New Business Process Requirement

Hi All,
I have a new business process requirement from my client.
My Client has their own product which they do normaly sell them and is called product A. Now they are planning for some new products. For this they purchase some WIP materials called product B & C from vendors and assemble them along wth product A. The assembled product which is called D is sold as finished product. this product D consists of product A and product B&C. Now in this type of scenario what should be the planning strategy? And also please let me know how to incorporate the assembling part in the present SAP system?
Thanks,
Rinky

Rinky,
What is the problem?  D is just another finished goods.  Is there something unique about this scenario?
D BOM = A, B, C
D assembly effort is contained in D routing, the same way you would create a routing for any other FG product.
D strategy is whatever your client wants.  MTS?  MTO?  Forecasted?  You pick the strategy the same way you would pick any other FG planning strategy.
A you need change nothing
B you need change nothing
C you need change nothing
Am I missing something here?
Rgds,
DB49

Similar Messages

  • Study business process requirements in sd implementation project?

    how to study business process requirements in sd implementation project?

    Hi chandu,
    I will suggest you first go through the document given below
    SAP Implementation is the whole of processes that defines a complete method to implement SAP software in an organization. The SAP implementation method described in this entry is a generic method and not a specific implementation method as such. It is based on best practices and case studies from various literature sources and presents a collection of processes and products that make up a complete implementation method to allow any organization to plan and execute the implementation of SAP (ERP) software.
    Concept Definition
    CHANGE MANAGEMENT ***Activities involved in (1) defining and installing new values, attitudes, norms, and behaviors within an organization that support new ways of doing work and overcome resistance to change; (2) building consensus among customers and stakeholders on specific changes designed to better meet their needs; and (3) planning, testing, and implementing all aspects of the transition from one organizational structure or business process to another. (www.gao.gov)
    CHANGE MANAGEMENT DOCUMENTATION All documentation that is required and being delivered whilst performing change management, e.g. the functional test cases and all the other documents a new end-user of SAP requires and the various tools and approaches used to manage change by the TSO. (Anderson, 2003)
    COST OF OWNERSHIP ANALYSIS Determination of where and when the costs are inquired within the context of the SAP solution stack and ongoing operations. The analysis addresses all internal and external costs, both one-time as well as recurring (Anderson, 2003)
    CUTOVER The process of transitioning from one system to a new one (Anderson, 2003)
    CUTOVER PLAN All documentation related to planning, preparing and executing cutover, describing how to lock down the system from a technical change management perspective, preparing the TSO for its new role and rolling out the SAP graphical user interface to all future end users. (Anderson, 2003)
    DATA CENTER A data center is a facility used for housing a large amount of electronic equipment, typically computers and communications equipment. (www.wikipedia.org)
    DATA CENTER REQUIREMENT A requirement for the SAP data center, i.e. a physical requirement like power requirements, a rack requirement, a network infrastructure requirement or a requirement to the network server. (Anderson, 2003)
    DISASTER RECOVERY (DR) REQUIREMENT Requirement that focuses on downtime that lasts many hours to days or even weeks (Anderson, 2003)
    FUNCTIONAL TEST CASE A set of conditions or variables under which a tester will determine if a certain business process works (www.wikipedia.org)
    HIGH AVAILABILITY (HA) REQUIREMENT Requirements that describes the amount of time that the system needs to be available to satisfy the needs of the users. (Anderson, 2003)
    INSTALLATION DOCUMENTATION All documentation related to the installation of an end-to-end SAP solution (Anderson, 2003)
    OPERATIONS MANUAL The collection of current state system documentation, day-to-day and other regularly scheduled operations tasks, various installation and operations checklists and how-to process documents. (Anderson, 2003)
    SAP SAP AG is the name of the biggest European software company. The head office is in Walldorf, Germany. SAP was founded in 1972 as Systemanalyse und Programmentwicklung ("Systems Analysis and Product") by five former IBM employees in Mannheim, Germany. (www.wikipedia.org)
    SAP IMPLEMENTATION PROJECT PLAN A comprehensive project plan that contains all products that are delivered whilst performing an SAP implementation project (Anderson, 2003)
    SOLUTION STACK Set of software subsystems or components needed to deliver a fully functional solution, e.g. a product or service. (www.wikipedia.org)
    SOLUTION STACK PARTNERS LIST A list of all vendors that deliver the products that make up the SAP solution stack (Anderson, 2003)
    SOLUTION VISION A vision of the future-state of the SAP solution (Anderson, 2003)
    STRESS TEST PLAN A test plan that is focused at determining the stability of a given system or entity. It involves testing beyond normal operational capacity, often to a breaking point, in order to observe the results. (www.wikipedia.org)
    TEST PLAN A detail of how the test will proceed, who will do the testing, what will be tested, in how much time the test will take place, and to what quality level the test will be performed. (IEEE 829)
    TRAINING The acquisition of knowledge, skills, and attitudes as a result of the teaching of vocational or practical skills and knowledge that relates to specific useful skills (www.wikipedia.org)
    TRAINING PLAN Consisting of training units, a training plan is the result of hierarchical decompositions of a training goal, tailored according to the learning preferences and prior knowledge of the trainee. A plan is the means by which the trainee satisfies the goal. (www.ece.eps.hw.ac.uk/)
    TSO Technical Support Organization. The people that are committed to implementation and management of SAP. (Anderson, 2003)
    TSO CHART A chart that depicts the structure of the TSO. (Anderson, 2003)
    Activity Sub-Activity Description
    Project preparation Craft solution vision Refine and communicate a SOLUTION VISION of the future-state of the SAP solution, to sketch a design that meets both business and financial requirements. The focus should be on the companyu2019s core business and how the SAP solution will better enable that core business to be successful.
    Design and initially staff the SAP TSO Design and staff the key positions of the SAP Technical Support Organization (TSO), the organization that is charged with addressing, designing, implementing and supporting the SAP solution.
    Sizing and blueprinting Perform cost of ownership analysis Perform a COST OF OWNERSHIP ANALYSIS to determine how to get the best business solution for the least money i.e. to determine where and when the costs are incurred within the context of the SAP solution stack.
    Identify high availability and disaster recovery requirements Determine all HIGH AVAILABILITY and DISASTER RECOVERY REQUIREMENTS, to plan what to do with later downtime of the SAP system
    Engage SAP solution stack vendors Select the best SAP hardware and software technology partners for all layers and components of the SAP SOLUTION STACK, based on a side-by-side sizing comparison
    Staff TSO Staff the bulk of the TSO, i.e. fill the positions that directly support the near-term objectives of the implementation, which are to develop and begin installation/implementation of the SAP data center.
    Execute training Train the various members of the SAP TSO, like data center specialists, high availability specialist and network specialists and train the end-users to give all the required SAP knowledge and skills
    Setup SAP DATA CENTER Build a new SAP DATA CENTER facility or transform the current data center into a foundation capable of supporting the SAP SOLUTION STACK
    Perform installations Install the (My)SAP components and technological foundations like a web application server or enterprise portal.
    Round out support for SAP Identify and staff the remaining TSO roles, e.g. roles that relate to help desk work and other such support providing work.
    SAP functional development Address Change Management Develop a planned approach to the changes in the organization. The objective is to maximize the collective efforts of all people involved in the change and minimize the risk of failure of implementing the changes related to the SAP implementation.
    Address SAP systems and operations management Create a foundation for the SAP systems management and SAP computer operations, by creating a SAP OPERATIONS MANUAL and by evaluating SAP management applications.
    Perform functional, integration and regression tests Test the SAP business processes, by executing functional tests to ensure that business processes work, integration tests to ensure that the organizationu2019s business processes work together with other business processes and regression tests to prove that a specific set of data and processes yield consistent and repeatable results.
    Final Preparation Perform systems and stress tests Plan, script, execute and monitor SAP STRESS TESTS, to see if the expectations of the end users, defined in service level agreements, will be met.
    Prepare for cutover Plan, prepare and execute the CUTOVER, by creating a CUTOVER PLAN that describes all cutover tasks that have to be performed before the actual go-live
    Go Live Turn on the SAP system for the end-users
    Hope this will help.
    Reward Point if helpful.
    Thanks,
    Raja

  • Collect business process requirements in sd implementation project?

    how to collect business process requirements in sd implementation project?

    how to collect business process requirements in sd implementation project?

  • Module-specific checklist for business process requirements mapping?

    Hi,
    I am looking for some ASAP tools to support the business process requirements mapping phase of an implementation. The best would be to have a checklist, a sheet of questions to ask during the meetings so that each requirements are considered when creating the business processes in solution manager.
    Anyone can recommend me such material?
    Thanks in advance,
    regards,
    Ádá

    Dear,
    Check: Pre Implementation Questions
    Implementation questionnaire
    http://it.toolbox.com/blogs/dhruvs-blog/sap-implementation-blueprints-32286
    Regards,
    Syed Hussain.

  • Down payment process for Poland, new business process or not ?

    Hello,
    I'm a little bit confused about implementation down payment process for Poland.
    The OSS-notes 818079 and 1007635 describe a solution for this.
    How do I have to implement the correct down payment process for Poland ? Do I have to create an extra business process with new sales order type, new billing type, separate calculation procedure, new output type and so on ?
    Or is it possible to use existing business processes in sales and distribution for down payment processes ?
    Thanks in advance
    Holger

    hi,
    Check the process for down payment processing
    The following Customizing settings have to be made for down payment processing:
    Settings for the billing plan - To activate the billing plan function, maintain the materials, for which you wish to process down payments, with item category group 0005 (milestone billing). This gives the item type TAO via item type determination. The item type TAO calls up the billing plan function.
    You need to implement the following activities in the billing plan for down payments:
    Maintain deadline category - This determines the billing rule (percentage or value down payment) for the down payment request. The system assigns billing type FAZ (payment request) defined in the standard system with billing category P. (For the billing type FAZ there is the cancellation billing document type FAS in the standard system).
    Maintain the deadline proposal - Use the down payments that are due for the proposed deadlines.
    Maintaining a Pricing Procedure with the Condition Type AZWR:
    In the standard system the condition type AZWR is delivered for the down payment value already provided but which has not yet been calculated. You must include this condition type in the relevant pricing procedure before output tax.
    Enter condition 2 (item with pricing) and the calculation formula 48 (down payment clearing value must not be bigger than the item value) for the condition type AZWR.
    Before the condition AZWR you can create a subtotal with the base value calculation formula 2 (net value). If the condition AZWR is changed manually, you can get information on the original system proposal from the subtotal.
    Maintain the printing indicator - The pricing procedure can not be marked as a transaction-specific pricing procedure (field Spec.proc.) The condition type AZWR has the calculation type B (fixed amount) and the condition category E (down payment request / clearing).
    Maintaining the Billing Document - In the standard system there is the billing type FAZ (down payment request) and the billing type FAS for canceling . The down payment is controlled using the billing category P of the billing type. A billing type becomes a down payment request when the billing category P is assigned. You have to maintain blocking reason 02 (complete confirmation missing) for the billing documents and assign it to billing type FAZ.
    Copying control - Copying requirement 20 must be entered in copying control at item level for the down payment request. In the standard system the order type TA for copying control is set up according to the billing type FAZ for the item category TAO.
    Copying requirement 23 must be entered in copying control at item level for down payment clearing. In the standard system the order type TA for copying control is set up according to the billing type F2 for the item category TAO.
    Financial Accounting settings - A prerequisite for down payment processing is that the account is assigned to the underlying sales document. To do this, change the field status settings in Customizing as follows:
    Set reconciliation accounts (transaction OBXR) - For the `received down payments' and `down payment requests' from
    the G/L accounts you have selected, you should assign the field status definition G031.
    Maintain accounting configuration (transaction OBXB) - For the down payments (posting key ANZ in the standard system) and the output tax clearing (posting key MVA in the standard system), you must maintain the posting key.
    You must also carry out a G/L account number assignment for the tax account.
    Maintain the posting key (transaction OB41) - For posting key 19, set the sales order as an optional field !!!
    Maintain the field status definition (transaction OB14) - For field status variant 0001, field status group G031, set the
    sales order as an optional field !!!
    Assign the company code to the field status variants (transaction OBC5)
    chandu

  • Kindly advise on new business process to map to SAP

    Hello All,
    I have one business process and I could not able to map to SAP.
    Please help me out.
    I have two company codes and one company code does the export business and other one supplies some parts to exports company code.
    Please find the scenario details in below.
    Company code 1000                 Company Code 2000 (Exports)
    Plant 1000                               Plant 2000
    X is the final product which is assembled with below parts (BOM)
    (Part A,Part B,Part C,Part D)
    Business Process:
    1. Plant 2000 places an order to Plant 1000 for final product "X".(It is the combination of Parts A,B,C,and D)
    2. Plant 2000 supplies Part E and Part F to plant 1000 without billing as RGP (Returnable goods packing).
    3. Plant 1000 receives parts E and F from Plant 2000
    4. Plant 1000 packs all the parts in one cart (ABCDE+F) and issues the final product "X" and part E and part F to Plant 2000
    5. Plant 2000 receives the final product X and part E and part F and as soon as GR done Part E and Part F should get consumed automatically in Plant 2000
    6. Plant 1000 sends the invoice for the Parts A,B,C and D and for service also.
    7. Plant 2000 pays invoice amount to plant 1000
    8. Plant 1000 receives the payment from plant 2000
    Please suggest me the suitable process in SAP and let me know if you need further explanation.
    << Moderator message - Please do not offer points >>
    Regards,
    Nag
    Edited by: Rob Burbank on Nov 19, 2010 4:59 PM

    Hi,
    For the above process you can map with Sub con process
    Step1 ) Create BOM in plant 2000 under cocd 2000  as End product /Header Material(X) and Component/child material as E and F
    Step 2) Create Sub con PO in plant 2000 under cocd 2000 with Vendor as Plant 1000 under co cd 1000
    Step 3) Transfer Component/child material E and F to Vendor as Plant 1000 under co cd 1000 using 541 Movt type.
    Steps 4) In Plant 1000 under co cd 1000 maintain material E and F as Non Valuated only Qty update.
    Step 5) Receipt the Component/child material E and F using Movt type 501 to update stock.
    Step 6) Create BOM IN Plant 2000 under co cd 2000 as End product/ Header material as X and Component/child material as A, B, C , D,  E & F.
    Step 7) Create sales order in Plant 1000 under co cd 1000 with customer as plant 2000 under cocd 2000
    Step 8) MRP run if require to plan the material A, B, C & D.
    Step 9) Procure the material A, B, C & D if stock less.
    Step 10) Create Production order/ Process order for Material X.
    Step 11) Confirm production order and receipt the End material (X) AGAINST Production order.
    Step 12) Crete out bond delivery VL01N for Material X and Goods issue (VL02N)
    Step 13) Billing VF01
    Step 14) MIGO goods receipt in  Plant 2000 under co cd 2000 against Sub on PO here Material E & F will consumes upon GR and end/ Header Material X will updated Stock.
    Step 15) MIRO to settle Vendor Account. Hope this will helps you.

  • New Business Process

    Hi SAP gurus !!
    I need  Help/inputs on the following business Process:
    We are into manufacturing & selling of Diesel Locomotive Engines. These Engines & its subcomponents first we assemble at a remote place far from main Plant. once the Engine is ready, we will put this inside the plant & then sell it.
    ( Plz remember all subcomponents will first come to main plant then to remote place for assembling then again to main plant to use it for business.)
    please help me to MAP this business process in SAP. It would be great if you can explain all the activities of SAP that is going to be used ...like.. Production, Material management then Sales process.
    if you need any clarification, please feel free to ask.
    Warm Regards,
    MAYANK

    Hi there,
    From the SD point of view, this is what I feel
    To receive the components from other vendors, you 1st need to create a PO. When vendor fulfills the delivery for the PO, you do the GR into your main plant.
    What you can do is that define 2 plants Plant A main plant & Plant B assembling plant. After you do GR into the mail plant A, then create a intra company stock transfer UB from Plant A to plant B. Delivery NL. Material type will be HALB raw materials. When the goods are assembled, they are treated as FERT finished goods. Then Plant B again does stock transfer to Plant A. When you do GR into Plant A, materials will be available in A. Post them into the required storage loc with relevant movement types.
    From PLant A, to fulfill customer orders, do it in the normal order - delivery - invoice process.
    I feel that this also requires integration MM & PP. I am not sure of the process they follow.
    Hope this helps.
    Regards,
    Sivanand

  • New Business process config in SAP

    Hi,
    I have business requirement.
    buying goods from Vendor A with Rs 100 and selling this to customer B with 30% margin
    buying goods from Vendor A with Rs 100 and selling this to customer C with 10% margin
    buying goods from Vendor B with Rs 200 and selling this to customer B with 30% margin
    How do i configure in SAP.We need to use Batch? apart from third party sales? Pl Advice
    Regards,
    Kumar

    Hi,
    Please do not forward your business requirements to the forum without you undergoing any thought process.
    Forum is there to help you,but not to take decisions for you.
    Please read the rules of engagement before you post.
    Step 1: Finding An Answer
    Rule number one: Try to find the answer first. There are tons of resources out there, show that you have tried to find the answer. <b><i>A question that shows that the person is willing to try and help themselves is more likely to be answered than one which simply demands information. Tell us what you have done to try and solve the problem yourself - often we can learn from that too!</i></b>
    Search the forums, the articles, the blog posts and the Frequently Asked Questions (FAQ) in the Wiki for your topic.

  • I am finding that a new business is requiring lots of files, photos and video and it seems to be slowing down my older imac. I am wondering if a 1TB mini can be used as a dedicated machine to house these files only and if I can simply keep all biz files

    Will a 1TB mac mini be a good solution to separate media rich biz files from personal home type files and will the uSB3 be a problem connecting to an older 1mac?

    A USB3 drive can connect to an older iMac by simply substituting a USB2 drive cable. Or enabling File Sharing between machines.
    There are organizational and legal reasons why you want personal and business content separate. Since you mention USB3, may I infer you are looking at the late 2012 Mac mini? It has four, USB3 ports.
    I would purchase three, identical external USB3 drives and configure two of them in a RAID 1 (mirror) configuration. This means that data that is written to drive 1, is simultaneously duplicated (mirrored) to drive 2. Drive 3 would be an additional fail-safe backup drive. Using Time Machine, back up drive 2 to drive 3. If you turn off the Mac mini at night, put drive 3 in a fireproof safe until morning when you reattach it to the mini. Rotate the USB3 port that you use for drive 3 to reduce wear.

  • Business Process requirement for Steel Industries : Need expert Advise

    1. What is the best solution for i. setting weekly  production order priority with option to reshuffle priority withiout lossing earlier given priority ii. issuing melt index no for production orders , iii. issuing heat no for melt index & production order.
    2. Addressing the dual unit of measurement for ingot & billet  no of pcs vs Kg / Lbs. There is no fix relation for pcs & lbs & varrying for very production lot ( eg 10 cm dia x 2 meter length steel ingot may have wt any values betwwen 400 lbs to 420 lbs. )
    3. What is the best solution for making Molten lot  to load the full furnace capacity say 50000 lb per shift , this molten steel will pass throug the hot / or cold rolling mills to get the finished products. so we need to group the similar members for make lot of molten steel.
    Rajiv K. Pandey , PMP
    SAP SCM-PP certified Consultant

    Dear,
    Try defining by this way ...
    In material master:
    Sales UOM = PCs. (Master Data->Sales Data Tab->Sales UOM) ;  Inventory UOM = PCs. (Master Data->Stock Data Tab->Stock UOM).
    If you want for purchases you can define at Master Data->Purchase Data Tab->Purchasing UOM.
    Maintain the correct conversions for the materials.
    Regards,
    Syed Hussain.

  • Business Process Monitoring via MAI

    Hi Experts,
    Currently I am exploring the new Business Process Monitoring via MAI (Monitoring and Alerting Infrastructure).
    I have setup monitoring objects and I am getting the required alerts.
    Need your help for following questions:
    1. What is the configuration required to send data to BW? For Classic Business Proces monitoring we select 'Keep Data in BW' under Alert Reorganizations. Is there any such configuration in case of BPMon via MAI ?
    2. In which cube is the alert data saved in case of BPMon via MAI ? (For Classic BPMon it is 0SM_BPM)
    3. Is there any configuration guide available for BPMon via MAI ? I have already referred to the presentations on the same.
    Please help me to get the answers.
    Best Regards,
    Kavita

    Hi Keiji,
    As always, your answers have helped us. Thank you for the quick response. Can you help me with the name of the table where BPMon MAI alerts are stored (just like we have DSWP_BPM_ALERTS for classic BPMon alerts. I have searched this table but could not find the BPMon MAI specific alerts.
    FYI, BPMon MAI is configured and is working fine and I am able to see the MAI alerts for the configured Monitoring Objects.
    Thanks again for the information provided.
    Best Regards,
    Kavita Meswani

  • BUSINESS PROCESS FLOW (BPF) TASK SETUP - CURRENT VIEW OPTIONS

    This article explains a few findings regarding the options on Current View Type for setting up Business Process Flow tasks and will discuss BPC for Excel, Data Manager and BPC Web tasks.
    Future posts will cover more tasks.
    This is valid for 5.x versions only.
      IMPORTANT NOTE:
    DATA MANAGER PACKAGES
        Data Manager Packages tasks such as Run Specific Package, Run User Package are not integrated
        with the Current View Type selection. Therefore, the options Inherit from Data Region, Inherit from
        Current View or Member Lookup does not work on Data Manager Packages. This is due to the diversity of Data Manager Packages, such as Import, Export, Clear, Default Formulas, each of them requiring a complete different set of parameters, some of them not related to the Current View.
    1. INHERIT FROM DATA REGION
      Once you choose to Open a BPF from BPC for Excel, you are prompted to choose the Data
      Region. Upon setting the desired Data Region, the Current View is changed
      accordingly on BPC Web.
        OPEN TEMPLATE / REPORT LIBRARY / SCHEDULE LIBRARY
        If a step is defined as Open Template/Report Library/Schedule Library
        and INHERIT FROM DATA REGION is set to one (or more) of the Data Region
        dimensions, the Current View on BPC for Excel should change to match
        the settings done Data Region settings, being the same as the one on BPC Web.
        SET WORK STATUS
        Same as above.
    2. INHERIT FROM CURRENT VIEW
        OPEN TEMPLATE / REPORT LIBRARY / SCHEDULE LIBRARY
        If a step is defined as Open Template/Report Library/Schedule Library and INHERIT FROM
        CURRENT VIEW is set to one (or more) dimensions, the report will pickup the Current View
        from BPC Web and BPC for Excel should change to match the Current View,
        being the same as the one on BPC Web.
        Example:
        1. Log on to BPC Admin on ApShell -> Manage Application Sets;
        2. Go to Business Process Flows -> Budgeting Process;
        3. Grant access to the BPF to your test user;
        4. Check Sub-Step 1 of Step 1 - Check Budget Data. This steps has a
           INHERIT FROM CURRENT VIEW setup (ENTITY).
        5. Log on to BPC Web on ApShell;
        6. Go to Open a Business Process Flow and choose Budgeting Process;
        7. Choose the desired Data Region;
        8. On BPC Web, verify the value setup for ENTITY on the Current View;
        9. Open the Check Budget Data;
        10. The ENTITY on the Current View will be set up accordingly to what
            was set on BPC Web.
        SET WORK STATUS
        Same as above.
    3. MEMBER LOOKUP
        OPEN TEMPLATE / REPORT LIBRARY / SCHEDULE LIBRARY
        If a step is defined as Open Template/Report Library/Schedule Library and MEMBER LOOKUP
        is set to one (or more) dimensions, the report will set the Current View
        on BPC for Excel to the member that was configured.
        Example:
        1. Log on to BPC Admin on ApShell -> Manage Application Sets;
        2. Go to Business Process Flows -> Budgeting Process;
        3. Grant access to the BPF to your test user;
        4. Check Sub-Step 1 of Step 1 - Check Budget Data. This steps has a
           MEMBER LOOKUP setup (CATEGORY).
        5. Log on to BPC Web on ApShell;
        6. Go to Open a Business Process Flow and choose Budgeting Process;
        7. Choose the desired Data Region;
        8. On BPC Web, verify the value setup for CATEGORY on the Current View;
        9. Open the Check Budget Data;
        10. The CATEGORY on the Current View will be set up accordingly to what
            was set on the Task configuration, in other words, there should be BUDGET set
            on the Current View.
        SET WORK STATUS
        Same as above.
    REFERENCES
    This is an unofficial addendum for the SAP BPC 5.1 ADMINISTRATION USER'S GUIDE on:
    PAGE 54 - Managing Business Process Flows
    PAGE 57 - Adding new business process flows -> To add a step -> Select the current view type
    SAP BPC 5.1 ADMINISTRATION USER'S GUIDE can be found on [BPC Instalation Guides and User Guides|http://service.sap.com/instguidescpm-bpc].
    Edited by: Gustavo Bortoloti on Dec 15, 2008 6:48 PM

    Hi Gustavo Bortoloti,
    That's right, the SAP BPC version 5.x SP x not have the specific setting.
    Thanks,
    Wandi Sutandi

  • Adding A Business Process To SolMan

    Hi,
    I've just upgraded our Solman system to EHP1 SPS22 and I'm now looking at business process monitoring.
    From documentation I've seen you go into DSWP and select your solution and away you go, I've also seen mention of transactions solar01/02. I seem to be missing something here as our defined solutions don't already have business processes defined and I'm being a bit lame as I can't seem to see how you would add a new business process in.
    Does anyone have any experience in doing this and is able to coomunicate process in a step by step guide to get us up and running?
    Thanks.

    Hi Spencer,
    as you probably heard here and ther the SAP Solution Manager supports the whole lifecycle of a business process. Hence there are especially two logical parts
    a) the project and business blueprint part which you access with your mentioned transactions SOLAR01/02
    b) the operations part where you have a similar but nevertheless separate directory the so called Solution Directory that you can access via DSWP > Solution Landscape > Solution Landscape Maintenance or via the "Business Process Operations" Work Center.
    In both directories you can maintain business processes from scratch or use the Business Process Repository or another Project or another Solution as source.
    What you require for using Business Process Monitoring is that business processes are maintained in the Solution Directory. If so far you processes are only maintained in SOLAR01/02 then you can copy them into the Solution Directory.
    You should find corresponding iTutors under http://service.sap.com/rkt-solman
    You can also have a look into http://service.sap.com/bpm > Media Library > Technical Information for different technical papers explaining on how to setup BPMon.
    Perhaps you also want to visit the FAQ page http://wiki.sdn.sap.com/wiki/display/SM/FAQBusinessProcess+Monitoring
    Best Regards
    Volker

  • Is it possible for the end user to make changes to business processes?

    Hi
    I'm investigating Oracle's BPEL Processor Manager and BPM technologies for a large project we are going to do. The client wants to be able to change/create new business processes which would mean different web services being called in different orders after different amounts of time.
    Is it possible to allow end users to change business processes in a SOA environment with a portal using Oracle's offerings. This would eliminate JDeveloper & the designer and the need for knowledge of the underlying architecture.
    The only way around this would be getting users to edit the business rules but that would only work in a linear environment with lots of decisions won't it?
    Regards
    Sean

    I will leave your real question to be answered by product folks.
    BPEL does have capabilities that let you change how a given process will execute. For example, it's normal to have a process that will react differently depending on an incoming message (CancelMessage processes one way, SubscribeMessage does something else, ...). You can have the partnerlink that is invoked be selected based on a variable, a rule, a message element, a property in a property file or a preference set in the BPEL console. However, these all fail to answer your original question, because they require the original designer to code it all, not giving someone the capability to add a new WSDL on the fly with JDeveloper.
    You can also overlay endpoints, like if the user is in California, send to the west-coast server instead of the east coast. There is (was?) a tutorial about overlaying WSDLs.
    Andy

  • Problem with business process modelling

    Hi guys,
    Im facing a new problem, while trying to build a new business process in Solution_Manager im getting the runtime raise_exception each time im activating the business process details button.
    What are the reasons? And how do i handle it?
    P.S. Is there any good documentation on configuration of business process?

    I'm agree with Dimitri,
    Is there any good documentation on configuration of business process?

Maybe you are looking for

  • 701 offline no internet connection

    When offline wifi opens but internet connection not. In online mode the internet opens in 3g phone connection and in Wifi connection. Solved! Go to Solution.

  • Factory Unlock Ipĥone 4 with version 5.1.

    Good Afternoon,           I just want to ask, how do I get my iphone 4 unlock. The carrier is telus but this Iphone was just given to me by my mom and she sent to me via mail, so i dont really know what to do to it. Its version is 5.1. I really want

  • Transferring Files from Triton Le (via Smart card) into Logic pro 9

    I'm trying to get original material from my triton Le smart card into Logic pro 9. I've looked at a couple forums and tried different ways. I know i can do it track by track/ real time audio, but would prefer having it as midi, as i've found cutting

  • Moving the database in the same server

    Your replay:- for WIN NT: take a look at note 61747.1 Moving a 7.3 or 8.x database. And take a look at Note:99275.1, UNIX/NT: Moving a Database Within the Same Machine. Clarification: Where can i get the help for Note:61747.1 & 99275.1

  • Can i put a Blu - Ray drive in my iMac Intel Core Duo?

    Will the iMac take the Blu - Ray Drive? Im asking because i dont know!