Multiple 'F3' Quality Notifications for defects from single Service Order

Those of you working w/ the QM module no doubt know that if a failure is recorded against an inspection characteristic linked to a Production Order (Order category 10), that SAP standard functionality creates a Defect document (Quality Notification type 'F3'). Any subsequent failures recorded that are linked to that same Production Order (as well as the material & serial number) are recorded, as additional line item defectes, on that same 'F3' Quality Notification.
HOWEVER, I have found when failures are recorded against inspection characteristics for a Maintenance Order (Order Category 30), a new Defect document (Quality Notification type 'F3') is created for each failure that is recorded. Why is this?
My client wants only a single 'F3' Quality Notification to be created for any and all failures that are recorded against a single Maintenance Order. I do not see any way to accomplish this w/o a core mod. Understanding WHY SAP treats these two order categories differently will go a long way to assisting me in designing an adequate solution.
Thanks for your help.

A couple more pieces of information....
1. We are currently running SAP Enterprise (4.7).
2. If I go to SPRO -> 'Quality Management' -> 'Inspection Lot Creation' -> 'Maintain Inspection Types', and display the details for Inspection Type 14 (which we use for Service Orders) the check box for 'One Q-notification per insp. lot' is active. Clearly the system is not processing a single Quality Notification per inspection lot on service orders.
Your assistance is greatly appreciated. Happy New Year

Similar Messages

  • How to sync user for planning from Shared Services

    Hi ..
    Can anybody please let me know how to sync users for planning from shared services.
    Thank you.

    You need to expand on your question.
    But the basic concept is you create or connect (for LDAP) users in Shared Services. You also create groups as required for these users. Then in shared services you provision those user to Planning applications (directly or indirectly through groups)
    Then in Planning you will see users or groups. And in planning you connect them to either members in dimensions or to objects like Forms, Task lists, Business Rules.
    There is therefore no such thing as synching Shared Services with Planning.
    Note: the 2 steps mentioned above can be done in batch through load utilities.
    Please expand you question if necessary

  • Several service cofirmations can be possible from one service order Item

    Dear Experts,
    We create a service order with one service item and create a service confirmation via follow-up function.
    After saving the service confirmation, the status of the service order Item is changed from "Released" into "Confirmed".
    Even though the status of the service item is "Confirmed", we can create a new service confirmation
    for the same item again and again until we set the status "Completed" in the service order header.
    Is the system working as designed?
    Could anyone advise how we can prevent the users from creating a new service confirmation
    from the service item which has been already confirmed(the service order header status is still "Released")?
    Any information would be highly appreciated.
    F.T.

    Hi Fumi
    In standard process  , multiple confirmations are possible for a single service order. there are number of reasons for this
    1. Mutiple engg are working on single service order. and each engg post separate time and expenses in the confirmation
    2. in case of service order which cannot be completed  in a single day. and engg want to book the time daily
    you can still restrict the user to create multiple confirmations  using code.
    Regards
    Naresh

  • Copy General Task List from one service order to another one

    Dear Guru,
    I have the following questions:
    1- From a service order in IW32, how can I see the link between the operations and components?
    2- I want to be able to copy all the operations and all the components contained in a service order into another service order for a similar type of equipment. Can someone help me step by step on what needs doing?
    KR
    Christian

    Hello Sebastian,
    Many thanks for your quick reply indeed on this.
    Now this is the catch: I know that I could create a new service order based on a previously created one using IW31, however in my department they are creating sales orders for equipments in the normal SAP SD flow.
    In one the material line they enter a service material which is converted into a ZC03 (Service order) when saving the normal sales order which creates automatically a Service Order number.
    Because they create a lot of those service order in that way, they want to be able to populate them with the same list of operations and relevant components all the time.
    If they would be using IW31 to make copies, they would have to cancel the previously generated service order deriving from the regular Sales Order in SD which we want to avoid simply because it alters the original sales document flow.
    Question:
    1- I tried to copy the description of the task lists present in my service order thinking that would also copy the list of relevant and subsequent components defined for each task. The system has only copied the description of the tasks but not the components.
    Is there a way we could copy a list of general tasks to automatically have those coming with the relevant components?
    Please advise
    KR
    Christian

  • Net Price from the Service Order

    Hi Experts,
    I want to read the net price from the service order, in the order_read_ow FM I am getting the pricing conditions tab and getting the prices related to the conditions.
    Is there any way to get the net price directly.
    Thanks in Advance,
    Praveen

    Pls use the FM CRM_PRIDOC_READ_OW. You can pass the header GUID.

  • Bapi for technically complete of service order

    Hi all,
    I need to call a bapi to technically complete a service order.
    I dono what are the values to be passed into the bapi..
    please provide the passing parameters of the bapi.
    Thanks and Regards,
    Vidhya

    Hi vidhya,
      You can use the BAPI 'BAPI_ALM_ORDER_MAINTAIN' for technical complete of service order.
      Pass below parameters as input.
    IT_METHODS :
    Populate the values to methods
      wa_methods-refnumber  = '00001'.
      wa_methods-objecttype = ''HEADER'.
      wa_methods-method     = ''TECHNICALCOMPLETE'
      wa_methods-objectkey  =  v_aufnr. "Order number
      APPEND wa_methods TO  it_methods.
      CLEAR : wa_methods.
    Populate the values to methods
      wa_methods-refnumber  ='00001'.
      wa_methods-objecttype = space.
      wa_methods-method     = 'SAVE'.
      wa_methods-objectkey  =  v_aufnr. "Order number
      APPEND wa_methods TO  it_methods.
      Afetr calling this BAPi call BAPI_TRANSACTION_COMMIT to commit the chnages to data base.
      Hope this may be helpful.
      Regards,
    Sravanthi.V

  • Create multiple sales orders from single service notification?

    Is it possible to create multiple sales orders from a single notification (IW51)? 
    We currently create sales orders directly within transaction IW51 (Create Service Notification).  We kick off the sales order creation by pressing the "SALES ORD." button in the notification screen.  We're now interested in creating a 2nd Sales Order which would tie directly to the same Service Notification.  This is so that we can have the second order assigned to a different account assignment WBS (there are two different parties doing work on the service notification).
    I assume you would have to go to VA01 to create the Sales Order, but am not sure how to tie it directly to the service notification from here.  I treied to do a create with reference, but there is no ability to create with reference to a service notification.
    Do I have to create a second service notification for the 2nd Sales Order for this to work?  I want to avoid doing this if at all possible.
    I'm running SAP R/3 Enterprise
    Thanks for your help!

    Hi,
    go to vtaa- copy controls for sales document to sales document.
    select your combination of order and quotation go to item level. There select value 0(zero) in field positive/negative negative.
    No need to change update document flow.
    After setting zero in copy control that be told on above. create order with respective to the quotation.
    After saving the order.
    go to document flow to see the status in between quotation and order.
    If you placed setting right, then u certainly observe for quotation status will be open. so you can create no. of sales order with respect to that quotation..
    Have a good day..

  • Customer Quality notification for multiple batches

    Hi All,
    Is there any way I can reference multiple Batches to single quality notification?
    Present solution Proposed -  Using user exit insert New Zfields to notification to enter Batch nos manually.
    is there any other standard enhasment where multiple batch entry can be done!
    Thanks in advance!
    Jay

    Dear Sadan,
    There is a chance of happening this due to that field is marked as mandatory.
    I hope this would happen, when Pm guy was making settings for the notification fields.
    He might have made this filed mandatory w/o any reference of Notification type (Influencing in spro filed selection), If he doesnt select Influencing and Notification type, that field Mandatory will effect all the Notification types.
    So please check with ur PM guy and change the field setting for Notifications and ask him to use Influencing - Notification type and desired notification type.
    Regards,
    Praveen

  • Quality notification for deviation

    Dear Experts,
    Can anyone brief the steps for allowing deviation for a product in inspection type:01?
    how to get approval in SAP using QM01?
    VRMP

    Hi,
    Enter trasaction QM01 and select the notification type A3
    then enter the material document or p.o number;if both are not available still go inside the notification.
    enter the material code for which you want deviation ; after that in subject tab enter the description for the approval, in Item tab enter defect and cause if any
    then on next subject screen enter Department resp ,coordinator ,priority and Quantity and save the notification; after that from change mode send it to the respective authority from which u want approval.
    it will go to his Inbox for approval,
    then he will go to the change mode of that notification select Decision tab and then go to action box of that notification and click on special approval link and approve your deviation; for writing any other instruction long text is there; if any inspection lot is pending for this approval the approver can directly give usage decision from that action box screen and then send back notification to the co ordinator
    I think all your doubts are cleared now if any left please revert back
    Thanks
    Vinay

  • Deactivate Quality Notification During Defect Recording

    Hi,
    How will I deactivate the Quality Notification Tabs during Defect Recording? Because it is showing a red traffic light which user dont want to see and mis understood that there is something wrong.
    Thank you,
    Raymond

    Hi
    What you can do is remove the creation of automatic notification in the background.
    QCC3->inspection lot creation>Maintain Inspection type->select inspec type--->remove defualt " notification type".
    This will neither create notification nor give pop-up.
    Sujit

  • Best quality settings for transfer from comp to itunes library

    What settings should I use to have the best quality sound when transfering from my computer to itunes?

    Do you mean from CD to iTunes? Because if the songs are already on your computer, they probably don't need to be converted again. If you do mean from CD to iTunes, the answer is "whatever sounds best to you." I'm not trying to be flip. It's just that there's a wide range of preference. It's going to be affected by where you listen and the background noise, your headphones, your speakers, how good your hearing is and so on. I generally recommend that you rip the same track in a number of different bit rates in both AAC and mp3 and see what sounds best to you and (if space is an issue) what provideds the best compromise between good sound and small file size. Personally, I use 192 aac VBR. Sounds good on my iPods and on my JBL Creature speakers. I don't have a stereo.

  • Notification for defects

    Hi, we want system to create a notification upon recording a defect during receiving insp? that notification should be the base to create corrective action and preventive action on that defect? How to map this req? Pls help.

    >
    ys yadav wrote:
    > Hi, we want system to create a notification upon recording a defect during receiving insp? that notification should be the base to create corrective action and preventive action on that defect? How to map this req? Pls help.
    If you want to create notification/ record defect during receiving inspection then in MIC control indicator select checkbox "Defect recording".
    Now in SPRO maintain inspection type & QN relation at "Maintain Inspection type". So once you record reject result then system will give you notification pop-up.
    If you want to customize QN then just go through this [link|Qualilty Notification Customization], where we have recently discussed this.
    Let me know if you any specific concern.
    Thanks!!!

  • Copy 'Services for Objects' from Quote to Order

    Can anyone tell me a way to copy 'Services for Object' from a Quote to an Order when the order is created via reference to the quote. For a simple case, lets say we have an excel sheet attached to the quote via/under Services for Objects. When we create a Sales Order with reference to that Quote I want the attached excel sheet to be visible under The 'Services for Object' of the Sales Order.
    Thanks in advance.

    Hi Mohanpreet,
    Have you craeted a new field BA for lead and activity?
    Is it also present in quotation and sales order?
    If the coupy contol from lead to opportunity does pass on the field details, they must also get transfered from opportunity to quotation and sales order. Maintain the copy contro settings properly.
    If the issue is still not resolved use BADI CRM_COPY_BADI for further enhancements.
    Wish this is helpful.
    Regards,
    Shalini Chauhan

  • Purchase Requisition from CRM Service Order

    Hello Everybody,
    I am trying to create Purchase requisition from Service Order for Service(Material type DIEN) as well as Material (Material type HAWA). I have maintained all the necessary configuration in CRM as well as ECC, like in CRM,  Logistic integration we maintained settings for Purchase requisition and in ECC we have maintained Document type and schema for the purchase requisition.
    For information purpose, I have created Service Material in ECC as DIEN and item category group as LIES.
    As soon as we save the Service Order in CRM with that item category, it should create Purchase requisition in ECC and the document flow in CRM should get activated.
    Currently we are not able to create Purchase requisition in ECC.
    Kindly let me know if there’s any configuration settings missing in CRM as well as ECC or if note to be applied.
    Best regards,
    Anup Bansal

    Hi Anup,
    I am facing purchase requisition creation problem for service products from crm.
    I have seen your query which was posted on same issue, so i thought i could get some help.
    The problem here is when i am saving the service order i am getting the below message.
    Enter a (default) purchasing group for material group SUB_MC (Notification E CRM_SRV_LOG_EXT_OLTP 002).
    I have actually downloaded mat_dien materials from ecc to crm and for material purchase group is already assigned for one plant, but still not able to recognise.
    Please help me out.
    Thanks in advance.

  • How can we restrict users from marking service orders as deleted

    Hi,
    Please guide me :
    Is it possible to restrict users (who are having authorization of marking service orders as deleted) from marking some service orders as deleted, if they have not created these service orders?
    In other words, requirement is : only the person creating the Service Order should be authorized to delete.
    Please guide.
    Thanks and Regards

    There are many BADI and EXITS available, you have find the appropriate place to put your code.
    USER - EXITS
    CNEX0013  Order: Cust. enhancement: Default item category comp. assgmt
    CNEX0026  Customer enhancement for general inspection of material
    CNEX0027  Customer enhancement: Plant, storage loc. finding for comp.
    IWO10004  Maintenance order: Customer check for order completion
    IWO10005  Maintenance order: Cust.-specif. determination of profit ctr
    IWO10006  Maint. order: Fcode exclusion through cust. enhancement
    IWO10007  Maint.order: Customer enhancement - permits in the order
    IWO10008  Cust. enhancement: Determination of tax jurisdiction code
    IWO10009  PM Order: Customer Check for 'Save' Event
    IWO10010  Maint. order: Cust. enhancement for determining WBS element
    IWO10011  Maint. order: Customer enhancement for component selection
    IWO10015  Maintenance order: F4 Help for user fields on operation
    IWO10016  PM Order: Cust. enhancement to check operation user fields
    IWO10017  Determine external order number by customer logic
    IWO10018  Maintenance order: User fields on order header
    IWO10020  Maintenance order: Automatically include task list
    IWO10021  Automatic task list transfer when creating order from notif.
    IWO10022  Determine calendar from user exit
    IWO10023  Service order: Change header data for advance shipment doc.
    IWO10024  Service order: Changes to items for advance shipment
    IWO10025  PM/SM order: Finding responsible cost center
    IWO10029  Inclusion of bill of material in PM/SM order
    IWO10030  Preset Fields for Event Object
    IWO10031  Hide personnel number in PM/SM order
    BADI
    Name of a BAdI Definition
    ARC_PM_ORDER_CHECK
    ARC_PM_ORDER_DELETE
    ARC_PM_ORDER_PREPROCESSING
    ARC_PM_ORDER_WRITE
    ARC_PM_QMEL_CHECK
    ARC_PM_QMEL_DELETE
    ARC_PM_QMEL_PREPROCESS
    ARC_PM_QMEL_WRITE
    IWO1_ORDER_BADI
    IWO1_PREQ_BADI
    IWO1_SCREEN_MODIFY
    IWO1_TL_INTEGRATION
    IWO1_TL_INTEGRATION2
    Edited by: Manish  Bisht on Jul 11, 2009 9:27 AM
    Edited by: Manish  Bisht on Jul 11, 2009 9:28 AM

Maybe you are looking for

  • Purchase order  WRT Contract

    Hi, everyone. I have created a purchase order with reference to a contract, purchase order update the field of contract, however the purchase req field is blank. How can I make the purchase requesition field in the purchase order wil be updated autom

  • Apple Remote Desktop update issue in Yosemite

    I bought ARD in 2009, before the App Store. It has been updating itself, and in fact, I now have the current version (3.7.2). I just upgraded to Yosemite. All other apps appear to have been updated correctly, but App Store appears to be confused abou

  • Quickstart index error

    Hi, I have Oracle 8.1.5, and am trying to run the InterMedia QuickStart sample index, but keep getting this error. Any ideas, thank you Aidan SF PL/SQL Release 8.1.5.0.0 - Production SQL> create index quick_text on quick ( text ) 2 indextype is ctxsy

  • 错误"Cannot open the file due to an unknown error. (FRM0007)"

    在XI3.0,当打开3层deski的时候,得到下面的错误 "Cannot open the file due to an unknown error. (FRM0007)" -所有的deski文件都打不开 -用2层deski打开没有问题 -发生在某些特定的UserID上 -目前在两台终端机上发生 下面是进行拖拽部分的log文件,或许有帮助 <busobj_2812_xxx> 2009/03/02 01:33:38.468|==| |X| 2812|3592|}|||||||||||||||_BO

  • Time machine initial backup duration

    How long should it take for Time Machine to make it's first full back up of data? I'm 92GB into a save of 496GB, and it's predicting 11 more DAYS of copying before it's done.  I did have to stop it once, but seems to have restarted.  Is this typical,