Moving Average Price Determination for new stock in project

Hi Gurus,
We have following scenario in our project. One plant is shut down ( say plant A ) and a new plant (plant B)  will come up to replace the older one. So we are transferring the materials present in A to B. We have extended the materials to B and maintained same MAP. Then we are doing goods issue in plant A (mb1a ) and goods receipts in plant B ( mb1c - movement type 501). But the account document shown for mb1c is not picking up correct MAP.
Please note: Plant A nad plant B are in different company code.
Could you please explain how is MAP determined in case of GR done thorugh MB1C and please suggest if the process we followed is correct ?
Regards
Sayan
Edited by: Jeyakanthan A on Jan 8, 2012 10:40 AM

HI Jurgen,
Thanks for your reply.
1. We have maintained the price control as V
2. You have mentioned "However it is as well possible to enter an external value in the movement (if enabled in customizing). then the movement is valuated with this value and the MAP in material master is adjusted."
Where to checl in IMG for the above ?
3. We did goods issue in the previous period 12/2011 but doing the GR in current period 01/2012. Do we need to maintain MAP for both the periods ?
If you can please tell us what is the standard process to carry out such activity ?
Regards
Sayan

Similar Messages

  • Moving Average Price tolerances for intercompany transfers

    We are looking to utilize the tolerance limit settings for GR's to prevent entry mistakes from affecting moving average prices severly.  I have sucessfully tested this process by triggering a warning/error message at the time of a goods receipt, but have been unable to trigger a warning/error for intercompany transfers.
    Is this configuration in the OMC0 settings, in config, or somewhere else?
    Thanks very much for any feedback.
    Matt

    HI Jurgen,
    Thanks for your reply.
    1. We have maintained the price control as V
    2. You have mentioned "However it is as well possible to enter an external value in the movement (if enabled in customizing). then the movement is valuated with this value and the MAP in material master is adjusted."
    Where to checl in IMG for the above ?
    3. We did goods issue in the previous period 12/2011 but doing the GR in current period 01/2012. Do we need to maintain MAP for both the periods ?
    If you can please tell us what is the standard process to carry out such activity ?
    Regards
    Sayan

  • Moving Average Price for Sales stock and Project stock of a material

    Hiya Gurus,
                     I am developing a report to display inventory details. My requirement is that I have to display the Moving average price of a material for all Valuation type. I also need to display the Moving average price if a material has got Project stock or Sales stock.
                     In MBEW table I can get the Valuation type and its Moving average price, but how can I find the moving average price for the same material if it has got Sales stock and project stock. Please let me know the table and field where I could get the relevant data.
                    Kindly help me on this, it would be deeply appreciated.
    Cheers,
    ZIa

    Hi
    can you look at tables
    EBEW                             Sales Order Stock Valuation
    QBEW                             Project Stock Valuation
    Nat

  • Moving average price for in-house produced spare parts

    Hi all:
    We use moving average price V for spare parts which are produced in-house - production order deployed for such business.
    During goods receipt, I can post the material document, but no material is posted into inventory, and no financial document is created either.
    Can anyone tell me the reason. It quite urgent. Thanks.
    Andy

    Hi,
    Check whether your material type is marked for Quantity and Value updates for that Valuation Area. This can be checked in Logistics General->Material Master->Basic Settings->Material Types->Attributes to Material Types and in that Quantity and Value Updation.
    Also Check OBYC settings for material account determination specific to BSX and WRX transaction keys for that valuation area.
    Thanks
    Krishna.

  • Moving Average Price Tolerance Report

    Is there any standard SAP report that can display moving average price variances?  I want to be able to see the percent change in the moving average price after each time that it changes.
    The report S_P00_07000139 displays the old moving average price and the new one, but there is no field for variance.  I know that OMR6 sets the tolerance keys to company codes, but is there any record of the VP key tolerance violations?
    The goal is to be able to see all of the materials that have a moving average price that changed by more than 10% from its last price.
    Thanks

    Hello, Uuklyph,
    if you are not satisfied with  S_P00_07000139l, the easiest way would be to create a query (tx SQ01/02/03) over table MSEG "Document Segment: Material", with custom formula for MAP change, calculating with field LBKUM "Total valuated stock before the posting" and SALK3 "Value of total valuated stock before the posting".
    Kind Regards
    TomT

  • Moving Average price issue

    Hello Experts,
    My client one Semi Finished material maintained Price Control as S (Standard) with 13.5 and accounting documents posted with 13.5 only with standard price no issues and working fine. Now the issue is MAP (Moving Average Price) updated for the same Semi Finished material with 4860, I don't know how this figure has arraived. when I check in material master records no one updated manually. Now my client's finance controller is asking how that figure (4860) arrived ?.
    I have checked in MSEG table and it updated the same 4860 only but material document posted with standard price only. I couldn't figure out how system arrived this amount (4860) ?,
    it would be great helpful if you can through some light on this issue.

    Dear Srinivasa,
    Kindly check follwing things
    1) Whether the material has got any goods receipt with higher value.
    2) Whether the Future price is maintained for the material  in Material master - Accounting view,with higher value and its validity
    3) Check the changes happened in past related to MAP, in Material master MM03-> Display changes.
    With regards,
    Ajay Bhalekar

  • Moving average price with each Posting

    Hi Friends,
    Is there any report where we can see the moving average price change for every material posting. Like present MAP is 100/- but with my next receipt it changed to 110/- so is there any report which show the price change from earlier price.
    If there is no standard report, is there any way we can build the logic to prepare a custom report. Thanks......
    Best Regards

    Hi Jaya,
    There is no standard report for this but you can use the transaction code CKM3. It will show you the detailed history of MAP - material movement & material document wise, provided the plant in consideration is active with Material Ledger.
    Try this and give your feedback.
    Thanks & regards,
    Indrashish

  • Moving Average Price does not get updated for Project Stock

    Hello Experts
    We have an Engineer-to-Order implementation for our client. Accordingly procurement is done per project. Each Project issues its PRs which are then converted to POs and recieved into Project Stock.
    While assigning the material to the Network activity in Project (using material component) the system uses the price found in the material master (MAP or STD) as a planned cost appended to the project.
    Problem:
    while procuring the material, when we receive it into Project Stock (Mvt 101 Q + ) the Moving Average Price in the material master does not get updated. this way all newly created material master will never have a moving average price, thus whenever we try to assign them to the project we receive an error message (Cost for Material Component ###Mat.Num### cannot be determined.
    Question:
    How can I get the system to update moving average price (for all types of stock) based on procurement for project stock.???
    Your help is kindly appreciated.

    I'm sorry for the confusion
    Case:
    The T-code is CJ20N Project Builder in PS module
    we are assigning material components to network activities under a certain WBS element in the project.
    there is a function in the Project Builder to calculate the cost of a network. it uses the costing variant assigned to the network which is PS02 (We get the error here)
    The costing variant has a valuation variant which lists a series of strategies  to get the material price. Planned 1 if not then STD if not then MAP. (you can choose between many options via a drop down menu) you can choose 5 consequent options.
    The MAP that the valuation variant is coded to get is the Plant Stock MAP -- Or the Project Stock MAP but only Per WBS element.
    The MAP that the Actual postings update is the Project Stock MAP only Per WBS element.
    This means that if you use a material component to purchase material 123 Acc.As. Q for WBS X for 10 $ then you try to assign a new material component with the same material 123 to WBS Y, the system will not get a MAP. because it's stored in QBEW per WBS element.
    This way the system will never get the MAP right.
    However, we don't always use project stock to procure for projects, for some requirements we can assign and use plant stock as well for Projects. that way we need the MAP from plant stock.
    In the Valuation Variant you can use a User Exit Strategy. The user exit's name is COPCP005
    My Suggestion is:
    Use the User Exit COPCP005 to calculate the { Total value / the total quantity (MAP) from QBEW + Total value / total quantity (MAP) from MBEW } / 2
    which is the MAP for both plant and project stock together, since that we are going to use both.
    Q: Is this correct !?

  • Stock of material and moving average price for each valuation type

    Hi
    Is anybody aware of any standard report which will show the stock of material and moving average price of the material for each valuation type.
    M5BL is one report but would like to check if there is any other report.
    Regards
    Vaibhav Mahajan

    Hi,
    Check MB52, select 'Display batch stock' option.
    Batch is nothing but your valuation type.
    You can see those details there.
    Regards,
    Piyush

  • Moving Average Price and Total Stock not updated for MTO scenario

    We are using MTO with planning strategy 20, individual collective indicator is 1 (individual requirement only) and price control is V for finished goods. We are facing the following problems after we perform GR of above FG from MFBF (Repetitive -run schedule header):
    1)Total Stock field (LBKUM)in Accounting View 1 remain as blank but the sales order stock is appear in Stock Overview screen.
    2)Moving average price does not updated after periodic settlement is carried out.
    It seem that problem can only be resolved if we change the planing strategy to MTS (ex:40), appreciate that if any of you can provide the solution.
    p/s: on ECC5 system.

    Hi,
    Good morning and greetings,
    The standard SAP says as below
    The Raw Materials should have MAP 'V' and the SFG and FG should have the price control as 'S' basically because the standard costing variant PPC1 uses the sequence of Standard Price as the first update at the time of price update and settlement.
    I presume MFBF is used for Repetitive Manufacturing and not for MTO scenario...Repetitive Manfuacturing is MTS scenario...Goods receipt of production order is normally done through MB31.
    If you still want to use the MAP for FG and SFG then you will have to change the costing variant appropriately to pick the MAP first at the time of goods receipt and settlement.
    Please reward points if found useful.
    Thanking you
    With kindest regards
    Ramesh Padmanabhan

  • Moving Average Price for non stock material

    Hi All,
    We are looking at loading a large number of material masters for items that will not be stocked - i.e. an account assignment will always be provided during purchasing.
    When we load these materials - what should the moving average price on the accounting tab be set to? If we put an estimated price in - then when we purchase we will get a warning if the variance between the purchase price and the moving average price is too great. And then when the material changes in price (in lets say a year because the vendor has increased prices by 10%) we can no longer update the moving average price.
    What is the best practice in this scenario?
    Kind Regards,

    non stock material (standard material type NLAG) does in general not have accounting views, hence it has no fields for moving average prices.
    however it can be customized to have an accounting view, we did it too. This  servers the requisition process, with accounting view the price defaults to the requisition. without accouting view, the valuation price needs to be entered manually by a user in the requisition.
    The MAP gets only updated if the stock is posted to inventory, which will never be the case for non-stock material, because of this you should always be able to change the MAP directly in the material master with MM02, or if not possible in MM02 with MR21.

  • Negative stock ('moving average price for material is negative')

    Dear all,
    I have a question with regards to negative stock.
    Does it means if I configure my system (i.e. OMJ1) by allowing the negative stock for a particular plant, the problem of Invoice bumping the error (i.e. 'moving average price for material is negative') WILL NOT happen at all again?
    If not, how can I solve this problem?
    thanks.
    tuffy

    Hi,
    As Jürgen said price can't be negative. You need to correct MAP first before posting the invoice. Try running consistency check (Tcode: MB5K) you might know the reason why system is showing -ve moving average price and then you can correct.
    Regards,
    Rakesh

  • Error in MIRO - Moving Average price for the Material is negative?

    Hi,
    While doing Invoicing, the following error is coming:
    Moving average price for material is negative: 13070106001 1000 NEW
    Message no. M8783
    Please note that all the Material Qty has been sold out
    Please help.
    Regards,

    Hi,
    Still, I am not able to get the Solution.
    The actual problem is that at the time of PO creation, we entered ADC value as 106.350,70 USD (which was actually 106.350,70 INR).
    MIGO - FI Document
    Local Tradeable Good     94.000,00
    GR/IR-clearing - ext     54.000,00-
    ADC Clearing     106.350,70-
    ADC recoverable     106.350,70
    Clearing Charges A/C     40.000,00-
    FI Document on simulation
    SILINK HOLDINGS LIMITED /      106.351,00-
    ADC Clearing     5.237.771,98
    Additional Duty     2.252.693,81-
    Price dif. Gain - Trading     2.878.727,17-
    Now we are doing MIRO for 106.350,70 INR and the System is giving the following error:
    Moving average price for material is negative: 13070106001 1000 NEW
    Message no. M8783
    Current Stock Status:
    Total Stock          4.390
    Total Value          929.695,90
    Moving price         211,78
    Price Control        V
    Please help!
    Regards,

  • Moving average Price for Material is Negative

    HI Friends,
    I am doing MIRO for PO where its giving me error while posting the Invoice that
    Moving average price for material is negative
    Can any please help me to resolve this.
    what would be the implications if the price difference is too high b/w MAP in Invoice .
    Thnaks
    Purna Nalluri

    It is ofcourse bcoz there is price difference in the between PO and IR....
    so as per the calculations the MAP becomes negative....
    The formula for it is :
    Difference/Current stock holding + current moving average...
    Pls check you price entered at PO and IR....
    There are no any implecations...excepts the price differece is reflected in the MAP of MMR....
    hope it helps...
    Regards
    Priyanka.P
    Edited by: Priyanka Paltanwale on Sep 23, 2008 7:28 AM

  • Moving Average Price for Non-Valuated Material

    Hello Experts
    The question may seem to be quirky but need your advice for the below.
    My client is buying non-valuated material against a cost center, they do not want to keep the stocks valuated. No value update only quantity update. The accounting documents are the following when the GR is done by receiving folks
    Qty of material XYZ goods receipted = 10
    Debit     Consumption GL   12345678       10 USD          Cost Center ABC123 (This is a warehouse cost center)
    Credit    GR/IR account                            10 USD
    Qty of mateiral XYZ issued = 5
    The goods are later on issued to Production cost center and the client was the below entries to be passed with MOVING AVERAGE PRICE.
    Debit    Consumption GL 12345678           6 USD          Cost Center ABC456 (This is production Cost center)
    Credit   Consumption GL 12345678           6 USD          Cost Center ABC123 (This is warehouse cost center)
    I am aware that as this is a non valuated material the above entry is not possible. Maybe, I will use BAPI_ACC_DOCUMENT_POST for the generating the accounting document when the goods are issued from warehosue to production center.
    My question is how can i get the moving average price.
    Regards
    Chokkalingam Pillai

    you can have an accounting view for non-valuated materials, this helps for example with purchase requisitions as they could take the valuation price from the material master and the user does not need to enter a valuation manually.
    But the material master moving average  price cannot be calculated and updated automatically, as it is not foreseen in any standard program to do this for cost center procurement, since SAP only calculates a MAP for valuated stocks.
    Further it is not logical to issue non-valuated stock valuated (even with a different price) from cost center to cost center.
    It looks like you want to  have a kind of internal billing for warehouse services, as you end up with a negative amount in the warehouse cost center which is then the profit.
    Why don't you just  create a report to run at the end of the month, listing all goods issue movements with their cost centers and taking the price from last PO (or from material master if you decide to maintain it manually) and use this for a manual cost center posting in CO module

Maybe you are looking for