Modify bcs default log data

Hello,
We've a problem with the displayed data in the log of  the currency translation task.
The system shows a exchange rate type wrong because it has been applied another exchange rate through a BADI because of a requirement.
My questions are, can we change the value displayed on the exchange data type in log of the task?
Where could we do this?
Have you ever change the data log through any BADI?
Thanks.

Although I've never changed the log via BADi, I have changed the log in the task configuration. When doing this I typically copy the default log and change the copied log to obtain the results the users request.

Similar Messages

  • How to set "Date Modified" as default tab in Open File window

    Photoshop CS5.1
    When I click on Open File, the window that comes up has several default columns (FileName, Date, Size, etc).
    I can right-click on the tab bar and add "Date Modified" to the tabs, but I would like to have "Date Modified" be a default column whenever I open the file selector (and no matter which folder I open up).
    I cannot find a way to do this. I want to know the last date I modified a file, not when it was created.
    Is there a way to universally set this column as a default?

    Date modified always shows for me in Details view.
    I believe what columns are showing has to do with what columns you've set in Windows Explorer...
    Here's an excerpt paraphrased from my Configure the Windows 7 "To Work" Options book that may cover what you need:
    Open Windows Explorer...
    Navigate to a folder of the type you want to see (e.g., one containing your Photoshop images) and set Details view. 
    Make the window look the way you'd like future Explorer windows to look.  Reorganize Details view columns, e.g., to Name, Size, Type, Date Created, Date Modified, Attributes, etc. and size them so they fit.
    Choose Tools - Folder options, then click the View tab.
    Click [ Apply to Folders ] to apply the above settings to all folders.
    [ OK ] to exit.
    Hope this helps. 
    If the Date modified still doesn't stick for you, there are some other things I've done (and documented) to tweak the configuration of my systems that may help make my seeing the columns being set as shown in the attached image when I choose File - Open in Photoshop.
    -Noel

  • How to determine Default Table Logging (log data changes )

    Does anyone know how to view exactly what tables and related data fields have change logging enabled by default? I know that some of the standard reports will produce "edit reports" show who changed what field, when ,old and new values, etc, but I don't know how to determine where the data is retrieved from.
    For example: If I look in the ABAP Dictionary at table LFA1, technical settings, it shows that log data changes is not "checked" or enabled. But if I run the standard AR Master Data Change Report, I get output showing valid field changes.
    I have seen other threads that refer to SCU3 but I can't determine the above this from report.
    Any assistance would be greatly appreciated.

    Hi Arthur,
    As far as I am aware, these are 2 different things. 
    There is table logging which is at the table level & if activated (i.e. it's listed in table DD0LV, PROTOKOLL=X and the table logging parameter is set in the system profile/s).
    The second one is programatical logging for change documents when data is maintained though a program that has been written to include a log.  I'm not sure how to identify a complete lit of these though unfortunately.
    Hope that is of some assistance.

  • Modify default due date and alarm with To dos

    Is it possible to modify the default alarm due date when creating a to do? Currently, when creating a to do from an email message, if you click on the arrow, youget a "to do options" pop up. The default is no due date and no alarm. When you choose a due date, the default is a message, one day before, at 11:45 PM. Can I change those default settings globally, so that the default is, say, 8 AM?
    Even better would be a plugin or setting like in ical that automatically sets an alarm. Anyone know of such a plug in?

    No responses received....

  • How to set the default display date of Calender prompt of SMPortal???

    Good Day!!
    As for as my knowledge, the default date Visible in all Calender prompt will be the
    Starting Date in the Specified date range either "RelativeDateRange" or "AbosoluteDateRange".
    But we have a requirement to set the default date to a date in the middle of the specified range, I don't find any option to specify in Request Offering Wizard or MP's xml file.
    Our scenario is as follows,
        We are trying to customize the CSPP's request offer "Request Virtual Machine", which has a user promt to select Decommission Date for the New VM. We have configured the date prompt as Relative Date range and set the
    Start date as "1 day next to user's current time" and Maximum date to "90 days after relative date".  So the user will get option to select Decomm date from (1-90) days with the defalut date as 1st day next to his current
    time. But our requirement is to set the default available date as 90th date in the above mentioned Relative Date Range.  
         I couldn't find any option in Request offering Wizard as attached below,
          Also I couldn't even find any tag to specify the default display date in the MP's XML file as attached below. Is there any other <tag> can be included inside <Details> tag to accomplish this ??
        Is there any other way to accomplish this???
        Please advise
    Thanks,
    Narayanababu
    Thanks and Regards, Narayana Babu

    This is probably a link editor parameter, see the linker and loader guide.
    Another thing you can do is write your own sbrk() that will log whenever it's called, so you can at least see how many times it's called and with what values. If you really need in-depth instrumentation, write your own heap routines and give them the same names as the CRTL routines. The linker should find yours first and route all memory operations through them. At least, that's the way it worked for me on SunOS 4.1....

  • How to modify a default report in ByDesign / Time series?

    Hello everybody,
    I am currently working with the HR Dashboard - Employee Time (HCMTLMU01_Q0010) and I am facing a problem with the time series <Year to date>. Actually, this is a problem for all reports with Time Series.
    I would like to know if it is possible to delete the Time Series from a default report? Because I cannot find how to do it.
    I could also do what I want in another way, by modifying the format of the Time Series. Is it possible or not?
    Like changing it from an interval to a fixed date, but keeping the behavior of the criteria from start of the year to current date. But I cannot find how to it neither.
    Are these actions possible or I have to go back to the original data sources used by this reports and create my own?
    Even if I doubt creating the same report "just" without the time series is not as easy as it sounds.
    Thank you all,
    Best regards,
    Jacques-Antoine

    thanks. it seemed like it worked. once. but when i tried to modify the default trans
    ition time, it would not accept the new value.
    also can you explain what is the difference between the unit that are used.
    the entry screen asks for frames, but if you look at the duration in the effects
    edit window the units appear to be min.sec.micros.
    thanks,
    rob

  • How to control the default Reverse Date at VL09

    Hello,
    At VL09 (reverse goods movement) screen, the default Reverse Date is today.
    If users want to modify the Reverse Date,
    users have to select a line, click on define date button and input date into the local date field at pop-up screen.
    I want the default Reverse Date at VL09 screen to be the same as the Actual GI date of delivery.
    Please tell me how.
    Thank you.

    1. There is no standard BADI and userexit which can fulfill your requirement.
    2. You can try to do the modification in RVV50L09.
    Before
    "CALL FUNCTION 'WS_REVERSE_GOODS_ISSUE'"
    You can add  "Move XLIKPUKWA-wadat_ist to  XLIKPUKWA-STDAT. "

  • How modify the default page from jdeveloper

    I´m trying set a aplications server whit jdeveloper, but i can´t find a configuration file, to modify the default page showed in http://localhost8080
    can you help me ???

    Thanks Maxi... I explain you, I'm trying to set a webservice whith JDeveloper 11g to simulate 3 layers, a computer whit windows system it will be the front end or first layer, and the second computer whit linux system it will be the second( coordination layer) and third layer ((data base layer)), and , my question is this; Jdeveloper has a server aplications like apache ??? where I can set a default page whith a JSP to connect the first layer whit the layer that has installed the linux system.
    Thanks.

  • Error 200279 and number / frequency of logged data

    Hello,
    I am new to LabVIEW and I am writing a VI that sends 2 voltage (AO voltage) to a motor, and read the voltage input (AI voltage) from a strain gauge and one of the corresponding AO signal that I sent out to the motor. Also, the VI reads encoder value. I am using a PCI 6230.
    I am unsure of the difference between the number of samples per channel in DAQmx Read (AI Volt), DAQmx Read (Encoder), and DAQmx Write (AO volt).
    If I set all three values to 1 (like in the attached VI), I will get a log data that has logical data for DAQmx Write (AO volt) and DAQmx Read (Encoder) (values changing and logged every 1ms). However, the log data from DAQmx Read (AO volt) has some error (it's not logging data with increment of 1ms), then the Error 200279 shows up.
    If I set DAQmx Read (AO volt) to 1000, and the other two to 1, I will get DAQmx Read (AO volt) data with increment of 1ms, and the others increment of 1s. While if I set all to 1000, my encoder and DAQmx write data will lag (shows up late in the log) by 1s (transient data is not shown, only stedy state after 1s).
    I have been trying to troubleshoot and read about the error description but found no helpful clues.
    Appreciate your help.
    Thanks a lot!
    Attachments:
    AnalogOutputandInputRev1b.vi ‏135 KB

    Hi Thomas,
    Thanks for your inputs. I have tried using the "Shared Sample Clock" example but I have an error which says:
    Error -200077 occurred at Property Node DAQmx Timing (arg 1) in DAQmx Timing (Sample Clock).vi:6->AnalogOutputandInputRev1c.vi
    Possible reason(s):
    Requested value is not a supported value for this property. The property value may be invalid because it conflicts with another property.
    Property: SampTimingType
    Requested Value: Sample Clock
    You Can Select: On Demand
    Task Name: _unnamedTask<2DE>
    And then,
    Error -50103 occurred at DAQmx Start Task.vi:3
    Possible reason(s):
    NI Platform Services: The specified resource is reserved. The operation could not be completed as specified.
    Task Name: _unnamedTask<2DF>
    I have attached my modified VI here as well.
    I would like all my tasks to occur at the same time, and most importantly, logged at the time it happens without some delay.
    Would you please advise on what's going wrong with my VI this time?
    Thank you very much.
    Attachments:
    AnalogOutputandInputRev1c.vi ‏131 KB

  • Cond Retrieve Trigger only logs data around set point?

    I need to acquire analog data after a set point level is reached until the signal falls back below that set point. The max level will be realtively high compared to the set point. I only seem to be logging data around a very narrow band relative to the set point. The vi is attahced. Thanks!
    Attachments:
    Force_Monitor3.vi ‏103 KB

    Well, that still didn't include your trigger level VI. No matter. First, upon taking a further look at your loop, you start a buffered continuous analog acquisition, but you don't have anything wired to the "number of scans to read" input of your AI read VI. The default for this input is -1, which means you read the entire buffer. This is not the setting you want when doing a continuous acquisition; you may get overrun errors doing this. You want to read a constant amount of data out of the buffer at a time, and it has to be less than your buffer size.
    Second, this is not a limitation of your DAQ board. As long as your DAQ board can do buffered analog input, the triggering you are using is a software trigger, which is NOT a function o
    f the DAQ board. The AI Read VI reads the data out of the buffer, and then based on the trigger specifications, determines whether or not this data should be passed out of the VI.
    Since your arrays are not particularly large, I think it best to do it a different way. For example, the way you are doing it, the AI Read VI will return part of the buffer when the trigger occurs, but then stop because the next reading from memory that it does may not satisfy trigger conditions (no "edge", rising or falling).
    Therefore, I propose that you get EVERY piece of data out of the AI Read VI (no trigger at all), and search through a particular channel's data for your trigger level. The first value that is above the trigger, get the rest of the data from that array. Then search the next arrays that come from AI Read VI until the value goes below the trigger value, and stop the acquisition when this occurs.
    I can show you how to do that. It's not that difficult.
    Mark

  • SAP Business Workplace - No log data exists message

    Hi,
    We have the work items of EDI 810 configured to reach the workflow inbox of certain users.  The users have 300+ items in their workflow inbox - but when they click the Workflow Inbox they get a message - "No log data exists".
    The message is an error type: Message BL 223
    The message is coming from the function module BAL_CNTL_REFRESH.
    We tried to get the same workflow positions assigned to our user id and the unprocessed 300 + items came to our inbox and we are able to view and process the work items without any issue.
    The issue pertains only to the two users. It seems like it has something to do with the filter / layout settings set for the two users alone.  Could you please advice.
    Regards,
    Prabaharan

    Hi
    i am using SAP GUI at client place via Citrix.
    it was working fine till yesterday
    pls suggest. wat could be other possible reason
    thanks

  • RRMX - No log data exists

    Hi experts
    when i am entering RRMX tcode. i am getting error message at status bar as " No log data exists"
    Please help me out. What could be reson and how can i reslove it
    thanks
    pavan

    Hi
    i am using SAP GUI at client place via Citrix.
    it was working fine till yesterday
    pls suggest. wat could be other possible reason
    thanks

  • Change Log Data from DSO to CUBE

    Hi Experts,
      Is it possible to load/transfer change log data as well from DSO to Cube
    Thanks

    Hi,
    Yes it is possible.
    Create a DTP from DSO to cube.
    In the extraction tab of DTP choose the option
    Datasource Change log
    Hope it Helps!!
    Reward if useful
    Manish

  • DSC 8.6.1 wrong timestamps for logged data with Intel dual core

    Problem Description :
    Our LV/DCS 8.6.1 application uses shared variables to log data to Citadel. It is running on many similar computers at many companies just fine, but on one particular Intel Dual Core computer, the data in the Citadel db has strange shifting timestamps. Changing bios to startup using single cpu fixes the problem. Could possibly set only certain NI process(es) to single-cpu instead (but which?). The old DSCEngine.exe in LV/DSC 7 had to be run single-cpu... hadn't these kind of issues been fixed by LV 8.6.1 yet?? What about LV 2009, anybody know?? Or is it a problem in the OS or hardware, below the NI line??
    This seems similar to an old issue with time synch server problems for AMD processors (Knowledge Base Document ID 4BFBEIQA):
    http://digital.ni.com/public.nsf/allkb/1EFFBED34FFE66C2862573D30073C329 
    Computer info:
    - Dell desktop
    - Win XP Pro sp3
    - 2 G RAM
    - 1.58 GHz Core 2 Duo
    - LV/DSC 8.6.1 (Pro dev)
    - DAQmx, standard instrument control device drivers, serial i/o
    (Nothing else installed; OS and LV/DSC were re-installed to try to fix the problem, no luck)
    Details: 
    A test logged data at 1 Hz, with these results: for 10-30 seconds or so, the timestamps were correct. Then, the timestamps were compressed/shifted, with multiple points each second. At perfectly regular 1-minute intervals, the timestamps would be correct again. This pattern repeats, and when the data is graphed, it looks like regular 1-sec interval points, then more dense points, then no points until the next minute (not ON the minute, e.g.12:35:00, but after a minute, e.g.12:35:24, 12:36:24, 12:37:24...). Occasionally (but rarely), restarting the PC would produce accurate timestamps for several minutes running, but then the pattern would reappear in the middle of logging, no changes made. 
    Test info: 
    - shared variable configured with logging enabled
    - data changing by much more than the deadband
    - new value written by Datasocket Write at a steady 1 Hz
    - historic data retrieved by Read Traces
    - Distributed System Manager shows correct and changing values continuously as they are written

    Meg K. B. , 
    It sounds like you are experiencing Time Stamp Counter (TSC) Drift as mentioned in the KB's for the AMD Multi-Core processors. However, according to this wikipedia article on TSC's, the Intel Core 2 Duo's "time-stamp counter increments at a constant rate.......Constant TSC behavior ensures that the duration of each clock tick is
    uniform and supports the use of the TSC as a wall clock timer even if
    the processor core changes frequency." This seems to suggest that it would be not be the case that you are seeing the issue mentioned in the KBs.
    Can you provide the exact modle of the Core 2 Duo processor that you are using?
    Ben Sisney
    FlexRIO V&V Engineer
    National Instruments

  • Default key date, Document date and posting date needs to be changed automa

    Hi Experts,
    The user wants to create a variant for Foreign currency valuation, wherein the default key date, Doc date and Posting date needs to be changed every month automatically. Is it possible?
    Please let me know your thoughts.
    Warm regards,
    Murukan Arunachalam

    Hi
    Please follow this process.
    Only specify fields that should be changed
    Select these fields by entering an X in the checkboxes
    Enter a U in the UPDATEFLAG field
    Always specify key fields when changing the data, including in the checkboxes
    The configuration is an exception here. If this needs to be changed, you need to complete it again fully.
    Maintain quantities and dates in the schedule line data.
    1. Minimum entry:
    You must enter the order number in the SALESDOCUMENT structure.
    You must always enter key fields for changes.
    You must always specify the update indicator in the ORDER_HEADER_INX.
    2. Commit control:
    The BAPI does not run a database Commit, which means that the application must trigger the Commit so that the changes are read to the database. To do this, use the BAPI_TRANSACTION_COMMIT BAPI.

Maybe you are looking for