
      sessions                 = 150
      timed_statistics         = TRUE
      shared_pool_size         = 822083584
      large_pool_size          = 8388608
      java_pool_size           = 8388608
      enqueue_resources        = 8000
      filesystemio_options     = SETALL
      control_files            = C:\oracle\PRD\origlogA\ctrlPRD.ctl, F:\oracle\PRD\saparch\ctrlPRD.ctl, E:\oracle\PRD\sapdata1\ctrlPRD.ctl
      db_block_checksum        = FALSE
      db_block_size            = 8192
      db_cache_size            = 1073741824
      compatible               = 9.2.0
      log_archive_start        = TRUE
      log_archive_dest         = F:\oracle\PRD\saparch
      log_buffer               = 4194304
      log_checkpoint_interval  = 0
      db_files                 = 254
      db_file_multiblock_read_count= 8
      log_checkpoints_to_alert = TRUE
      control_file_record_keep_time= 30
      dml_locks                = 2500
      row_locking              = always
      replication_dependency_tracking= FALSE
      transactions_per_rollback_segment= 20
      transaction_auditing     = FALSE
      undo_management          = AUTO
      undo_tablespace          = UNDOTBS1
      undo_retention           = 43200
      remote_os_authent        = TRUE
      db_domain                = world
      service_names            = PRD.world, PRD.WORLD
      hash_join_enabled        = FALSE
      background_dump_dest     = F:\Oracle\PRD\saptrace\background
      user_dump_dest           = F:\Oracle\PRD\saptrace\usertrace
      max_dump_file_size       = 1240
      core_dump_dest           = F:\Oracle\PRD\saptrace\background
      optimizer_features_enable= 9.2.0
      sort_area_size           = 0
      sort_area_retained_size  = 0
      db_name                  = PRD
      open_cursors             = 800
      optimizer_mode           = CHOOSE
      sortelimination_cost_ratio= 10
      btree_bitmap_plans     = FALSE
      eliminatecommon_subexpr= FALSE
      pushjoin_predicate     = FALSE
      optimizerjoin_sel_sanity_check= TRUE
      parallel_threads_per_cpu = 4
      optimizer_index_cost_adj = 10
      optimizer_index_caching  = 50
      optimpeek_user_binds   = FALSE
      pga_aggregate_target     = 536870912
      optimizeror_expansion  = DEPTH
    PMON started with pid=2, OS id=17336
    DBW0 started with pid=3, OS id=16972
    LGWR started with pid=4, OS id=16900
    CKPT started with pid=5, OS id=17236
    SMON started with pid=6, OS id=17436
    Regards
    Pieter

  • Getting Error while doing month end provisions using FS00

    Hi Guru,
    please suggest.
    while making month end provisions for salraies by using t code FS00 geeting error that Account XXXXX does not exist in company code level
    please help me on reslove this.
    Rgds..Suresh

    Hello Suresh,
    The GL Account does not exist for that Company code. Hence extend the GL Account to the Company Code by using Copy with template in FS00.
    Regards
    Kalpana

  • Asset Under Construction(AUC),During month end settlement run(via KO8G)

    Hi Guys ,
    please hlep on this AUC :
    During month end settlement run (via tcode KO8G), if there are -ve (credit) values to be settled to an Asset Under Construction (AUC) asset which does not have sufficient +ve value in the current FY, the settlement run will prompt an error message "Balance for transaction type group 10 negative for the area 01". The TT posted via the settlement run is TT115. To get around, user has to raise a manual journal (via doc type AT) to post the -ve value to the same AUC asset via TT101. TT 115 and 101 are configured differently (see attached).
    Since the Fixed Assets system does accept credit posting to AUC via a journal, is there a solution to make posting go through via the settlement run?
    Regards,
    Narra

    You can settle the AUC value in one period and posting can be made in another period. in the same you can give the different asset value date in KO88 screen. The only limitation is this possible only if the fiscal year is same.
    Give the asset value date as 15.07.2007 in KO88
    Hope this will work
    Radha

  • Project Accounting Month end Closing Process

    Dear Experts,
    Any one can help me by explaining Project Accounting Month End Closing Process
    Thanks & Regards
    Bharath

    Bharath
    1. Clear all the transactions from Interface tables
    2. Import them
    3. Run all the Expenditures (PRC, Interface processes) make sure none of the expenditures are not accounted
    4. Run Borrow and Lent process if any, Transfer to GL
    5. Run Revenue Process, make sure revenue is generated, accounted
    6. Review the revenue draft versions created, make sure all revenue draft versions are released
    7. INterface revenue to GL, then later Tie back process
    8. Run the Invoicing process
    9. Make sure to Approve, release all the Invoices in draft version
    10. Interface to AR ( ensure that none of the records are in error)
    11. Auto Invoice Import in AR
    12. Tieback process in PA
    13. run Exc: Transaction Exception details by GL Period/ PA period , Exc: Transaction Exception summary by GL Period/ PA Period
    14. Make sure the report output on step 13 are blank, if yes try to clear all the transactions and re run the reports
    15. Now try closing the period
    Thanks
    Krishna

  • Reversal is only possible after CO month end closing

    I am getting the error Reversal is only possible after CO month end closing while doing partial or full confirmation. I had already checked the OKP1 the period is open. Also in MMRV it is fine. Please suggest what could be the reason for this error.
    With Regards
    Tarun

    HI
    Yes u are right it is a custom message starting with Z. The message is as below:
    Msg.typ Application Area     MsgNo Name of Area of Responsibility Spec.ResAr Number   Numer.
    Order        Seq.   OpAc
    Message Text
    E       Z1                   025                                                  1        1
    Reversal is only possible after CO-month end closing !
    In detail analysis the only details are
    Reversal is only possible after CO-month end closing !
    Message no. Z1025
    Also when i do the back button the message i am getting is
    Error in determining actual costs for order. The detail analysis for the same is
    Error in determining actual costs for order 70076492
    Message no. RU085
    Diagnosis
    The actual costs could not be determined correctly due to incorrect or missing data.
    System Response
    The determination of actual costs is terminated.
    However, the confirmation itself can be saved. Error records are written for a subsequent determination of actual costs. Using these error records, the determination of actual costs can be repeated once the original causes of the errors have been removed.
    The transaction COFC for reprocessing the determination of actual costs can be found, for example, using the menu options "Logistics -> Production -> Production Control -> Confirmation -> Reprocessing -> Actual Costs."
    However, it is not possible to write error records for run schedule headers, QM orders or header confirmations. In this case, the confirmation transaction must be terminated because a subsequent determination of actual costs is not possible.
    Procedure
    You can find the exact cause of the termination of the determination of actual costs in the error log for actual cost determination.
    You can switch the error log on and off using the variable parameters.
    With Regards
    Tarun
    With Regards
    Tarun

  • Someone can help me here with posting period error in doing GR post in SAP

    Hi Seniors,
    I've been getting below error while doing GR post. could someone help me to step on further with this error.
    "Check table T001B for record type "0", the selected company code, account type S and G/L account 191***  If required, make sure that an entry is made in the table or an interval is changed."
    i'm using test system as am a student of SAP MM.
    Thank you very much..
    Shivakumar

    Open and Close Posting Periods
    In this activity, you can specify which periods are open for posting for each variant. You have two time intervals (time period 1 and time period 2). In each interval, specify a period lower limit, a period upper limit, and the fiscal year.
    You close a period by selecting the period specifications so that the period to be closed does not fall within them.
    You can also assign authorization groups for permitted posting periods. This means that in month-end or year-end closing for example, you can open some posting periods for specific users only. The authorization group only has an effect on time period 1. The authorization object is F_BKPF_BUP (Accounting document: Authorizations for posting periods). For more information about assigning authorizations, see the corresponding section for User Maintenance.
    Note
    Specify G/L account numbers for your specifications. You define the permitted posting periods for the subledger accounting accounts using the relevant reconciliation accounts. To do this, specify the account type for the subledger accounting, such as D or K, and the relevant reconciliation account.
    Caution
    There must be a minimum entry for each variant. This entry must have + in column K, and the columns From Account and To Account must not contain entries. In the columns for the posting periods, specify the periods you want to always be open in this variant. With further entries, you define more specifically which periods are to be open for which accounts.
    Activities
    1. Specify the periods permitted for posting.
    2. First enter the periods permitted for posting for all variants (minimum entry).
    3. Then add entries for account types or account areas if the periods are to be further restricted for specific accounts.
    4. In addition, enter an authorization group for each time period 1 in order to limit user access.

  • Sales doc items with the status CLSD ARE being selected for month-end

    We are working to improve month-end processing time for Sales Orders  We use SAPKKA12 to set CLSD status on line items
    SAP Help states: be sure that the status CLSD (closed) is set for all sales document items that you do not want to include in the period-end closing process. The sales document items with the status CLSD are then not selected for processing in the period-end closing process. Use report program SAPKKA12 to set the status.
    This use to work (in 4.0). I have been on other projects and just brought back to this after several years (now in 5.0).  Testing today shows that orders with CLSD status are being selected for month-end process.
    Any ideas why this is so?  System is selceting over 300,000 orders when well over half of them are set to CLSD.  I do get a message that the order is not relevant to processing, but selecting the order and logging the message take time. and the logs are VERY long.
    thanks

    Does any one else have this issue  that Sales documents with status CLSD are selected by RA (KKAK)?
    In just one of our jobs, i get this Basic List
    Perform actual results analysis      31273      
    Not relevant                                                 103894
    Error                                                        2306      
    Objects Selected                                    137,473
    75% of the orders are CLSD.  and the system is still counting them. (we do not out put information messages)
    I do understand that the orders are not analyzed,  but all documentaion states that CLSD status is not selected, and in our 5.0 system, they are selected.  In our 4.0 system, they were not selected.
    Does this truely work for anyone in a 5.0 system?
    Thanks
    Althea

  • Navigation for Month End Closings &  Some inputs on Monthly closing issues

    Hi Experts
    Some inputs on Month End Closing and
    what type of issues will be come accross during the closing( Mention any ).
    Navigation for the Month End Closings

    In the case of Inventory: Monthly Accounting Period closure, you need to ensure that there are no unprocessed shipping transactions, uncosted material transactions, pending WIP costing transactionsm etc.. The number of these kinds of transactions should be Zero. For example, if there are any unprocessed shipping transactions which might be stuck/errored out during Interface Trip Stop program run, then you can NOT close the period for that month until you clear these transactions. Check the metalink note, 262979.1 for the same.
    Navigation is Inventory > Accounting Close Cycle > Inventory Accounting Periods. Click on the Pending button to see the pending transactions. If there are NO requried resolutions to be done, you can close the INV period for that month.
    Regards,
    Hemanth

  • Month-end

    Hi friends,
    I have some knowledge of month end acivities.
    here i mentioned ....
    1)Open and close posting periods in FI….OB52
    2)Close MM period…………..MMPV
    3) Collect and post all outstanding vendor Invoices……F-43
    4) Collect and post all customer Invoices……F-22
    5) Post accruals/deferrals ……FBS1
    6) Generate Recurring entries….F.14
    7) Run the interest calculation…..F.52
    8) Maintaining Exchange Rates …… OB08
    9) Run the foreign currency valuation….F.05
    10) Run depreciation run……..AFAB
    11) GR/IR clearing account ….F.13
    12) Complete Bank Reconciliation………FF67
    Please any mistakes rectify and any another acivities mentioned  the with T.codes.
    pls let me know.
    Regards,
    Chandra.

    Hi
    Other few activities given below:
    FI
    1. Depreciation Run - AFAB
    2. F.5D Balance sheet adjustment calculation
    3. F.5E Balance sheet adjustment Post
    4. F.05 Foreigh Currency Valuation.
    CO
    1. CO43 Overhead calculation
    2. KKAO - WIP Calculation
    3. KKS1 - Variance Calculation
    4. CO88 - Settlement
    If you think it helpful kindly assign the points
    Thanks & Regards
    Mahesh

  • GR/IR at the month end

    Hello,
    What we have to do with GR IR account for clearing at the month end.
    Regards
    Ravi

    Hi Ravi,
    GR/IR clearing is the month end activity. To do this first you should maintain gl accounts under open item managment.
    the GR/IR Clearing account is used to account for Goods Receipt and Invoice entry for the vendor invoices. The GR/IR clearing account program reclassifies the entries in GR/IR account as either assets or liabilities for reporting purpose. At the period end which goods receipt has been done and for which Invoice has not been recd or goods for which invoice has been done and GR has not been done. During the time between invoice being created and delivered the goods. To accommodate this timing difference a gr/ir clearing account is maintain temporarily to record the flow
    hope it will useful and pl assign points
    thanks
    venkat

  • Delivery Block at PGI level based on GI date and Month end date

    Business need a check on delivery processing based on the Planned GI date, Month end date and transit period. This transit period is a custom field and dependent on customer. Also it is not maintained anywhere in system. Business store it in some excel format.
    The logic needed is: For any given month, the delivery order MUST be goods issued in the same month, i.e. once the order is delivered, the Post goods issue should ONLY be allowed if and only if , the PLANNED GI date ( as maintained in delivery ) + transit time ( at customer level ), falls within the month end date. If not, a block should be applied at PGI and only authorized personnel should be able to release that block.
    Also, there will be no check at invoicing VF01 level. Once the PGI blocked is removed, there will be no check on invoicing. The month end date may vary month to month and need to in combination of Sales Org / Plant as mentioned
    In addition, the business need an exception report where the information of releasing the block should appear for release date, user id of the responsible person, time sales order no etc. and it should be downloadable.
    We can have a custom table to maintain the month end day in given combination.
    But I need your expert inputs as-
    1-     Can we add this transit period in at customer master data as it is dependent on customer and there are huge no of customers for the sales unit? If not, then how to maintain it; may be a z table?
    2-     Based on this logic, what should the code/logic to be written for block at PGI.
    3-     How to control the authority check for removing the block.
    4-     The source fields for exception report.
    Pls revert accordingly.
    Many thanks in advance.

    Hello,
    Please refere the answers to your questions:
    1- Can we add this transit period in at customer master data as it is dependent on customer and there are huge no of customers for the sales unit? If not, then how to maintain it; may be a z table?
    You can either use some un-used Feild in Customer Master or maintain a Z-Table. I believe maintaining a Z-Table would be easy as you have huge number of Customers. You can also write a dmall program to Pick the Customer-wise transit dates from a excel file & store in Z-Table.
    2- Based on this logic, what should the code/logic to be written for block at PGI.
    You have explained the requirement well in your thread, you need to explain the same to your ABAPer & Basis person & they would do the needful.
    3- How to control the authority check for removing the block.
    Basis person would create & assign a Z-Authorization object which the ABAPer would use in his program.
    4- The source fields for exception report.
    Once you do the above development, your ABAPer will easily pick the required feild in Report as he has already used all the feilds somewhere in his development.
    Hope this helps,
    Thanks,
    Jignesh Mehta

  • Month end accrual posting date- Last day of the month

    Hi Experts,
    I have set up month end accruals for PY US by configuring posting dates, LDCD, WageType accrual processing class, Schema changes. I have also set the closing dates as the end of the month.
    Now after I do the posting , there are three documents getting generated.
    1. Accrual posting document with first day of the current month
    2. Normal Payroll posting  document with payroll period posting date
    3. Accrual reversal document with first day of the following month.
    My Question is:  As per standard SAP configuration, the month end accrual will have first day of the month. Can we customize this to end of the month for doc#1 - accrual document?
    Please do let me know your suggestion and ideas.
    Thanks,
    Amosha

    Hello,
    I have a similar question and I hope to have more details on how to change the posting date.
    The point is that I have an amount of 1200 and I have to post 100 for each month.
    Key Date for Accruals: 31.01.2011
    I posted 100 with Document date: 31.01.2011 and Posting date 31.01.2011
    Key Date for Accruals: 28.01.2011
    I posted 200 with Document date: 28.02.2011 and Posting date 28.02.2011
    Also I reversed the amount posted in the previous month (100) with Document date: 31.01.2011 Posting date 28.02.2011
    And so on...
    The problem are the dates because I need to post the amount at the end of each month (28/02) and to reverse the previous amount at the beginning of the next month (01/02).
    How can I change these dates?
    Thanks a lot in advance
    Kind Regards,
    E.

Maybe you are looking for

  • CameraRaw 4.4.1 Download Issue

    I am having a problem with installing the above plugin for PE6 on Mac OSX. The instructions on the adobe website say that I should remove the previous 4.3.1 before placing the 4.4.1 plugin in the suggested PE6/plug ins/file formats folder. However, t

  • How to get my iBook listed iTunes

    HI to anyone that can help. I have completed my first iBook and is available in the iTunes store but if I search for the book it will not sow in the search engine THis is the link http://itunes.apple.com/au/book/virtual-car-care/id526696055?mt=11 I w

  • HT2426 How can I explore the 1tb hard drive

    My Mac Book Pro died and I want to explore my Time Capsule 802.11n Wi-Fi hard drive. All I have is a windows 7 machine and I want to explore it with this computer but, I don't know if its possible because of the format difference. Could someone pleas

  • Coding inside badi bom_exit

    hi friends thanks in advance. in se19 i need to implement that badi for that help me in coding. this is the badi for making field alterations in screen 100 for CS02 transaction in ecc 5.0 now the thing is , i need to make the field aennr(change numbe

  • [solved] VirtualBox: libqt-mt.so.3: cannot open shared object file

    When I try to run VirtualBox: /opt/VirtualBox-1.5.6/VirtualBox: error while loading shared libraries: libqt-mt.so.3: cannot open shared object file: No such file or directory What's wrong?  I have qt installed. Last edited by synthead (2008-05-01 23: