No price determination for Material/Plant error CK465

While calculating the cost for a material through process order ,  no price could be determined for  input material despite the standard price of the same is being released , error message CK465.Apart from that the valuation variant and costing varaiant has also been checked and found correct. Still the error persist.
How to correct the cost calculation while creating process order ? Plz suggest

HI,
Please check the Plan Costing variant (usually 'PPP1') assigned to Order ('Control' Tab) and make sure you maintained the prices as per this Valuation strategy maintained in transaction OPL1.
Hope this helps.

Similar Messages

  • No price could be determined for material/batch DWFB1.1-07GL2/ plant DAAL

    Hi Gurus,
    While doing GR (MB31) of Finish product  DWFB1.1-07GL2 in plant DAAL, we are getting this error.
    No price could be determined for material/batch DWFB1.1-07GL2/ plant DAAL
    Message no. CK465
    Diagnosis
    The system could not calculate a price for material/batch DWFB1.1-07GL2/ in plant DAAL for valuation view 0, because none of the valuation strategies in valuation variant 007 was successful.
    We kept price control for finised good material master rececord is 'V'
    I assigned valuation  variant 007 to the plant DAAL.
    Pls. suggest the solution.
    Praveen

    hi,
    Please check same valuation variannt has been configured in order costing variant or apprearing order control data.
    Did you maintained MAP for that material in material master?
    Regards,
    Ashok

  • CO88-Error :Perform the planned price change for material

    Hi Experts,
    While running CO88 i get this error. "Perform the planned price change for material ". My material is manage at S and it doesn't have any marked cost. The status is FR and no other status on cost etimate for the article are active. what i shoul do? why if i run the PP order with KO88 i don't have any error?
    Please help i'm facing the closing period.

    Hi,
    If dynamic price change is active in your system the first posting in the new period of this material tries to
    - release a future cost estimate of that period OR
    - change the price to the future price in accounting view
       (if the future price date is reached)
    Unfortunately this dynamic price change does not work in order settlement. Therefore you are asked to perform the price change first by t-code CKME (or CK24).
    If you are using price determination control 3, any price change or release should always be the first transaction in a new period to avoid any inconsistencies.
    The dynamic price release will only release the price with transactions which involve material movement and this is not the case by posting invoices and order settlements.
    if you are in period 12/2009 then a settlement in 12/2009 does not require the release cost estimate of 01/2010.
    But if you are already in 01/2010 therefore settlement in 12/2009 is a posting into the previous period. This will change also data of the current period. Therefore the cost estimate has to be released first.
    Another option, if you don't want to receive this message, would be to change this message from Error to Warning (check note 434752).
    Please follow the following steps:
    T-CD:OMRM
    Message M8 394
    =>you set the message type to '-' for error message M8394, that means no message is to be issued.
    regards
    Waman

  • Shall v maintain price control  for material type with plant specific ?

    Hai Guru,
                       In OMS2, we change HALB price control [valuation] as V or S.  whether shall v maintain this for plant specific.?
    Kindly guide
    With Regards
    Swetha

    Hi
    if you do not make the indicator Price control manadatory active then you can have different price indicator for each plant. However thsi indicator is never done plant specific. If you wish to have plant specific then you may have to have a new material type and again you need to control the MM01 creation for that particular plant by means of Authorisation control which is littel involved also but can be done.
    Regards

  • No valid task list for material ""  plant "" for selection criteria

    I am getting the following error while creating a production order:
    No valid task list for material ""  plant "" for selection criteria
    Does anyone know how to fix this?
    thanks,
    Scott

    Dear,
    1. Check in Order type dependent parameter - OPL8, select your Plant & Order type. In this check the task list, it should be N. then selection priority in OPJF settings
    2. Chek the routing valid from date for this material by CA02. The production order start date must be between valid date.
    3)Kindly check the routing header.Whether it is for usage 1 and Release status '4'
    4) Task list we maintain in OP8B please check and come back.
    Regards,
    R.Brahmankar
    Edited by: R Brahmankar on Nov 19, 2008 9:57 AM

  • No retail price available for material MMMM in master conditions

    Hi All ,
    When running transaction VKU6 to pickup and display price changes for retail price . I am getting this message.
    "No retail price available for material <MMMM> in master conditions"
    I have already maintained the condition record for retail prices , am not sure what does these Master Conditions refer to.
    Kindly give some advice...
    thanks!!

    Hi
    VKU6 is for retail Re-valuation, if you want re-valuation to be done based on retail sales price than MAP then you use this transaction and see the changes here for the stores you selected  then you go to VKU7 for  automatic revaluation. If you are getting such error means you must be using two step price calculation and ran re-valuation for DC, try using re-valuation for store and you don't get such errors.
    Pre-requisite is you should have old and new retail sales price for stores, these prices to be maintained against master condition type like VKP0 and same to be assigned in the list field.
    If you are objective is  to see only change in sales price  then you can use t code VKP2 / VKP3
    Best Regards
    Swami

  • Output Determination for Material movement

    Hi All,
    I am configuring output Determination for Material movement.
    In my case, am doing the config when the movement type is 311, we want to generate IDoc.
    i have configured everything, output type,output Determination schema..
    When i am trying to maintain the condition record for the same through MN21,
    here i am facing one problem on Partner Function.
    Here what partner functuion i'll give.
    waiting for all valuable response.
    Regards
    Indrashish

    Hello Indrashish,
    Maintain that output type as partner independent.
    This will help.
    Regards
    Arif Mansuri

  • Minimum & maximum price paid for material

    hi gurus
    Can u tell me how to see max.& minimum purchase price paid for material with respect to vendor.
    Reg
    ROC

    try the reports
    ME80FN, ME2N, ME2M, ME2L
    Regards
    Sujoy

  • Maintain price lit for material

    hi sir,
    I am a ABAPER.
    plz help me how can i maintain price lit for material for a customer.which t-code and condition type
    i have to use..
    Thanks,
    sunil sahoo

    Hi Sunil,
    You can use T.Code VK11 to maintain price. you need to look into sales order pricing, which condition is missing. Generally standard condition is PR00.
    Regards,
    Naveed Ansari.

  • T code for Material,plant, stock and price data in std sap

    Dear All,
    In Std SAP is der any t-code to get Material,plant, stock and price data in 1 go..
    waiting for ur early reply
    Regards
    Nainesh

    Hi,
    Try T.Code: MC.9 and MC.5 etc. These reports will give you total value of the stock but not unit price.
    If you are looking at unit price please write a small query using SQVI or append the relevant info structure.
    Regards
    Srinivas.P

  • Price control for material as per delivery

    They are purchasing material which are used in the production process  these have a fluctuating price and the price paid is the price at the point of delivery not the point of ordering.  The prices are fixed for three months at a time but the delivery lead time is six weeks to two months, this means that at the time of ordering they do not know what the price will be.
    This results in a significant volume of manual work to change all the POu2019s as they cannot think how to put the prices into the system.  We would like to remove the requirement for the local to have to update the prices constantly and have the prices placed in the system centrally and then called off from locally.
    What is the best possible solution for above business process .

    See the SAP help:
    Date of Price Determination
    In the automatic price determination process, the price can be calculated as at the document date of the PO, or as at another date (such as the current dayu2019s date, the delivery date, or the goods receipt date). You can specify the date to which the price that is determined relates at the following points:
    In the vendor master record, in the Pricing date control field, if you wish to use the same price determination date for all a vendoru2019s materials.
    In the purchasing info record, in the Pricing date category field, if you wish to use a different pricing date for a certain material supplied by a particular vendor.
    The value in the purchasing info record takes precedence over the value in the vendor master record.
    In the purchase order, in the Pricing date category field (found via Item ® More functions ® Additional data).
    The value from the info or vendor master record is preset when a purchase order is created. However, this is only used if you change it in the purchase order and carry out a new price determination process.
    The pricing date category in the PO takes precedence.
    Example:
    In the info record, you have specified that the price determination process is to be carried out with the conditions that are valid on the delivery date (pricing date category 2). Furthermore, you have created two validity periods (from 04. 01.1997 until 04. 31.1997 and from 05. 01.1997 until 12. 31.1997), each with different conditions.
    You create a purchase order with the delivery date 05.05.1997. The pricing date category from the info record is adopted. In the course of the price determination process, the info record conditions from the validity period 05. 01.1997 until 12. 31.1997 are then adopted.
    If you wish to adopt the info record conditions from the first validity period in the purchase order, you must change the pricing date category in the PO to blank and carry out a new price determination process.

  • Sap tables for material, plant & vendor combination

    Hi Experts,
    Can you pls help to get the sap application common tables to join material, plant & vendor in infoset ?
    Please answer any related to this. I want to create one info set using above 3 objects looking for tables
    Irfan.

    Hi,
    Please check the below tables
    EINA - General Data
    EINE - Purchasing data.
    EINP - Price History.
    KONP - Condition Item
    KONH - Condition Header
    EIPA - Order Price History: Info Record
    Regards,
    Divya

  • Single level price determination in material ledger

    What is the meaning of single level?Doe it include only the price determination of procured raw materials or will it also include semi finished and finnished goods?

    Hi
    Single level price determination is to calculate the unit price of material for a period. It takes into account the price differneces arising out of Price Differences like GR/IR Differences, Exchange Rate Differences, and revaluation differences to calculate the actual price of  a material.
    You can have more information of Single Level Price Determination at the following link:
    http://help.sap.com/saphelp_47x200/helpdata/en/d2/cb4f37455611d189710000e8322d00/frameset.htm
    Regards,
    Suraj

  • Table for material plant and divison

    Dear All,
    Please help me getting tables to get material plant and division in 1 report.
    Regards,
    Shreya

    Hi
    Use the Table: MARA for Division
    Table: MARC for Plant
    Regards
    Prasanna

  • 'Reserved'  qty from Tcode MMBE in zreport for (Material, Plant & SLoc)

    HI,
    In MMBE for combination of Material, Plant & SLoc -->
      We have column displayed as "Reserved".
    I want to display this Qty in z report.
    I searched in all Stock related tables - like MARC, MARD, MBEW, S032...etc.
    But unable to find the total of Reserved Qty.
    Shall I use RESB for this?
    But it has thousand of records (for same Mat, Plant & sloc  combination)...
    Which "WHERE"  conditions will work?

    try with the field bdmng in rseg.
    Edited by: Keshav.T on Jun 29, 2010 12:20 PM

Maybe you are looking for

  • DvD Studio Pro recently updated, not working properly

    Sometime it seems it just doesn't pay to update software. I Recently updated my OS to Tiger and along with it I updated to the latest FCP and DVD Studio pro. Now in DVD Studio Pro it will not properly read existing projects and when I build a project

  • Dummy Profit Center in Accumulated Dep.

    Hi All In my companies we still have 4.7 version of sap with report based on profit center accounting. Now we are facing problem that when we run the depreciation system transfer the Accumulated Depreciation to Dummy profit center rather in the profi

  • Get parent movieclip name

    using the MovieClipLoader, all works fine. attaching a series of movieclips with a nested clip, and loading a jpg into each of these movieclip's nested clip. in the listener func onLoadInit, I get passed the clip name that is loaded, how do I neatly

  • Render link depending on calculated value of another field

    I am using jdeveloper 11.1.2 I have table with many columns, and the last column contains commandLink I want to render this command link depending on calculated function (FileExport.getTranslateFileName) using another fields in the table (row.SciId)

  • Install failed on early 2008 Mac Pro

    I've put off installing 10.8 on my old (but not that old) Mac Pro. Bought a new hard drive, partitioned it, installed 10.6 on it, installed 10.6.8 on it, and then bought and downloaded Mountain Lion. The install seems to work, but then, rebooting, i