Multiple Schedule Agents for One Work Repository

Hi
Does anyonem know if it should be possible to have multiple schedule agents running (on different machines, with different names, ports etc.), but all agents use the same master and work repository (defined in odiparams.sh).
I seem to be having a problem with this set up. Only one of the schedules is working. I can add schedules to any of the other agents, but when I go to update scheduling (in TM) and then view the schedule, odi tells me it is unable to retrieve the schule information.
This error is usually caused by either empty schedule, or odiparams.sh connection information not being set correctly. But in my case it must be correct as I can see items in one of the schedules.
Thanks

Hi,
I don't really know if multiple Scheduler agents on the same repositories is possible.
But I just can say that I have the following message too : "unable to retrieve the schedule information".
This message appears each time I try to view the schedule.
I have tried to correct things to avoid this message but it always appears.
At the end all my scheduling works fine so I let it.
Moreover when this message appears if I click ok it loads me the calendar with all the scheduled tasks of the period.
So my question is, what do you see when you click Ok after the Warning message occurs ?
Do yo see the scheduling planning empty ?

Similar Messages

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Multiple free goods for one item in standalone CRM

    Hi Gurus,
    We are trying to implement multiple free goods for one item in standalone CRM.
    As per SAP.help.com, it says that we can configure multiple free goods scenario in standalone CRM system.
    We tried to set up this in our system.  Basically we want to implement the scenario, where a user wants to  purchase item A, he should get a prompt for choosing between two free goods  B and C.
    We did the relevant IMG settings required for Free goods at  IMG ->CRM -> Basic Functions -> Free Goods.-> Set up Free Goods
    We also did the relevant item category determination where we have made an entry with
    Item Usage = " Free Goods" , Main item cat. = "TAN' , Item Category = "TANN".
    Now we went to create condition records in the path  "SAP Menu -> Master Data -> Prices and Conditions -> SAPCND/GCM - Maintain condition"
    We chose Application ="PRT", MaintenanceGrp="PRT_FGOODS", Maintenance context ="GCM"
    Then while creating conditon records , when I try to create two condition records where the Main Product is same but free good product is different, the system is not allowing to save these two condition records.
    it is giving error "Overlapping validity periods for two condition records".
    Please advice, if i am missing something. Thanks in advance for your help.
    thanks,
    Randhir
    Edited by: Randhir Soni on Feb 8, 2010 8:12 AM

    Constraints in free goods in R3 taken from SAP library
    Free goods can only be supported on a 1:1 ratio. This means that an order item can lead to a free goods item. Agreements in the following form are not supported: u2018With material 1, material 2 and material 3 are free of chargeu2018 or u2018If material 1 and material 2 are ordered at the same time, then material 3 is free of chargeu2018.
    Free goods are not supported in combinations with material structures (for example, product selection, BOM, variants with BOM explosion).
    Free goods are only supported for sales orders with document category C (for example, not quotations).
    Free goods are not supported for deliveries without reference to a sales order.
    Free goods cannot be used in make-to-order production, third-party order processing and scheduling agreements.
    If you defined a free goods for variants in a generic article (only SAP Retail), you can only process the variants in the purchase order and goods receipt individually (as single articles). In other words, you cannot process them using the generic article matrix.
    This answers your qn Not possible in R3
    If you are on Retail scenario this is possible thro bonus buy schemes
    But a lot of customizations needs to be done and you need a retail server to do that
    Regards
    Raja

  • Multiple free goods for one main material

    Hello SAP Gurus,
    we have a business requirement that to issue multiple free products for one main product, if the upliftment is beyond the specified quantity.
    Using free goods functionality, is it possible to achive the above requirement.
    e.g                                                     Quantity
    main product        123456                         10
    free goods             xxxxx                           2
    free goods             yyyyy                           1
    is it possible to maintain such data thru free goods or any development needs to be done.
    regards
    Casimer

    Constraints in free goods in R3 taken from SAP library
    Free goods can only be supported on a 1:1 ratio. This means that an order item can lead to a free goods item. Agreements in the following form are not supported: u2018With material 1, material 2 and material 3 are free of chargeu2018 or u2018If material 1 and material 2 are ordered at the same time, then material 3 is free of chargeu2018.
    Free goods are not supported in combinations with material structures (for example, product selection, BOM, variants with BOM explosion).
    Free goods are only supported for sales orders with document category C (for example, not quotations).
    Free goods are not supported for deliveries without reference to a sales order.
    Free goods cannot be used in make-to-order production, third-party order processing and scheduling agreements.
    If you defined a free goods for variants in a generic article (only SAP Retail), you can only process the variants in the purchase order and goods receipt individually (as single articles). In other words, you cannot process them using the generic article matrix.
    This answers your qn Not possible in R3
    If you are on Retail scenario this is possible thro bonus buy schemes
    But a lot of customizations needs to be done and you need a retail server to do that
    Regards
    Raja

  • Creation of multiple cost center for one emplyee

    HI All,
    I have requirement . one emplyee is working two projects so need create two cost centers for one employee.
    please tell me how create multiple cost center for one employee.
    Thanks&Regards
    ramesh

    hai.
    if he works half the time... u can give 50%.. or just get it confirmed from core team member..
    manu

  • How to run multiple CodedUI Ordered Tests over multiple Test Agents for parallel execution using Test Controller

    we are using VS 2013, I need to run multiple Coded UI Ordered Tests in parallel on different agents.
    My requirement :
    Example:   I have 40 Coded UI Test scripts in single solution/project. i want to run in different OS environments(example 5 OS ).  I have created 5 Ordered tests with the same 40 test cases. 
    I have one Controller machine and 5 test agent machines. Now I want my tests to be distributed in a way that every agent gets 1 Ordered test to execute. 
    Machine_C = Controller (Controls Machine_1,2,3,4,5)
    Machine_1 = Test Agent 1 (Should execute Ordered Test 1 (ex: OS - WIN 7) )
    Machine_2 = Test Agent 2 (Should execute Ordered Test 2 (ex:
    OS - WIN 8) )
    Machine_3 = Test Agent 3 (Should execute Ordered Test 3
    (ex: OS - WIN 2008 server)  )
    Machine_4 = Test Agent 4 (Should execute Ordered Test 4 (ex:
    OS - WIN 2012 server) )
    Machine_5 = Test Agent 5 (Should execute Ordered Test 5 (ex:
    OS - WIN 2003 server) )
    I have changed the  “MinimumTestsPerAgent” app setting value
    as '1' in controller’s configuration file (QTController.exe.config).
    When I run the Ordered tests from the test explorer all Test agent running with each Ordered test and showing the status as running. but with in the 5 Test Agents only 2 Agents executing the test cases remaining all 3 agents not executing the test cases but
    status showing as 'running' still for long time (exp: More then 3 hr) after that all so  its not responding. 
    I need to know how I can configure my controller or how I can tell it to execute these tests in parallel on different test agents. This will help me reducing the script execution time. 
     I am not sure what steps I am missing. 
    It will be of great help if someone can guide me how this can be achieved.
    -- > One more thing Can I Run one Coded UI Ordered Test on One Specific Test Agent?
    ex: Need to run ordered Test 1 in Win 7 OS (Test Agent 1) only.
    Thanks in Advance.

    Hi Divakar,
    Thank you for posting in MSDN forum.
    As far as I know, we cannot specify coded UI ordered test run on specific test agent. And it is mainly that test controller determine which coded UI ordered test assign to which test agent.
    Generally, I know that if we want to run multiple CodedUI Ordered Tests over multiple Test Agents for parallel execution using Test Controller.
    We will need to change the MinimumTestsPerAgent property to 1 in the test controller configuration file (QTControllerConfig.exe.config) as you said.
    And then we will need to change the bucketSize number of tests/number of machines in the test settings.
    For more information about how to set this bucketSize value, please refer the following blog.
    http://blogs.msdn.com/b/aseemb/archive/2010/08/11/how-to-run-automated-tests-on-different-machines-in-parallel.aspx
    You can refer this Jack's suggestion to run your coded UI ordered test in lab Environment or load test.
    https://social.msdn.microsoft.com/Forums/vstudio/en-US/661e73da-5a08-4c9b-8e5a-fc08c5962783/run-different-codedui-tests-simultaneously-on-different-test-agents-from-a-single-test-controller?forum=vstest
    Best Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Unable to enter multiple Schedule lines for BOM material in Sales Order

    Hi All,
    We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
    The schedule lines are greyed out, user was able to add schedule lines earlier.
    I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
    Please provide a solution for this.
    PFB link in which similar situation posted in this community but the final resolution method is not discussed.
    http://scn.sap.com/message/13201504#13201504
    Regards,
    Samiksh

    Hi Samiksh,
    Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
    or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
    With regards
    S.Siva

  • Show or view multiple album art for one song on iPhone 4?

    Is it possible to show or view multiple album artwork for one song on an iPhone 4, especially on the now playing screen? I figured since iTunes has this feature then the iPhone should too. Can I download an app that does this? I've searched but couldn't find any, maybe I'm using other keywords. Could anyone point me in the right direction with this?

    Darn. I hope an app is designed to be able to do this soon. From what I've seen this feature isn't really in demand so it could take a while. Thanks for replying.

  • Multiple Lease Duration for one DHCP Scope?

    Hi All,
    I have an urgent question. I wanted to know if it is possible to have many lease durations for different computer groups getting their addresses from one DHCP scope. I saw somewhere that it is possible to use User Classs or Vendor Classes for setting a lease
    duration for a group of computers sharing the same class Id ?
    If it is true, How can to configure ?
    Also i would like to know about the lease duration period what is the maximum days can we have ( 8 days After )?
    Thanks
    Atul

    Please refer to the following-
    http://social.technet.microsoft.com/Forums/windowsserver/en-US/26de79f9-6ad7-4088-9077-006b9dd8c1fb/multiple-lease-durations-for-one-dhcp-scope?forum=winserveripamdhcpdns
    You can configure any value as lease duration; however if you want a very big/infinite value; it makes sense to convert the lease(s) to a reservation.

  • Multiple component instances for one component usage

    Hi,all
    How can I create multiple component instances for one component usage.
    I'm using the following code for creating  a single component instance for specific component usage:
    if(c_Usage.hasActiveComponent())
          c_Usage.deleteComponent();
    if(wdContext.currentContextElement().getSelectedTab().equalsIgnoreCase("Registered"))
          c_Usage.createComponent("health.gov.registered.Registered";);
    I can't create one more component instance for
    IWDComponentUsage c_Usage
    cause I have to delete the component instance associated with this component usage.
    Any idea how can I do it anyway?
    Regards,
    Michael

    Hi,
    To create another instance of the same component you need to embed the same component under the Used Components more then once. For Example if you have Componet A to which you want to embed Component B then under "Used Components" of Component A add component B twice.

  • Multiple db connections for one report

    Hi all,
    I am using Oracle Reports 10g R2. Could someone tell me if Oracle Reports supports multiple database connections for one rdf file, like this (using servlet)
    http://your_web_server:port_num/reports/rwservlet?server=server_name&report=myreport.rdf& userid1=username/password@my_db1&userid2=username/password@my_db2 &desformat=pdf&destype=cache
    I am asking this question because my report needs data from two separate Oracle databases.
    Edited by: user12239004 on Apr 27, 2010 2:14 AM

    No, you can only have one login.
    However, this is simple to resolve by creating a database link in one database to the other database.

  • If an internal ID is changed for the Work Repository how does it affect objects that are already in it?  Will they continue to run or do you need to cycle the ODI agent?

    I was having trouble migrating the Master and Work repositories from my QA to my Prod environment.  I was getting an error message that the internal id's were alike so I changed the internal id in my Prod Master repository.  Then I tried to migrate the Work repository and was getting a similar error.  I did a search on the internet for the error message and it recommended that I renumber the Work repository so I did.    My concern now is how these changes affect the objects that are already in the repositories?  Will those objects continue to run?  Also do these changes take affect immediately or do you need to cycle the ODI agent?

    Well I cannot completely assure you but so far I have not faced any issues after a renumber. It will affect the exist object only when you have imported the object in synonym_update mode. I believe you have the daily backup of your production repository.
    Bhabani
    http://dwteam.in

  • How to use scheduled agent for query in database

    Hi there I'm working with database on my app and when use the query for search in the database the application freeze for a maximum of one minute I want change that why I want what runs ok and I wonder if I can use a background agent for do that manage
    the queries .
    But I don't know how can I call the queries from the other project if the files are in the main project.

    Hi OzkarLeo,
    Background task provides functionality to do work when your app not in foreground, it need some conditions to trigger.
    https://msdn.microsoft.com/en-us/library/windows/apps/xaml/Hh977056(v=win.10).aspx. If you need scheduled query when app is active in foreground, then it’s no need to use background task.
    Regards,
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place. Click HERE to participate
    the survey.

  • Send Multiple notification mails per one work item

    Hi all,
    How to send notification mails to multiple agents when only one work item hits the inbox of one of the agents ?
    The scenario is like this :-
    Say, we have 3 agents : - agent1, agent2, agent3.
    The workitem will hit the inbox of only one agent, say agent1.
    But the notification mails for the workitem will be droped in the external mail IDs of all the 3 agents - agent1, agent2 and agent3.
    How can we achieve this.
    Regards,
    Debi

    Hi Sujith
    My requirement is a bit different.
    Actually I am facing the problem for PO Workflow.
    This is the standard PO wokflow what i have customized.
    Depending on the release code, i am fetching the next level agent (who will release the PO.)
    Once the first user releases the PO, its release code gets automaticaaly changed.
    And we will find the 2nd agent base on release code once again and the process continues till the end.
    In one of the step (say when 1st user released the PO and now the PO is sent to 2nd agent) we want the notification to be sent to multiple agents (not the work item.)
    Regards,
    Debi

  • Production order from sales order with multiple line item(for one material)

    Dear Gurus,
    I am working in MTO scenarios. If there is several line item in a sales order for one material, multiple production order( same as no. of sales order line item) is getting created against each of the line item.My requirement is,since the material code is same in each line item and sales order is one, one production order should be generated for all line item. please tell me how to do it.
    (Here for one material, multiple line item is required for some specific reason)
    Regards
    Rajib Pathak

    Hi,
    This is not possible.
    In Std SAP will create one production order for one sales order. The stock is also allocated to thet particular sales order only. Because each and every sales order may vary in any one of the parameters. Considering this, SAP has designed like this.
    Regards,
    V. Suresh

Maybe you are looking for

  • Is it posible to compare 2 variales in single if statement in BIP report?

    Hi, I want to know following things reg BI Publisher- 1. Is it possible to compare 2 variables in single if statement in BI Publisher report as follows- <?if: xdoxslt:get_variable($_XDOCTX,'RVal1') = xdoxslt:get_variable($_XDOCTX,'RVal2')?> 2. Is it

  • How to create a folder in mac os x (10.5.x) with director 11.5

    hi: i'm using FileXtra4 in windows and it's work perfect, when i try it in mac os x, director tell me 'Script Xtra not found' this xtra file is in de Xtra folder and i don't now what's happened. i need create a folder for save a historial file of use

  • Updating groups in Active Directory LDAP

    Hi, We are making use of the LDAPResourceAdapter to manage user information present in AD. To manage group membership, the resource schema contains mapping of Identity System user attribute to the 'ldapGroups' resource attribute and the Group Member

  • How in the world do I know my phone is backed up?

    I started out loving my Windows phone / Nokia 822; but lately everything seems to be malfunctioning. I want to do a factory reset but first I want to know my phone is backed up and that I can get things back after I reset the 822. My problems are the

  • URGH! Make clipping mask/path out of a placed image?!

    I'm having major issues. I'm a n00b at Illustrator, though. I need to make a placed photo into a clipping path, and I can't figure out how to do it correctly. It's homework for a college course in Digital Illustration. I need to recreate a photo usin