No FI document generated while doing GR for Production Order in MTO Scenaro

Hi All,
In material master the strategy group is 20.No FI document generated while doing GR for Production Order in MTO Scenario. Then strategy group changed from 20 to 50 but still No FI document generated while doing GR for Production Order in MTO Scenario.
Could u please let me know whether FI document is generated at the time of GR against production order in case of MTO scenario.
Regards,
Nandan.

Hi,
While doing GR with ref to Production order check whether price is picking up or not for the production order.
Regards
Ravi Shankar.

Similar Messages

  • Error While doing settlement for Sale Order in MTO scenario

    Hi,
    In MTO Scenario - when i try to settle Sales Order i am getting the below error. Even i have maintained the settlement cost element for PSG in allocation structure A1.
    Kindly help me
    Define a settlement cost element for receiver type PSG
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type PSG.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Kishore

    Hi
    Please check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
    Go to Allocation structure configuration (OKO6) and check your allocation structure A1.
    check settlement cost elements is it by cost element or you have assigned separate cost element for settlement.
    if you wants to settle with same cost element select By cost element.
    if you wants to settle with different cost element create a cost element and assign settlement cost element.
    http://help.sap.com/saphelp_di46c2/helpdata/EN/9d/1f4b6e5733d1118b3f0060b03ca329/frameset.htm
    hope this helps you.
    Regards

  • Error while calculating variances for production order

    Hi Gurus,
    while calculating variances for production order i am getting the following error
    "Cannot calculate scrap variances" ( Error message)
    " no standard value estimate for material" (Warning message"
    A standard cost estimate exists for the material at the date mentioned in the error in released status.
    Please give solution for the error.
    Thanks in advance n Regards
    Arul.

    Is there an <b>itemization</b>, generated for the cost estimate used to calculate the target costs?
    Does the material components listed in the BOM of the cost estimate used to calculate the target costs, <b>assigned to the operations</b> in which they are used. Otherwise it is not possible to correctly report the variances and scrap when operations are confirmed.
    Does the order for which the variances are calculated have a valid <b>variance key.</b> ?
    Does the order have the status DLV (delivered) or TECO (technically completed). If the status was withdrawn, any variances and <b>scrap variances are canceled</b>.

  • Transfer Order not created while performing GR for Production order

    Hi, I am facing a problem while recieving stock from a production order. The system does not create a transfer requirement or a TO.
    Let me give you a brief background.
    This is a new functionality introduced in ECC 6.0 for working with kanban in WM.
    Supply area is created for WM location.
    Control cycle is created for material, supply area. Warehouse, storage type and Bin is maintained in control cycle record. When the GR is done for production order material is recieved in this bin.
    1) Now when the Kanban is set empty a production order is automatically created.
    2) Once the production order is confirmed the material automatically shows up in the bin.
    A material document is created which shows IM movement type 101 and WM movement type 103. Also in material document Immediate auto TO checkmark is blank.
    3) *PROBLEM* - System does not create a TR or a TO. the material automatically shows up in the Bin. How can we enable an auto TR and TO creation.
    Following are the settings which I have already checked:
    1) In IMG, WM movement type 103 has auto TO indicator set.
    2) IM-WM interface for 102 movement type and 103 movement type is maintained.
    The main problem is: Although the material document displays WM movement type 103 and the stock lies in WM bin, System never created a Transfer requirement or a Transfer order.
    I would really appreciate if anyone can help me in this.
    Thanks

    Hi Mike,
    I do not know this function in SAP, so these are just my ideas:
    1.
    System does not create a TR or a TO. the material automatically shows up in the Bin.
    I think it's a normal SAP behaviour. If you do GR against a PO the quant(s) will appear in interim storage bin w/o TO. The TO is to move the quants from one bin to another, but in this case the quant comes from 'nothing' and arrives at the bin.
    If you make confirmation and consume the components refering to a PrdOrd, the components will disappear w/o TO from storage type 100 + dynamic bin, because there's no TO that could move them from dynamic bin to 'nothing'.
    So, these 'movements' are to change the WM stock level and TOs are not designed for this.
    2.
    There's difference between auto creation of TO and immediate TO creation. Please check what SAP help says in case of TOs for outbound deliveries:
    http://help.sap.com/saphelp_47x200/helpdata/en/c6/f8406c4afa11d182b90000e829fbfe/frameset.htm
    3.
    Now when the Kanban is set empty a production order is automatically created.
    So, if you remove the stock from the Kanban it triggers the creation of a PrdOrd. This is very logical in a Kanban system because it is a pull system. but your problem is not this, it's clear.
    If you just created an automatic TO and would remove the stock from Kanban-bin, a new PrdOrd would be generated, and so on. As many times you remove the stock a new PrdOrd is created and this might be the reason why no TO is crated automatically. In this case this would be a push system and not kanban system.
    I do not know this process but if we concentrate only on the pull system, maybe this Kanaban is to store the FG until an event (e.g. shipment) should trigger the stock removal from this bin. (just my assumption)
    Please try to mark the TR creation for the movement type w/o auto / immediate TO and tell us the result (whether you get the TR if you confirm the PrdOrd).
    Regards,
    Csaba

  • Error when doing GR for production order with serial number

    I'm not familiar with serial number and equipment management but I'm trying to help my user resolve this issue.
    This product is returned from customer site.
    I saw that this material is being reset in IQ02 from status in warehouse to become Available when the material is consumed in the production order via 261 movement type. So now the status is available. Then the user went to change a new serial number. Later, GR for production order is done in MB31. Errors are encountered when prompted to enter the new serial number.
    Configurations XX01 and XX02 are different
    Message no. CX126
    Configuration of serial number SN02 incompatible with document item
    Message no. IO226

    Hi..
    Can you please explain in detail, I facing same problem, while assigning unrestricted stock to sales order.
    Regards,
    Sumit Pukale

  • Duplicate document generated while doing mrko

    Hi experts,
    While doing mrko,
    1. Two documents are generated. The correct one is A and the duplicate one is B
    2. FBL1n shows both these documents A& B
    If i Cancelled all material documents associated with A
    Now wht will happen to B? Because I can see all 3 docs in Fbl1n...
    How to remove duplicate entry?.how to make payment to vendor?
    regards,
    Mahboob

    While doing mrko,settlement of consingnment
    1. Two documents are generated automatically. The correct one is A and the duplicate one is B
    2. FBL1n and faglb03 shows both these documents A& B
    If i Cancelled all material documents associated with A
    Now wht will happen to B? Because I can see all 3 docs in Fbl1n...
    because of that it showing 2 line items for vendor and payment is double
    How to remove duplicate entry?.how to make exact payment to vendor?

  • Run time error while running BDC for production order creation and confirmation:

    Dear Gurus,
    We have a situation, where the users are trying to do the entries creation of order or confirmation (through manual and BDC). But, if there is any kind of a deficit quantities in consumption or GR quantity, then it is going to run time error and Dumps are coming in program SAPLCORB
    and the transaction code is coming for CO11N.
    How to avoid this error to run the production system in smoothing way...Any flash lights on this will be great full
    Regards,
    Madhu.G

    Hi Madhu,
    Expert Caetano has rightly point out. Refer Note 1840705 - RAISE_EXCEPTION short dump if running CO11N in background
    Cause
    The short dump is triggered because SAP transaction CO11N contains new GUI elements that cannot always be dealt with in a background process,
    such as the confirmation texts.
    Resolution
    SAP recommends that the standard production order BAPIs, such as BAPI_PRODORDCONF_CREATE_TT, should be used to post a confirmation in background.
    If this is not feasible, the following workaround may be uses:
    Define a confirmation profile in transaction OPK0; 
    In the detail areas, remove the area "Confirmation text"; 
    Set this profile as standard, so that it is chosen automatically by the system when a batch-job
    is started; 
    Assign this confirmation profile to the batch user with transaction SU3 using parameter CORUPROF.
    Also see Note 429432 - CO11N: Batch input in background dumps if long text is maintained
    Refer to note 1154692 - Endless loop during confirmation in background if you doing Auto GR during confirmations
    Thanks & Regards,
    Ramagiri

  • Error while doing migo for STO order

    hi,
    we have done migo wrt the outbound delivery number and due to wrong invoice values they have cancelled the GR and again they are going to do the GR but system is not allowing to post the document since there is an entry in rg23d table with the specified invoice number.how to cancel the rg23d entry.
    please help
    regards
    msp

    Hi,
    Cancel the Excise Invoice which is captured at the time of GR and post it.
    And do the GR with new excise invoice.

  • Warning message during batch determination while doing GR for process order

    Hi Experts,
    During delivery against process order for all SFGs and FGs, we are getting warning message u201CInvalid batch according to selection criteria in batch determinationu201D.
    Following settings maintained for batch determination in process order.
    Condition table for order/material type maintained
    Access sequence maintained for order/material type
    In strategy type above access sequence has been maintained. The common class and sort sequence created for all materials in the plant have also been assigned to this strategy type. In batch split changes allowed box has been checked and quantity proposal maintained as 1.
    In search procedure control maintained for order/material type. Search procedure has been assigned to all process order types and check activated.
    In spite of the above when GR for order is taking place , system is throwing warning message.
    GI of components is being done through backflush and without any warning message.
    Please advise how to ensure proper batch determination during GR against order.
    Regards
    Sm.

    Issue resolved by removing required indicators from characteristics which were not being valuated but were maintained in the class assigned to SFGs/FGs.
    Regards
    Sm.

  • Error while doing  GR for scheduling aggrement

    Dear Experts,
    We are facing error while doing GR for scheduling aggrement.
    we have done the following steps.
    1) Scheduling aggreement in ME31L
    2) Released in ME35L
    3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
    When we are trying to do GR in MIGO system is giving the following message.
    Document 5500000152 does not contain any selectable items
    can I know what I have missed in the above steps.
    Please guide me to resolve this.
    Regards,
    Prasad

    Hi,
    Please check Please check if Gr is already done against this document.  Also please check whether you have attached SA in the source list with line items.
    T-code:ME01
    Enter Mat.code & Plant.
    In the next screen pl.do the following:
    Valid from - commencement date of the SA
    Valid to - End date of the SA
    Vendor - Vendor on whom the SA is released
    POrg - Your purchase organisation
    PPL - Leave it blank(This is only for interplant)
    OUn - Ordering unit
    Agreement - SA number
    Item - 1
    I hope this will resolve your issue. Thanking you

  • What are the main steps to be taken care while doing recording for LSMW

    Hi,
    I am facing problem in LSMW.
    Can anybody suggest me that What are the main steps to be taken care while doing recording for LSMW for recording mm01 ?
    thanks'
    naresh

    Hi,
    Recording in LSMW is similar as SHDB.
    in LSMW after you give Project-Subproject and Object.
    1)Go to-> Maintain Object Attributes -> double click
    2)Press Display/Change Button at top left to make editable mode.
    3)Select radiobuton -> Batch Input -> Give Recording name say Z_mm01
    4) Click the Recording Overview boton on right -> Give TCode which u want to record....
    Rest refer the Document link attached.
    Please find the links to various threads on the same.
    Re: LSMW - Using a BAPI
    BAPI, IDOC in LSMW
    Upload the data in LSMW using BAPI
    This one is the most complete document for the same
    http://sapabap.iespana.es/sapabap/manuales/pdf/lsmw.pdf
    http://service.sap.com/lsmw.
    Regards
    Kiran

  • Error while doing IV for Service Delivery Payment

    Dear Support,
      There is Problem while doing Invoice for delivery Payment(Agent commission) in case of Service Order having without
    account assingment.
    While doing Invoice for that Delivery cost , system is giving a error message 'Enter a GL Account'.
    Pls provide some solution regards .
    Ragerds
    Mukesh

    Hi,
    if your service order is a service purchase order, please read the following:
    Planned delivery costs are not supported for service orders.                    
    There is no plan to change this in the near future.  
    Delivery costs are generally not supported in external services                
    management and in case of blanket purchase orders, item category D or B.       
    Instead of representing delivery costs via conditions, in case of              
    service documents, freight costs and other, SAP recommends to add in           
    additional service lines. (note 381030 )                                                                               
    For the future we recommend to use additional service line instead              
    of planned delivery costs condition. There is no problem to post                
    invoice for different vendor for particular SES created for service             
    line that constitutes delivery costs.    
    Regards,
    Edit

  • Error while doing MIGO for a sub-contracted item

    Hello to Everybody,
    I am facing below problem -
    Error : Incorrect CCtr <Cost Center Code> with this account (CCtr category must=D) for
    <Item Code> , while doing MIGO. (for receiving sub-contracted item from vendor).
    May I request for possible solution to above error ?
    regards,

    Dear Sanjay,
    You can determine the cost object for the posting of the  costs in the transaction OKB9.
    Following thread should resolve this issue:
    Re: cost of subcontracting
    Regards,
    Naveen.

  • I am getting error while doing MFBF for semifinisg good

    Hi,
    i am getting error while doing MFBF for semifinisg good
    Existing standard cost estimate cannot be used
    Message no. RM175
    Diagnosis
    This error appears under the following circumstances:
    The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
    The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
    Procedure
    The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
    Use product costing to create the standard cost estimate.

    I had already check REM profile repetitive mfg profile final backflush w. activities.
    this particular material is semifinish material attached in BOM of finish material.
    backflush of finish good is possible but now new requirement is to do production booking for the semifinish material.
    i had assign production version , done routing and maintain REM profile,
    created material cost with quantity structure ck11n then run the costing in ck40n.
    still getting the error what else is to done to able to book this thru MFBF.

  • Error while doing PGI for Outbound delivery using BAPI BAPI_GOODSMVT_CREATE

    Hi All,
    I am getting an below error while doing PGI for outbound delivery using the BAPI BAPI BAPI_GOODSMVT_CREATE:
    Goods movement not possible with mvmt type 601
    Can anyone suggest me what will be the solution for it?
    Regards,
    Raghuraman.k

    I tried with the above BAPI but it is not working.
    In my case a delivery has one line item with batch split and other line item without batch split.
    Below is my code :
    DATA : gwa_header_data TYPE bapiobdlvhdrcon,
           gwa_header_ctrl TYPE bapiobdlvhdrctrlcon,
           lv_delivery     TYPE bapiobdlvhdrcon-deliv_numb,
           git_item_data TYPE STANDARD TABLE OF bapiobdlvitemcon,
           gwa_item_data TYPE bapiobdlvitemcon,
           git_item_ctrl TYPE STANDARD TABLE OF bapiobdlvitemctrlcon,
           gwa_item_ctrl TYPE bapiobdlvitemctrlcon,
           git_return    TYPE STANDARD TABLE OF bapiret2,
           gwa_return    TYPE bapiret2.
    *Header data
    gwa_header_data-deliv_numb = '0808000002'.
    *Header Control data
    gwa_header_ctrl-deliv_numb = '0808000002'.
    gwa_header_ctrl-post_gi_flg = 'X'.
    *Delivery Number
    lv_delivery = '0808000002'.
    *Item data and its corresponding control data
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '900002'.
    gwa_item_data-dlv_qty         = 4.
    gwa_item_data-dlv_qty_imunit  = 4.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '900002'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '900003'.
    gwa_item_data-dlv_qty         = 6.
    gwa_item_data-dlv_qty_imunit  = 6.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '900003'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '000020'.
    gwa_item_data-dlv_qty         = 10.
    gwa_item_data-dlv_qty_imunit  = 10.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '000020'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    BREAK-POINT.
    CALL FUNCTION 'BAPI_OUTB_DELIVERY_CONFIRM_DEC'
      EXPORTING
        header_data    = gwa_header_data
        header_control = gwa_header_ctrl
        delivery       = lv_delivery
      TABLES
        item_data      = git_item_data
        item_control   = git_item_ctrl
        return         = git_return.
    BREAK-POINT.
    IF git_return IS INITIAL.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
    ENDIF.

Maybe you are looking for

  • Not possible to open/create a new connection within BT manager on Satellite M40

    Bluetooh manager is open and present in system bar. However it is never possible to open/create a new connection within bluetooth manager as it always say "bluetooh is not ready". Troubleshooting is required but no clear indication is available; butt

  • Hp laserjet CP1525nw Color

    Hi my HP is contantly jumping off the network. It is pausing itself and running idle. Sometimes my computer can see it and others it can't. My wireless devices are also having trouble contacting it until hours later. I run the latest mac and Have dow

  • Split Billing document by value

    Hi Expert    I have a requirement by customer that the max value of an invoice should be 100,000 usd. that means any sales orders whose total value greater than this will be splitted into serveral invoices. for example:    a sales order has a total a

  • Ldapclient  and multiple location for searching

    When I try to change some of the parameters with ldpaclient using semicolon part of command after semicolon is not accepted. On http://docs.sun.com/app/docs/doc/806-4077/6jd6blben?a=view I read that if I want to search in ldap on multiple locations I

  • CS5 Ruler and straighten tool

    I had been working on a large amount of photos using the ruler and straighten tool with no problems. Then, with no reason that I could determine, although the images were still being straightened, they were no longer being cropped. I would very much