OMF, XML, and project management all failing with exports.

I'm having trouble pinning down what exactly is going on but I'm unable to export any of these. OMF takes much longer than normal and ends with a very long export log. When I use try creating a new project via project management, the export claims to have failed.

Ok ... totally PC here and not the most experienced person around by a few thousand or so ... but I'll make a stab.
First, is the footage and export locations on "internal" drives (connected directly to your mobo w/high-speed connections) or is one or the other remote/network or otherwise a slower connection?
Second ... Plural Eyes modified footage on the Mac has resulted in quite a few threads around here ... there've been some hiccups with that combo'd with PrPro. So ... there's something to consider. You might see if some footage you've got that isn't Plural-Eyed has the same issues. If not ... well ... there's the problem.
Neil

Similar Messages

  • I in need of oracle project costing,project billing and project management setup documents? can you please help me.

    I am in need of project costing and project billing and project management setup documents with screen shoot? Can anyone help me?

    I have no clue about recovering the info, but when you say you save you should always use Save As. That clears unneeded info from the file. With the file size you have, that may be an important need.

  • Start Of Ramp-Up for SAP Portfolio and Project Management 5.0

    Start Of Ramp-Up for SAP Portfolio and Project Management 5.0
    Starting with this new release, the application SAP Portfolio and Project Management 5.0
    replaces both the SAP Resource and Portfolio Management (SAP RPM) application and the
    Collaboration Projects (cProjects) application.
    Start of ramp-up for SAP Portfolio and Project Management is 19th of April, 2010. The end
    of ramp-up is currently scheduled for 19th of October, 2010.
    Functional Innovations And New Features
    A detailed description of all new and/or enhanced functional innovations and features can
    be found in the Release Notes:
    [http://service.sap.com/releasenotes |http://service.sap.com/releasenotes]
      -> SAP Solutions
        -> Release Notes SAP Portfolio and Project Management
    There are some SAP Notes which are in general very important for SAP Portfolio and Project
    Management 5.0 and which also serve as central points of entry to find import information:
    SAP Note [1377104|https://service.sap.com/sap/support/notes/1377104]      FAQs - SAP Portfolio and Project Management 5.0
    SAP Note [1402912|https://service.sap.com/sap/support/notes/1402912]      PPM 5.0: Supported Browsers, Java versions, etc. 
    SAP Note [1411953|https://service.sap.com/sap/support/notes/1411953]      PPM 5.0: Configuration Content
    SAP Note [1436778|https://service.sap.com/sap/support/notes/1436778]      SAP Portfolio and Project Management 5.0: Restrictions
    Kind regards,
       Florian

    Thanks very much for taking the time to post the info Florian. I will update this thread as well if I run into any new information.
    Do we have any idea on SAP's direction for Product Definition? PD is still version 2.0 and I heard that PD functionality will be incorporated into PPM 5.0 which does make a lot of sense. I very briefly went through the notes and config doc in this post and did not get the impression that PPM has any idea and concept management capabilities.

  • XML cannot fully get all metadata with "getItemRequest"

    Hi All,
    My client is using GroupWise 7.0.3.
    We want to get the dropdown list custom field data of document, but the XML file cannot fully record all corresponding custom field data by using "getItemRequest".
    For example:
    GroupWise Client - Document 1 :
    Dropdown list custom field 1: aaa
    Sub dropdown list custom field 1-1 of custom field 1: aab
    Sub dropdown list custom field 1-2 of custom field 1: aac
    Dropdown list custom field 2: bbb
    Sub dropdown list custom field 2-1 of custom field 2: bbc
    Sub dropdown list custom field 2-2 of custom field 2: bbd
    Sub dropdown list custom field 2-3 of custom field 2: (Empty data)
    XML recording - Document 1:
    <custom type="String">
    <field>custom field 1</field>
    <value>aaa</value>
    </custom>
    <custom type="String">
    <field>custom field 1-1</field>
    <value>aab</value>
    </custom>
    <custom type="String">
    <field>custom field 2-1</field>
    <value>bbc</value>
    </custom>
    <custom type="Numeric">
    <field>custom field 2-3</field>
    <value>0</value>
    </custom>
    In my program, i just call "getItemRequest" and export the response to XML
    Code:
    WebReference.getItemRequest req = new WebReference.getItemRequest();
    WebReference.getItemResponse resp;
    string outPath = @"c:\GW\"
    string FileName = filename.toString();
    req.id = doc.ID;
    req.view = "View";
    resp = ws.getItemRequest(req);
    if (0 == resp.status.code)
    if (null != resp.item)
    ObjectToXml(resp, outPath + FileName + ".xml");
    Am i missing something or step?
    Or what i need to do?
    Could anyone to give me some suggestion?
    Thank you very much.
    Jimmy

    Hi Preston,
    But client doesn't update GW, therefore we will find another ways.
    However, thank you for your advice.
    Jimmy
    Originally Posted by Preston Stephenson
    Sorry, there is no support for 7.0.x.
    The only place you will get support (with some exceptions) is GW 2012.
    (There will be some changes made to 8.0.x, but this would not qualify.)
    You can try GW 2012.
    There is little support for Document Management in the SOAP API.
    When you try GW 2012 and you still have a problem, let me know.
    Preston
    >>>
    Hi All,
    My client is using GroupWise 7.0.3.
    We want to get the dropdown list custom field data of document, but the
    XML file cannot fully record all corresponding custom field data by
    using "getItemRequest".
    For example:
    GroupWise Client - Document 1 :
    Dropdown list custom field 1: aaa
    Sub dropdown list custom field 1-1 of custom field 1: aab
    Sub dropdown list custom field 1-2 of custom field 1: aac
    Dropdown list custom field 2: bbb
    Sub dropdown list custom field 2-1 of custom field 2: bbc
    Sub dropdown list custom field 2-2 of custom field 2: bbd
    Sub dropdown list custom field 2-3 of custom field 2: (Empty data)
    XML recording - Document 1:
    <custom type="String">
    <field>custom field 1</field>
    <value>aaa</value>
    </custom>
    <custom type="String">
    <field>custom field 1-1</field>
    <value>aab</value>
    </custom>
    <custom type="String">
    <field>custom field 2-1</field>
    <value>bbc</value>
    </custom>
    <custom type="Numeric">
    <field>custom field 2-3</field>
    <value>0</value>
    </custom>
    In my program, i just call "getItemRequest" and export the response to
    XML
    Code:
    WebReference.getItemRequest req = new WebReference.getItemRequest();
    WebReference.getItemResponse resp;
    string outPath = @"c:\GW\"
    string FileName = filename.toString();
    req.id = doc.ID;
    req.view = "View";
    resp = ws.getItemRequest(req);
    if (0 == resp.status.code)
    if (null != resp.item)
    ObjectToXml(resp, outPath + FileName + ".xml");
    Am i missing something or step?
    Or what i need to do?
    Could anyone to give me some suggestion?
    Thank you very much.
    Jimmy
    jimmyng25
    jimmyng25's Profile: View Profile: jimmyng25 - Novell Forums
    View this thread: XML cannot fully get all metadata with "getItemRequest"

  • SAP Portfolio and Project Management: u201CCustomer Connectionu201D

    SAP Portfolio and Project Management: u201CCustomer Connectionu201D
    SAP Portfolio and Project Management is one of the first focus topics of the [Customer Connection initiative|https://service.sap.com/influence].
    The related developments are delivered by SAP Notes and/or by Support Package (SP) only (in case delivery by SAP Note is not possible). Target releases are 5.0 (for all points) and 4.5 (for those points where it is technically possible and reasonable to downport).
    [Composite SAP Note 1631964 |https://service.sap.com/sap/support/notes/1631964]collects and links all SAP Notes released for Customer Connection for SAP Portfolio and Project Management. It also includes a PDF file giving an overview of all released Customer Connection PPM developments as well as a PDF file with details about each released Customer Connection PPM development.
    An overview about all influence channels for customers can be found under [https://service.sap.com/influence|https://service.sap.com/influence].
    Kind regards,
       Florian

    Hi
    Thanks for your Valuable information -Customer connection PPM.
    Regards
    PP

  • Portfolio and Project Management

    Hi All,
    We have applied the business package for Project Management and Portfolio Management and it is working fine but it only works fine if Super Admin Role is assigned to the user with Project Management and Portfolio Management Role.
    We need to provide only 2 Roles i.e.,Portfolio Management Role and Project Management Role not Super Admin, how to achieve  that pls help.
    thanks & regards...
    Gaurav Makin

    Gaurav,
    Looks like you would have to play around with the permissions to resolve this.
    1.In the PCD, where you find the Project Management and Portfolio Management folder, right click and open permissions, ensure you add the everyone group there and have the enduser checked.
    2. In the system administration-system configuration-system folder, check if you have any system created for the Project Management and Portfolio Management, right click and open the permissions, ensure you add the everyone group there and have the enduser checked.
    This should help resolve the issue with out the super admin role
    Good Luck,
    Cheers!
    Sandeep Tudumu

  • Applications Management and Change Management Packs Certified with EM 10gR5

    Applications Management and Change Management Packs Certified with Enterprise Manager Grid Control Release 5
    For more details about the new features, documentation, and patches for the latest Application Management Pack and Application Change Management Pack releases, see:
    [Applications Change Management Pack 3.0 and Applications Management Pack 3.0 Now Available|http://forums.oracle.com/forums/thread.jspa?threadID=935145&tstart=0]
    Oracle E-Business Suite Prerequisites
    11.5.10 with ATG_PF.H RUP5 and higher
    Release 12.0.4 and higher
    Release 12.1
    Certified Platforms
    Linux x86
    Linux x86-64
    Sun Solaris SPARC
    HP-UX Itanium
    HP-UX PA-RISC
    IBM AIX Based Systems
    Certification on Windows platforms is in progress.

    It takes me a lof of time to comprehend the sentence you write. Cause I am a Chinese. My poor English.
    I have to say "you are genius". I used to use the indesign CS2. There is no GREP function in CS2. When I get the new script, I do not know how to use it. Just when I saw the
    'grep {findWhat:"  +"} {changeTo:" "} {includeFootnotes:true, includeMasterPages:true, includeHiddenLayers:true, wholeWord:false} Find all double spaces and replace with single spaces.'
    Being confused.
    Thanks so much. It seems I have to relearn the advanced Indesign.

  • Link Contract Manager and Project Management

    Hi all.
    I follow userguide and some
    solution in Knowledgebase to link Contract Manager 12.1
    and Project Management 6.2, but it doesn't succeed.<br
    />In Contract manager, when I right click on project
    -> Project Setting -> Schedule. The
    "schedule" option is gray out. I can not select
    "Primavera".
    Is there anyone try to
    link these modules ? Please help me.
    <br
    />Regards

    First check if Contract Manager Service has access to
    the server that contains P6 database.<br
    />
    If there is a connection, try to make
    sure you are using good credentials (make sure that
    you get the <servername>
    <instancename> username/password
    correct).
    ... post more
    details, how its set up, etc...
    <br
    />good luck ;]

  • SBS2011: Starting Exchange Management shell failed with the following Error 7BF3678A-829B-4F11-884C-4D 49060D84E6

    SBS2011: Starting Exchange Management shell failed with the following Error 7BF3678A-829B-4F11-884C-4D 49060D84E6
    This is not a REMOTE Exchange 2010 server, I'm launching it from the SBS2011 Console with the Domain Admin.
    It looks like a permissions error, because when I use "RUN AS ADMINISTRATOR" on the exchange management tool, it launches with no errors and no issues...
    I searched and I couldn't find anything that fits this exact error.
    Thanks
    Russ

    Hi,
    Any update?
    Just checking in to see if the suggestions were helpful. Please let us know if you would like further assistance.
    Best Regards,
    Andy Qi
    TechNet
    Subscriber Support
    If you are TechNet
    Subscription user and have any feedback on our support quality, please send your feedbackhere.
    Andy Qi
    TechNet Community Support

  • HT201363 My iPhone, iPad and iPod are all associated with the same Apple ID.  How can I remove the iPod and associate it with a new Apple ID without affecting the data on the other devices (note: there is no data on the iPod I want to keep)?

    My iPhone, iPad and iPod are all associated with the same Apple ID.  How can I remove the iPod and associate it with a new Apple ID without affecting the data on the other devices (note: there is no data on the iPod I want to keep)?

    Very simple.  Turn off Find my iDevice, then  Tap Settings, General, Erase, Erase all content and settings.

  • I am new in indesign scripting, please tell me how to write a script to get  content of a element in xml and then sort all the content

    I am new in indesign scripting, please tell me how to write a script to get  content of a element in xml and then sort all the content

    Hi,
    May the below code is useful for you, but I dont know how to sort.
    Edit the tag as per your job request.
    alert(app.activeDocument.xmlElements[0].contents)
    //Second alert
    var xe = app.activeDocument.xmlElements[0].evaluateXPathExpression("//marginalnote");
    alert(xe.length)
    for(i=0; i<xe.length; i++)
        alert(xe[i].texts[0].contents)
    Regards
    Siraj

  • General Availability of SAP Portfolio and Project Management 5.0

    Hi,
    SAP Portfolio and Project Management 5.0 is now in unrestricted shipment (GA). The unrestricted shipment is based on SP04 of SAP Portfolio and Project Management 5.0. See also SAP Note [1377104|https://service.sap.com/sap/support/notes/1377104] (FAQs - SAP Portfolio and Project Management 5.0).
    Kind regards,
       Florian

    Thanks for update...
    So its now available for download...
    PlayStation PPM available, better and improved..
    Niranjan

  • Feature Request: Project Manager Trim Compatibility with all formats please!

    It's 2013, Premiere Pro CC is out, and is more "Final Cut Pro" than ever (thanks Adobe), but there are still some basic things that need to be fixed. This is a DOOZY!...
    With DSLR media being used pretty much everywhere, the inability to created trimmed projects using Project Manager for H.264 clips (and GoPro clips, and more!) is simply insane. Seriously?
    Help me Adobe.... please...
    thanks
    jesse

    Actually, Kevin works right across the San Francisco Bay from where I live. So yes, he is here in the USA.
    You will occasionally get some answers around here from people with Indian names, but we are happy to have them on the forums.
    The conversation about how to deal with the various codecs has been going on for some time, and the more people who request the feature, the more likely they will get it done. I don't like to say that the squeeky wheel gets the grease, but pretty much? It does!
    I know they are thinking about it because of some of the comments I have seen and emails I have received. It appears to be fairly complicated, but personally, I think it is well worth the effort.
    I would like to be able to ingest subclips from Prelude without transcoding (I don't use Prelude because it is useless to me without this feature). Once ingested, if I only use part of a clip, I want it trimmed in the Project Manager to just the footage I might need in the future if I have to make minor adjustments. And yes, that includes handles. So if handles solve part of the problem, that's fine.

  • Hire Dedicated QA Testers and Project Manager for minimum 4-6 months

    Requirement Gathering is the most important phase and forms the baseline for any IT Project therefore Business Analysts should have great vision and experience in the particular domain and should be able to carry our extensive research as well. 
    If you wish to hire Full Time Business Analyst/Project Manager, please send us an email at sales [at] technousa dot com and our Business Development team at Technousa will assist you with the same. Apply for the latest IT Project Management jobs with The Technousa IT Consulting Services UK, USA, Australia. Apply now!

    Oh... That Cal-Bay!   I thought they sounded familiar.. 
    Spoiler (Highlight to read)
    okay... so what's the relevance??     LOL!!     Why are all the good companies so far away... 
    okay... so what's the relevance??     LOL!!     Why are all the good companies so far away... 

  • Sync problem BB Curve 8310 and Desktop Manager v4.6 with Outlook 2003

    I have a BB Curve 8310 with Desktop Manager v4.6 that I syn with Outlook 2003. Calendar, tasks, and memo will sync.  The sync fails on the address book with this message:  Unable to read application data record. Translation Canceled!  From other message boards, I understand that the problem could be with a particular contact record but I can't find that record.  I've followed all suggestions about organizing Outlook to look for blank entries for name or company and have deleted all those found.  The names on the BB log are not alpa so finding the one that is incorrect is a problem.  The sync failed at record 1211 out of 1428.  I deleted the last record shown on the log and but then it failed at record 1210!  I deleted several addresses and now it fails at record 1192.  There must be more to this!  I am getting ready to purchase a new computer and all new software and would like to resolve this issue before moving to new equipment.  HELP!

    First perform a clean uninstall oof DM 4.6.
    http://www.blackberry.com/btsc/search.do?cmd=displayKC&docType=kc&externalId=KB02206&sliceId=SAL_Pub...
    Download site for 4.2.2
    https://www.blackberry.com/Downloads/entry.do?code=A8BAA56554F96369AB93E4F3BB068C22
    Download DM 4.2.2 and install. reboot the PC. start the new DM , rest the configuration for synchroniation for athe calender only,
     Two way,  connect phone via USB, Proceed with synch.
    Please let me know how it goes!
    Thanks,
    Message Edited by Bifocals on 09-06-2008 03:24 PM
    Message Edited by Bifocals on 09-06-2008 03:26 PM
    Click Accept as Solution for posts that have solved your issue(s)!
    Be sure to click Like! for those who have helped you.
    Install BlackBerry Protect it's a free application designed to help find your lost BlackBerry smartphone, and keep the information on it secure.

Maybe you are looking for