Need to skip one process in process chains

Hi Experts,
I have made some changes in the Endroutines at the third level target and moved the changes to BWP. Now, I need not extract the data from ECC. So I need to skip those process in the process chains for this.
How to achieve this?
Thanks in advance,
Abdul

Hi,
Right click on that process and display messages -> backg tab -> batch monitor > Stop the job.
it will be failed now with red status.
Now in the display messages , from the Chain tab
Take the Variant and Instance Name
Then goto SE11 - > RSPCPROCESSLOG
Give the Variant and Instance Name here and get other details like LOGID , TYPE..
Now goto SE38 -> RSPC_PROCESS_FINISH
Give all the details collected from above steps and fill the STATE value as 'G'
Execute.. This will Skip that process and start the next process in the process chain
If it is temporary then you can just copy that chain and remove that process step and run the chain.
Thanks
Nethaji Guru

Similar Messages

  • One Process Chain but different schedule.

    Hi Experts:
    I have this issue. I need to run one process chain in different schedule. For example:
    From days 28 to 5 of each month I need to run every hour.
    From days 6 to 27 of each month I need to run every four hour.
    I have BW 3.5
    Do you have any idea How I could do that?.
    Thanks in advanced.
    Message was edited by:
            Víctor Olivera

    Hi,
    maintain variant>change selections>after at operation mode if you further check the double arrow button it will leads you to workday/time screen
    check if it works for you coz' it has following option"Do not execute before"
    cheers,
    Swapna.G

  • Stopping one process chain when another is running

    Hi All,
    We have two process chains which are inter dependent.
    One process chain has to be scheduled hourly & another daily.
    I would like to know the way to stop the hourly running process chain when the daily process chain is running.
    & the daily process chain run time will be varying like 1-2 hours.
    Please help me to solve this problem
    REDDY

    Hi,
    You can do it.
    1.Create one Table with Flag (Values 0 or 1), and give Table maintaince also in SM30.
    2.Craeate one program to check the Table Flag = 0 or 1. If it is 0 then trigger Event then that event will trigger Hourly Process Chain. You need to schedule this Program Hourly. (Your Hourly PC wil work based on Events)
    3. Craete Daily Process Chain, once it will start it will update teh Flag =1 then once it will reach the last node it will turn the flag = 0.
    Start
        |
    Update Flag = 1 in table (Program)
        |
    Load data
        |
    Update Flag = 0 in table (Program)
    4. So every hour your program will run (in Step 2), it will check table Entry and trigger Event.
    The code is like below
    Report1.
    IF Flag = 0 Then
    *Raise Event
    DATA: EVENTID LIKE TBTCJOB-EVENTID.
    DATA: EVENTPARM LIKE TBTCJOB-EVENTPARM.
          EVENTID = 'ZEVENT1'.
          EVENTPARM = 'ZEVENTPARAM'.
      CALL FUNCTION 'RSSM_EVENT_RAISE'
              EXPORTING
                I_EVENTID                    = EVENTID
                I_EVENTPARM                  = EVENTPARM
             EXCEPTIONS
               BAD_EVENTID                  = 1
               EVENTID_DOES_NOT_EXIST       = 2
               EVENTID_MISSING              = 3
               RAISE_FAILED                 = 4
               OTHERS                       = 5
            IF SY-SUBRC <> 0.
             MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                     WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
            ENDIF.
    ELSE
    Exit
    endif
    Note: It will Work try it. Don't forget to give SE30 access to table, because some time if you want to maintain Flag value manually, you required it.
    Thanks
    Reddy
    Edited by: Surendra Reddy on Mar 9, 2009 11:09 AM

  • On what Basis V need to Design the Process Chain in BI7

    Dear All,
    Hope every one having a great time. I am designing the Process Chain for the DTP's in BI7  its for the Attributes load, what things i need to consider while designing  dis chain mean is der any dependency i need to follow suppose der is "material" is an info provider  and it consist of "material type" as attribute, where dis "material type' is also a infoprovider which one should i load first. and how many processes can i assign to start variant n what is the effective way to decide dis. shall i need to consider the Datasource also suppose if the 2 or 3 process r feeding the data from the same Datasource den what i hav to do in BI7.
    Your Contribution will b appreciated
    Thanx in Advance.
    KK

    Hi ,
    There are several schools of thought on how to design your process chain for master data. For us, we load the attributes first, then hierarchies, then run ACR, and then load the texts.
    We have a meta chain (same as a process chain) that executes 2 process chains. The first loads our attibutes, hierarchies and runs the ACR. The second loads the texts. So, theoretically, we have one process chain that loads all our master data.
    Things to consider:
    1. Determine how many batch processes you can execute at one time on the system. This will determine how many infopackages you can have running at the same time (big influence on the design of your process chain).
    2. Determine the order in which you want to update your master data. Some say to update the infoobjects that are attributes of other master data first. Also, some extracts may take longer to execute than others. This may also influence your design.
    3. When connecting the infopackages in the process chain, you will be prompted as to how the connection should proceed (successful, error, or always). In your case, the decision should be always.
    Pls search for the links like this;
    http://help.sap.com/saphelp_nw04/helpdata/en/ce/dc87c1d711f846b34e0e42ede5ebb7/content.htm
    Re: Next step...
    Hope this helps.
    Regards
    CSM Reddy

  • Setting of one process chain triggering by other?

    Hi Friends,
    we are having two process chains, PC1 and PC2.
    Daily PC1 triggers PC2.
    But i want to know where this setting is done in the system (PC1 triggers PC2)
    Can any one please tell me?
    Thanks..in advance
    Tony

    There are several ways to trigger the process chain from the another process chain.
    <u><b>Start variant</b></u>,
    Maintain the same start variant for all the process chain which u want to be trigerred by dependence, ie on executing the one prcess chain from group, all will be triggered.
    <u><b>Local process chain:</b></u>
    Insert the (secound) child process chain in a (first )parent chain. by this when u execute the parent process chain the child will be triggered.
    <u><b>Event:</b></u>
    For all process chain there will be event name. U can write code with this event as a reference so that completion of one process chain will triger  the secound.
    More.........

  • How to check the status of other process chain from one process chain

    Hi All
    I have a requirement where I need to send an Email after successful completion of 3 process chains.
    all these 3 chains starts at same time.Out of these 3, one chain daily takes more time to complete.
    Is there any way so that in 3rd chain( the one that takes more time to complete) i can check whether the other two chains have completed successfully or not.So that when this chain gets complete I can send the success notification for all the three chains.
    If possible please tell me the step by step procedure for doing this.
    I have no question on sending Email through process chain.
    Regards
    Ashish

    Hi
    The OS Command is used for the following:
    You use this process type to stop a system command in the operating system of an application server.
    In the process maintenance for the operating system command, define:
    The logical name of the operating system command you want to stop.
    A command defined in transaction SM49 is used here. You can also change the command using the Change pushbutton.
    The operating system of the application server on which you want to execute the command.
    Additional parameters, as long as the defined command permits them.
    The application server on which the command is to be executed. If you always want to use the current host, set the corresponding indicator. If you want to use a host other than the current one, enter this in the Target Host field; the system automatically deselects the Current Host.
    After the run, you can find the standard text output by the command on the Process tab page of the log for this process.
    For processes you may have implemented yourself, you can access this log using the CL_RSPC_SYSTEMCOMMAND=>IF_RSPC_GET_LOG~GET_LOG method.
    I have never used the OS command myself, so I am not sure, whether it can be used in your case.
    Check the following link, it might help,
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/fa/096d5a543b11d1898e0000e8322d00/frameset.htm
    Regards
    Shilpa

  • Need help with BW Process chain issue

    Hi Gurus,
    I had made a copy of the existing process chain so that I can work on the changes. Its a metachain and I tried to copy a sub chain.
    But at a later point of time, I have realized that the process chain had got into a  nested loop in the meta chain, for the sub chain, I had copied. How do I rectify it?
    Kindly suggest

    hi,
    use the bottom up approach.
    Looking at the attached file it has many PCs.
    Just note down all list of all PC and then do the copy of individual PCs, later you can copy the complete meta chain.
    If you want give one more chance and try to copy meta chain again.
    Thank-You.
    Regards,
    VB

  • How to run multiple packages in one process chain

    Hi,
    we want to run a script logic with badi, followed by a standard move function. The BADI will perform a check and generate an error. If no error occurs, the move can continue ...
    We created our own process chain, which is in fact the combination of a script logic and a move. The data package has underlaying syntax.
    Problem is that the data package does not trigger the process chain ... Nothing happens when running it. When checking the status, nothing gets in here ... We assigned the correct process chain and get message a postivie message when running the package... Is this not possible?
    PROMPT(COPYMOVEINPUT,%SELECTION%,%TOSELECTION%,"Selecteer de gegevens waarvoor een omboeking dient te gebeuren","%CATEGORY_DIM%,%ENTITY_DIM%,PRODUCTIEHUIS,PRODUCTIEWIJZE,NET,KWADRANT")
    INFO(%TEMPNO1%,%INCREASENO%)
    INFO(%ACTNO%,%INCREASENO%)
    INFO(%EQU%,=)
    INFO(%TAB%,;)
    TASK(ZBPC_RUN_LOGIC,TAB,%TAB%)
    TASK(ZBPC_RUN_LOGIC,EQU,%EQU%)
    TASK(ZBPC_RUN_LOGIC,SUSER,%USER%)
    TASK(ZBPC_RUN_LOGIC,SAPPSET,%APPSET%)
    TASK(ZBPC_RUN_LOGIC,SAPP,%APP%)
    TASK(ZBPC_RUN_LOGIC,SELECTION,%SELECTION%)
    TASK(ZBPC_RUN_LOGIC,LOGICFILENAME,STOCK.LGF)
    TASK(/CPMB/CM_CONVERT,OUTPUTNO,%TEMPNO1%)
    TASK(/CPMB/CM_CONVERT,ACT_FILE_NO,%ACTNO%)
    TASK(/CPMB/CM_CONVERT,SAPPSET,%APPSET%)
    TASK(/CPMB/CM_CONVERT,SAPP,%APP%)
    TASK(/CPMB/CM_CONVERT,SELECTION,%SELECTION%)
    TASK(/CPMB/CM_CONVERT,TOSELECTION,%TOSELECTION%)
    TASK(/CPMB/CM_CONVERT,CLEARDATA,0)
    TASK(/CPMB/CLEAR_SOURCE_CUBE,CHECKLCK,1)
    TASK(/CPMB/CLEAR_SOURCE_CUBE,SELECTION,%TOSELECTION%)
    TASK(/CPMB/APPEND_LOAD,INPUTNO,%TEMPNO1%)
    TASK(/CPMB/APPEND_LOAD,ACT_FILE_NO,%ACTNO%)
    TASK(/CPMB/APPEND_LOAD,RUNLOGIC,%RUNLOGIC%)
    TASK(/CPMB/APPEND_LOAD,CHECKLCK,1)
    TASK(/CPMB/APPEND_LOAD,CLEARDATA,0)
    TASK(/CPMB/CLEAR_CUBE,CHECKLCK,1)
    TASK(/CPMB/CLEAR_CUBE,ACT_FILE_NO,%ACTNO%)
    TASK(/CPMB/CLEAR_CUBE,SELECTION,%SELECTION%)

    Hi Sheldon,
    we never have issues when we combine standard objects, like a cliear with a load inforprovider, or the master data integration you mentioned in your document. However, from the moment we combine a script logic with a standard package (like a move) it does not work .The data package contains the task needed for the script and for the move. the process chain is called up but always comes in error in the first step (BPC modify dynamically ) ... there is also no log when checking the view status ...
    I can sent you some screenshots if you like ...
    D

  • Need a table for process chains of when these are scheduled!!

    Hi,
    I had like to have list of all the process chains and their schedules of how often these are loaded and whether been triggered by event or directly scheduled. If periodically scheduled then the period----
    is there any table which can have the information as i said??
    Raj

    Hi....
    process chain tables
    RSPC_BUFFER Shared Buffer for Processes (Esp. Customer
    RSPC_MONITOR Monitor individual process chains
    RSPCABAPASYNC Logging for ABAP Processes(Synchronously a
    RSPCCATEGORY Process Type Categories
    RSPCCATEGORYT Texts for Category
    RSPCCHAIN Process chain
    RSPCCHAINATTR Attributes for a Process Chain
    RSPCCHAINEVENTS Multiple Events with Process Chains
    RSPCCHAINT Texts for Chain
    RSPCCOMMANDLOG System Command Execution Logs (Process Cha
    RSPCENQUEUE Dummy Table for Runtime Locks of a Process
    RSPCEXOR Excluding Or: Log Table
    RSPCINFO Special Values for Communication between P
    RSPCINFOT Special Values for Communication between P
    RSPCINSTANCE Generic Instance Storage
    RSPCINSTANCET Texts for Generic Instance-Storage
    RSPCLOGCHAIN Cross-Table Log ID / Chain ID
    RSPCLOGCROSS Cross-Table Log ID Old / Log ID New
    RSPCLOGS Application Logs for the Process Chains (G
    RSPCPROCESSLOG Logs for the Chain Runs
    RSPCRUNVARIABLES Variables for Process Chains for Runtime
    RSPCTRIGGER Variants for the Trigger Processes
    RSPCTRIGGERT Texts for the Trigger Variants
    RSPCTYPESDEP Dependencies for Processes
    RSPCTYPESPROC Attributes of BW processes (RSSM)
    RSPCVARIANT Generic Variant-Storage
    RSPCVARIANTATTR Attributes of a Process Variant
    RSPCVARIANTT Texts for Generic Variant Storage
    Among all these tables I think.......
    RSPCCHAINATTR Attributes for a Process Chain
    RSPCCHAINEVENTS Multiple Events with Process
    Chains
    RSPCPROCESSLOG Logs for the Chain Runs .........can help you.......
    Regards,
    Debjani........
    Edited by: Debjani  Mukherjee on Oct 21, 2008 1:32 PM

  • Skip steps in process chain if 0 records received from InfoPackage

    Hi Experts,
    In one business scenario, we need to change existing process chain such that if InfoPackage/DTP has brought 0 records process chain should skip rest steps or it should get failed.
    Do you have any ideas about this.
    Regards,

    Dear Ganesh,
    you can change the traffic light color for empty request in the infoPackage maintenance window. Top menu --> Scheduler --> Traffic light color for empty request.
    Using this option and connecting process chain nodes correctly, process chain execution will stop whenever the infoPackage gets 0 records.
    For a DTP, you can use ABAP code in the start routine of the corresponding transformation. You should check the contents of SOURCE_PACKAGE internal table and raise exception accordingly.
    I hope this information helps you.
    Best regards,
    Nacho

  • Process Chain: Urgent help needed!!!

    Hi Guru's,
    I need to change the process chain:
    We are currently loading the data form 000000 to 100000 in a single process but now the customer asked us to change it to 4 packages:
    000000 to 250000, 250001 to 500000, etc..
    Could any one help me in this pls???
    your help much appreciated.
    regards,
    BH

    Hi Varma,
        I am assuming you are using generic extractor using function module.
    Create a z-control table which maintains ranges 250K records. In future use can even change the range if you want .
    below is piece of code from function module
    Auxiliary Selection criteria structure
      data: l_s_select type srsc_s_select.
      data : l_lines type i.
    Maximum number of lines for DB table
      statics: s_s_if type srsc_s_if_simple,
    counter
              s_counter_datapakid like sy-tabix,
              counter type i.
    Initialization mode (first call by SAPI) or data transfer mode
    (following calls) ?
      if i_initflag = sbiwa_c_flag_on.
    Check DataSource validity
        case i_dsource.
          when  <check your datasource name>
           when others.
            if 1 = 2. message e009(r3). endif.
            log_write 'E'                  "message type
                      'R3'                 "message class
                      '009'                "message number
                      i_dsource            "message variable 1
                      ' '.                 "message variable 2
            raise error_passed_to_mess_handler.
        endcase.
        append lines of i_t_select to s_s_if-t_select.
    Fill parameter buffer for data extraction calls
        s_s_if-requnr    = i_requnr.
        s_s_if-dsource   = i_dsource.
        s_s_if-maxsize   = i_maxsize.
      else.
        if s_counter_datapakid = 0.
    read z-table to know the size i.e. 250K
    first read
           z-ctr_frm  =  0.
           z_ctr_frm  = z_ctr_frm + 250000.
    endif.
         if z-ctr_frm > 0.
           z_ctr_frm = z-ctr_frm + 250000.
           z_ctr_to   = z_ctr_frm  + 250000.
        endif.
    ***Generate data packets 
        select data from table with the number range variables z_ctr-frm and z_ctr_to.
        s_counter_datapakid = s_counter_datapakid + 1.
      endif.
    ENDFUNCTION.
    I hope this help you.
    Rgds,
    Se Vu

  • Need help in process chain *need help immdtly*

    I need help in creating one process chain.
    1. i have to load one infopackage to a PSA.
    2. then have to do load for one infocube from two different infocubes one after the other.
    for all these loads one restriction of fiscal year period  to be common value.
    this value may either be allowed to user to select or loaded automatically taking the previous fiscal year value .. any of these two options are fine.
    it would be helpful if anyone can help me out.

    Here is the code for Z program...you can create Tcode thr SE93 where user can enter value .
    parameters: fsper type /BI0/OIFISCPER DEFALUT 2010008.
    data: wa_tvarvc type tvarvc.
    wa_tvarvc-NAME = 'FISCPER'
    wa_tvarvc-TYPE = 'P'.
    wa_tvarvc-NUMB = '
    wa_tvarvc-SIGN = 'I'.
    wa_tvarvc-OPTI = 'EQ'.
    wa_tvarvc-LOW = FSPER
    INSERT TVARVC FROM wa_tvarvc.
    Code for DTP's in Field Level.
    data: wa_tvarvc type tvarvc.
    select single from tvarvc into wa_tvarvc where NAME = 'FISCPER'.
    L_T_RANGE-low = wa_tvarvc-LOW
    L_T_RANGE-SIGN = 'I'.
    L_T_RANGE-OPTION = 'EQ'.
    APPEND L_T_RANGE

  • Process Chain - Need Help

    Hello Gurus,
    I need to create a process chain for the following:
    1.Load to PSA through infopackage.
    2.Load to ODS through DTP.
    3.Activate ODS.
    4.Load cube from ODS through DTP.
    I am not much familiar with process chains. If you can let me know the steps it should be great. As always thanks for the help.
    Senthil

    Your Pchain shud luk like below :
    1. Start
    2. Execute Infopackage ( loads till psa )
    3.Execute DTP ( to load DSO frm PSA  )
    4.Activate DSO
    5.Further Processing
    6.Delete Indexes for Cube
    7.Execute DTP ( to load Cube frm DSO )
    8.Create Indexes for Cube
    Infopackages n DTPs shud all be delta in update type.

  • Need to find process chain from event

    Dear Experts,
    I need to find out all process chains which are getting triggered by a certain event.
    ( I have an event name , need to find corresponding process chain ).
    Kindly suggest.
    Regards
    Vaibhav Halde

    Hi,
    In SM37 you can find it, give event in SM37 an dsee the log. In the following blog you hav esome comments on the same so see the comments.
    How to trigger the Process Chains in BW from ECC
    /people/surendrakumarreddy.koduru/blog/2009/03/18/how-to-trigger-the-process-chains-in-bw-from-ecc
    Thanks
    Reddy

  • How repeat a process step in a process chain automatically after error?

    Hello guys.
    Have some method to repeat automatically a process in a process chain after a error occur ?
    Now, we need to make a manual procedure for repeat the process... We need make it more "fast", one "auto repeat" when failing.

    Hi Leo,
    Auto repeat of a process chain is always not ad visible as in most of the cases we can see the job got finished in SM37 and even spool got generated but unfortunately it will fail if any of the data package is wrong.In these cases we can skip the process chain and make it continue.
    I have written a blog on the same.please go through it.i feel for those scenarios it is good.
    How to override a process block in the process chain and make it force complete ?
    My personal advice is to go and check the job log before repeating any process as the job may fail for n no of cases.it is a complex challenge of adding all those errors tracked.
    Regards,
    Kannan

Maybe you are looking for

  • Connecting non-powered speakers to iMac Intel

    Is there a product that will connect non-powered speakers (that normally connect to a receiver), directly to the iMac Intel (mid 2006)? Either by a cable connector to the headphone port or USB? I bought 2 Harman Kardon speakers super cheap last year,

  • Oracle Service Problem

    I HAVE LOADED ORACLE 8i ON WINDOWS XP. IT HAD LOADED SUCCESSFULLY AND I HAD WORKED ON IT. BUT ON NEXT REBOOT WINDOWS IS NOT ABLE TO START THE SERVICE CALLED OracleServiceORCL. WHEN I TRY TO START IT AGAIN IT ENDS WITH AN ERROR:- Could not start the O

  • Comparing with a similar field(not same)??

    Hi all, I am having some entries in a table which are unique identified by pernr and comnig from infotype pa0001. Now, i want to get data from table bsik for the vendor acct. balance, having for all entries, on the first internal table, The twist is

  • EMBED URL link in Illustrator

    I found that many people are searching a way to add an URL link to a .AI file that works after exporting to PDF. The only way seems to place a text field with the complete URL (for ex.  a youtube link: http://www.youtube.com/watch?v=3c7-EPNTnPI). In

  • Cannot connect (or very, very slow) to MacBook pro (1,1) as registered user

    I have a Macbook Pro running Lion and a Mac Pro running lion - as well as a Macbook Pro (1,1) running Snow Leopard (although the problem also occurred in Leopard too, as I updated the OS to see if that would resolve it). The problem is that I can con