Need SCA components instance-wise statistics (processing time etc.)?

Hi,
Is there any way to gather information (processing time, start time, end time etc.) on individual sca component instances by accessing weblogic MBean through java API?
Please note that, Oracle WebLogic System MBean Browser provides avg processing time, max time and min time for all instances, but we need individual instance processing time.
However, we can manipulate OFM Infrastructure Management Java API to get those information from SOA Infra DB, but instead of doing that, can we get the same using mbean api? It will help in minimizing coding effort.
Thanks in advance.
- @rc

Hi Thierry,
In Stad if we see Processing time is much higher than the CPU time,
there may be some lost time.
You can confirm this lost time as follows:
Perform ST05 or ST12 trace for any particular transaction and you can
see the Detialed trace list. Search for the particular time stamp
for which STAD has been opened in the detailed trace list.
Difference between the two consecutive time stamps should be equal to the
value in the duration column. If this is not equal, means some lost time
is there.
Inorder to find where this lost time has occured, go to the transaction
SQLR and for the same time and date( which you entered in STAD). If you click on the
Summary tab, then you can see the SQL Trace Records with Longest Non-Database Times (Gaps).
You can tune the programs listed in this table.
Note: STAD and SQLR data won't be available for more that 24 hours, so better have the data copied in HTML format.
There may be some kernel bug also for this difference in the CPU and processing time. But as per your message, other application servers are fine.
If you need any help kindly attach trace files and stad record files to this message so that will try to figure out the exact problem.
Please dont forget to check the kernel level of your system before performing the ST05 trace.
For 700 release minimum patch level should be 145
For 640 release minimum patch level should be 193.
If your system kernel patch is not updated, kindly update it and do the trace to avoid system crash.
Hope this helps.
Please feel free to contact.
Regards,
Kiran

Similar Messages

  • Purchase Requisition Processing Time

    I am currently facing an issue with the purchase requisitoin processing time functionality. It does not appear to work for items without a material master. So if I create a purchase requisition with material master line items and non-material master line items only the material master line items will have the delivery date increased by the purchase requisitoin processing time. Is this standard SAP or a bug?

    Dear MM Project.
    PR processing time/ GR processing time etc are fields which are mentioned in the material master for each material.
    while you process the document with a master record, these details make an impact in those documents. however we may or may not have master records for consumables. the consumables which have a master record will show this impact. these are material types UMBW and NLAG.
    for consumables which doesnt have any master record, you can not expect system to impact these values.
    hence if you need to have the impact of PR processing time, please create a master record for all those materials and process documents further.
    Raghavan

  • How to make sure one instance of BPEL process runs at a time.

    Hello,
    we have a BPEL web service and would like to run the BPEL processes serially. below is our senario
    Process "A" kicks of ( 100's of them via file polling)
    at some activity (not at the beginning) the BPEL process should check if there are any other BPEL instances of same Process "A" are running? If so then it should wait until the process completes.
    is there an API to check what other instances are running and if so if they completed or not?

    Have a look at metalink note 779136.1, you have to be on
    10.1.3.3.1 MLR#14 or above
    10.1.3.4 MLR1
    There is a note saying model on a synchronous pattern. There is no instructions on how to do this you need to create a new message definition to the wsdl
    <message name ="Dummy">
    <part xmlns:xsd="http://www.w3.org/2001/XMLSchema" name="Dummy_element" type="xsd:string"/>
    </message>
    in the port type add an output definition
    <portType name="Read_ptt">
    <operation name="Read">
    <input message="tns:payload_msg"/>
    <output message="dummy_output"/>
    </operation>
    </portType>
    here is an example
    <definitions
    name="GetFile"
    targetNamespace="http://xmlns.oracle.com/pcbpel/adapter/file/GetFile/"
    xmlns="http://schemas.xmlsoap.org/wsdl/"
    xmlns:tns="http://xmlns.oracle.com/pcbpel/adapter/file/GetFile/"
    xmlns:bpws="http://schemas.xmlsoap.org/ws/2003/03/business-process/"
    xmlns:plt="http://schemas.xmlsoap.org/ws/2003/05/partner-link/"
    xmlns:jca="http://xmlns.oracle.com/pcbpel/wsdl/jca/"
    xmlns:pns1="http://xmlns.oracle.com/ComplexFile/correlationset"
    xmlns:pc="http://xmlns.oracle.com/pcbpel/"
    xmlns:imp1="http://TargetNamespace.com/GetFile"
    xmlns:hdr="http://xmlns.oracle.com/pcbpel/adapter/file/"
    >
    <import namespace="http://xmlns.oracle.com/ComplexFile/correlationset" location="ComplexFile_Properties.wsdl"/>
    <import namespace="http://xmlns.oracle.com/pcbpel/adapter/file/" location="fileAdapterInboundHeader.wsdl"/>
    <types>
    <schema xmlns="http://www.w3.org/2001/XMLSchema">
    <import namespace="http://TargetNamespace.com/GetFile" schemaLocation="sample_1.xsd"/>
    </schema>
    </types>
    <message name="payload_msg">
    <part name="payload" element="imp1:payload"/>
    </message>
    <message name="dummy_msg">
    <part name="dummy_string" xmlns:xsd="http://www.w3.org/2001/XMLSchema" type="xsd:string"/>
    </message>
    <portType name="Read_ptt">
    <operation name="Read">
    <input message="tns:payload_msg"/>
    <output message="tns:dummy_msg"/>
    </operation>
    </portType>
    <binding name="Read_binding" type="tns:Read_ptt">
    <pc:inbound_binding/>
    <operation name="Read">
    <jca:operation PhysicalDirectory="c:\temp\inbound\ComplexFile" ActivationSpec="oracle.tip.adapter.file.inbound.FileActivationSpec"
    DeleteFile="true" IncludeFiles=".*\..*" PollingFrequency="10" MinimumAge="0"
    Sorter="oracle.tip.adapter.file.inbound.listing.TimestampSorterDescending"
    OpaqueSchema="false"/>
    <input>
    <jca:header message="hdr:InboundHeader_msg" part="inboundHeader"/>
    </input>
    <output/>
    </operation>
    </binding>
    <service name="GetFile">
    <port name="Read_pt" binding="tns:Read_binding">
    <jca:address location="eis/FileAdapter" UIincludeWildcard="*.*"/>
    </port>
    </service>
    <plt:partnerLinkType name="Read_plt">
    <plt:role name="Read_role">
    <plt:portType name="tns:Read_ptt"/>
    </plt:role>
    </plt:partnerLinkType>
    </definitions>
    cheers
    James

  • How can I get composite processing time through Weblogic System MBean

    Hi All,
    Can anybody please tell me where to find SCA Composite processing time under 'System MBean Browser' properties?
    We have a requirement to access composite instance processing time from Oracle Weblogic MBean through java.
    Please note, component wise statistics can be found in +'oracle.dms'+ package under 'Application Defined MBean'. Also +'oracle.soa.config'+ & +'oracle.mds.lcm'+ packages under 'Application Defined MBean' doesn't provide details composite wise.

    You need LineIn. Scroll down on:
    <http://www.rogueamoeba.com/freebies/>

  • Is there any version of Indesign that allows to open multiple instance at the same time

    I am using Indesign CS3 to generate the bulk reports automatically(programmatically) using Adobe indesign library . One of the key limitation to this tool is it allows to open only one instance at a time unlike word where multiple instances can be opened at the same time. Is there any adobe indesign too version desktop/server which allows to open multiple instances at the same time. Any help on is appreciated. Thanks.

    @PeterG
    You said "You might want to examine the End User Licensing Agreement (EULA) for  any prohibition against using these two instances at the same time with  the same license; the license does permit two installs for the same user  that are not used simultaneously." I thought that meant you had read the EULA. It's pretty unambiguous on that point.
    For everyone's edification about multiple installations and server use with a standard license here's the relevant text:
    2. Software License.
    If you obtained the Software and any required serial number(s) from Adobe or one of its authorized
    licensees and as long as you comply with the terms of this agreement, Adobe grants you a non-exclusive
    license to install and use the Software in a manner consistent with its design and Documentation and as
    further set forth below. See Section 16 for specific provisions related to the use of certain products and
    components, for example font software, Acrobat, After Effects, Adobe Presenter, Contribute, Adobe
    Device Central, Flash Player, Flash Builder, and Adobe Runtimes.
    2.1 Limited Use. The Software, or portions of the Software, may allow installation and use without a serial
    number. If so, you may install but not use such non-serialized Software on any number of Computers as
    part of an organizational deployment plan. Further, you may install and use such non-serialized Software
    on any number of Computers for demonstration, evaluation and training purposes only and only if any
    Output Files or other materials produced through such use are used only for internal, non-commercial and
    non-production purposes. You may not use such non-serialized Software after any applicable time-out
    period has ended, unless you input a valid serial number under Section 2.2. ACCESS TO AND USE OF
    ANY OUTPUT FILES CREATED WITH SUCH NON-SERIALIZED SOFTWARE IS ENTIRELY AT
    YOUR OWN RISK.
    2.2 General Use. You may install and use one copy of the Software only on the Permitted Number of your
    compatible Computers into which you enter a valid serial number.
    2.3 Distribution from Server. You may copy an image of the Software onto Computer file server(s) within
    your Internal Network for the purpose of downloading and installing the Software onto Computers within
    the same Internal Network for use as permitted by Section 2.1 and 2.2.
    2.4 Server Use. You may install the Software on Computer file server(s) within your Internal Network only
    for use of the Software initiated by an individual from a Computer within the same Internal Network only
    as permitted by Section 2.2. The total number of users (not the concurrent number of users) able to use the
    Software on such Computer file server(s) may not exceed the Permitted Number.
    By way of example, the foregoing does not permit you to install or access (either directly or through
    commands, data or instructions) the Software: (a) from or to a Computer not part of your Internal Network,
    (b) for enabling Web hosted workgroups or services available to the public, (c) by any individual or entity
    to use, download, copy or otherwise benefit from the functionality of the Software unless licensed to do so
    by Adobe, (d) as a component of a system, workflow or service accessible by more than the Permitted
    Number of users, or (e) for operations not initiated by an individual user (e.g., automated server
    processing).
    2.5 Portable or Home Computer Use. Subject to the important restrictions set forth in Section 2.6, the
    primary user of the Computer on which the Software is installed under Section 2.2 (“Primary User”) may
    install a second copy of the Software for his or her exclusive use on either a portable Computer or a
    Computer located at his or her home, provided that the Software on the portable or home Computer is not
    used at the same time as the Software on the primary Computer.
    2.6 Restrictions on Secondary Use by Volume Licensees. If the Software was obtained under an Adobe
    volume license program (currently known as Adobe Open Options) by any licensee other than an
    educational volume licensee, the second copy of the Software made under Section 2.5 must be used solely
    for the benefit and business of that volume licensee. For more information about secondary use by volume
    licensees, please visit our Web Site at http://www.adobe.com/go/open_options.
    There is also language stating that if you have a dual boot or other system capable of running more than one OS you will need a separate license for each platform if you want to run the software on more than one.

  • Single SOA Suite Install with multiple oc4j instances and java processes

    We right now have 5 BPEL processes and 5 ESB processes all running under one java.exe process. We would like to seperate some of
    them out into their own java.exe processes without having to install more
    %ORACLE_HOME% instances of SOA Suite. I can create an oc4j instance but of
    course it doesn't have any SOA Suite stuff deployed to it. I tried to see what
    the install would do with this new oc4j instance but it wants to create a new
    %ORACLE_HOME% with an entire installation of SOA Suite.
    Is there some sort of way to clone oc4j instances that have SOA Suite deployed to them so that you
    don't need multiple %ORACLE_HOME% instances?
    ### How is this Issue Impacting Your Business ###
    We really don't want to have a lot of %ORACLE_HOME% instances to have to maintain. We are
    migrating projects over from our current integration server product and we'll
    have potentially dozens more BPEL and ESB projects. We definitely want to
    group and isolate projects so that outages of one project do not bring down
    others that are unrelated.
    We are currently experiencing periodic problems with one BPEL project that requires recycling but all the other BPEL and ESB
    projects get recycled also. If we could put this project into it's own java
    process without creating another SOA SUITE instance, it would be a big
    help.
    ANSWER
    =======
    You can create multiple domains in BPEL or create multiple systems/groups in ESB to group different projects.
    MY REPLY:
    =========
    We have been using systems/groups in ESB but they all run under the save java.exe process. I would assume that having a seperate domain in BPEL would also run in that same java.exe process.
    Right now, the one BPEL project we have a problem with will gobble up all the JDBC connections from time to time and that requires a recycle of SOA Suite, which means all BPEL and ESB projects that run in that java.exe process get recycled also. We're working that issue in a different ticket.
    It would be nice if the SOA Suite installation would install against a new oc4j instance and not assume it has to create a complete %ORACLE_HOME% instance. The components of SOA Suite seem to be J2EE based components.
    Scenario: I already have an oc4j instance called oc4j_soa and a complete %ORACLE_HOME% installation of soa suite. I then create a new oc4j instance from Enterprise Manager. Then I would deploy the esb-dt, esb-rt, orabpel, etc. components of SOA Suite to that new oc4j instance and modify the necessary config file so that it can work with OHS and the SOA Suite Databases. Is this possible?
    Does anyone have any experience with this or do people typically install multiple complete installation of SOA Suite with mulitple Oracle Homes?

    Hi,
    yes, on metalink you get in touch with real experts....
    You have to install serveral application servers to get different ORACLE_HOMEs.
    For each one, you can install a BPEL PM.
    But: For each BPEL PM you need your own database instance, or you have to configure them as a clustered BPEL installation.... (but i do not know if this work with non RAC DBs)

  • How to show the processing time taken for a BPEL process in BAM report.

    Hi All,
    I have the data as below in the Data object. I would like to show the time taken for each order to complete in the report.
    instance Id     order Id     product Name     product Code     price     status     instance Time      updaterName
    1360010     ord004     Guitar     prod003     2000     requested     9/22/2008 12:12:11 PM     Invoke_InsertSalesOrder
    1360010     ord004     Guitar     prod003     2000     Approved     9/22/2008 12:15:11 PM     Invoke_OrderStatusUpdate
    This data comes from simple BPEL process where sensors are configured at the start and end of BPEL process. Also have a human task activity in between to create the time difference.
    In Enterprise link design studio, I tried to calculate the time difference using expression calculator and store it as calculated field. But that doesn't seems to work because when I execute the plan, second sensor data reaches only after human approval whereas first sensor data would be waiting for calculation and ultimately nothing comes into data object.
    How and where the calculation be done to show the processing time in the report. Please someone throw some light on this.
    Regards
    Jude.
    Edited by: user600726 on Sep 30, 2008 1:30 AM

    I would suggest modifying your data object so that the data can all be in a single row and use the sensor at the end of the process to upsert (update) the row created by the sensor at the start of the process. The time difference between two fields in the same row is then an easy calculation on a BAM report -- No EL plan should be needed.

  • 2 Logical Components for 1 Business Process Step

    Hello All,
    I'm looking for a way to assign in SolMan --> transaction Solar01 - Tab Structure - Business Process Step, 2 logical components for 1 business step. When creating the business step I have to assign 1 specific logical component to this step. Once I have done this I can only select  the chosen logical component ffor SAP Transactions, configuration object etc.. As my business step is running on 2 different systems I need to find a way to link transactions etc. in the step to the different systems. Is there any way to change this for the Level 3 elements, like it is for level 2 (business processes) where I can choose in the different tabs between all the logical components?
    Thanks in advance
    Ramó

    I've seen people use some absolute craziness to get more than three levels. The most extreme being using multiple projects at the highest level (i.e. a project for PTP Accounts Payable). Don't go there.
    I personally like to have 1 transaction per process step. Don't use the transaction tab as another process level, use it to better describe the process step (like all the other tabs are uses). It results in a better understanding of the system as you go forward. To do that I make teams break up things they think are one step (this can take some arm twisting, so hit the gym and maybe take a few judo classes).
    This allows you to use SolMan in more powerful ways. For instance, if you attach development objects to a step with 5 transactions, you cannot tell which transaction is modified by the development object. However, one transaction per node provides you this link. There are other examples, but basically the "where used" button becomes very useful when you have 1 transaction per node.
    Maybe you could provide a specific example of your process and we can think of a better way to collapse it.
    Such as:
    - PTP Non-Merchandise Purchasing
    -- Expense Purchasing
    --- Create Purchase Requisition
    --- Create Purchase Order (Assign Vendor & Price)
    --- Send to Vendor
    --- Post Goods Receipt
    --- Perform LIV
    --- Process Payment
    Some companies have 6 level processes already defined in models and putting it into SolMan can be a pain for sure. Your naming convention is usually the best route.
    regards,
    Jason
    The system role and template work around doesn't apply to your situation.

  • Need for separate instance on RAC database 11g

    Hi Experts,
    Currently we have a RAC 11g database with two instances. Our business is requesting to create one more instance with an user to store historical data. They claim that they need this separate Instance for the following reasons
    1)     Easy backup and recovery for a specific instance in case of historical data
    2)     Point-in-time recovery is possible
    3)     If any other node fails, then it won’t affect this instance
    Please share your expertise on this regard. Thanks in advance.
    Regards,
    Richard

    user12075620 wrote:
    1)     Easy backup and recovery for a specific instance in case of historical dataWhat data will that be? If this is a 3rd RAC instance, then it will not make backup easier as the data is in the database (on shared storage media) and that needs to be backed up - the database's data does not reside locally on the instance.
    2)     Point-in-time recovery is possibleAgain, I do not see how this is a specific advantage that now suddenly occurs with the introduction of a 3rd RAC instance.
    3)     If any other node fails, then it won’t affect this instance Correct - a 3rd instance increases the redundancy in the cluster. It also scales it and provides additional processing capacity.

  • Unnecessary Purchasing Processing Time in scheduling agreement

    According to its business logic, the scheduling agreement is a document  that has  already been  released  by purchasing department,  and  its scheduling lines, that have been created by MRP  are valid for goods receipt without any need for additional purchasing  processing time. However, MRP scheduling incorrectly takes purchasing processing time into account (as defined in the IMG in plant parameters for external procurement - TCODE  OPPQ) when calculating planned availability date. Please advise how to correct this issue.
    Best Regards,
    Itzik Eshed

    This can be customized in
    SAP Customizing Implementation Guide
    -> Production
    --> Material Requirements Planning
    ---> Planning
    > Procurement Proposals
    > Define External Procurement
    Here you can select the indicator "Scheduling according to purchasing info record or agreement" either at plant or MRP group level.

  • How do I sync my new ipad mini with my old ipad 2, without losing any apps or data in notes?  I need step by step instructions for first-time sync with ipad mini.  Thanks.

    How do I sync my new ipad mini with my old ipad 2, without losing any apps or data in notes?  I need step by step instructions for first-time sync with ipad mini.  Thanks.

    If you synced it many times, you have to have a backup. It's just a question of how old that backup is now. When did you last sync?
    First of all launch iTunes on your computer and go to Edit>Preferences>Devices. Do you see any backups for you iPad in that window? If so, how new is the newest backup? That will be the backup that you will want to use. But remember that if you use that backup and it is one month old, you can only restore from that date back in time. Anything that you did on the iPad in the past month will not be in that backup.
    Turn on the new iPad Minin and start activating OTA via WiFi. You will get to a certain point in the process where you will be given the choice to Set up as new, Restore from iCloud - or Restore from iTunes. You will want to select Restore from iTunes.
    That is the short and sweet version. There are step by step instructions in this article. This applies to the mini as well as the iPad 4 or the iPad 3 for that matter.
    http://www.everythingicafe.com/how-to-set-up-new-ipad/2012/03/16/

  • Error Message: Information is needed before this report can be processed.

    Hi Experts,
    I am scheduling a Crystal Report from Infoview. Data Source for Report is BEx Query.
    While scheduling i am providing all  details like Parameters, Formats, Destination etc.
    But  Schedule is failing. The reason is parameter field is empty when i checked
    in failed status , as below.
    Parameters: [No Value]; [No Value]
    Error Message: Information is needed before this report can be processed.
    But when i am viewing the report with the same parameters, it is executing.
    Please help
    Regards,
    Ajay Singh
    Edited by: Ajay Singh on Sep 15, 2009 1:05 PM

    Hi,
    Try the below mentioned steps in addition to scheduling of your report.
    Method 1:  Following information might be helpful in resolving the issue.
    To check if the .rep file exists in the Output FRS
    1.Log on to the Central Management Console (CMC). Click Objects.
    2.Click the report object to view its properties.
    3.Click the History tab to view the list of instances.
    4.Click Success to view the latest instance. Scroll to Instance Location.
    5.Note the path name to the report.
    6.Check the file store under the Output directory for the report.
    If the report does not exist, delete the instance from the History tab in the CMC. Reschedule the report.
    Method 2: To verify the configuration of multiple FRS
    1.Log on to the CMC.
    2.Click Servers.
    3.Click the first Input file server. Note the home directory.
    4.Click Home > Servers.
    5.Click the second Input file server.
    6.Check the home directory path for the second Input FRS. It must point to the same directory as the first Input FRS.
    7.Repeat steps 2 through 6 to check the Output FRS.
    ====================
    NOTE:
    The Input and Output FRS physical machines must be able to connect to the file share for the file store. Also the Input and Output FRS are installed using the local administrator account. That account may not have rights to the network share for the file store. The security on the file store must be changed so the local administrator for each server can access it.
    ====================
    Above mentioned steps are for deski/webi reports.
    Cheers,
    Suresh ALuri.

  • Processing time

    Hi guys,
    my question is this: I should to use the Processing time(WRPL-BZTEK) defined in customizing (SPRO>Materials Management>Purchasing>Purchase Requisition>Processing Time) in according to material type and not to side/division as such is now.
    My purpose is to enlarge the processing time purchasing (or the planned delivery time) to modify the delivery date scheduled by MRP.
    Is there a user-exit\Badi to implement this?Is necessary to modify the standard and if this is the one way how and where can I act?
    Thanks in advance to all,bye
    Maximilian

    Hello, Riva
    Processing Time: (configuration setup)
    Here, you define the plant-specific purchasing department processing time.
    And the processing time is the time required by the buyer to convert a requisition into a purchase order. And the processing time is taken into account during the scheduling process for externally procured materials within the framework of materials planning and control.                                                  
    Actions                                                                
    Suggestion:   
    Maintain the purchasing department processing time for each plant.
    Processing time required by purchasing department.
    -> Time that the purchasing department requires to convert a purchase requisition into a purchase order.                                      
    The usage of this configuration setup is
    -> The purchasing department processing time is included in the computation of the delivery date.
    Table Name: WRPL (i.e, for Replenishment: quantities per customer/material)
    Field Name: SRP_BZTEK (i.e, for Processing time required by purchasing department)
    Data element: BZTEK (i.e, data element for processing time for purchase department)                                                                         
    If you want to change the length of the field BZTEK (allowable characters is 2), you can do it, by modifying the TWO TABLES (i.e, T399D (Control parameters for MRP &
    WRPL (Replenishment: quantities per customer/material)) using the Acess key (from SAP)
    Importent Note: Before you modify it, you need to check with the PP &MM (since this requirement belongs to both modules)
    Suggestion: As per my knowledge this (processing time for PR) configuration setup is for the plant (or plants).
    Hope this will clarifies you,
    Reward, if it helps,
    Regards,
    Srin.K

  • BZTEK - Purchasing Processing Time to convert PR in PO

    Hi all,
    In SAP stanrdard, Purchasing Processing Time to convert PR in PO is maintainable in customizing at plant level.
    As anyone any advice of solution to implement when there is a business need to have this time depending on:
    - PO type
    - PO type / material
    Thank you,
    Laetitia

    Hello, Laëtitia,
    not in standard; but you can modify the field FRGDT "Purchase Requisition Release Date" through customer enhancement MEREQ001 "Customers' Own Data in Purchase Requisition" / function EXIT_SAPLMEREQ_005 "Checking Customer's Own Purchase Requisition Data" -- yep, it sounds strange that you can change some standard fields thou function called " "Checking Customer's Own Data", but that is how it works (see enhancement documentation for details).
    Of course, the PO type (or rather PREQ type) / Material Purchasing Processing Time will have to be stored in custom tables.
    Kind Regards
    TomT

  • Need to show data related to Process order request , BOM in a smart form

    Hi,
    I need to show data related to
    •     Process order request
    •     BoM
    Now in selection screen we are entering the followings.
    Manufacturing  Plant ,MRP Controller, Production scheduler, Order type , Order , Material, Sales order, WBS Element,Release,Scheduled start, Scheduled finish ,Selection profile.
    how to get 1> Process Order number,Produced Material,Material Description,Print date,Narcotics indicator , Quantity produced , Phase number , Phase description ,Resource description,Standard value  to show in a request form.
      2> Item category ,Component code,Component description , Component quantity ,Component Unit of measure ,BoM base quantity.
    Please help me how to get those values , what should be the aaproach , how to write the select quiry.
    Thanks

    Hi
    To get BOM details, do the following:
    1. Use the material number and goto Article to BOM link table (MAST) to get STLNR (BOM).
    2. With this STLNR, goto STPO table (where STLNR is the key field).  Here you will get all the BOM details like components (IDNRK), UoM (MEINS) etc....
    Hope this helps.
    THanks
    Vijay
    <b>PLZ REWARD POINTS IF HELPFUL</b>

Maybe you are looking for

  • Display image in bipublisher (10g) template

    Hi, Is it possible to display image in template which was stored in database. In database we have a table with customer name, customer number and image(BLOB datatype). Is it possible to display it in the report by calling through sql command or else.

  • Can you a second Sata Hard Disk Drive in M Series?

    Hello, Can I install a second hard drive in M Series? In particular I would like to install a Seagate Barracuda SATA 1TB drive. I know it only has one bay, but I can house the disk in a separate case. Thank you Solved! Go to Solution.

  • Need help upgrading from iPhoto 2... keep photo comments?

    I currently have iPhoto 2 that originally came with my eMac. I have recently upgraded the operating system to the 10.4.11. I have tons of photos in iPhoto 2. Ultimately, this has slowed down the response time when working in iPhoto. I am trying to fi

  • I need to Re-download Photoshop onto a new computer

    How do i download photoshop onto my new computer. My old computer crashed, and I need to know how to get photoshop on my new one. Where do I start?

  • A question on a future purchase

    Ok, right now i do not own a laptop, but i am thinking of buying the GP70 Leopard as a replacement for my old one that died several years ago (i've been stuck using a shared computer for a while now). So far, everything i've seen about it seems to be