New development maintenance workflow message

Dear All,
I am new to SAP Plant Maintenance and one of my client has a requirement that "As soon as the Maintenance Order is confirmed with T-Code IW41 an email has to be triggered to the Plant Section which is reflected in the Maintenance Order Location TAB.
How to achieve this requirement in better way? Please provide your suggestions/solutions for the same.
Thanks,
Narresh

You have to link mail ids to Plant section
Provide the logic to ABAP / Workflow consultant
Check the user exit CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
Provide the workflow mail template details with its table logic

Similar Messages

  • Purchase Order Workflow message for previous level approver

    Hi folks!!
    We are implementing PO workflow through which we want to notify the next level releaser as well as we also want to notify the previous levels releaser as well as Purchase requisition creator (if PR has been used as reference document to create PO).
    I have already successfully implemented the workflow, in which next level of approver gets the notification in his/her SAP Business Workplace as soon as the PO gets approved by the previous level.
    But my requirement is on final approval of PO, notification should also send back to the previous levels approver of PO and Requisition creator.How can I achieve it, please help.
    Best regards

    Hi,
    A check can be made during final level of approval for which e-mail will get triggered to the previous approver and the requisitioner. you would need to provide a Logic to your developer with the message body whihc will trigger an e-mail during final approver and mail recipients will be the previous approver and the Requisitioner which can be picked from Line item in Purchase Order.
    Prashant

  • Develop a Workflow to unblock Invoice

    Objective
    - Use BTE u2013 Business Transaction events to raise the event Invoice is blocked
    - Extend existing Business object and add new method to unblock the invoice
    - Develop a Workflow to unblock Invoice
    Questions:
    - Is there any standard FM to unblock the invoice?
    - EVENT Text
    00001025 POST DOCUMENT: Final checks completed
    I have identified this BTE for triggering WF using blocked price event. But this event get called twice so WF get called twice. Is there any way to prevent it?
    - I have copied the FM for above event and this FM gets called when invoice is posted. But in import parameters I am not able to find the key field l EBELN (Document no).
    Thanks & Regards,
    Anshul

    Hi,
    I think you can try SAVE routine in RV60AFZZ ( or sort ) to trigger your workflow...
    Regards
    Gautam Maini

  • Password self-service workflow message

    Hello
    Where in configuration do I go to change the password self-service workflow message:
    "Your password has been reset.  Your password is..."
    I know where these messages are for provisioning, but not sure where to go for p/w s-s.
    Thanks
    JD

    Hi,
      As Chinmaya mentioned, this message is not easily available to configure. None of the emails are being maintained in backend systems. All of these messages are maintained in NW (front-end) table called Virsa_AE_Message. Go to this table and search for the correspnding message and change it.
    FYI, when you upgrade to new SP and upload the initial data xml file, it will overwrite the changes you have made to the message.
    Regards,
    Alpesh

  • Add new User Awareness Status Messages(Collboration)... :)

    Hello All,
    I want to add new user availability status messages (which are related to Awareness Status Selector in Collaboration).
    When an user enables the Collaboration Launch Pad, the user can enable on:
    i> Auto Detect Status
    ii> Not Available
    I would like to add essages like "Be Right Back", "In Meeting", etc....just like we have in Yahoo Messenger.
    I found the par file which is respensible for such  Collboration feaures & its:
    "com.sap.netweaver.coll.shared.ui.par"
    but when I opened the par file to check the details...noticed that all is in the portalapp.xml file.
    Cannot understand where can i add new messages....
    Please help...
    Awaiting Reply.
    Thanks and Warm Regards,
    Ritu R Hunjan
    <i>Note: Please excuse me for posting this in EP Development Content and not KMC Forum section.</i>
    Message was edited by: Ritu  Hunjan

    Reinstalling isn't a drastic measure w/Snow Leopard. It just replaces all OS components with new and uncorrupted ones and Apple's basic apps, such as TextEdit, Mail, Safari, and Terminal. That eliminates any mucked up ones. Once you assure yourself that the problem's solved, make a bootable backup/clone or Time Machine backup and update via Software Update. Let us know how it turns out.

  • Plant Maintenance Workflow

    Dear Experts,
    What is the purpose of workflow ? How do we effectively use a workflow in plant maintenance ? Is it the responsiblity of a PM consultant or a ABAP consultant or a BASIS person's job ?
    Please refer some literature on this .
    Thanks and Regards,
    Vivid

    Workflow is a process which is followed by triggering of the event.
    Ex- If maintenace task is deleted or completed then if concern person is to be informed for further action then worflow feature is required.
    Basically its a combination of  functional ,technical  and security team
    If the standard is avaialble process is available then technical involvments are not required, but if you want to have a diffrent process or event  to be mapped then logic is to be wriiten for it.
    Some imp transaction for workflow are
    Workflow Builder (SWDD)
    Development Environment
    Workflow Log (SWI1)
    Administrative Tool
    Business Workplace (SBWP)
    SAP Inbox
    Business Object Builder (SWO1)
    Event Trace (SWEL)
    Event Type Linkages (SWETYPV)
    regards
    Anil Kumar
    Edited by: Anil Kumar on Aug 25, 2008 12:27 PM

  • New Development and CA

    We are in process of developing new eCommerce application on ATG. We also have a business requirement to manage images and products using BCC. Most of the business requirements in phase 1 of the project is to configure and deploy application code along with CA ( BCC / Merchandising). My question is whether it is advisable to do new application development along with CA configuration at the same time. What does ATG best practice say in this regard. My opinion is that we should do new application development (deliver new functionality) first to be followed by CA initiative. I have never directly worked on CA projects but I have been part of large teams with multiple initiatives where CA being one of the initiative and I have seen there are quite a few steps that one need to follow in configuring and deploying CA / BCC e.g. versioning of modules, modifying DB schema to support versioning etc. I don't want to run into issues where our main focus is to deliver new functionality and want to avoid the complexity of doing both new development and CA at the same time.
    Edited by: 899085 on Nov 24, 2011 12:01 PM

    The best practice recommendation would be to include any BCC/CA implementation as early as possible in your project plan. Understanding the process of how the business users will be using the tools and what impact any customizations to the ATG code your applications make are very important in a successful rollout of a site usign the BCC and Merchandizing. We tend to see that the projects which attempt to implement BCC/CA at the last minute are the ones that encounter the most problems. Projects which include the BCC and CA in the early stages of the applciation design, project planning, and UAT and load testing go through a much smoother test cycle and launch.

  • How to add new fields in Reduced message ( in BD53 )

    Hi Experts,
    How to add new fields in Reduced message ( in BD53 ), when the required field iis available in Table or Structure and need to be added in BD53 so that we can ALE.
    Thanks,
    Ninad

    Hello,
    I think of something like:
    First, you create extension, with transaction WE30.
    Then, reduce your idoc, your extension should also be proposed.
    Do not forget to add this extension in outbound we82, and/or we57 in inbound, and WE20, and find BTE or exit to populate extension.
    regards.
    F.S.

  • New development forums

    I discovered that there's a whole new section I have never seen in the cisco forums that specifically targets developers:
    http://forums.cisco.com/eforum/servlet/CDN?page=main
    Amongst other things, there are separate forums for various APIs and a forum about IP Phone services.
    So I'm wondering if anybody working at Cisco would care to comment as to what the idea is with having multiple forums for the same purpose. Are we supposed to migrate to the new developer area and will posts be moved at some date and this forum closed, or what will happen with it?

    That is a news to me. Thanks for sharing. I hope Cisco can merge these forums so we have only one place to search.

  • New Development system copy from Production

    Hi All,
    Hope you can help me out here with some ideas.
    We are currently planning to implement a new SAP BW Development system, and for this we would like to make it a 1:1 copy of our current production system. Meaning all from customizing, ABAP, workbench objects etc.
    But what we do not want is all the transaction and master data in infoobject, cubes etc., we are only interested in the structure and objects. Therefore we can rule out "System copy".
    My question is then, is there any other ways to do this when system copy is a no go? I know we can do client copy but then we will not get all the workbench / ABAP programs which we need.
    Any ideas on how to do this?
    Thx. in Advance

    Hi Rasmus,
    But what we do not want is all the transaction and master data in infoobject, cubes etc., we are only interested in the structure and objects. Therefore we can rule out "System copy".
    Options 1: As BI objects are cross client , copying client will not solve your purpose 100%.
                    You can perform system copy and then clean up data in DEV
    Option 2: You can create a new Development and then create TRs for required configuration objects and move to new development system.
    Option 3: Use SLO tools to perform container copy without any data.
    Hope this helps.
    Regards,
    Deepak Kori

  • New Development - Leave Application (HR)

    I am working on a project where my client need a new development on leave where both some attendance types and absence types should be request from same screen.
    so please help me in this issue.

    Hi,
    you need to work on Infotype 2001 & 2002.
    That is tables PA2001 & PA2002.
    Regards,
    Amit

  • New Development - No Infrastructure!

    We have moved into a new development and did have an engineer visit scheduled for yesterday to install our new line. The appointment was between 1-6pm, I called at 3pm and was told he was coming, I then call again at 5.15pm and was told the engineer wouldn't be coming. The reason was that additional work needed to be done at the exchange.
    I then went with the building site manager and we inspected the BT ducting that surrounds my property. To my surprise there was absolutely no BT infrastructure at all in any of the ducts...no wonder the engineer couldn't install our line!
    Today I have spent over 2 hours trying to speak to someone, 6 calls, 2 supervisors and got absolutely nowhere! All the call agents were hard to understand due to their very strong Indian accent. I've now had to open a complaint both over the phone and just now online.
    I've believe that the 'New Building Site Development Team' needed to visit the site to install the core infrastructure. I've tried to make contact with them and failed, I've tried to escalate the issue and failed, I've tried to speak to someone senior enough to understand my problem....once again I've failed.
    I'm literally lost for words at the customer service, not to mention angry for wasting a days holiday and even more upset that we will now have to spend over £400 a month on child care as we can't work from home.
    If anyone can help me I'd be really grateful. 

    Just to clarify, this is not the builders responsibility.
    The house itself has been cabled with the normal house points and cabling with a terminating "white" cable poking out the front of the house, all ready for the engineer to connect to. The onsite ducting and BT Manholes have all been installed, either by a contractor of Openreach or Bovis (if they are an approved installer). The only people who are allowed to install cabling within a BT duct is BT or a part of BT like Openreach, unless you seek Wayleave permission. I know this as I project manage 'dark fibre' installations across private estates.
    Bovis themselves completed their work and gave BT permission to install infrastructure over 2 months ago. I confirmed this with both the site manager and Bovis headoffice.
    After all my calls yesterday, I decided to phone BT Business as I know they are UK based, the person I spoke to was more useful and did give me the number for the 'New Estates Team' (0800 616866) - however when I called them I was told they can't deal with end users and I need to speak to my ISP...which is interesting as that's BT who I've so far spent 5 hours trying to communicate with. 
    I then tried to call Openreach but once again they won't speak to end users...
    So the current position is;
    1) I have no phone line
    2) The estate has no BT infrastrucutre
    3) I have complained via Twitter (36hrs response time) and the normal complaint channel (72hrs reponse time)
    4) 5 Hours worth of calls (at a cost to me)
    5) 1 days holiday taken for no reason
    6) The additional cost of childcare (approx £150 a week) 
    7) Having to work in the office until midnight most evenings
    8) I had to spend another 45mins talking to the accounts team, as they'd tried to take directdebit for the service!
    The average time to actually get to speak to an 'agent' is 12mins, then 4-5mins to verify details, then 3mins for them to read the screen, then 3mins of them mumbling in an extrememly hard to hear accent. Eventually you explain the situation again, they pause, carry on with their script, you ask to speak to a supervisor...they also can't help.
    There is without a doubt a problem in the process for getting a new estate setup, I really hope that somehow, via some method I manage to speak to someone who can help!

  • Error while querying workflow message attributes for task

    Can some one please help me with this error?
    I get this error when I submit a task in worklist app. I have figure out that it is causing due to one payload in the table in the task. If remove that payload I am able to submit the task.
    Error while querying workflow message attributes for task a99d1cf3-5e91-4c4a-8660-aeae91bfbec0 with version 5.
    Check the underlying exception and the database connection information. If the error persists, contact Oracle Support Services.
    oracle.jbo.JboException: Error while querying workflow message attributes.
    Error while querying workflow message attributes for task a99d1cf3-5e91-4c4a-8660-aeae91bfbec0 with version 5.
    Check the underlying exception and the database connection information. If the error persists, contact Oracle Support Services.
         at oracle.bpel.services.datacontrol.XSDDataControl.invokeOperation(XSDDataControl.java:460)
         at oracle.adf.model.bean.DCBeanDataControl.invokeMethod(DCBeanDataControl.java:430)
         at oracle.adf.model.binding.DCInvokeMethod.callMethod(DCInvokeMethod.java:261)
         at oracle.jbo.uicli.binding.JUCtrlActionBinding.doIt(JUCtrlActionBinding.java:1635)
         at oracle.adf.model.binding.DCDataControl.invokeOperation(DCDataControl.java:2144)
         at oracle.adf.model.bean.DCBeanDataControl.invokeOperation(DCBeanDataControl.java:467)
         at oracle.adf.model.adapter.AdapterDCService.invokeOperation(AdapterDCService.java:307)

    Can anybody help me on this?
    I did some google but I get this only which is not much helpful.
    http://download.oracle.com/docs/cd/E14571_01/core.1111/e10113/chapter_bpm_messages.htm

  • Need create a new control key, which message control is "error mode", then PR or PO

    Hi All,
    Can please help me I got an issue in QM ,
    Issue Description :-  Current QM control key for supplier validation date is “0001”, the message mode is only warning. PR or PO still can be created forcibly. Need create a new control key, which message control is “error mode”, then PR or PO cannot be created successfully.
    I thing should add some additional logic using BADI or USER-EXIT.
    can please help me how to find BADI or USER-EXIT if you know the appropriate BADI please let me know.
    Regards,
    Nani

    Hi,
    I tried that way I entered message control as Defect even purchase requisition is created how can I restricted purchase request ion.
    Regards,
    Nani.   

  • I have iWork 09 with a family license. I am unable to install the software on my new Macbook Pro (the message is simply "Installation failed"). I wonder if I need to remove an old computer from the family license, and if so, how?

    I have iWork 09 with a family license. I am unable to install the software on my new Macbook Pro (the message is simply "Installation failed"). I wonder if I need to remove an old computer from the family license, and if so, how?

    Yes, gladly. I am trying to install on a 13" MacBook Pro with OS X 10.8.3. I insert the disk into the SuperDrive. The I work '09 window pops up with two icons: one Tim install and one that says "Read before you install iWork." I double-click on the "Install iWork '09" icon, and a window appears that says, "This package will run a program to determine if the software can be installed." I click "continue" and see "Welcome to the iWork '09 installer." I click on "Continue." The "read me" bullet on the left lights up, and I see "Read before you install. . . ." I click "Continue," then see the software license agreement. When I click on "Continue" again, I am asked to agree, and I do. The window then says, "Standard Install on 'Mackintosh HD" and indicates how much space the program will take.
    I click "Install," enter my password, and the installation begins. It goes through a validating phase and begins "writing files." It indicates that installation will take about 30 minutes (although that number fluctuates). After about four minutes it goes to "cleaning up." Then after just a few seconds, the "Summary" bullet on the left lights up and this message appears: "There were errors with the installation. You may want to try installing again." There is a large yellow triangle with an exclamation point in it, and a bold "The installation failed." Below that appears "The installer encountered an error that caused the installation to fail. Contact the software manufacturer for assistance."
    At that point, a "Close" button is pulsating blue at the bottom of the window.
    Sorry for the tedious detail. Anything revealing there?
    Thanks!

Maybe you are looking for