Hi SAP Gurus,
How can I work around if a product cost collector with material XXX has been overwritten by a new material YYY when creating the KKF6N.
Both material code having the same plant, same orde type,same production version but just different material code.
When saving the preliminary costing for the product cost collector for material YYY, the system prompted me the order number 700022 which is already existing and created for material XXX.
By right, this shd not be happened but indeed it did.
Now when displaying the report S_ALR_87013127 - Order Selection, the report showed the new material YYY was created with order number 700022 but the content of the data was for old material XXX.
Now my problem is how can I get back the product cost collector for material XXX as the original order number 700022 was meant for material XXX and not mat YYY.
And also when executing backflush (MFBF) for old material XXX, the error msg prompted as 'content of order 700022: Mat YYY transferred to interface (IMSEG):Mat XXX due to this I can't backflush material XXX.
Really appreciate your expertise on this urgently.
many thanks!

problem due to system bug, have to log to OSS for help.

Similar Messages

  • Standar cost and product cost collector not updating the new price

    Hi,
    Created Standard cost estimate for one FG product and runned the product cost collector. Based on that consumption delivery everthing is made. Later on the work center and activity type changed in routing. Now i am trying to run the standard cost with new activity price (due to work center change) for the current period, system is showing only the previous rate(previous period) and it is not updating the new price becuase of already we have created the product cost collector.
    Can any one give the suggestion for how to update the new price in standard cost as well as new price updation in product cost collector.
    govind.

    Hi
    1. If the original cost estimate was run in the current month - Then you cant re-release cost estimate unless you reverse it from CKR1
    If the cost estimate was of previous months - then you can definetely release it again
    2. In cost collector, you need to manually cost it again using the Preliminary costing feature... Your cost coll will then show 2 cost estimates i.e. One from Original date to current date-1, and 2nd from Current date to 31.12.9999
    br, Ajay M

  • Please maintain  the master data for material during product cost collector

    hi
    i get a error
    please maintain  the master data for material during product cost collector
    please guide me
    regards
    leo

    Hi Leo,
    Can you elaborate your issue, like when did you get the error exactly?
    If it is the error you got while creating Product Cost Collector, then this is not the right Forum to post.
    Please post your question in the 'ERP Manufacturing (PP)' forum
    Regards,
    Manimaran M

  • Deleting old Product cost collectors with variances

    Hi Experts
    The client is wanting to archive old Product Cost Collectors.  There are 3 of them that say that they have unsettled variances.  I need to delete these which are in 1999 and 2001
    The error message is KO451.  I have tried to set this error to a warning but it is not allowing this
    Please advise
    Kind regards
    Dawn

    Hi Dawn,
    you can check SAP note 140672 in which the procedure to be followed is explained
    in case of KO451.
    A workaround would be: You can uncheck the indicator 'Variances to
    Costing-Based PA' in
    settlement profile. Then you can close/archive the order.
    br, Guido

  • Returning Demaged Material and getting new Material free of Cost

    Dear Experts
    As per my sceneriao ,one of our Bearing is got demaged and we told to vendor for the replaement.Once replacemnt is recived we will send back demaged material what is correct Cycle for this.
    Regards
    Raj

    Hi Raj,
    As per your scenario, one of our Bearing is got damaged and returned to vendor for the replacement. Once replacement is receivedwilll send back the damaged material the correct Cycle for this is as below.
    You can create a single PO for free of goods PO by ticking 'Free Item" indicator & item which has to be return with 'Return" tick.
    Now in MIGO, enter PO number & post the document. For free goods, there won't be accounting entry. Same you can not have liability to pay anything to vendor.
    For Return Goods, have to use movt type 161 which reduces your inventory & inventory account will get credited & GR/IR will get debited. If previously MRO vendor invoice posting was happened then you have do MIRO-Credit MEMO in order to reverse the amount. If you had carried out returned delivery before MIRO vendor invoice posting then system automatically take care of the qty when you performed MIRO which will post after reducing return delivery qty. Hope this helps you.

  • To convert Old material Number (BISMT) to  new material number

    HI Folks,
                           I have the requirement is how to convert OLD material number to New material number.  Is  thier any  Global  exists is thier? Please let me know.
    Thanks,
    Vijay

    Hi,
           use MGA00001 in changing parameters u can change...
    Regards

  • Quality Inspection stock passed to new material unrestricted stock

    Hello Friends,
    I have created production order and done MB31 with ref to production order and at that time inspection lot is automatically created and quality having the stock suppose 10 kg.
    And then i have completed the usage decision and passed 5 kg to production order material unrestricted stock and 5 kg to some another material unrestricted stock and now therefore no stock in quality.
    Now i have do the reversal scenario.
    With the help of movement type 102 with ref to production order i can reverse the unrestricted stock quantity of the production order material
    then 5 kg is reversed . and i have cancel the inspection lot.
    But i have to ask how to reverse the quantity with have passed to new material unrestricted stock ie remaining 5 kg.
    My solution says:
    I have to first with help of mvt type 310 pass the stock from the new material to production order material and then have to 102 mvt type with complete quantity 10 kg and then cancel of inspection lot and creation of new lot again with 101 mvt type.
    Please tell me above procedure is the right solution or there any other method also exist.
    I have read one solution that i have to change the inspection type 08 in material master and then do reversal with the help of movement type 322. but in this i have to go material master.
    We are avoiding to make material master changes .so this solution doesn't suits me.
    Secondly with the help of user exits , i have done the cancel of usage decision but that also never reverse the material stock.
    correct me if am wrong.
    Thirdly  i have implemented the note report also ,but that also doesn't work becoz my material is serialized and for serialized material that report doesn't get executed.
    Please give me ur suggestions and solutions.
    Thanks a lot.

    Dear,
    I think you have no perticular solution if it is intergated with QM.
    Once you do UD and the reversal is very deficult.
    Hence if you want to get the original material stock from new material..perform MB1B and tranfer the stock.

  • Creation of New T Code Using Transaction Variant

    Hi,
    I have created a new T code (YMM02) by using transaction variant. The new T code created is copy of MM02.
    I have changed the material by using new T code (YMM02) which is created using Transaction variant. Once I complete the Transaction (i.e. have done changes in material master and save) it is going to original T Code (MM02). Requirement is it should be in the same T Code (YMM02), so that I can edit the material again with the new T Code (YMM02)
    Regards,
    Hari.

    Hi Hariprasad,
    If restricting certain fields using field selection option is not suitable for you, you can go ahead with the option Screen Variend
    Also refer the link
    [https://wiki.sdn.sap.com/wiki/display/Snippets/Transaction%20Variant%20-%20A%20Step%20by%20Step%20Guide%20for%20Creation]

  • Creation of New T Code using Transcation Variant

    Hi,
    I have created a new T code (YMM02) by using transaction variant. The new T code created is copy of MM02.
    I have changed the material by using new T code (YMM02) which is created using Transaction variant. Once I complete the Transaction (i.e. have done changes in material master and save) it is going to original T Code (MM02). Requirement is it should be in the same T Code (YMM02), so that I can edit the material again with the new T Code (YMM02)
    Regards,
    Hari.

    Hi Hariprasad,
    If restricting certain fields using field selection option is not suitable for you, you can go ahead with the option Screen Variend
    Also refer the link
    [https://wiki.sdn.sap.com/wiki/display/Snippets/Transaction%20Variant%20-%20A%20Step%20by%20Step%20Guide%20for%20Creation]

  • Transfer material stock into another material

    hi
    I want to transfer the stock of one material into a new material,
    Is it possible? if yes then how? and is there any financial effect.
    thanks
    Pankaj Garg

    Hi Garg ,
    Transfer posting is done through MB1B T.Code which requires the necessary movement tyep
    Transferring the material stock into another Material uses the mvt type 309
    The quantity is posted from unrestricted-use stock of the issuing material into unrestricted-use stock in the receiving material
    Prerequisite: both materials have the same stockkeeping unit.
    Possible special stock indicators: E, O, Q, V, W 
    Hope this helps you out
    If found useful award accordingly
    Thanks & Regards
    Pavan

  • Material Master (Material Ledger- Product cost actual costing)

    When I create a material in MM01 and no Standard price is set the columns "Company code currency" y "Profit valuation" are disabled.
    The only column available is the one corresponding to company code currency. The field "Price unit" starts with the number of 1000 and this information is not copied to the other price unit fields unless you introduce a value in the Standar price - Company code currency field.
    Does any one knows a user exit that can modify this values (Price unit - Group Currency and Price unit - Profit valuation) ?
    Kind Regards

    Hi
    1. It is not  mondatory to activate Material ledger to create Product Cost collector.
    2  It is not  mondatory to create product cost collector if we actovate Material Ledger.
    Material ledger Activation
    1. In OMX1 activate ML and price determination 3 for production plants and 2 for sales depo plants (if need)
    2 In. OMX3 assign ML type standard
    3. Configure dynamic price changes : assign price release  1
    4. Assign material update structure to a valuation area
    5. Activate actual costing indicator and assign  2     Activity update relevant to price determination
    PCC:
    1.In KKF6N,enter the material,plant and select create button and select the order type as
    RM01, radio button selected for production version and assign the production version here
    2.Save the PCC for preliminary costing
    3. PCC integrates with PP module in production version selection
    Regards
    Dev

  • Bill of material change & Cost collector

    Dear All,
    In case of our client scenario,they are using REM with standard cost collector.
    But the frequency of changing the bill of material is more , So is It necessary to change all the time
    product cost collector.
    Please suggest.
    Thanks In advance
    Regards,
    Pravin

    Hi Pravin,
    Hope you are using REM with setting "Backflush with Standard Cost Estimate".
    If the BOM Components changes frequently, For settlement the Variance will be more.
    Planned Costs will be captured as per Std. Cost estimate, but the Actuals will very considerably.
    If it is OK, then there is no need re-run the Std. Cost Estimate regularly.
    Hence, your CO consultants role is crucial.
    Hope this helps..
    Regards,
    Siva

  • Production costs for material with price control V

    Dear all,
    Can anyone pls tell me, how will the costing occur for a material produced in-house and having price control 'V' ? I am not able to see the target costs.
    Also kindly tell me the settings to be done in CO, like target cost version, valuation variant, costing variant, etc.
    Thank you,
    Shrenik

    Rather than giving my own versions I have compiled here SAP inputs. Pl let me know if you require any clarifications:
    Costing variant has the following components:
    <b>Define Costing Types
    Define Valuation Variants
    Define Date Control
    Define Quantity Structure Control
    Define Transfer Strategy
    Define Reference Variants</b>
    <u>Costing type:</u>
    In the costing type, you define the purpose of a material cost estimate by specifying, for example, which field in the material master record the costing results can be transferred to:
    Update Cost Estimate
    Standard price Standard cost estimate (01)
    Tax-based price Inventory cost estimate
    Commercial price Inventory cost estimate
    Price other than std price Modified standard cost estimate or
    current cost estimate
    No update Any cost estimate
    Define Valuation Variants:
    Define Valuation Variants
    Here you create a valuation variant containing the parameters required for valuation of a cost estimate.
    You also specify which costing sheet should be used to calculate overhead.
    Valuation Strategies
    Material valuation
    Here you define the sequence in which the system searches for prices from the accounting view or costing view of the material master record to valuate materials. You can also access prices from purchasing info records and condition types.
    For material cost estimates, you also specify whether additive costs can be added to the selected price.
    With configurable/configured material components and with procurement alternatives, the sequence defined here is ignored if the strategy "price from purchasing info record" was selected, in which case that strategy is always executed first. For more information, refer to the SAP Library in the component Product Cost Planning under Raw Material Costing or Mixed Costing.
    Activity Types / Processes
    Here you define the sequence in which the system searches for prices in activity type planning or actual activity price calculation in Cost Center Accounting or Activity-Based Costing to valuate the utilized activity types and business processes.
    You also specify which plan/actual version is used.
    Subcontracting
    Here you define the sequence in which the system searches for prices in the purchasing info record. In purchasing, quota arrangements are used to create a mixed price for materials that are manufactured with external vendors with parts provided by the customer. You can specify whether the quota of the individual vendors that are entered in the source list for the material to be processed should be determined through the planned quota arrangement or the actual quota arrangement.
    External processing
    Here you define the sequence in which the system searches for prices in the purchasing info record or routing operation for valuation of the external activities.
    Strategy Sequence
    You define the individual valuation methods for the valuation variant as strategy sequences. For the valuation of the material components you define a strategy sequence that reads the fields of the material master record in a particular sequence such as:
    1. Planned price 1
    2. Standard price
    3. Moving price
    The first price that is not zero is used to valuate the material component.
    Target versions:
    Target cost versions  are used in the following ways:
    In variance calculation:
    To control which variance (total variance, production variances or planning variance) is calculated
    To valuate unplanned scrap( scrap variance)
    Unplanned scrap is valuated in the period-end closing activities when the variances are calculated. You can specify in a valuation variant for WIP and scrap which cost estimate you want to use to calculate the target costs for the valuation of unplanned scrap. You assign the valuation variant to target cost version 0 if you want to include it in the valuation of scrap.
    When you are using a cost object hierarchy with active distribution, you use the target cost version to control which cost estimate the system uses to calculate the target costs, which are used as the basis for determining equivalences for actual cost distribution.
    The actual costs collected at the level of the hierarchy are distributed across the orders in accordance with these equivalences. This distribution is proportional to the target costs for the cost element under which the actual costs are written. Actual costs for material costs are distributed in proportion to the target costs for the origin group, such as for the material, if you have entered an origin group in the costing view of the material master record and have set the indicator Material origin, for example.
    If no target costs were calculated under this cost element, enter a cost element group in the target cost version. The actual costs are distributed in proportion to the target costs for this cost element group. This cost element group should be complete. If costs were updated under a cost element that is not in this cost element group, no distribution is possible.
    You can calculate equivalences on the basis of SAP standard target cost versions 0, 1 and 3.
    The standard system supplies the following target cost versions:
    Target cost version 0 ( total variance)
    The amount of the total variance generates a posting in Financial Accounting during settlement.
    For this version, select actual costs as the control costs and standard cost estimate as the target costs.
    Target cost version 1 ( production variance)
    For this version you choose actual costs as the control costs and planned costs as the target costs.
    Target cost version 2( planning variance)
    With target cost version 2, the costs from the preliminary order cost estimate are interpreted as control costs.
    For this version, select planned costs as the control costs and current cost estimate as the target costs. You cannot calculate planning variances for the product cost collector.
    Target cost version 3 (production variance of the period)
    You compare the planned costs of the period calculated on the basis of an alternative material cost estimate (such as a modified standard cost estimate) with the actual costs of the period on the basis of the yield delivered to stock in the period.
    The base quantity for variance calculation is the yield.
    For this version, you choose the actual costs as the control costs and the alternative material cost estimate as the target costs. To determine the alternative material cost estimate, enter a costing variant and choose a costing version.
    The target cost version specifies which data is to be compared. The target cost version also specifies which variance variant is used and therefore which variance catagories are calculated. You can define a different target cost version for each controlling area

  • I have a problelm- I am planning on buying a new iMac in March. I would like to everything in my old iMac. The problem is that I believe I have malware in my old iMac. Is there a way to transfer the material to the new iMac without the malware?

    How can I transfer material from my old imac to a new imac without ransferring malware or viruses?

    Download and run Etrecheck.  Copy and paste the results into your reply. It's a diagnostic tool that was developed by one of the most respected users here in the ASC to help identify the more obvious culprits.

  • Creation of New T Code for Material Master

    HI,
    I have to create a new T Code for Material Master Change i.e. for MM02, with writing restrictions to few fields. How to achieve this? 
    Thanks and Regards,
    Hari Prasad.

    Hi Hariprasad,
    If restricting certain fields using field selection option is not suitable for you, you can go ahead with the option Screen Variend
    Also refer the link
    [https://wiki.sdn.sap.com/wiki/display/Snippets/Transaction%20Variant%20-%20A%20Step%20by%20Step%20Guide%20for%20Creation]

Maybe you are looking for

  • Retrieving Image Data Type from SQL Server 2000

    I'm trying to retrieve an Image using getBinaryStream() like descripbed in below code and encounter an error : java.lang.ClassCastException: com.microsoft.jdbc.base.BaseInputStreamWrapper What've I done wrong? Please help if(rs.next()){              

  • Configuring networking on Solaris 10

    How do I configure networking on Solaris 10, is there a single command or must I edit each file individually? If so, what's the format of /etc/hostname.hme0

  • Electronic signature and intranet security

    Hi, I find the 9.0 version of Adobe Acrobat professonal really annoying. I am creating a lot of PDF-documents which are to be presented on my company's Intranet pages. What is really disturbing is that I have to electronically sign all the PDFs - oth

  • Spinning gear on startup after update

    After updating my mac mini to OS 10.9 all I get is the spinning gear upon startup. Tried booting in safe mode but got the same result. Is there a way to fix this without reinstalling the OS. Thanks

  • Illustrator CS4 - Distribute Spacing Auto option

    I made regular use of the Auto setting of Distribute Spacing to equally space all objects between the end two objects. This option appears to have disappeared from CS4 - there is no Auto option available from the spacing box. Is there an alternative