Error While doing settlement for Sale Order in MTO scenario

Hi,
In MTO Scenario - when i try to settle Sales Order i am getting the below error. Even i have maintained the settlement cost element for PSG in allocation structure A1.
Kindly help me
Define a settlement cost element for receiver type PSG
Message no. KD506
Diagnosis
In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type PSG.
Procedure
Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
Thanks
Kishore

Hi
Please check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
Go to Allocation structure configuration (OKO6) and check your allocation structure A1.
check settlement cost elements is it by cost element or you have assigned separate cost element for settlement.
if you wants to settle with same cost element select By cost element.
if you wants to settle with different cost element create a cost element and assign settlement cost element.
http://help.sap.com/saphelp_di46c2/helpdata/EN/9d/1f4b6e5733d1118b3f0060b03ca329/frameset.htm
hope this helps you.
Regards

Similar Messages

  • No FI document generated while doing GR for Production Order in MTO Scenaro

    Hi All,
    In material master the strategy group is 20.No FI document generated while doing GR for Production Order in MTO Scenario. Then strategy group changed from 20 to 50 but still No FI document generated while doing GR for Production Order in MTO Scenario.
    Could u please let me know whether FI document is generated at the time of GR against production order in case of MTO scenario.
    Regards,
    Nandan.

    Hi,
    While doing GR with ref to Production order check whether price is picking up or not for the production order.
    Regards
    Ravi Shankar.

  • Update terminated error while doing changes in sales order

    Hi
    We had found below error message while trying to save a sales order
    RV_sales_document_update
    Report-LV45UF0V
    Row 265
    Error details-SAPSQL_ARRAY_INSERT_DUPREC-671
    This had happened for 2 sales orders alone..
    "SAPSQL_ARRAY_INSERT_DUPREC" "CX_SY_OPEN_SQL_DB"
    "SAPLV45U" or "LV45UF0V"
    "VBEP_BEARBEITEN"
    We are not using any user exit for VBEP...
    Can u please tell us how to overcome this error
    Regards
    Sudha

    How was it solved ? I have the same Issue.
    << Moderator message - Everyone's problem is important. But the answers in the forum are provided by volunteers. Please do not ask for help quickly. And consider opening your own thread on this >>
    Thanks
    Abhinav
    Edited by: Rob Burbank on Jan 12, 2011 4:08 PM

  • Error while doing migo for STO order

    hi,
    we have done migo wrt the outbound delivery number and due to wrong invoice values they have cancelled the GR and again they are going to do the GR but system is not allowing to post the document since there is an entry in rg23d table with the specified invoice number.how to cancel the rg23d entry.
    please help
    regards
    msp

    Hi,
    Cancel the Excise Invoice which is captured at the time of GR and post it.
    And do the GR with new excise invoice.

  • Getting the error while doing PGI for depot delivery

    Hi
    I am getting the below error while doing PGI for Depot delivery. This error is happening only when I taking the materials from stock transfer order which has more than 10 line items. Same issue is not happening when I am taking one material in Stock transfer order in & same material in depot delivery. Please see the screen shots below attachment. I have already maintained no range for the object J_1IDEPINV for year 2014.
    Regards
    PK

    Moved from SAP ERP SD Sales to Internationalization and Unicode.  Please post all your CIN related queries here.  Also ensure that before posting, you made efforts in searching in SCN or Google.  The reason for this indication is the issue you posted has already been discussed many times here and you will get some clue had you searched.
    G. Lakshmipathi

  • Error while doing  GR for scheduling aggrement

    Dear Experts,
    We are facing error while doing GR for scheduling aggrement.
    we have done the following steps.
    1) Scheduling aggreement in ME31L
    2) Released in ME35L
    3) Mainatined Sch.Agmt Schdule in ME38 for todays and date 200 qty and other line is 800 qty.
    When we are trying to do GR in MIGO system is giving the following message.
    Document 5500000152 does not contain any selectable items
    can I know what I have missed in the above steps.
    Please guide me to resolve this.
    Regards,
    Prasad

    Hi,
    Please check Please check if Gr is already done against this document.  Also please check whether you have attached SA in the source list with line items.
    T-code:ME01
    Enter Mat.code & Plant.
    In the next screen pl.do the following:
    Valid from - commencement date of the SA
    Valid to - End date of the SA
    Vendor - Vendor on whom the SA is released
    POrg - Your purchase organisation
    PPL - Leave it blank(This is only for interplant)
    OUn - Ordering unit
    Agreement - SA number
    Item - 1
    I hope this will resolve your issue. Thanking you

  • Error while doing settlement from WBS to P&L Account

    Hello
    I am trying to do a settlement from WBS to P&L Account(Expense account). In this case, "Dummy" Prof Ctr is getting derived from 0KE5 (we have maintained a dummy prof ctr). We have set the validations to disallow any postings/settlements to dummy prof ctr. Hence I am getting an error while doing settlement.
    Now I am maintaning a Prof ctr in my WBS master data. I am unable to understand why system is deriving dummy prof ctr and not the one maintained on WBS master data. The settlements are working fine when I do them against Balance sheet accounts and proper prof ctr is getting derived, which is being maintained on WBS master data. I am getting trouble only while doing settlement to my P&lL i.e. expense accounts.
    can anyone throw some light on this?
    Thks
    Sarang

    Dear Sarang,
    You have maintained profit center in WBS master which is not updated at the time settlement to FI that what makes you worried. If you are making FI posting and give WBS as an additional account assignment then Profit center in WBS master will be updated. Here in settlement WBS is sender not the receiver so that profit center will not be updated. In settlement receiver (any) is debited and sender (WBS) is credited so this credit entry will be updated in profit center.
    To your second query that when you carry out settlement to balance sheet account right profit center is updated then please make sure, that balance sheet account is maintained in 3KEH with profit center or OKB9.
    Your P&L account (expense) receives dummy profit center because it is not able to find cost center which can fetch profit center from the master. So, if you can afford, maintain that cost elements (expense account) with profit center in OKB9.
    might help you..........................................................

  • I am getting error while doing MFBF for semifinisg good

    Hi,
    i am getting error while doing MFBF for semifinisg good
    Existing standard cost estimate cannot be used
    Message no. RM175
    Diagnosis
    This error appears under the following circumstances:
    The existing standard cost estimate cannot be used for backflushing activities as the repetitive manufacturing profile was not maintained correctly when the standard cost estimate was carried out.
    The standard cost estimate must come from product costing. Other cost estimates (such as base object controlling) are not possible.
    Procedure
    The repetitive manufacturing profile assigned to the material at the time of the planned cost estimate must be a profile for repetitive manufacturing with product cost collector.
    Use product costing to create the standard cost estimate.

    I had already check REM profile repetitive mfg profile final backflush w. activities.
    this particular material is semifinish material attached in BOM of finish material.
    backflush of finish good is possible but now new requirement is to do production booking for the semifinish material.
    i had assign production version , done routing and maintain REM profile,
    created material cost with quantity structure ck11n then run the costing in ck40n.
    still getting the error what else is to done to able to book this thru MFBF.

  • Error while doing PGI for Outbound delivery using BAPI BAPI_GOODSMVT_CREATE

    Hi All,
    I am getting an below error while doing PGI for outbound delivery using the BAPI BAPI BAPI_GOODSMVT_CREATE:
    Goods movement not possible with mvmt type 601
    Can anyone suggest me what will be the solution for it?
    Regards,
    Raghuraman.k

    I tried with the above BAPI but it is not working.
    In my case a delivery has one line item with batch split and other line item without batch split.
    Below is my code :
    DATA : gwa_header_data TYPE bapiobdlvhdrcon,
           gwa_header_ctrl TYPE bapiobdlvhdrctrlcon,
           lv_delivery     TYPE bapiobdlvhdrcon-deliv_numb,
           git_item_data TYPE STANDARD TABLE OF bapiobdlvitemcon,
           gwa_item_data TYPE bapiobdlvitemcon,
           git_item_ctrl TYPE STANDARD TABLE OF bapiobdlvitemctrlcon,
           gwa_item_ctrl TYPE bapiobdlvitemctrlcon,
           git_return    TYPE STANDARD TABLE OF bapiret2,
           gwa_return    TYPE bapiret2.
    *Header data
    gwa_header_data-deliv_numb = '0808000002'.
    *Header Control data
    gwa_header_ctrl-deliv_numb = '0808000002'.
    gwa_header_ctrl-post_gi_flg = 'X'.
    *Delivery Number
    lv_delivery = '0808000002'.
    *Item data and its corresponding control data
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '900002'.
    gwa_item_data-dlv_qty         = 4.
    gwa_item_data-dlv_qty_imunit  = 4.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '900002'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '900003'.
    gwa_item_data-dlv_qty         = 6.
    gwa_item_data-dlv_qty_imunit  = 6.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '900003'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    gwa_item_data-deliv_numb      = '0808000002'.
    gwa_item_data-deliv_item      = '000020'.
    gwa_item_data-dlv_qty         = 10.
    gwa_item_data-dlv_qty_imunit  = 10.
    gwa_item_data-fact_unit_nom   = 1.
    gwa_item_data-fact_unit_denom = 1.
    APPEND gwa_item_data TO git_item_data.
    gwa_item_ctrl-deliv_numb      = '0808000002'.
    gwa_item_ctrl-deliv_item      = '000020'.
    gwa_item_ctrl-chg_delqty      = 'X'.
    APPEND gwa_item_ctrl TO git_item_ctrl.
    BREAK-POINT.
    CALL FUNCTION 'BAPI_OUTB_DELIVERY_CONFIRM_DEC'
      EXPORTING
        header_data    = gwa_header_data
        header_control = gwa_header_ctrl
        delivery       = lv_delivery
      TABLES
        item_data      = git_item_data
        item_control   = git_item_ctrl
        return         = git_return.
    BREAK-POINT.
    IF git_return IS INITIAL.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
    ENDIF.

  • Error while doing settlement

    Hi,
    I am getting the below error while doing the settelment
    Program Errors: no COBRB found 001
    Kindly advice me
    Thanks
    Supriya

    Hi Supriya,
    COBRB is table for Settlement Rules for Order Settlement. Debug if the Table itself is missing or table contains no entries to be picked up for settlement...
    Pls revert back with update...
    Srikanth Munnaluri

  • Error while calculating variances for production order

    Hi Gurus,
    while calculating variances for production order i am getting the following error
    "Cannot calculate scrap variances" ( Error message)
    " no standard value estimate for material" (Warning message"
    A standard cost estimate exists for the material at the date mentioned in the error in released status.
    Please give solution for the error.
    Thanks in advance n Regards
    Arul.

    Is there an <b>itemization</b>, generated for the cost estimate used to calculate the target costs?
    Does the material components listed in the BOM of the cost estimate used to calculate the target costs, <b>assigned to the operations</b> in which they are used. Otherwise it is not possible to correctly report the variances and scrap when operations are confirmed.
    Does the order for which the variances are calculated have a valid <b>variance key.</b> ?
    Does the order have the status DLV (delivered) or TECO (technically completed). If the status was withdrawn, any variances and <b>scrap variances are canceled</b>.

  • Error while doing IV for Service Delivery Payment

    Dear Support,
      There is Problem while doing Invoice for delivery Payment(Agent commission) in case of Service Order having without
    account assingment.
    While doing Invoice for that Delivery cost , system is giving a error message 'Enter a GL Account'.
    Pls provide some solution regards .
    Ragerds
    Mukesh

    Hi,
    if your service order is a service purchase order, please read the following:
    Planned delivery costs are not supported for service orders.                    
    There is no plan to change this in the near future.  
    Delivery costs are generally not supported in external services                
    management and in case of blanket purchase orders, item category D or B.       
    Instead of representing delivery costs via conditions, in case of              
    service documents, freight costs and other, SAP recommends to add in           
    additional service lines. (note 381030 )                                                                               
    For the future we recommend to use additional service line instead              
    of planned delivery costs condition. There is no problem to post                
    invoice for different vendor for particular SES created for service             
    line that constitutes delivery costs.    
    Regards,
    Edit

  • Budget error while creating delivery from sales order

    hi Gurus,
    System is throwing error PB603 "Item 004 WBS element ABC-XXX budget exceeded" while creating delivery from sales order.
    I am picking material from unrestricted plant stock (not in project stock).
    I am also confused as sales order has 3 line items & error shows Item 004 !

    Hi Kuldeep,
    Check this note,
    Note 159387 - Message BP603: incorrect line item is displayed
    Its valid only till 4.6. Might give you some idea but.
    Regards,
    Gokul

  • Error while doing MIGO for a sub-contracted item

    Hello to Everybody,
    I am facing below problem -
    Error : Incorrect CCtr <Cost Center Code> with this account (CCtr category must=D) for
    <Item Code> , while doing MIGO. (for receiving sub-contracted item from vendor).
    May I request for possible solution to above error ?
    regards,

    Dear Sanjay,
    You can determine the cost object for the posting of the  costs in the transaction OKB9.
    Following thread should resolve this issue:
    Re: cost of subcontracting
    Regards,
    Naveen.

  • Settlement for sales order  TAB item

    Hi Experts,
    1. Is that only when the sales order item status change from " Not invoiced " to Invoiced ", the settlement can be performed ?
    2. We have one sales order , which item category is TAB, we alreday GR for parts, GI for sales order, and invoiced to customer, when we run VA88, why there is no change on this item ?
    Thanks and Regards
    Shubin

    when u invoiced, then run VA88 (settlement).
    kapil

Maybe you are looking for

  • How to import hierarchy text node from BW infoobject

    I tried to import hierarchy from BW InfoObject through process chain /CPMB/IMPORT_IOBJ_HIER. But BPC complains the hierarchy text node haven't been dimension member. As result, I have to export the hierarchy text node to a flat file and import again

  • Performance issue of simple mapping

    Hi All, We cretated one simple mapping the details are as follows: 01. We had created on public dblink in Oracle 11g pointing to sqlserver 02. By using the publicdblink we create one view at Oracle 11g. This view acts as a source in my mapping. 03. W

  • HT3810 How to install leopard on a 10.4 correctly

    Steps reguired to install snow leopard onto my 10.4?

  • IDM GRC Integration Versions

    Hi All We have IDM 7.1 fully integrated with AC 5.3 and it is working well. We want to upgrade both applications, but what we need to understand is whether we need to upgrade both applications at the same time or whether we can have a mixture. AC 5.3

  • Mystery forced mailbox imports

    This has happened to me three times now over the past couple of months since I moved to Leopard. For no apparent reason Mail.app pops up a dialogue box telling me (if I remember right) that it needs to rebuild the indexes and forces me to quit. On re